1) The document provides step-by-step instructions for disassembling and assembling the final drive of a 315C excavator.
2) Disassembly includes removing 21 components from the final drive housing.
3) Assembly requires determining the proper shim thickness to set the rolling torque and installing components in reverse order of disassembly. Cleanliness and applying oil to components is emphasized.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01960779
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
B 1U-7600 Slide Hammer 1
C 138-7575 Link Brackets 3
D 154-6181 Forcing Screw 2
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive- Remove".
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
1/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Dispose of all fluids according to local regulations and mandates.
NOTICE
Failure to properly assemble parts or failure to follow established
procedures can lead to damage of the parts and assembly.
To avoid damage to parts, always identify and mark the parts so that
they can be installed in the same location. Ensure that gear surfaces
align. Never force parts during assembly.
Illustration 1 g00777501
1. Install the final drive assembly on Tooling (A) .
Illustration 2 g01018685
2/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 2. Remove bolts (1). Remove plugs (2) and the O-ring seals from cover (3). Remove cover
(3) .
Illustration 3 g00777515
3. Use Tooling (B) in order to remove plate (4) .
Illustration 4 g00777542
4. Remove carrier assembly (5) from the main housing. The weight of the carrier assembly is
approximately16 kg (35 lb).
3/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 5 g00777548
5. Remove spacer (6) .
Illustration 6 g00777570
6. Use a suitable punch and a hammer to install spring pin (7) into planetary shaft (8) .
Illustration 7 g01021689
4/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 7. Remove planetary shaft (8). Remove spring pin (7). Remove thrust washers (9). Remove
planetary gear (11) and bearing (10) .
8. Repeat Steps 6 and 7 in order to remove the other two planetary gears from the carrier.
Illustration 8 g00777624
9. Remove gear (12) .
Illustration 9 g00777626
10. Remove gear (13). Remove spacer (14) .
5/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 10 g00777631
11. Use Tooling (C) and a suitable lifting device in order to remove carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 11 g01021690
12. Use a suitable punch and a hammer to install spring pin (16) into planetary shaft (17) .
Illustration 12 g01021692
6/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 13. Remove spring pin (16) from planetary shaft (17). Remove thrust washers (18), bearings
(19) and gear (20) from the carrier assembly.
Illustration 13 g01018688
14. Remove bolts (21) .
Illustration 14 g00778413
15. Use Tooling (D) in order to push gear (22) from the upper housing.
7/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00778461
16. Remove gear (22). Four dowel pins (23) will stay with the gear.
Illustration 16 g00778471
17. Use a suitable press in order to remove dowel pins (23) .
Illustration 17 g01018689
18. Remove shim (24) and washer (25) .
8/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g01018690
19. Separate housing (26) from housing (27) .
Illustration 19 g01018692
20. Remove Duo-cone seal gp (28) from housing (27) .
9/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 20 g01018693
21. Remove Duo-cone seal gp (29) and bearings (30) from housing (26) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:26:14 UTC+0800 2020
10/10
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961218
Final Drive - Assemble
SMCS - 4050-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Repair Stand 1
C 138-7575 Link Brackets 3
D 126-3994 Seal Installer 1
E
1U-9895 Crossblock 1
5F-7369 Leg 2
5P-4808 Cap 2
3H-0465 Plate 4
1B-4207 Nut 2
F 6V-2012 Depth Micrometer 1
G 169-0503 Installation Kit 1
Note: Replace all O-ring seals and gaskets. Apply a light film of"10W" oil to all components
before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 1 g01021697
1. Place housing (27) on Tooling (A) .
2. Use Tooling (G) in order to clean the Duo-cone seal gp prior to installation. Use Tooling
(D) in order to install Duo-cone seal gp (28) into housing (27) .
Illustration 2 g01018693
3. Install bearings (30) into housing (26). Use Tooling (D) in order to install Duo-cone seal gp
(29) into housing (26).
2/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 3 g01018690
4. Install Tooling (C) to housing (26). Use Tooling (C) and a suitable lifting device in order to
install housing (26) onto housing (27) .
Illustration 4 g01018688
5. Install gear (22). Install bolts (21) in order to hold the two housings together. This is
necessary in order to transport the housings to the press.
Note: The following steps are necessary in order to determine the proper shim or shims
needed to set the rolling torque.
3/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 5 g01018688
a. Set the main housing assembly in a suitable press. Remove bolts (21). Remove gear
(22) .
Illustration 6 g01021714
b. Install Tooling (E). Use a suitable press in order to apply the load of 4000 kg (8818
lb). Rotate the housing in order to seat bearings (30). Reduce the load to 1000 ± 100
kg (2204 ± 220 lb).
4/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 7 g01018888
c. Maintain the load pressure of 1000 ± 100 kg (2204 ± 220 lb). Use Tool (F) in order to
obtain Measurement (A). Record the measurement.
Illustration 8 g00781842
d. Use Tooling (F) in order to obtain Measurement (B) on gear (22). Record the
measurement.
5/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 9 g00781847
Illustration 10 g01018689
e. Measure the thickness of washer (25). Record the measurement.
f. Install washer (25). Install the required shims. The shim thickness is determined by
subtracting Dimension (A) from Dimension (B) and subtractingDimension (C). This
thickness has a tolerance of ± 0.050 mm ( ± 0.0020 inch). If two shims are required,
install the thinner shim next to gear (22) .
6/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 11 g00782429
6. Install gear (22) and pins (23). Install bolts (21). Tighten bolts (21) to a torque of 270 ± 40
N·m (199 ± 30 lb ft).
Illustration 12 g01021692
7. Install bearings (19) and gear (20). Install thrust washers (18). Install planetary shaft (17)
and spring pin (16) .
Illustration 13 g01021690
7/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. 8. Use a suitable punch and a hammer in order to drive spring pin (16) into planetary shaft
(17) .
Illustration 14 g00782239
Stake marks on each side of spring pin (16)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
9. Use a suitable punch in order to peen planetary shaft (17) on each side of spring pin (16).
Each stake mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of
the spring pin.
10. Repeat Steps 7 through 9 in order to install the other two planetary gears into the carrier.
Illustration 15 g00777631
8/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 11. Use Tooling (C) and a suitable lifting device in order to install carrier assembly (15). The
weight of carrier assembly (15) is approximately 30 kg (65 lb).
Illustration 16 g00777626
12. Install spacer (14). Install gear (13).
Illustration 17 g00777624
13. Install gear (12) .
9/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 18 g01021689
14. Install planetary gear (11) and bearing (10). Install thrust washers (9). Install planetary shaft
(8). Install spring pin (7) .
Illustration 19 g00782239
Stake marks on each side of spring pin (7)
(D) Measurement of 1.5 mm (0.06 inch) from outside diameter
15. Use a suitable punch in order to peen shaft (8) on each side of spring pin (7). Each stake
mark should be approximately 1.5 mm (0.06 inch) from the outside diameter of the spring
pin.
16. Repeat Steps 14 and 17 in order to install the other two planetary gears into the carrier.
10/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 20 g00777548
17. Install spacer (6) .
Illustration 21 g00777542
18. Install carrier assembly (5) into the main housing. The weight of carrier assembly (5) is
approximately 16 kg (35 lb).
Illustration 22 g00782448
11/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 19. Install plate (4) .
Illustration 23 g01018685
20. Install cover (3). Install bolts (1). Tighten bolts (1) to a torque of 105 ± 20 N·m (77 ± 15 lb
ft). Install plugs (2) and the O-ring seals. Tighten plugs (2) to a torque of 80 ± 10 N·m (59 ±
7 lb ft).
End By: Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Nov 2 23:27:10 UTC+0800 2020
12/12
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Eng...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 315C EXCAVATOR CFB
Configuration: 315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engine
Disassembly and Assembly
315C Excavator Machine Systems
Media Number -RENR5525-05 Publication Date -01/11/2008 Date Updated -10/11/2008
i01961382
Final Drive - Install
SMCS - 4050-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7574 Link Bracket 2
C 9S-3263 Thread Lock Compound 1
1. Make sure that the mating surfaces of the final drive and the undercarriage frame are
thoroughly clean and free of dirt and debris prior to assembly.
2. Check the condition of the O-ring seals that are used in the ends of the tube assemblies.
Check the condition of the O-ring seals that are used in the ends of the hose assemblies. If
the O-ring seals are worn or damaged, use new parts for replacement.
1/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
26. Illustration 1 g00486987
3. Fasten Tooling (A) and a suitable lifting device to final drive (7). Carefully, put the final
drive in position on the undercarriage frame.
Illustration 2 g00486988
4. Apply Tooling (C) on the threads of bolts (8). Install bolts (8) that hold the final drive to the
undercarriage frame. Tighten bolts (8) evenly.
5. Install plugs (9) in the forcing bolt holes.
NOTICE
Care must be taken to ensure that fluids are contained during
performance of inspection, maintenance, testing, adjusting and repair
of the product. Be prepared to collect the fluid with suitable containers
before opening any compartment or disassembling any component
containing fluids.
Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop
Products Guide" for tools and supplies suitable to collect and contain
fluids on Caterpillar products.
Dispose of all fluids according to local regulations and mandates.
2/4
315C & 315C L Excavators CFB00001-UP (MACHINE) POWERED BY 3046 Engin...
2020/11/2
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...