This document provides instructions for removing and installing camshafts on a Caterpillar C7 engine. The removal procedure involves:
1. Removing the vibration damper, pulley, rocker arms and pushrods.
2. Inserting timing pins into the no. 1 cylinder to hold the camshaft timing.
3. Using a puller to remove the camshaft sprocket and then removing the camshaft.
The installation procedure gives instructions for installing the camshaft and ensuring proper timing using the timing pins.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02303869
Rocker Shaft and Pushrod - Install
SMCS - 1102-012; 1208-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 8T-2998 Lubricant 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
3. Illustration 1 g01153544
1. Apply Tooling (A) to both ends of pushrods (6) .
2. Lubricate pushrods (6) with clean engine oil. Install pushrods (6) and inlet valve bridges
(5) .
3. Position rocker shaft (3). Install bolts (1) and bolts (2). Finger tighten bolts (1) and bolts (2).
Tighten bolts (2) and bolts (1) to standard torque.
4. Apply Tooling (A) to each of the button faces of the rocker arms.
5. Adjust the valve lash of the rocker arm by turning rocker arm adjustment screws (4). Refer
to Testing and Adjusting, "Engine Valve Lash - Inspect/Adjust".
End By: Install the valve mechanism cover. Refer to Disassembly and Assembly, "Valve
Mechanism Cover - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:41:31 UTC+0800 2020
2/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
4. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02303932
Cylinder Head - Remove
SMCS - 1100-011
Removal Procedure
Start By:
A. Remove the valve mechanism cover base. Refer to Disassembly and Assembly, "Valve
Mechanism Cover Base - Remove and Install".
B. Remove the rocker shaft and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft
And Pushrod - Remove".
C. Remove the unit injectors. Refer to Disassembly and Assembly, "Unit Injector - Remove".
D. Remove the fan drive mounting group. Refer to Disassembly and Assembly, "Fan Drive
Mounting Group - Remove and Install".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
1/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
5. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
Illustration 1 g01153598
1. Disconnect harness assemblies (1), (2), (3), (4), and (5) .
Illustration 2 g01153599
2/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
6. 2. Disconnect hose assembly (6) and tube assembly (7) .
Illustration 3 g01153600
3. Disconnect tube assembly (8) and tube assembly (10) from turbocharger (9) .
Illustration 4 g01153645
4. Attach a suitable lifting device to cylinder head (11). The weight of cylinder head (11) is
approximately 175 kg (385 lb).
3/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
7. 5. Remove bolts (12) and bolts (13). Remove cylinder head (11) and the gasket from the
cylinder block.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:42:26 UTC+0800 2020
4/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
8. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02304034
Cylinder Head - Install
SMCS - 1100-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 6V-4876 Lubricant 1
B 4C-5590 Anti-Seize Compound 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1. Install a new cylinder head gasket.
1/5
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
9. Illustration 1 g01153645
Illustration 2 g01153662
Note: To avoid damage to the cylinder head gasket, use guide bolts of an appropriate size to
install the cylinder head.
2. Attach a suitable lifting device to cylinder head (11). The weight of cylinder head (11) is
approximately 175 kg (385 lb). Position cylinder head (11) onto the cylinder block.
3. Apply Tooling (A) to the threads and both sides of the washers of bolts (12). Apply Tooling
(B) to the threads and both sides of the washers of bolts (13). Install bolts (12) and bolts
(13) .
4. Tighten the cylinder head bolts according to the following procedure:
2/5
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
10. a. Tighten Bolt (1) through Bolt (14) in a numerical sequence to a torque of 300 ± 15
N·m (221 ± 11 lb ft).
b. Loosen Bolt (1) through Bolt (14) until the washers are loose under the bolt heads.
c. Tighten Bolt (1) through Bolt (14) in a numerical sequence to a torque of 130 ± 15
N·m (95 ± 11 lb ft).
d. Tighten Bolt (1) through Bolt (14) again in a numerical sequence to a torque of 130 ±
15 N·m (95 ± 11 lb ft).
e. Turn Bolt (1) through Bolt (14) in a numerical sequence for an additional 90° (1/4
turn).
f. Tighten Bolt (15) through Bolt (20) in a numerical sequence to a torque of 55 ± 7
N·m (41 ± 5 lb ft).
Illustration 3 g01153600
5. Connect tube assembly (8) and tube assembly (10) to turbocharger (9) .
3/5
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
11. Illustration 4 g01153599
6. Connect hose assembly (6) and tube assembly (7) .
Illustration 5 g01153598
7. Connect harness assemblies (1), (2), (3), (4), and (5) .
End By:
a. Install the fan drive mounting group. Refer to Disassembly and Assembly, "Fan Drive
Mounting Group - Remove and Install".
b. Install the unit injectors. Refer to Disassembly and Assembly, "Unit Injector - Install".
c. Install the rocker shaft and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft
And Pushrod - Install".
4/5
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
12. d. Install the valve mechanism cover base. Refer to Disassembly and Assembly, "Valve
Mechanism Cover Base - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:43:22 UTC+0800 2020
5/5
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02304097
Lifter Group - Remove and Install
SMCS - 1209-010
Removal Procedure
Start By:
A. Remove the rocker arms and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft
and Pushrod - Remove".
B. Remove the unit injector hydraulic pump. Refer to Disassembly and Assembly, "Unit
Injector Hydraulic Pump - Remove".
C. Remove the speed/timing sensors. Refer to Disassembly and Assembly, "Speed/Timing
Sensor - Remove and Install".
D. Remove the electronic control module (ECM). Refer to Disassembly and Assembly,
"Electronic Control Module - Remove and Install".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
14. Illustration 1 g01125745
1. Remove bolts (1) .
2. Remove side covers (2) .
Illustration 2 g01125748
3. Place identification marks on each lifter in order to identify the proper location on the side
cover for installation.
Note: Ensure that the sleeves of the side covers remain in the side covers.
4. Remove bolts (3) and the dowels that hold lifter arms (4) and lifter shaft (5) to each side
cover. Remove seal (6) .
2/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
15. Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 9S-3263 Thread Lock Compound 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Illustration 3 g01125748
1. Install seal (6) .
2. Install lifter arms (4) on lifter shaft (5) .
3. Position lifter shaft (5) over the dowels on the side cover. Ensure that the oil holes in the
lifter shaft are facing the side cover. Apply Tooling (A) on the threads of bolts (3) that hold
lifter shaft (5) to the side cover. Install bolts (3). Tighten bolts (3) to a torque of 13 ± 3 N·m
(10 ± 2 lb ft). Tighten the two center bolts. Then tighten the end bolts.
4. Lubricate the lifters with clean engine oil.
3/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
16. Illustration 4 g01125745
5. Position the gaskets and side covers (2). Install bolts (1) .
End By:
a. Install the electronic control module (ECM). Refer to Disassembly and Assembly,
"Electronic Control Module - Remove and Install".
b. Install the speed/timing sensors. Refer to Disassembly and Assembly, "Speed/Timing
Sensor - Remove and Install".
c. Install the unit injector hydraulic pump. Refer to Disassembly and Assembly, "Unit Injector
Hydraulic Pump - Install".
d. Install the rocker arms and pushrods. Refer to Disassembly and Assembly, "Rocker Shaft
and Pushrod - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:44:18 UTC+0800 2020
4/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
17. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02304162
Camshaft - Remove
SMCS - 1210-011
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
136-4632 Timing Pin 1
139-7063 Timing Pin Adapter 1
B FT-2730 Puller 12
Start By:
A. Remove the vibration damper and the pulley. Refer to Disassembly and Assembly,
"Vibration Damper and Pulley - Remove and Install".
B. Remove the rocker arms and the pushrods. Refer to Disassembly and Assembly, "Rocker
Shaft and Pushrod - Remove".
C. Remove the front cover. Refer to Disassembly and Assembly, "Front Cover - Remove and
Install".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
18. 1. Use Tooling (B) to reposition the valve lifters out of the way.
2. Ensure that the No. 1 cylinder is at the top center compression stroke. Refer to Testing and
Adjusting, "Finding Top Center Position for No. 1 Piston". Install Tooling (A) in the
flywheel.
3. Ensure that the timing marks on the following gears are aligned: the camshaft drive gear, the
idler gear and the crankshaft gear.
Illustration 1 g01125899
4. Rotate camshaft gear (1) in order to access bolts (2). Remove bolts (2) .
5. Remove thrust plate (3) .
6. Remove camshaft (4) from the cylinder block.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:45:13 UTC+0800 2020
2/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
19. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02304177
Camshaft - Install
SMCS - 1210-012
Installation Procedure
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
1/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
20. Illustration 1 g01125899
1. Carefully install camshaft (4) in the cylinder block.
2. Install thrust plate (3) .
3. If necessary, rotate camshaft gear (1) in order to access thrust plate (3). Install bolts (2) .
4. Ensure that the No. 1 cylinder is at the top center compression stroke. Refer to Testing and
Adjusting, "Finding Top Center Position for No. 1 Piston".
5. Ensure that the timing marks on the following gears are aligned: the camshaft drive gear, the
idler gear and the crankshaft gear.
End By:
a. Install the front cover. Refer to Disassembly and Assembly, "Front Cover - Remove and
Install".
b. Install the rocker arms and the pushrods. Refer to Disassembly and Assembly, "Rocker
Shaft and Pushrod - Install".
c. Install the vibration damper and the pulley. Refer to Disassembly and Assembly, "Vibration
Damper and Pulley - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:46:09 UTC+0800 2020
2/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
21. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i06290358
Camshaft Gear - Remove and Install
SMCS - 1210-010-GE
Removal Procedure
Start By:
A. Remove the camshaft. Refer to Disassembly and Assembly, "Camshaft - Remove".
1. Wrap the camshaft with a protective covering in order to prevent damage to the camshaft.
Illustration 1 g00987675
1/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
22. NOTICE
Do not allow the camshaft to fall to the floor when pressing it from the
drive gear. Also make sure that the camshaft lobes do not catch on the
press plates.
2. Place the camshaft assembly in a suitable press. Press camshaft (2) from camshaft gear (1) .
3. If necessary, remove key (3) from the camshaft.
Installation Procedure
1. Raise the temperature of the camshaft gear from 200° C (392° F) to 250° C (482° F).
Note: Do not use a torch to heat the camshaft gear.
Illustration 2 g00987675
2. Align key (3) in the camshaft with the groove (keyway) in the camshaft gear.
3. Install camshaft gear (1) on the end of camshaft (2) .
End By: Install the camshaft. Refer to Disassembly and Assembly, "Camshaft - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Wed Jun 3 15:47:05 UTC+0800 2020
2/2
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
23. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i02232381
Camshaft Bearings - Remove and Install
SMCS - 1211-010
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 8S-2241 Camshaft Bearing Tool Group 1
Start By:
a. Remove the camshaft. Refer to Disassembly and Assembly, "Camshaft - Remove".
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
Note: Note the oil hole orientation in each camshaft bearing prior to removal for assembly
purposes.
1/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
24. Illustration 1 g00989974
1. Use Tooling (A) to remove camshaft bearing (1) from the front of the cylinder block.
Remove the remaining camshaft bearings (2) from the cylinder block.
Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
A 8S-2241 Camshaft Bearing Tool Group 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
2/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 2 g00990062
1. Use Tooling (A) to install all of the camshaft bearings (2) except for the front camshaft
bearing. Locate the oil hole in each bearing so that oil hole (3) is located at the top of the
bore. Refer to Specifications for more information.
Illustration 3 g00989938
2. Use Tooling (A) to install front camshaft bearing (1). Align oil hole (5) in the front
camshaft bearing with the oil hole in the cylinder block. Locate joint (4) in the front
camshaft bearing in the proper position. Refer to Specifications for more information.
End By:
a. Install the camshaft. Refer to Disassembly and Assembly, "Camshaft - Install".
3/4
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
27. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D L EXCAVATOR SCR
Configuration: 325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
C7
Engines for Caterpillar Built Machines
Media Number -RENR9218-13 Publication Date -01/06/2014 Date Updated -04/06/2014
i05954439
Engine Oil Pan - Remove and Install
SMCS - 1302-010
Removal Procedure
Start By:
A. Remove the engine.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting, and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Dealer Service Tool
Catalog" for tools and supplies suitable to collect and contain fluids on
Cat products.
Dispose of all fluids according to local regulations and mandates.
1/3
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...
28. 1. Drain the engine oil into a suitable container for storage or disposal. Refer to Operation and
Maintenance Manual, "Engine Oil and Filter - Change" for the correct draining and filling
procedures.
Illustration 1 g01153839
Note: Do not pry or gouge the sealing surface of the engine oil pan. Use a rubber mallet to
tap lightly on the engine oil pan, if necessary.
2. Remove bolts (2) . Remove engine oil pan (1) and the gasket.
Installation Procedure
Table 1
Tool Part number Part Description Qty
A - Loctite 598 1
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened component life.
2/3
325D & 325D L Excavators SCR00001-UP (MACHINE) POWERED BY C7 Engine(...
2020/6/3
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisw...