EXQUISITE DOMINANCE
UNLEASHED
NEW CAMRY
EXQUISITE taste hints at the level of prestige you command.
DOMINANCE in everything you do alludes to the power within.
With the New Camry, your true superiority will be UNLEASHED.
EXQUISITEDOMINANCEIN
PERFORMANCE
Immense sophistication requires
the power to back it up.
The New Camry was built to deliver
excellent performance in every drive.
2.5L DYNAMIC FORCE ENGINE WITH VVT-iE
The New Camry is powered by a new 2.5L engine
with higher engine output and combustion
efficiency to exude absolute power on the road.
Max.
Output
209PS
6,600rpm
Max.
Torque
253Nm
5,000rpm
DIRECT SHIFT 8-SPEED
AUTO TRANSMISSION
Offers impressive starting
acceleration as well as fuel
efficiency when cruising at
high speeds.
DRIVE MODE SELECT
SPORT MODE offers a more
responsive and exhilarating ride,
ECO MODE prioritises fuel
efficiency and NORMAL MODE
provides a perfect balance of
the two.
TNGA PLATFORM WITH DOUBLE
WISHBONE REAR SUSPENSION
Provides more stable, responsive and
agile handling to enhance the quality
of your ride.
SEQUENTIAL SHIFTMATIC
& PADDLE SHIFTERS
Gives the driver control similar to
a manual car with excellent
response, and allows the driver to
shift the gears up or down while
their hands remain comfortably
on the steering wheel.
EXQUISITEDOMINANCEINSTYLE
The New Camry makes an incredible first impression with
breathtaking aesthetics that inspire amazement at a glance.
REAR LED COMBINATION LAMPS
When illuminated, the full LED lamps
grant a sophisticated aesthetic for
others to follow.
18" ALLOY RIMS
The new twisted dark spokes
add an element of dynamic
expression to a refined design.
ENHANCED IMPRESSION
Aesthetic enhancements all over the sedan
grant the New Camry a bold presence
wherever it roams.
BI-BEAM LED HEADLAMPS WITH
FOLLOW-ME-HOME FUNCTION &
DAYTIME RUNNING LIGHTS (DRL)
Turn heads with a stylish pair of powerful
Bi-LED projector headlamps equipped with
the Follow-me-home Function and Daytime
Running Lights (DRL) that automatically
light up your path for enhanced visibility
and safety.
EXTERIOR
GRAPHIC
WELCOME LIGHTS*
Add an advanced
sense of flair when
occupants enter and
exit the vehicle.
*Optional accessory.
EXQUISITEDOMINANCEINCOMFORT
In a position of prestige, everything is at your command. Inside
the New Camry, you’re granted the power to have things precisely
to your liking.
LUXURIOUS DESIGN
Attention to detail instantly greets you on the inside in
the form of intricate ornamentation that layers organic
patterns and straight lines to express an elegant flow.
10" COLOUR HEAD-UP DISPLAY
Projects information in the driver's line of sight for easier
access to important information such as shift position
and Toyota Safety Sense (TSS) warning alerts.
7" COLOUR MULTI-INFORMATION DISPLAY
(MID) WITH OPTITRON METER
Presents vehicle information (such as speed, fuel
consumption and range, TSS feature settings, and tyre
pressure) with impeccable clarity.
* Android AutoTM
will be available when the service is officially launched in Malaysia.
Functions may vary depending on smartphone model.
9" CAPACITIVE TOUCHSCREEN DISPLAY WITH
9-SPEAKER JBL AUDIO SYSTEM
Can be operated with simple finger movements, provides
real sound quality courtesy of Clari-Fi™ technology and
has Apple CarPlay & Android Auto-ready Connectivity*.
INTERIOR
1.
SMART ENTRY &
PUSH START SYSTEM
Allows the driver to store one preferred position of
the driver seat, wing mirror & steering column in the
New Camry remote key.
POWER ADJUSTABLE STEERING WHEEL WITH
MEMORY FUNCTION
Adjusts the steering column to one of two preferred settings
when the engine is turned on, and retracts the steering column
when the engine is turned off to allow the driver an easy exit.
2.TRI-ZONE AUTOMATIC CLIMATE
CONTROL WITH REAR VENT
Allows the driver, front passenger & rear
passenger to set their temperatures
independently according to their
own preferences.
1. POWER REAR SUNSHADE
Allows rear passengers to enjoy convenient
comfort from the heat of the sun.
4.POWER-RECLINING REAR SEATS
Offers a luxuriously comfortable recline angle
of 8°. Complete with Control Panel Armrest to
have full control over the seats, air-conditioning,
power sunshades and audio system.
3.LEATHER SEAT WITH DRIVER
MEMORY FUNCTION
Conveniently adjusts the seat to a preferred
position at the push of a button.
2.
3.
4.
1.
PRE-COLLISION SYSTEM (PCS)*
Avoids or mitigates frontal collisions by
alerting the driver and automatically
applying the brakes when there is a risk
of collision. Now applies to pedestrians
and bicyclists.
DYNAMIC RADAR
CRUISE CONTROL (DRCC)
FOR ALL SPEEDS*
At any speed, it maintains a safe
distance with the preceding vehicle
and brakes automatically when the car
ahead slows down. It also allows
low-speed following from 0km/h
onwards, speeds up when the turn
signal is on to facilitate overtaking
(turn-signal-linked control), and slows
down when going around curves
(curve-speed reduction).
LANE DEPARTURE ALERT
(LDA)*
The Lane Departure Alert (LDA) warns
you when an unintentional lane change
is detected, while the Steering Assist
gently corrects your steering wheel.
LANE TRACING ASSIST (LTA)
FOR ALL SPEEDS*
Keeps the vehicle centered either
by detecting the lane or the
preceding vehicle.
EXQUISITEDOMINANCEINSAFETY
Excellence has no time for second-guessing, especially on
the road. Make the right decision with the advanced
technology of the New Camry.
It’s all about Trust & Technology by Toyota.
Trust for smoother journeys ahead
*Driver remains solely responsible at all times for safe driving.
SAFETY
AUTOMATIC HIGH BEAM (AHB)*
Automatically switches between high beam and low
beam as needed to provide maximum road visibility.
PANORAMIC VIEW MONITOR (PVM)
Get a detailed 360° view of your vehicle for
manoeuvring confidently in tight spaces.
BLIND SPOT MONITOR (BSM)
Detects and alerts if there is another vehicle in the
blind spot.
REAR CROSS TRAFFIC AUTO BRAKE
(RCTAB)*
Detects other vehicles approaching from the rear of
the vehicle when reversing out from a parking spot,
alerts the driver and automatically brakes if a collision
might happen.
VEHICLE STABILITY CONTROL (VSC)
WITH TRACTION CONTROL (TRC)
VSC prevents side skids and helps stabilise the
vehicle. TRC applies the brakes or slows down the
engine to regulate spinning and ensure proper
contact of tyres.
INTELLIGENT CLEARANCE SONAR
(ICS)*
When objects are in close proximity, sensors will alert
the driver, while the car reduces engine power and
brakes automatically.
HILL-START ASSIST CONTROL (HAC)
Sustains brake pressure for 3 seconds to prevent the
vehicle from rolling backwards on an incline.
7 SRS AIRBAGS
Driver, front passenger, side, curtain and driver’s knee
airbags provide complete protection for the driver
and passengers in the event of a collision.
FRONT DIGITAL VIDEO RECORDER
(DVR)
Record your journeys for your protection should
evidence be necessary.
VEHICLE TELEMATICS SYSTEM (VTS)
An integrated system that monitors and shares your
vehicle’s real-time location through a mobile app.
5 years vehicle warranty from the date of
first registration with unlimited mileage.
Terms and conditions apply.
*Driver remains solely responsible at all times for safe driving.
Burning Black CS. GF. (222)
Silver Metallic (1D4)
Graphite Metallic (4X7)
Red Mica (3T3)
Platinum White Pearl Mica (089)
SECURITY
TOYOTA PREMIUM SECURITY & SOLAR FILM
Security meets comfort - prevents glass from break-ins
easily, reflects harmful rays and keeps the cabin cool.
COLOURSELECTION
SPECIFICATIONS
Engine A25A-FKS
PERFORMANCE 2.5V
Type 4-cylinder, In-line, 16V, DOHC with VVT-iE (Intake) and VVT-i (Exhaust)
Displacement cc 2,487
Max. Output PS / rpm 209 / 6,600
Max. Torque Nm / rpm 253 / 5,000
Transmission Direct Shift 8-speed Automatic with Sequential & Paddle Shifters
Drive Modes With (ECO / NORMAL / SPORT)
CHASSIS
Suspension Front / Rear MacPherson Strut / Double Wishbone
Brakes Front / Rear Ventilated Disc / Solid Disc
Steering Parallel Axis Electric Power Steering
Tyres & Rims 235/45R18, Alloy
Spare Tyre Temporary Tyre
DIMENSIONS
Overall Length mm
Width mm
Height mm
4,885
1,840
1,445
Wheelbase mm 2,825
Tread Front / Rear mm 1,580 / 1,605
Kerb Weight kg 1,545
Min. Turning Radius m 5.8
Fuel Capacity litre 60
EXTERIOR FEATURES
Headlamps Type Automatic Bi-LED Projector with Follow-me-home Function
Daytime Running Lights (DRL) LED
Fog Lamps Front / Rear LED / LED
Rear Combination Lamps LED
Wing Mirrors Auto-retractable, Reverse-linked with 2-position Memory
Wipers Automatic
Welcome Light Optional
DIMENSIONS
1,580mm
1,840mm
2,825mm
4,885mm
1,605mm
1,840mm
1,445mm
Seats Material Smooth Leather (Black)
Driver Seat 10-way Power Adjustable with 2-position Memory
Front Passenger Seat 8-way Power Adjustable with Shoulder Switch & Collapsible Headrest
Rear Seat Power-reclining with Centre Armrest Control Panel
Audio System 9" Display Audio with JBLTM
Speakers
Apple CarPlay & Android Auto* Connectivity With
SPECIFICATIONS
•UMW Toyota Motor reserves the right to alter any details of specifications and equipment without notice.
•Details of specifications and equipment are also subject to change to suit local conditions and requirements.
•Vehicle and specifications in this catalogue may vary from models available locally.
•Vehicle body and accessory colours might differ slightly from the printed photos in this catalogue.
•All images used are for illustrative purposes.
Rear View Mirror Electrochromic Mirror
INTERIOR FEATURES 2.5V
Smart Entry & Start System With
Sunshades Powered Rear Window & Manual Rear Side Windows
Air-conditioning Tri-zone Automatic Climate Control with Rear Vent
Ambient Lighting With
Multi-Information Display (MID) With (7" Colour)
Head-up Display (HUD) With
Steering Wheel Power Adjustable, Leather-wrapped with 2-position Memory
Power Windows All Automatic
Wireless Charger With
USB Charging Ports With
Digital Video Recorder (DVR) With
SAFETY & SECURITY
Toyota Safety Sense (TSS) With
Pre-collision System (PCS) With
Lane Departure Alert (LDA) With
Lane Tracing Assist (LTA) With
Dynamic Radar Cruise Control (DRCC) With (All Speeds)
Automatic High Beam (AHB) With
SRS Airbags 7 (Front, Front Side, Curtain & Driver Knee)
Vehicle Stability Control (VSC)
& Traction Control (TRC)
With
Anti-lock Braking System (ABS)
Hill-start Assist Control (HAC)
With Electronic Brake-force Distribution (EBD)
& Brake Assist (BA)
With
Emergency Stop Signal (ESS) With
Panoramic View Monitor (PVM) With
Blind Spot Monitor (BSM) With Rear Cross Traffic Auto Brake (RCTAB)
Intelligent Clearance Sonar (ICS) With (Front & Rear)
Tyre Pressure Monitoring System (TPMS) With
Electric Parking Brake (EPB) With Automatic Brake Hold
Vehicle Telematics System (VTS) With
ISOFIX With (Rear Seat)
Window Tint Toyota Premium Security & Solar Film
Alarm Immobiliser, Siren with Backup Battery, Intrusion Sensor
Note: *Android Auto™ will be available when the service is officially launched in Malaysia. For details, please contact your nearest Toyota showroom.
5 years vehicle warranty from
the date of first registration
with unlimited mileage.
Terms and conditions apply.
The Camry
has been awarded
a 5-star ASEAN NCAP
safety rating.
For Your Auto-Financing Needs
Visit the
TOYOTA ONLINE SHOWROOM
and book a test drive!
TOYOTA FREEPHONE: 1800-8-TOYOTA (1800-8-869682) from 8:00am – 5:30pm, Monday to Friday.
TOYOTA E-MAIL: customersupport@toyota.com.my
The colour, accessories and/or specifications of available models may differ from the vehicle(s) shown here.
UMW Toyota Motor Sdn. Bhd. (60576-K)

Camry-E-Brochure.pdf

  • 1.
  • 2.
    EXQUISITE taste hintsat the level of prestige you command. DOMINANCE in everything you do alludes to the power within. With the New Camry, your true superiority will be UNLEASHED.
  • 3.
    EXQUISITEDOMINANCEIN PERFORMANCE Immense sophistication requires thepower to back it up. The New Camry was built to deliver excellent performance in every drive.
  • 4.
    2.5L DYNAMIC FORCEENGINE WITH VVT-iE The New Camry is powered by a new 2.5L engine with higher engine output and combustion efficiency to exude absolute power on the road. Max. Output 209PS 6,600rpm Max. Torque 253Nm 5,000rpm DIRECT SHIFT 8-SPEED AUTO TRANSMISSION Offers impressive starting acceleration as well as fuel efficiency when cruising at high speeds. DRIVE MODE SELECT SPORT MODE offers a more responsive and exhilarating ride, ECO MODE prioritises fuel efficiency and NORMAL MODE provides a perfect balance of the two. TNGA PLATFORM WITH DOUBLE WISHBONE REAR SUSPENSION Provides more stable, responsive and agile handling to enhance the quality of your ride. SEQUENTIAL SHIFTMATIC & PADDLE SHIFTERS Gives the driver control similar to a manual car with excellent response, and allows the driver to shift the gears up or down while their hands remain comfortably on the steering wheel.
  • 5.
    EXQUISITEDOMINANCEINSTYLE The New Camrymakes an incredible first impression with breathtaking aesthetics that inspire amazement at a glance.
  • 6.
    REAR LED COMBINATIONLAMPS When illuminated, the full LED lamps grant a sophisticated aesthetic for others to follow. 18" ALLOY RIMS The new twisted dark spokes add an element of dynamic expression to a refined design. ENHANCED IMPRESSION Aesthetic enhancements all over the sedan grant the New Camry a bold presence wherever it roams. BI-BEAM LED HEADLAMPS WITH FOLLOW-ME-HOME FUNCTION & DAYTIME RUNNING LIGHTS (DRL) Turn heads with a stylish pair of powerful Bi-LED projector headlamps equipped with the Follow-me-home Function and Daytime Running Lights (DRL) that automatically light up your path for enhanced visibility and safety. EXTERIOR GRAPHIC WELCOME LIGHTS* Add an advanced sense of flair when occupants enter and exit the vehicle. *Optional accessory.
  • 7.
    EXQUISITEDOMINANCEINCOMFORT In a positionof prestige, everything is at your command. Inside the New Camry, you’re granted the power to have things precisely to your liking.
  • 8.
    LUXURIOUS DESIGN Attention todetail instantly greets you on the inside in the form of intricate ornamentation that layers organic patterns and straight lines to express an elegant flow. 10" COLOUR HEAD-UP DISPLAY Projects information in the driver's line of sight for easier access to important information such as shift position and Toyota Safety Sense (TSS) warning alerts. 7" COLOUR MULTI-INFORMATION DISPLAY (MID) WITH OPTITRON METER Presents vehicle information (such as speed, fuel consumption and range, TSS feature settings, and tyre pressure) with impeccable clarity. * Android AutoTM will be available when the service is officially launched in Malaysia. Functions may vary depending on smartphone model. 9" CAPACITIVE TOUCHSCREEN DISPLAY WITH 9-SPEAKER JBL AUDIO SYSTEM Can be operated with simple finger movements, provides real sound quality courtesy of Clari-Fi™ technology and has Apple CarPlay & Android Auto-ready Connectivity*. INTERIOR
  • 9.
    1. SMART ENTRY & PUSHSTART SYSTEM Allows the driver to store one preferred position of the driver seat, wing mirror & steering column in the New Camry remote key. POWER ADJUSTABLE STEERING WHEEL WITH MEMORY FUNCTION Adjusts the steering column to one of two preferred settings when the engine is turned on, and retracts the steering column when the engine is turned off to allow the driver an easy exit. 2.TRI-ZONE AUTOMATIC CLIMATE CONTROL WITH REAR VENT Allows the driver, front passenger & rear passenger to set their temperatures independently according to their own preferences. 1. POWER REAR SUNSHADE Allows rear passengers to enjoy convenient comfort from the heat of the sun. 4.POWER-RECLINING REAR SEATS Offers a luxuriously comfortable recline angle of 8°. Complete with Control Panel Armrest to have full control over the seats, air-conditioning, power sunshades and audio system. 3.LEATHER SEAT WITH DRIVER MEMORY FUNCTION Conveniently adjusts the seat to a preferred position at the push of a button. 2. 3. 4. 1.
  • 10.
    PRE-COLLISION SYSTEM (PCS)* Avoidsor mitigates frontal collisions by alerting the driver and automatically applying the brakes when there is a risk of collision. Now applies to pedestrians and bicyclists. DYNAMIC RADAR CRUISE CONTROL (DRCC) FOR ALL SPEEDS* At any speed, it maintains a safe distance with the preceding vehicle and brakes automatically when the car ahead slows down. It also allows low-speed following from 0km/h onwards, speeds up when the turn signal is on to facilitate overtaking (turn-signal-linked control), and slows down when going around curves (curve-speed reduction). LANE DEPARTURE ALERT (LDA)* The Lane Departure Alert (LDA) warns you when an unintentional lane change is detected, while the Steering Assist gently corrects your steering wheel. LANE TRACING ASSIST (LTA) FOR ALL SPEEDS* Keeps the vehicle centered either by detecting the lane or the preceding vehicle. EXQUISITEDOMINANCEINSAFETY Excellence has no time for second-guessing, especially on the road. Make the right decision with the advanced technology of the New Camry. It’s all about Trust & Technology by Toyota. Trust for smoother journeys ahead *Driver remains solely responsible at all times for safe driving. SAFETY
  • 11.
    AUTOMATIC HIGH BEAM(AHB)* Automatically switches between high beam and low beam as needed to provide maximum road visibility. PANORAMIC VIEW MONITOR (PVM) Get a detailed 360° view of your vehicle for manoeuvring confidently in tight spaces. BLIND SPOT MONITOR (BSM) Detects and alerts if there is another vehicle in the blind spot. REAR CROSS TRAFFIC AUTO BRAKE (RCTAB)* Detects other vehicles approaching from the rear of the vehicle when reversing out from a parking spot, alerts the driver and automatically brakes if a collision might happen. VEHICLE STABILITY CONTROL (VSC) WITH TRACTION CONTROL (TRC) VSC prevents side skids and helps stabilise the vehicle. TRC applies the brakes or slows down the engine to regulate spinning and ensure proper contact of tyres. INTELLIGENT CLEARANCE SONAR (ICS)* When objects are in close proximity, sensors will alert the driver, while the car reduces engine power and brakes automatically. HILL-START ASSIST CONTROL (HAC) Sustains brake pressure for 3 seconds to prevent the vehicle from rolling backwards on an incline. 7 SRS AIRBAGS Driver, front passenger, side, curtain and driver’s knee airbags provide complete protection for the driver and passengers in the event of a collision. FRONT DIGITAL VIDEO RECORDER (DVR) Record your journeys for your protection should evidence be necessary. VEHICLE TELEMATICS SYSTEM (VTS) An integrated system that monitors and shares your vehicle’s real-time location through a mobile app. 5 years vehicle warranty from the date of first registration with unlimited mileage. Terms and conditions apply. *Driver remains solely responsible at all times for safe driving.
  • 12.
    Burning Black CS.GF. (222) Silver Metallic (1D4) Graphite Metallic (4X7) Red Mica (3T3) Platinum White Pearl Mica (089) SECURITY TOYOTA PREMIUM SECURITY & SOLAR FILM Security meets comfort - prevents glass from break-ins easily, reflects harmful rays and keeps the cabin cool. COLOURSELECTION
  • 13.
    SPECIFICATIONS Engine A25A-FKS PERFORMANCE 2.5V Type4-cylinder, In-line, 16V, DOHC with VVT-iE (Intake) and VVT-i (Exhaust) Displacement cc 2,487 Max. Output PS / rpm 209 / 6,600 Max. Torque Nm / rpm 253 / 5,000 Transmission Direct Shift 8-speed Automatic with Sequential & Paddle Shifters Drive Modes With (ECO / NORMAL / SPORT) CHASSIS Suspension Front / Rear MacPherson Strut / Double Wishbone Brakes Front / Rear Ventilated Disc / Solid Disc Steering Parallel Axis Electric Power Steering Tyres & Rims 235/45R18, Alloy Spare Tyre Temporary Tyre DIMENSIONS Overall Length mm Width mm Height mm 4,885 1,840 1,445 Wheelbase mm 2,825 Tread Front / Rear mm 1,580 / 1,605 Kerb Weight kg 1,545 Min. Turning Radius m 5.8 Fuel Capacity litre 60 EXTERIOR FEATURES Headlamps Type Automatic Bi-LED Projector with Follow-me-home Function Daytime Running Lights (DRL) LED Fog Lamps Front / Rear LED / LED Rear Combination Lamps LED Wing Mirrors Auto-retractable, Reverse-linked with 2-position Memory Wipers Automatic Welcome Light Optional DIMENSIONS 1,580mm 1,840mm 2,825mm 4,885mm 1,605mm 1,840mm 1,445mm
  • 14.
    Seats Material SmoothLeather (Black) Driver Seat 10-way Power Adjustable with 2-position Memory Front Passenger Seat 8-way Power Adjustable with Shoulder Switch & Collapsible Headrest Rear Seat Power-reclining with Centre Armrest Control Panel Audio System 9" Display Audio with JBLTM Speakers Apple CarPlay & Android Auto* Connectivity With SPECIFICATIONS •UMW Toyota Motor reserves the right to alter any details of specifications and equipment without notice. •Details of specifications and equipment are also subject to change to suit local conditions and requirements. •Vehicle and specifications in this catalogue may vary from models available locally. •Vehicle body and accessory colours might differ slightly from the printed photos in this catalogue. •All images used are for illustrative purposes. Rear View Mirror Electrochromic Mirror INTERIOR FEATURES 2.5V Smart Entry & Start System With Sunshades Powered Rear Window & Manual Rear Side Windows Air-conditioning Tri-zone Automatic Climate Control with Rear Vent Ambient Lighting With Multi-Information Display (MID) With (7" Colour) Head-up Display (HUD) With Steering Wheel Power Adjustable, Leather-wrapped with 2-position Memory Power Windows All Automatic Wireless Charger With USB Charging Ports With Digital Video Recorder (DVR) With SAFETY & SECURITY Toyota Safety Sense (TSS) With Pre-collision System (PCS) With Lane Departure Alert (LDA) With Lane Tracing Assist (LTA) With Dynamic Radar Cruise Control (DRCC) With (All Speeds) Automatic High Beam (AHB) With SRS Airbags 7 (Front, Front Side, Curtain & Driver Knee) Vehicle Stability Control (VSC) & Traction Control (TRC) With Anti-lock Braking System (ABS) Hill-start Assist Control (HAC) With Electronic Brake-force Distribution (EBD) & Brake Assist (BA) With Emergency Stop Signal (ESS) With Panoramic View Monitor (PVM) With Blind Spot Monitor (BSM) With Rear Cross Traffic Auto Brake (RCTAB) Intelligent Clearance Sonar (ICS) With (Front & Rear) Tyre Pressure Monitoring System (TPMS) With Electric Parking Brake (EPB) With Automatic Brake Hold Vehicle Telematics System (VTS) With ISOFIX With (Rear Seat) Window Tint Toyota Premium Security & Solar Film Alarm Immobiliser, Siren with Backup Battery, Intrusion Sensor Note: *Android Auto™ will be available when the service is officially launched in Malaysia. For details, please contact your nearest Toyota showroom. 5 years vehicle warranty from the date of first registration with unlimited mileage. Terms and conditions apply. The Camry has been awarded a 5-star ASEAN NCAP safety rating. For Your Auto-Financing Needs Visit the TOYOTA ONLINE SHOWROOM and book a test drive! TOYOTA FREEPHONE: 1800-8-TOYOTA (1800-8-869682) from 8:00am – 5:30pm, Monday to Friday. TOYOTA E-MAIL: customersupport@toyota.com.my The colour, accessories and/or specifications of available models may differ from the vehicle(s) shown here. UMW Toyota Motor Sdn. Bhd. (60576-K)