SlideShare a Scribd company logo
BuchansResources Limited
Buchans VMS Project, Newfoundland - Update
November 2018
Forward-Looking Statements
Buchans Resources Limited (“Buchans” or the “Company”) has prepared this presentation for information purposes only. The
information contained herein was prepared by management on a best efforts basis and is believed to be accurate. This
presentation contains or refers to "forward-looking information" within the meaning of applicable Canadian securities legislation.
All statements in this release, other than statements of historical fact, which address activities, events or developments that the
Company believes, expects or anticipates will or may occur in the future are forward-looking information. Wherever possible,
words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "anticipates" or "does not
anticipate", "believes", "intends" and similar expressions or statements that certain actions, events or results "may", "could", "
"would", "might" or "will" be taken, occur or be achieved, have been used to identify forward-looking information. In particular, all
statements in this presentation that address estimated resource quantities, grades and contained metals, possible future
mining, and exploration and development activities are forward looking statements.
Forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ
materially from expected results. Shareholders and prospective investors are cautioned not to place undue reliance on forward-
looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties,
both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events
will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information
whether as a result of new information, future events or other such factors which affect this information, except as required by
law.
This presentation may contain certain information derived from official government publications, industry sources and third
parties. While we believe inclusion of such information is reasonable, such information has not been independently verified by
us or our advisers, and no representation is given as to its accuracy or completeness.
The TSX Venture Exchange nor any other exchange has reviewed and nor do they accept responsibility for the adequacy or
accuracy of material presented in this document.
BuchansResources
Outline
• Company Introduction
• Project Background
• Current Strategy & 2018 Program
• Results
• where we are headed…
BuchansResources
• a new company formed from base metal assets spun out of Minco Plc after Minco taken over
by Dalradian Resources (Aug-2017)
• Not Currently Listed - “… postpone the planned listing of the Company’s shares pending more
favourable market conditions.”
• … continue in good standing as a Reporting Issuer in the Provinces of British Columbia,
Alberta, Nova Scotia, and Newfoundland & Labrador… in compliance with…Securities Acts
and Regulations in Canada…including NI 43-101… public filings available on SEDAR
BuchansResources Limited (formerly Minco Plc)
International Presence:
Trans-Atlantic Resource Opportunities
Toronto North Pennine Orefield (Zn-Pb-Ag)
Exploration Irish-Type Zn-Pb
Buchans (Zn-Pb-Cu-Ag-Au)
 PEA & Exploration
 historic mining district
 very high-grade VMS deposits
Woodstock (Mn)
 PEA Plymouth deposit (Mn carbonate)
Xtierra Ag-Zn-Pb (22% - TSXV:XAG)
 PEA Bilbao (skarn)
 Laguna Project (Ag-Tailings)
BuchansResources
Irish Midland Orefield (Zn-Pb-Ag)
 Moate – Exploration Irish-Type Zn-Pb
 Navan – JV Tara Boliden
(adjacent - Boliden’s Tara Mine)
Volcanic/epiclastic rocks
Ophiolite
Deposits >200,000 tonnes
(production and/or reserves)
AVALON
ZONE
CENTRAL MOBILE
BELT
St. John’s
• Buchans Resources controls
several undeveloped deposits
(Ord. - Buchans Group & Cambro-Ord.
Victoria Lake Group)
(after Swinden,1991 and Evans & Kean, 2002)
100 km
Buchans VMS Camp BuchansResources
Buchans
BUCHANS PROJECT - BACKGROUND BuchansResources
Asarco - 16.2 Mt - 23.4% CBM - 14.5%Zn, 7.6%Pb, 1.3%Cu, 1.37g/t Au, 126g/t Ag (mined 1928-84)
• 2007 - resources left behind - large resource - lower-grade stockwork -
potential for open pit development - Lundberg
• 2008 - Inferred Resource - Lundberg
• 2011 - Positive PEA (Inferred Resource - Lundberg)
• 2013 - expanded & upgraded to Indicated & Inferred resources - Lundberg
• 2017 - RDC metallurgical study (Lundberg + district’s satellite deposits - central mill)
Map Area
District Opportunity
Cambro-Ord. Volc.
Millertown
BuchansResources
20 km
Buchans
Buchans Resources Properties
Canadian Zinc Properties
NI 43-101 Compliant Resource
Historic mine
Boomerang Deposits 100% NZC (1% Zn cut-off)
Indicated - 1.36 Mt @ 7.1% Zn, 3.0% Pb, 0.5% Cu, 110.4 g/t Ag, 1.7 g/t Au
Inferred - 0.28 Mt @ 6.7% Zn, 2.9% Pb, 0.4% Cu, 96.5 g/t Ag, 1.3 g/t Au
Domino (Inferred) – 0.41 Mt @ 6.3% Zn, 2.8% Pb, 0.4% Cu, 94 g/t Ag, 0.6 g/t Au
Hurricane (Inferred) – 0.06 Mt @ 13.4% Zn, 7.0% Pb, 1.2% Cu, 159 g/t Ag, 0.9 g/t Au
Lundberg – 100% BRL
Indicated – 23.4 Mt @ 1.41% Zn, 0.60% Pb,
0.35% Cu, 5.31 g/t Ag, 0.07 g/t Au
Inferred – 4.3 Mt @ 1.29% Zn, 0.54% Pb, 0.27%
Cu, 4.47g/t Ag & 0.08 g/t Au ($15US NSR cut-off)
Bobbys Pond (1.1% CuEq) - 100% BRL
Indicated - 1.1 Mt @ 4.6% Zn, 0.4% Pb, 0.9% Cu, 16.6 g/t Ag, 0.2 g/t Au
Inferred- 1.2 Mt @ 3.8% Zn, 0.3% Pb, 1.0% Cu, 11.0 g/t Ag & 0.06 g/t Au
Lemarchant 100% NZC (4% zinc equiv. cut-off)
Indicated - 2.42 Mt @ 6.2% Zn, 1.6% Pb, 0.7% Cu,
64.0 g/t Ag, 1.22 g/t Au
Inferred – 0.56 Mt @ 4.7% Zn, 1.1% Pb, 0.5% Cu,
44.7 g/t Ag, 1.1 g/t Au
Daniels – 100% BRL
Indicated-0.93 Mt @ 5.1% Zn, 2.5% Pb, 0.3% Cu,
101.4 g/t Ag, 0.6 g/t Au
Inferred- 0.33 Mt @ 4.6% Zn, 2.1% Pb, 0.3% Cu,
85.9 g/t Ag, 0.53 g/t Au (2% Zn cut-off)
Long Lake 100% NZC (using a 7.0% zinc equiv. cut-off)
Indicated – 0.41 Mt @ 7.8% Zn, 1.6% Pb, 1.0% Cu, 49 g/t Ag, 0.57 g/t Au
Inferred – 0.08 Mt @ 5.8% Zn, 1.2% Pb, 0.7% Cu, 34 g/t Ag, 0.48 g/t Au
Duck Pond Mine (past prod.)
5.0 Mt @ 4.4% Zn, 2.7% Cu,
53 g/t Ag, 0.6 g/t Au
(Teck, 2007-15)
Buchans (past prod.) 16.2 Mt
14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag
(Asarco, 1928-1984)
Tulks Hill – 49% BRL:51% Prominex
Indicated-0.43 Mt @ 4.0% Zn, 1.6% Pb, 0.9%
Cu, 35.1 g/t Ag, 1.2 g/t Au (1.1% CuEq)
0
500
1,000
1,500
2,000
2,500
Zn (lbs)
Pb (lbs)
Cu (lbs)
851
361
207
1,179
357
136
2,030
718
342
Millions
- District hosts >2 billion lbs Zn,
>700 million lbs Pb, & >300
million lbs Cu
- Lundberg hosts more than half
district’s Cu & Pb, and almost as
much Zn as all other deposits
combined
* combined Indicated & Inferred resources
Lundberg – District’s
Pivotal deposit
Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be considered for
estimation of mineral reserves, and there is no certainty that inferred mineral resources will be realized.
BuchansResources
District
Total
VLSG
(all NI 43-101)
Lundberg
metallurgy - recoveries
2PEA based on Inferred Mineral Resources, not Mineral Reserves, and do not have demonstrated economic viability. Inferred Mineral Resources are considered too speculative
geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is therefore no certainty that the
conclusions of the PEA will be realized. PEA assumptions: metal prices - ($US) $1.22 Zn/lb, $1.10 Pb/lb, $3.62 Cu/lb, $22.74 Ag/oz; Exchange Rate: $1.012 CAN$:US$.
1Resources that are not mineral reserves do not have demonstrated economic viability. Resource Estimate reported from: Technical Report prepared by Michael Cullen, P.
Geo. & Andrew Hilchey, P.Geo., of Mercator Geological Services Limited. * “cut off” based on operating & processing costs estimated by Tetra Tech (2011 PEA). Feb 2013 - 3yr
trailing average metal prices: $0.95 /lb Zn, $1.00 /lb Pb, $3.68 /lb Cu, $29.00 /oz Ag, $1,493.65 /oz Au.
LUNDBERG RESOURCE BuchansResources
processing - central mill
upgraded resource
open pit – bulk tonnage
Since 2011…
Red Indian Lake
deposits (past producers-projected to surface)
sulphide prospects
favourable alteration
5 km
Lundberg (near surface - stockwork)
below Lucky Strike (massive sulphides)
Outline of Buchans Camp rocks after GSC 2016
Buchans camp rocks
BUCHANS
Lundberg Deposit
Asarco mined 16.2 Mt 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag (1928-1984)
- 80% historic production from Buchans Resources property -
BuchansResources
Schematic block diagram of the MacLean channel, Lucky Strike area, illustrating hydrothermal vents along synvolcanic faults, diatreme activity
associated with subvolcanic plutonic body, ore bearing slumps and debris flows (modified after Kirkham and Thurlow, 1987; and Thurlow, 2001).
stockwork ore
sulphide-rich vein networks
(2-6% Zn-Pb-Cu)
(not mined) transported ore
debris flow deposits
(16-22% Zn-Pb-Cu)
(52% of ore mined)
VMS DEPOSITS (Buchans model) BuchansResources
in situ ore
massive sulphides
(25-28% Zn-Pb-Cu)
(48% of ore mined)
Mineralization
LUNDBERG
Bulk Tonnage Resource
BuchansResources
Lundberg
H-3356 – 37 m
LUNDBERG
STOCKWORK DEPOSIT
BuchansResources
200 m
Resource Limits - projected to surface
2012 drill hole
Previous surface drill hole
Workings projected to surface
2013 – Indicated & Inferred (US$15 NSR)
Historic underground drill hole
2008 drill hole
Lundberg Zone
14
BuchansResources
Lundberg
Engine House Zone
*Figure excludes holes drilled after 2012
Section A (looking Northeast)
0 m
200 m
400 m
NW SE
700 m
2013 Resource Model ($15 US cut off)
$0.95 lb Zn
$1.00 lb Pb
$3.68 lb Cu
$29.00 oz Ag
$1,493.65 oz Au
LUNDBERG
Bulk Tonnage Resource
15 to 25
25 to 50
50 to 75
75 to 100
100 to 150
NSR ($ US)
>150
resource blocks 5 m
includes Indicated & Inferred
(2013 Resource Block Model)
* excludes holes drilled after 2012
BuchansResources
Lundberg
300 m
old workings
Two Level
glory hole
old workings
Lucky Strike
SW NE
2013 Resource Model ($15 US cut off)
$0.95 lb Zn
$1.00 lb Pb
$3.68 lb Cu
$29.00 oz Ag
$1,493.65 oz Au
LUNDBERG
Bulk Tonnage Resource
15 to 25
25 to 50
50 to 75
75 to 100
100 to 150
NSR ($ US)
>150
BuchansResources
0 m
200 m
400 m
300 m
400 m
Section B (looking Northwest)
Lundberg
glory hole
old workings - Lucky Strike
resource blocks 5 m
includes Indicated & Inferred
(2013 Resource Block Model)
* excludes holes drilled after 2012
NW SE
2013 Resource Model ($15 US cut off)
$0.95 lb Zn
$1.00 lb Pb
$3.68 lb Cu
$29.00 oz Ag
$1,493.65 oz Au
LUNDBERG
Bulk Tonnage Resource
15 to 25
25 to 50
50 to 75
75 to 100
100 to 150
NSR ($ US)
>150
old workings
Lucky Strike
old workings – Engine House
BuchansResources
glory hole
0 m
200 m
400 m
300 m
300 m
Section C (looking Northeast)
Engine House
resource blocks 5 m3
includes Indicated & Inferred
(2013 Resource Block Model)
* excludes holes drilled after 2012
SW NE
2013 Resource Model ($15 US cut off)
$0.95 lb Zn
$1.00 lb Pb
$3.68 lb Cu
$29.00 oz Ag
$1,493.65 oz Au
LUNDBERG
Bulk Tonnage Resource
15 to 25
25 to 50
50 to 75
75 to 100
100 to 150
NSR ($ US)
>150
BuchansResources
0 m
200 m
400 m
300 m
300 m
Section D (looking Northwest)
Engine House
resource blocks 5 m3
includes Indicated & Inferred
(2013 Resource Block Model)
* excludes holes drilled after 2012
2018 PROGRAM
• Drilling (~8,000 m)
• Borehole Geophysical Surveys
• SkyTEM AEM surveys (~1,000 line km)
• Lundberg – Updated Resource Estimate (fill in gaps in the 2013 resource)
• Lundberg - Internal Scoping Study...recent technical inputs - since 2011 PEA
STRATEGY
• continue to advance evaluation of Lundberg - incorporating improve results - recent
work completed since 2011 PEA (expanded resource, improved metallurgy, milling options)
• explore for additional nearby resources that could complement Lundberg
BUCHANS PROJECT
LUNDBERG
• substantial base metal inventory – large potentially open
pitable resource
• brownfield site - excellent infrastructure
• potential access - existing mill (65 km road)
Mill
(~2,000 t/d mill)
BuchansResources
SkyTEM AEM Surveys
~1,000 ln km in 2 blocks
some areas - 1st AEM since 1980’s
2018 Program
Exploration
BuchansResources
Buchans Resources Properties
NI 43-101 Compliant Resource
Historic mine
Cambro-Ord. Volc.
Millertown
10 km
Buchans
Bobbys Deposit
Daniels Deposit
Lundberg Deposit
Buchans Drilling (5,200 m)
2,200 m - Lundberg - (16 ddh)
3,000 m - “other targets” – (10 ddh)
Tulks North Drilling (2,800 m)
1,100 m - Bobbys - (2 ddh)
1,700 m – Daniels - (3 ddh)
BHEM surveys
Buchans & Tulks North
exploration potential at depth
underground workings
projected to surface
100 m
BuchansResources2018 Results – Lundberg Resource Drilling
1.0 m - 21.99% CBM &
1.8 m - 32.22% CBM
0.10 m - 36.53% CBM
4.8 m - 15.48% CBM
23.8 m - 9.11% CBM
incl. 8.0 m - 20.38% CBM
0.5 m - 5.22% CBM
N
2013 Lundberg
Resource Outline
28.0 m - 2.63% CBM
152.0 m - 2.49% CBM
0.8 m - 1.7% CBM
29.0 m - 1.86% CBM
6.0 m - 1.23% CBM
10.0 m - 1.0% CBM
wk. min.
wk. min.
wk. min.
wk. min.
35.7 m - 2.57% CBM
8.9 m - 3.93% CBM &
64.0 m - 1.25% CBM
34.7 m - 4.53% CBM
incl. 23.0 m - 6.18% CBM
4.0 m 19.61% CBM
0.8 m 24.95% CBM
2.7 m 9.87% CBM
2.65 m 4.61% CBM
5.05 m 5.98% CBM
0.94 m 12.04% CBM
2018 drill hole (angle hole)
2007-12 drill hole
historic surface/
underground hole
topographic contours 2 m
2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade
mineralization above Lundberg may ultimately enhance - open pit development...
%CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
underground workings
projected to surface
100 m
BuchansResources2018 Results – Lundberg Resource Drilling
N
2013 Lundberg
Resource Outline
28.0 m - 2.63% CBM
152.0 m - 2.49% CBM
0.8 m - 1.7% CBM
29.0 m - 1.86% CBM
6.0 m - 1.23% CBM
10.0 m - 1.0% CBM
wk. min.
wk. min.
wk. min.
wk. min.
35.7 m - 2.57% CBM
8.9 m - 3.93% CBM &
64.0 m - 1.25% CBM
34.7 m - 4.53% CBM
incl. 23.0 m - 6.18% CBM
2018 drill hole (angle hole)
2007-12 drill hole
historic surface/
underground hole
topographic contours 2 m
2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade
mineralization above Lundberg may ultimately enhance - open pit development...
%CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
underground workings
projected to surface
100 m
BuchansResources2018 Results – Lundberg Resource Drilling
1.0 m - 21.99% CBM &
1.8 m - 32.22% CBM
0.10 m - 36.53% CBM
4.8 m - 15.48% CBM
23.8 m - 9.11% CBM
incl. 8.0 m - 20.38% CBM
0.5 m - 5.22% CBM
N
2013 Lundberg
Resource Outline
4.0 m 19.61% CBM
0.8 m 24.95% CBM
2.7 m 9.87% CBM
2.65 m 4.61% CBM
5.05 m 5.98% CBM
0.94 m 12.04% CBM
2018 drill hole (angle hole)
2007-12 drill hole
historic surface/
underground hole
topographic contours 2 m
2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade
mineralization above Lundberg may ultimately enhance - open pit development...
%CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
100 m
2013 Lundberg
Resource Outline
Two Level
underground workings
projected to surface
BuchansResources
Lucky Strike Drilling
N
2018 BRL drill hole
2007-15 BRL drill hole
historic surface/
underground hole
topographic contours 2 m
H-18-3500 (-58°)
H-18-3501
H-18-3502
H-18-3503
H-18-3504
H-18-3505
H-18-3506 (-45°)
H-18-3516b (-45°)
H-18-3515 (-84°)
H-18-3520
H-18-3519
H-18-3514
H-18-3521
H-18-3518 (-48°)
H-18-3526
in progress
H-18-3523 - no significant mineralization
horizon faulted out at this location
H-18-3524
1.80 m 9.48% CBM
0.76% Cu, 3.15% Pb, 5.57% Zn, 90.5 g/t Ag & 0.37 g/t Au
incl. 1.00 m 14.83% CBM
1.26% Cu, 4.87% Pb, 8.70% Zn, 133.2 g/t Ag & 0.47 g/t Au
Two Level (proximal-transported)
0.30 Mt - 0.5% Cu, 4.6% Pb, 8.0% Zn,
125 g/t Ag, 1.6 g/t Au (mined)
North Orebody (proximal-transported)
0.55Mt @ 0.5% Cu, 4.5% Pb, 8.2% Zn,
123 g/t Ag, 1.7 g/t Au (mined)
1 km
N
Lucky Strike
others
others
BRL
BRL
BRL
BRL
Sandfill
(transported)
Oriental
Lundberg
Sandfill
Target Area
Clementine
Target Area
Oriental East
Target Area
West Orebodies
Target Area
Lucky Strike North
Target Area
Middle Branch
Target Area
Old Buchans North
Target Area
BuchansResources2018 Drilling
Other Target Areas
“other targets”
2018 drilling
Target Areas
(relogging)
Orebodies (historic/ mined out)
(mined 1928-1984 - 16.2 M tonnes 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag
Stringer Mineralization
(projected to surface)
Prospect
(undeveloped,
projected to surface)
Lundberg & Engine House Zone
(projected to surface)
Lundberg Model Open Pit
500 m
breccia-tuffs
conglomerate
(granite cobbles)
Sandfill Prospect – 2018 Drilling BuchansResources
thrust panel - “other rocks”
(above Buchans rocks)
BRL
other
Lundberg (stockwork)
Lucky Strike (in situ & proximal-transported)
5.6 Mt @ 1.6% Cu, 8.6% Pb, 18.4% Zn,
112 g/t Ag, 1.7 g/t Au (mined)
Middle Branch (transported) (hist. intercept)
1.8 m - 0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag & 0.7 g/t Au
Oriental (in situ & transported)
3.3 Mt -1.47% Cu, 7.90% Pb, 14.18% Zn,
154.0 g/t Ag & 1.96 g/t Au (mined)
Sandfill (transported) (historic, non-43-101 compliant)
68,000 tonnes – 1.5% Cu, 4.7% Pb, 10.0% Zn, 85.7 g/t Ag & 0.34 g/t Au
Buchans Lake
500 m
barren rocks thrust over
prospective Buchans rocks
Middle Branch (transported)
H-1910 (historic) 1.83 m - 8.3% CBM
(0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag, 0.69 g/t Au)
1582
3350
BuchansResources
2018 Sandfill Drilling - Buchans
Thrust Fault
Ski Hill (basalt/ intermediate fragmentals)
Geology
Sandy Lake (prominent qtz rhyolite/ arkose/basalt)
Diabase
Buchans River (rhyolite/ m.sulphs./ basalt/ felsic tuffs
Surface/ underground DDH & historic assays
BRL DDH (2007-15)
2018 BRL drill hole
N
too shallow
too shallow
too shallow
too shallow?
min. debris
min. debris
limits - transported sulphides
(projected to surface)
3.1 m - 2.4% CBM
0.1% Cu, 0.7% Pb, 1.6% Zn, 7 g/t Ag
1.52 m - 4.9% CBM
0.3% Cu, 2.0% Pb, 2.6% Zn, 93 g/t Ag, 1.03 g/t Au
1.22 m - 17.7% CBM
0.2% Cu, 3.9% Pb, 13.7% Zn, 62 g/t Ag, 1.20 g/t Au
3.35 m - 21.7% CBM
2.6% Cu, 6.5% Pb, 12.6% Zn, 87 g/t Ag, 0.34 g/t Au
3.66 m - 11.2% CBM
0.5% Cu, 3.1% Pb, 7.7% Zn
0.46 m - 31.3% CBM
1.4% Cu, 8.6% Pb, 21.3%
Zn, 219 g/t Ag, 2.74 g/t Au
0.24 m - 13.4% CBM (one sample)
1.6% Cu, 1.8% Pb, 10.0% Zn, 26 g/t Ag, 0.38 g/t Au
H-18-3513 - transported sulphides - 7.0 m - 7.4% CBM Upper Zone
incl. 1.0 m - 23.6%CBM - 2.96% Cu, 5.13% Pb, 15.5% Zn, 96 g/t Ag & 0.27 g/t Au
and 3.10 m - 6.4% CBM Lower Zone
incl. 1.0 m - 17.5%CBM - 0.56% Cu, 5.50% Pb, 11.40 % Zn, 153 g/t Ag & 0.70 g/t Au
assays pending
Sandfill (transported)
narrow diam. drilling
300-400 m depth - 25-35 m OB
assays pending
500 m
barren rocks thrust over
prospective Buchans rocks
Middle Branch (transported)
H-1910 (historic) 1.83 m - 8.3% CBM
(0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag, 0.69 g/t Au)
1582
3350
BuchansResources
Sandfill - Middle Branch Drilling
Buchans - 2018
Thrust Fault
Ski Hill (basalt/ intermediate fragmentals)
Geology
Sandy Lake (prominent qtz rhyolite/ arkose/basalt)
Diabase
Buchans River (rhyolite/ m.sulphs./ basalt/ felsic tuffs
Surface/ underground DDH & historic assays
BRL DDH (2007-15)
2018 BRL drill hole
N
too shallow
too shallow
3.1 m - 2.4% CBM
0.1% Cu, 0.7% Pb, 1.6% Zn, 7 g/t Ag
1.52 m - 4.9% CBM
0.3% Cu, 2.0% Pb, 2.6% Zn, 93 g/t Ag, 1.03 g/t Au
1.22 m - 17.7% CBM
0.2% Cu, 3.9% Pb, 13.7% Zn, 62 g/t Ag, 1.20 g/t Au
3.35 m - 21.7% CBM
2.6% Cu, 6.5% Pb, 12.6% Zn, 87 g/t Ag, 0.34 g/t Au
3.66 m - 11.2% CBM
0.5% Cu, 3.1% Pb, 7.7% Zn
0.46 m - 31.3% CBM
1.4% Cu, 8.6% Pb, 21.3%
Zn, 219 g/t Ag, 2.74 g/t Au
0.24 m - 13.4% CBM (one sample)
1.6% Cu, 1.8% Pb, 10.0% Zn, 26 g/t Ag, 0.38 g/t Au
H-18-3513 - Sandfill Prospect transported sulphides (assays released October 17, 2018)
Upper Zone 7.0 m - 7.4%CBM - 0.69% Cu, 1.58% Pb, 5.15% Zn, 33.5 g/t Ag, & 0.21 g/t Au
incl. 1.0 m - 23.6%CBM - 2.96% Cu, 5.13% Pb, 15.5% Zn, 96 g/t Ag & 0.27 g/t Au
Lower Zone 3.1 m - 6.4%CBM - 0.22% Cu, 1.99% Pb, 4.19% Zn, 52.04 g/t Ag & 0.25 g/t Au
incl. 1.0 m - 17.5%CBM - 0.56% Cu, 5.50% Pb, 11.40 % Zn, 153 g/t Ag & 0.70 g/t Au
H-18-3522 - Middle Branch transported sulphides
0.30 m - 0.23% CBM - 0.07% Pb, 0.16% Zn, 162.8 g/t Ag & 0.054 g/t Au
Sandfill (transported)
H-18-3525
assays pending
Daniels Pond deposit
Bobbys Pond deposit
District Opportunity BuchansResources
Tulks North Property (VLSG)
Advanced Exploration Opportunities
Footwall volcanics
Hanging wall volcanics
Massive to semi-massive
sulphides - Daniels – SW Zone
Approximately
5 metres
BuchansResources
Bobbys
Exploration Potential At Depth
0 m
100 m
200 m
300 m
400 m
500 m
depth m
Relative NSR Value
High
Low
uncategorized
resource block
model
(5x5 m blocks)
Drilled Pierce Point
Bobbys Deposit
LONGITUDINAL VIEW
(looking northwest)
100 m
100m
BP-18-41 (600 m)
Mass. pyrite over 0.85 m with
visible base metal sulphides
(assays pending)
BP-18-40 (328 m)
10-15% pyrite with base
metal sulphides
over 14.8 m (assays
pending)
* 2018 program to include
surveying of new and select
historic drill holes by BHEM
BuchansResources
Excellent depth potential below 300 m
4 m
blue shading &
contours grade (Zn)
x thickness (m)
(contour interval 10 units
& incl. 2008 drill results)
drill hole pierce point
SW Lens NE Lens
100 m
100m
100 m
200 m
300 m
400 m
depth m
DN-52 – 6.1 m
1.2% Zn, 0.2% Pb, 0.2% Cu, 8.4 g/t Ag
500 m
600 m
8 m
12 m
16 m
24 m
4 m 4 m
Massive Pyrite Lobe
Contoured True Thickness (m)
4 m
16 m
proposed hole with Borehole
TDEM search radius (~75 m)
Indicated Resource
Inferred Resource
2008 drill hole - post
2007 resource estimate
(all holes returned low grade
over width, but meet resource
threshold >1% Zn)
500 m
600 m
700 m
Daniels
Exploration Potential At Depth
BuchansResources
DN-18-130 - 3.5 m semi-massive pyritic sulphides
1.5 m - 0.11% Cu, 0.65% Pb, 1.46% Zn, 24.5 g/t Ag & 0.33 g/t Au
incl. 0.5 m - 0.15% Cu, 1.36% Pb, 2.67% Zn 46.6 g/t Ag & 0.23 g/t Au
DN-18-131
8.6 m massive pyrite & 5.70 m semi-
massive pyrite (assays pending)
DN-18-132
~2 m semi-massive pyritic
sulphides (assays pending)
Summary
Buchans Project
• substantial metal inventory with excellent potential for discovery of additional
resources
• underpinned by large, potentially open pitable resource - brownfields setting
• excellent infrastructure - potential access to an existing mill
Looking Forward
• exploration results pending
• drilling - Buchans “other targets” + Bobbys & Daniels deposits
• borehole geophysical surveys
• airborne SkyTEM surveys
• pre-development-related results pending
• updated resource - Lundberg (Q4)…appropriately consider higher-grade
Lucky Strike remnants - may enhance open pit development
• internal scoping study - identify optimum scenarios that could be incorporated
into a new PEA
THANK YOU
Special thanks:
Town of Buchans
Department of Natural Resources - Buchans Core Library
Department of Natural Resources - Junior Exploration Assistance
Lucky Strike
BuchansResources
www.buchansresources.com

More Related Content

What's hot

River & channel protection, short presentation
River & channel protection, short presentationRiver & channel protection, short presentation
River & channel protection, short presentation
Nicola Era
 
Berkwood Resources Corporate Presentation
Berkwood Resources Corporate PresentationBerkwood Resources Corporate Presentation
Berkwood Resources Corporate PresentationBerkwood Resources Ltd.
 
News Release: Commerce Resources Corp. Initiates 2016 Field Program at the A...
News Release:  Commerce Resources Corp. Initiates 2016 Field Program at the A...News Release:  Commerce Resources Corp. Initiates 2016 Field Program at the A...
News Release: Commerce Resources Corp. Initiates 2016 Field Program at the A...
Commerce Resources Corp. (TSXv:CCE)
 
News Release: Commerce Resources Corp. Provides Update on the 2016 Field Pro...
News Release:  Commerce Resources Corp. Provides Update on the 2016 Field Pro...News Release:  Commerce Resources Corp. Provides Update on the 2016 Field Pro...
News Release: Commerce Resources Corp. Provides Update on the 2016 Field Pro...
Commerce Resources Corp. (TSXv:CCE)
 
Buchans Minerals Announce captivating PEA for Lundberg Deposit
Buchans Minerals Announce captivating PEA for Lundberg DepositBuchans Minerals Announce captivating PEA for Lundberg Deposit
Buchans Minerals Announce captivating PEA for Lundberg Deposit
Buchans-Minerals-Corp
 
Aben Resources Ltd. Company Presentation
Aben Resources Ltd. Company PresentationAben Resources Ltd. Company Presentation
Aben Resources Ltd. Company Presentation
Company Spotlight
 

What's hot (6)

River & channel protection, short presentation
River & channel protection, short presentationRiver & channel protection, short presentation
River & channel protection, short presentation
 
Berkwood Resources Corporate Presentation
Berkwood Resources Corporate PresentationBerkwood Resources Corporate Presentation
Berkwood Resources Corporate Presentation
 
News Release: Commerce Resources Corp. Initiates 2016 Field Program at the A...
News Release:  Commerce Resources Corp. Initiates 2016 Field Program at the A...News Release:  Commerce Resources Corp. Initiates 2016 Field Program at the A...
News Release: Commerce Resources Corp. Initiates 2016 Field Program at the A...
 
News Release: Commerce Resources Corp. Provides Update on the 2016 Field Pro...
News Release:  Commerce Resources Corp. Provides Update on the 2016 Field Pro...News Release:  Commerce Resources Corp. Provides Update on the 2016 Field Pro...
News Release: Commerce Resources Corp. Provides Update on the 2016 Field Pro...
 
Buchans Minerals Announce captivating PEA for Lundberg Deposit
Buchans Minerals Announce captivating PEA for Lundberg DepositBuchans Minerals Announce captivating PEA for Lundberg Deposit
Buchans Minerals Announce captivating PEA for Lundberg Deposit
 
Aben Resources Ltd. Company Presentation
Aben Resources Ltd. Company PresentationAben Resources Ltd. Company Presentation
Aben Resources Ltd. Company Presentation
 

Similar to Buchans Resources - Investor Presentation - Buchans Project Update - November 2018

160530 corporate presentation
160530 corporate presentation160530 corporate presentation
160530 corporate presentation
reservoirminerals
 
160603 corporate presentation
160603 corporate presentation160603 corporate presentation
160603 corporate presentation
reservoirminerals
 
Minco AGM 2015
Minco AGM 2015Minco AGM 2015
Minco AGM 2015
Minco Plc
 
Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017
MomentumPR
 
Augusta Resource Investor Presentation
Augusta Resource Investor PresentationAugusta Resource Investor Presentation
Augusta Resource Investor Presentation
Company Spotlight
 
Benton April 2022 presentation.pdf
Benton April 2022 presentation.pdfBenton April 2022 presentation.pdf
Benton April 2022 presentation.pdf
CHF Investor Relations
 
BRL - Investor Presentation - May 2024.pdf
BRL - Investor Presentation - May 2024.pdfBRL - Investor Presentation - May 2024.pdf
BRL - Investor Presentation - May 2024.pdf
Tyler Hosey
 
Special General Meeting Presentation
Special General Meeting PresentationSpecial General Meeting Presentation
Special General Meeting Presentation
NovaCopper
 
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
Objective Capital Conferences
 
Boulder muligheder Paleo-kanal guld opdagelse
Boulder muligheder Paleo-kanal guld opdagelseBoulder muligheder Paleo-kanal guld opdagelse
Boulder muligheder Paleo-kanal guld opdagelse
cody0yang96
 
1911 Gold Corp Presentation (Sept 2022).pdf
1911 Gold Corp Presentation (Sept 2022).pdf1911 Gold Corp Presentation (Sept 2022).pdf
1911 Gold Corp Presentation (Sept 2022).pdf
Shaun Heinrichs
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
AlderResources
 
Brixton presentation 2015 June
Brixton presentation 2015 JuneBrixton presentation 2015 June
Brixton presentation 2015 June
Brixton Metals Corporation
 
Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020
MomentumPR
 
160111 corp presentation
160111 corp presentation160111 corp presentation
160111 corp presentation
reservoirminerals
 
Alder Presentation
Alder PresentationAlder Presentation
Alder Presentation
AlderResources
 
CBH Resources - Resources & Energy Symposium 2012
CBH Resources - Resources & Energy Symposium 2012CBH Resources - Resources & Energy Symposium 2012
CBH Resources - Resources & Energy Symposium 2012Symposium
 
Why invest in zinc
Why invest in zincWhy invest in zinc
Why invest in zinc
Elena Ivanova
 
Alder Presentation October 2014
Alder Presentation October 2014Alder Presentation October 2014
Alder Presentation October 2014
AlderResources
 

Similar to Buchans Resources - Investor Presentation - Buchans Project Update - November 2018 (20)

160530 corporate presentation
160530 corporate presentation160530 corporate presentation
160530 corporate presentation
 
160603 corporate presentation
160603 corporate presentation160603 corporate presentation
160603 corporate presentation
 
Minco AGM 2015
Minco AGM 2015Minco AGM 2015
Minco AGM 2015
 
Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017Puma Exploration Corporate Presentation November 2017
Puma Exploration Corporate Presentation November 2017
 
Augusta Resource Investor Presentation
Augusta Resource Investor PresentationAugusta Resource Investor Presentation
Augusta Resource Investor Presentation
 
Benton April 2022 presentation.pdf
Benton April 2022 presentation.pdfBenton April 2022 presentation.pdf
Benton April 2022 presentation.pdf
 
BRL - Investor Presentation - May 2024.pdf
BRL - Investor Presentation - May 2024.pdfBRL - Investor Presentation - May 2024.pdf
BRL - Investor Presentation - May 2024.pdf
 
Special General Meeting Presentation
Special General Meeting PresentationSpecial General Meeting Presentation
Special General Meeting Presentation
 
Skyharbour jun13pres
Skyharbour jun13presSkyharbour jun13pres
Skyharbour jun13pres
 
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
Stefan Wozniak: Opportunities in Ontario (Day 2 - Session 5: Global Hotspots)
 
Boulder muligheder Paleo-kanal guld opdagelse
Boulder muligheder Paleo-kanal guld opdagelseBoulder muligheder Paleo-kanal guld opdagelse
Boulder muligheder Paleo-kanal guld opdagelse
 
1911 Gold Corp Presentation (Sept 2022).pdf
1911 Gold Corp Presentation (Sept 2022).pdf1911 Gold Corp Presentation (Sept 2022).pdf
1911 Gold Corp Presentation (Sept 2022).pdf
 
Corporate Presentation February 2015
Corporate Presentation February 2015Corporate Presentation February 2015
Corporate Presentation February 2015
 
Brixton presentation 2015 June
Brixton presentation 2015 JuneBrixton presentation 2015 June
Brixton presentation 2015 June
 
Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020
 
160111 corp presentation
160111 corp presentation160111 corp presentation
160111 corp presentation
 
Alder Presentation
Alder PresentationAlder Presentation
Alder Presentation
 
CBH Resources - Resources & Energy Symposium 2012
CBH Resources - Resources & Energy Symposium 2012CBH Resources - Resources & Energy Symposium 2012
CBH Resources - Resources & Energy Symposium 2012
 
Why invest in zinc
Why invest in zincWhy invest in zinc
Why invest in zinc
 
Alder Presentation October 2014
Alder Presentation October 2014Alder Presentation October 2014
Alder Presentation October 2014
 

Recently uploaded

Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
New Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptxNew Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptx
RajkumarRajamanikam
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
Sysco_Investors
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 

Recently uploaded (8)

Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
New Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptxNew Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptx
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 

Buchans Resources - Investor Presentation - Buchans Project Update - November 2018

  • 1. BuchansResources Limited Buchans VMS Project, Newfoundland - Update November 2018
  • 2. Forward-Looking Statements Buchans Resources Limited (“Buchans” or the “Company”) has prepared this presentation for information purposes only. The information contained herein was prepared by management on a best efforts basis and is believed to be accurate. This presentation contains or refers to "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements in this release, other than statements of historical fact, which address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future are forward-looking information. Wherever possible, words such as "plans", "expects" or "does not expect", "budget", "scheduled", "estimates", "forecasts", "anticipates" or "does not anticipate", "believes", "intends" and similar expressions or statements that certain actions, events or results "may", "could", " "would", "might" or "will" be taken, occur or be achieved, have been used to identify forward-looking information. In particular, all statements in this presentation that address estimated resource quantities, grades and contained metals, possible future mining, and exploration and development activities are forward looking statements. Forward-looking statements are subject to risks, uncertainties and other factors that could cause actual results to differ materially from expected results. Shareholders and prospective investors are cautioned not to place undue reliance on forward- looking information. By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur. The Company undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law. This presentation may contain certain information derived from official government publications, industry sources and third parties. While we believe inclusion of such information is reasonable, such information has not been independently verified by us or our advisers, and no representation is given as to its accuracy or completeness. The TSX Venture Exchange nor any other exchange has reviewed and nor do they accept responsibility for the adequacy or accuracy of material presented in this document. BuchansResources
  • 3. Outline • Company Introduction • Project Background • Current Strategy & 2018 Program • Results • where we are headed… BuchansResources • a new company formed from base metal assets spun out of Minco Plc after Minco taken over by Dalradian Resources (Aug-2017) • Not Currently Listed - “… postpone the planned listing of the Company’s shares pending more favourable market conditions.” • … continue in good standing as a Reporting Issuer in the Provinces of British Columbia, Alberta, Nova Scotia, and Newfoundland & Labrador… in compliance with…Securities Acts and Regulations in Canada…including NI 43-101… public filings available on SEDAR BuchansResources Limited (formerly Minco Plc)
  • 4. International Presence: Trans-Atlantic Resource Opportunities Toronto North Pennine Orefield (Zn-Pb-Ag) Exploration Irish-Type Zn-Pb Buchans (Zn-Pb-Cu-Ag-Au)  PEA & Exploration  historic mining district  very high-grade VMS deposits Woodstock (Mn)  PEA Plymouth deposit (Mn carbonate) Xtierra Ag-Zn-Pb (22% - TSXV:XAG)  PEA Bilbao (skarn)  Laguna Project (Ag-Tailings) BuchansResources Irish Midland Orefield (Zn-Pb-Ag)  Moate – Exploration Irish-Type Zn-Pb  Navan – JV Tara Boliden (adjacent - Boliden’s Tara Mine)
  • 5. Volcanic/epiclastic rocks Ophiolite Deposits >200,000 tonnes (production and/or reserves) AVALON ZONE CENTRAL MOBILE BELT St. John’s • Buchans Resources controls several undeveloped deposits (Ord. - Buchans Group & Cambro-Ord. Victoria Lake Group) (after Swinden,1991 and Evans & Kean, 2002) 100 km Buchans VMS Camp BuchansResources Buchans
  • 6. BUCHANS PROJECT - BACKGROUND BuchansResources Asarco - 16.2 Mt - 23.4% CBM - 14.5%Zn, 7.6%Pb, 1.3%Cu, 1.37g/t Au, 126g/t Ag (mined 1928-84) • 2007 - resources left behind - large resource - lower-grade stockwork - potential for open pit development - Lundberg • 2008 - Inferred Resource - Lundberg • 2011 - Positive PEA (Inferred Resource - Lundberg) • 2013 - expanded & upgraded to Indicated & Inferred resources - Lundberg • 2017 - RDC metallurgical study (Lundberg + district’s satellite deposits - central mill)
  • 7. Map Area District Opportunity Cambro-Ord. Volc. Millertown BuchansResources 20 km Buchans Buchans Resources Properties Canadian Zinc Properties NI 43-101 Compliant Resource Historic mine Boomerang Deposits 100% NZC (1% Zn cut-off) Indicated - 1.36 Mt @ 7.1% Zn, 3.0% Pb, 0.5% Cu, 110.4 g/t Ag, 1.7 g/t Au Inferred - 0.28 Mt @ 6.7% Zn, 2.9% Pb, 0.4% Cu, 96.5 g/t Ag, 1.3 g/t Au Domino (Inferred) – 0.41 Mt @ 6.3% Zn, 2.8% Pb, 0.4% Cu, 94 g/t Ag, 0.6 g/t Au Hurricane (Inferred) – 0.06 Mt @ 13.4% Zn, 7.0% Pb, 1.2% Cu, 159 g/t Ag, 0.9 g/t Au Lundberg – 100% BRL Indicated – 23.4 Mt @ 1.41% Zn, 0.60% Pb, 0.35% Cu, 5.31 g/t Ag, 0.07 g/t Au Inferred – 4.3 Mt @ 1.29% Zn, 0.54% Pb, 0.27% Cu, 4.47g/t Ag & 0.08 g/t Au ($15US NSR cut-off) Bobbys Pond (1.1% CuEq) - 100% BRL Indicated - 1.1 Mt @ 4.6% Zn, 0.4% Pb, 0.9% Cu, 16.6 g/t Ag, 0.2 g/t Au Inferred- 1.2 Mt @ 3.8% Zn, 0.3% Pb, 1.0% Cu, 11.0 g/t Ag & 0.06 g/t Au Lemarchant 100% NZC (4% zinc equiv. cut-off) Indicated - 2.42 Mt @ 6.2% Zn, 1.6% Pb, 0.7% Cu, 64.0 g/t Ag, 1.22 g/t Au Inferred – 0.56 Mt @ 4.7% Zn, 1.1% Pb, 0.5% Cu, 44.7 g/t Ag, 1.1 g/t Au Daniels – 100% BRL Indicated-0.93 Mt @ 5.1% Zn, 2.5% Pb, 0.3% Cu, 101.4 g/t Ag, 0.6 g/t Au Inferred- 0.33 Mt @ 4.6% Zn, 2.1% Pb, 0.3% Cu, 85.9 g/t Ag, 0.53 g/t Au (2% Zn cut-off) Long Lake 100% NZC (using a 7.0% zinc equiv. cut-off) Indicated – 0.41 Mt @ 7.8% Zn, 1.6% Pb, 1.0% Cu, 49 g/t Ag, 0.57 g/t Au Inferred – 0.08 Mt @ 5.8% Zn, 1.2% Pb, 0.7% Cu, 34 g/t Ag, 0.48 g/t Au Duck Pond Mine (past prod.) 5.0 Mt @ 4.4% Zn, 2.7% Cu, 53 g/t Ag, 0.6 g/t Au (Teck, 2007-15) Buchans (past prod.) 16.2 Mt 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag (Asarco, 1928-1984) Tulks Hill – 49% BRL:51% Prominex Indicated-0.43 Mt @ 4.0% Zn, 1.6% Pb, 0.9% Cu, 35.1 g/t Ag, 1.2 g/t Au (1.1% CuEq)
  • 8. 0 500 1,000 1,500 2,000 2,500 Zn (lbs) Pb (lbs) Cu (lbs) 851 361 207 1,179 357 136 2,030 718 342 Millions - District hosts >2 billion lbs Zn, >700 million lbs Pb, & >300 million lbs Cu - Lundberg hosts more than half district’s Cu & Pb, and almost as much Zn as all other deposits combined * combined Indicated & Inferred resources Lundberg – District’s Pivotal deposit Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be considered for estimation of mineral reserves, and there is no certainty that inferred mineral resources will be realized. BuchansResources District Total VLSG (all NI 43-101) Lundberg
  • 9. metallurgy - recoveries 2PEA based on Inferred Mineral Resources, not Mineral Reserves, and do not have demonstrated economic viability. Inferred Mineral Resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is therefore no certainty that the conclusions of the PEA will be realized. PEA assumptions: metal prices - ($US) $1.22 Zn/lb, $1.10 Pb/lb, $3.62 Cu/lb, $22.74 Ag/oz; Exchange Rate: $1.012 CAN$:US$. 1Resources that are not mineral reserves do not have demonstrated economic viability. Resource Estimate reported from: Technical Report prepared by Michael Cullen, P. Geo. & Andrew Hilchey, P.Geo., of Mercator Geological Services Limited. * “cut off” based on operating & processing costs estimated by Tetra Tech (2011 PEA). Feb 2013 - 3yr trailing average metal prices: $0.95 /lb Zn, $1.00 /lb Pb, $3.68 /lb Cu, $29.00 /oz Ag, $1,493.65 /oz Au. LUNDBERG RESOURCE BuchansResources processing - central mill upgraded resource open pit – bulk tonnage Since 2011…
  • 10. Red Indian Lake deposits (past producers-projected to surface) sulphide prospects favourable alteration 5 km Lundberg (near surface - stockwork) below Lucky Strike (massive sulphides) Outline of Buchans Camp rocks after GSC 2016 Buchans camp rocks BUCHANS Lundberg Deposit Asarco mined 16.2 Mt 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag (1928-1984) - 80% historic production from Buchans Resources property - BuchansResources
  • 11. Schematic block diagram of the MacLean channel, Lucky Strike area, illustrating hydrothermal vents along synvolcanic faults, diatreme activity associated with subvolcanic plutonic body, ore bearing slumps and debris flows (modified after Kirkham and Thurlow, 1987; and Thurlow, 2001). stockwork ore sulphide-rich vein networks (2-6% Zn-Pb-Cu) (not mined) transported ore debris flow deposits (16-22% Zn-Pb-Cu) (52% of ore mined) VMS DEPOSITS (Buchans model) BuchansResources in situ ore massive sulphides (25-28% Zn-Pb-Cu) (48% of ore mined)
  • 13. Lundberg H-3356 – 37 m LUNDBERG STOCKWORK DEPOSIT BuchansResources
  • 14. 200 m Resource Limits - projected to surface 2012 drill hole Previous surface drill hole Workings projected to surface 2013 – Indicated & Inferred (US$15 NSR) Historic underground drill hole 2008 drill hole Lundberg Zone 14 BuchansResources Lundberg Engine House Zone *Figure excludes holes drilled after 2012
  • 15. Section A (looking Northeast) 0 m 200 m 400 m NW SE 700 m 2013 Resource Model ($15 US cut off) $0.95 lb Zn $1.00 lb Pb $3.68 lb Cu $29.00 oz Ag $1,493.65 oz Au LUNDBERG Bulk Tonnage Resource 15 to 25 25 to 50 50 to 75 75 to 100 100 to 150 NSR ($ US) >150 resource blocks 5 m includes Indicated & Inferred (2013 Resource Block Model) * excludes holes drilled after 2012 BuchansResources Lundberg 300 m old workings Two Level glory hole old workings Lucky Strike
  • 16. SW NE 2013 Resource Model ($15 US cut off) $0.95 lb Zn $1.00 lb Pb $3.68 lb Cu $29.00 oz Ag $1,493.65 oz Au LUNDBERG Bulk Tonnage Resource 15 to 25 25 to 50 50 to 75 75 to 100 100 to 150 NSR ($ US) >150 BuchansResources 0 m 200 m 400 m 300 m 400 m Section B (looking Northwest) Lundberg glory hole old workings - Lucky Strike resource blocks 5 m includes Indicated & Inferred (2013 Resource Block Model) * excludes holes drilled after 2012
  • 17. NW SE 2013 Resource Model ($15 US cut off) $0.95 lb Zn $1.00 lb Pb $3.68 lb Cu $29.00 oz Ag $1,493.65 oz Au LUNDBERG Bulk Tonnage Resource 15 to 25 25 to 50 50 to 75 75 to 100 100 to 150 NSR ($ US) >150 old workings Lucky Strike old workings – Engine House BuchansResources glory hole 0 m 200 m 400 m 300 m 300 m Section C (looking Northeast) Engine House resource blocks 5 m3 includes Indicated & Inferred (2013 Resource Block Model) * excludes holes drilled after 2012
  • 18. SW NE 2013 Resource Model ($15 US cut off) $0.95 lb Zn $1.00 lb Pb $3.68 lb Cu $29.00 oz Ag $1,493.65 oz Au LUNDBERG Bulk Tonnage Resource 15 to 25 25 to 50 50 to 75 75 to 100 100 to 150 NSR ($ US) >150 BuchansResources 0 m 200 m 400 m 300 m 300 m Section D (looking Northwest) Engine House resource blocks 5 m3 includes Indicated & Inferred (2013 Resource Block Model) * excludes holes drilled after 2012
  • 19. 2018 PROGRAM • Drilling (~8,000 m) • Borehole Geophysical Surveys • SkyTEM AEM surveys (~1,000 line km) • Lundberg – Updated Resource Estimate (fill in gaps in the 2013 resource) • Lundberg - Internal Scoping Study...recent technical inputs - since 2011 PEA STRATEGY • continue to advance evaluation of Lundberg - incorporating improve results - recent work completed since 2011 PEA (expanded resource, improved metallurgy, milling options) • explore for additional nearby resources that could complement Lundberg BUCHANS PROJECT LUNDBERG • substantial base metal inventory – large potentially open pitable resource • brownfield site - excellent infrastructure • potential access - existing mill (65 km road) Mill (~2,000 t/d mill) BuchansResources
  • 20. SkyTEM AEM Surveys ~1,000 ln km in 2 blocks some areas - 1st AEM since 1980’s 2018 Program Exploration BuchansResources Buchans Resources Properties NI 43-101 Compliant Resource Historic mine Cambro-Ord. Volc. Millertown 10 km Buchans Bobbys Deposit Daniels Deposit Lundberg Deposit Buchans Drilling (5,200 m) 2,200 m - Lundberg - (16 ddh) 3,000 m - “other targets” – (10 ddh) Tulks North Drilling (2,800 m) 1,100 m - Bobbys - (2 ddh) 1,700 m – Daniels - (3 ddh) BHEM surveys Buchans & Tulks North exploration potential at depth
  • 21. underground workings projected to surface 100 m BuchansResources2018 Results – Lundberg Resource Drilling 1.0 m - 21.99% CBM & 1.8 m - 32.22% CBM 0.10 m - 36.53% CBM 4.8 m - 15.48% CBM 23.8 m - 9.11% CBM incl. 8.0 m - 20.38% CBM 0.5 m - 5.22% CBM N 2013 Lundberg Resource Outline 28.0 m - 2.63% CBM 152.0 m - 2.49% CBM 0.8 m - 1.7% CBM 29.0 m - 1.86% CBM 6.0 m - 1.23% CBM 10.0 m - 1.0% CBM wk. min. wk. min. wk. min. wk. min. 35.7 m - 2.57% CBM 8.9 m - 3.93% CBM & 64.0 m - 1.25% CBM 34.7 m - 4.53% CBM incl. 23.0 m - 6.18% CBM 4.0 m 19.61% CBM 0.8 m 24.95% CBM 2.7 m 9.87% CBM 2.65 m 4.61% CBM 5.05 m 5.98% CBM 0.94 m 12.04% CBM 2018 drill hole (angle hole) 2007-12 drill hole historic surface/ underground hole topographic contours 2 m 2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade mineralization above Lundberg may ultimately enhance - open pit development... %CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
  • 22. underground workings projected to surface 100 m BuchansResources2018 Results – Lundberg Resource Drilling N 2013 Lundberg Resource Outline 28.0 m - 2.63% CBM 152.0 m - 2.49% CBM 0.8 m - 1.7% CBM 29.0 m - 1.86% CBM 6.0 m - 1.23% CBM 10.0 m - 1.0% CBM wk. min. wk. min. wk. min. wk. min. 35.7 m - 2.57% CBM 8.9 m - 3.93% CBM & 64.0 m - 1.25% CBM 34.7 m - 4.53% CBM incl. 23.0 m - 6.18% CBM 2018 drill hole (angle hole) 2007-12 drill hole historic surface/ underground hole topographic contours 2 m 2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade mineralization above Lundberg may ultimately enhance - open pit development... %CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
  • 23. underground workings projected to surface 100 m BuchansResources2018 Results – Lundberg Resource Drilling 1.0 m - 21.99% CBM & 1.8 m - 32.22% CBM 0.10 m - 36.53% CBM 4.8 m - 15.48% CBM 23.8 m - 9.11% CBM incl. 8.0 m - 20.38% CBM 0.5 m - 5.22% CBM N 2013 Lundberg Resource Outline 4.0 m 19.61% CBM 0.8 m 24.95% CBM 2.7 m 9.87% CBM 2.65 m 4.61% CBM 5.05 m 5.98% CBM 0.94 m 12.04% CBM 2018 drill hole (angle hole) 2007-12 drill hole historic surface/ underground hole topographic contours 2 m 2014-15 drill hole …although further work is needed, we believe availability of remnant high-grade mineralization above Lundberg may ultimately enhance - open pit development... %CBM- combined Cu+Pb+Zn% - complete assays available on www.buchansresources.com
  • 24. 100 m 2013 Lundberg Resource Outline Two Level underground workings projected to surface BuchansResources Lucky Strike Drilling N 2018 BRL drill hole 2007-15 BRL drill hole historic surface/ underground hole topographic contours 2 m H-18-3500 (-58°) H-18-3501 H-18-3502 H-18-3503 H-18-3504 H-18-3505 H-18-3506 (-45°) H-18-3516b (-45°) H-18-3515 (-84°) H-18-3520 H-18-3519 H-18-3514 H-18-3521 H-18-3518 (-48°) H-18-3526 in progress H-18-3523 - no significant mineralization horizon faulted out at this location H-18-3524 1.80 m 9.48% CBM 0.76% Cu, 3.15% Pb, 5.57% Zn, 90.5 g/t Ag & 0.37 g/t Au incl. 1.00 m 14.83% CBM 1.26% Cu, 4.87% Pb, 8.70% Zn, 133.2 g/t Ag & 0.47 g/t Au Two Level (proximal-transported) 0.30 Mt - 0.5% Cu, 4.6% Pb, 8.0% Zn, 125 g/t Ag, 1.6 g/t Au (mined) North Orebody (proximal-transported) 0.55Mt @ 0.5% Cu, 4.5% Pb, 8.2% Zn, 123 g/t Ag, 1.7 g/t Au (mined)
  • 25. 1 km N Lucky Strike others others BRL BRL BRL BRL Sandfill (transported) Oriental Lundberg Sandfill Target Area Clementine Target Area Oriental East Target Area West Orebodies Target Area Lucky Strike North Target Area Middle Branch Target Area Old Buchans North Target Area BuchansResources2018 Drilling Other Target Areas “other targets” 2018 drilling Target Areas (relogging) Orebodies (historic/ mined out) (mined 1928-1984 - 16.2 M tonnes 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag Stringer Mineralization (projected to surface) Prospect (undeveloped, projected to surface) Lundberg & Engine House Zone (projected to surface) Lundberg Model Open Pit
  • 26. 500 m breccia-tuffs conglomerate (granite cobbles) Sandfill Prospect – 2018 Drilling BuchansResources thrust panel - “other rocks” (above Buchans rocks) BRL other Lundberg (stockwork) Lucky Strike (in situ & proximal-transported) 5.6 Mt @ 1.6% Cu, 8.6% Pb, 18.4% Zn, 112 g/t Ag, 1.7 g/t Au (mined) Middle Branch (transported) (hist. intercept) 1.8 m - 0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag & 0.7 g/t Au Oriental (in situ & transported) 3.3 Mt -1.47% Cu, 7.90% Pb, 14.18% Zn, 154.0 g/t Ag & 1.96 g/t Au (mined) Sandfill (transported) (historic, non-43-101 compliant) 68,000 tonnes – 1.5% Cu, 4.7% Pb, 10.0% Zn, 85.7 g/t Ag & 0.34 g/t Au Buchans Lake
  • 27. 500 m barren rocks thrust over prospective Buchans rocks Middle Branch (transported) H-1910 (historic) 1.83 m - 8.3% CBM (0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag, 0.69 g/t Au) 1582 3350 BuchansResources 2018 Sandfill Drilling - Buchans Thrust Fault Ski Hill (basalt/ intermediate fragmentals) Geology Sandy Lake (prominent qtz rhyolite/ arkose/basalt) Diabase Buchans River (rhyolite/ m.sulphs./ basalt/ felsic tuffs Surface/ underground DDH & historic assays BRL DDH (2007-15) 2018 BRL drill hole N too shallow too shallow too shallow too shallow? min. debris min. debris limits - transported sulphides (projected to surface) 3.1 m - 2.4% CBM 0.1% Cu, 0.7% Pb, 1.6% Zn, 7 g/t Ag 1.52 m - 4.9% CBM 0.3% Cu, 2.0% Pb, 2.6% Zn, 93 g/t Ag, 1.03 g/t Au 1.22 m - 17.7% CBM 0.2% Cu, 3.9% Pb, 13.7% Zn, 62 g/t Ag, 1.20 g/t Au 3.35 m - 21.7% CBM 2.6% Cu, 6.5% Pb, 12.6% Zn, 87 g/t Ag, 0.34 g/t Au 3.66 m - 11.2% CBM 0.5% Cu, 3.1% Pb, 7.7% Zn 0.46 m - 31.3% CBM 1.4% Cu, 8.6% Pb, 21.3% Zn, 219 g/t Ag, 2.74 g/t Au 0.24 m - 13.4% CBM (one sample) 1.6% Cu, 1.8% Pb, 10.0% Zn, 26 g/t Ag, 0.38 g/t Au H-18-3513 - transported sulphides - 7.0 m - 7.4% CBM Upper Zone incl. 1.0 m - 23.6%CBM - 2.96% Cu, 5.13% Pb, 15.5% Zn, 96 g/t Ag & 0.27 g/t Au and 3.10 m - 6.4% CBM Lower Zone incl. 1.0 m - 17.5%CBM - 0.56% Cu, 5.50% Pb, 11.40 % Zn, 153 g/t Ag & 0.70 g/t Au assays pending Sandfill (transported) narrow diam. drilling 300-400 m depth - 25-35 m OB assays pending
  • 28. 500 m barren rocks thrust over prospective Buchans rocks Middle Branch (transported) H-1910 (historic) 1.83 m - 8.3% CBM (0.4% Cu, 3.1% Pb, 4.8% Zn, 48 g/t Ag, 0.69 g/t Au) 1582 3350 BuchansResources Sandfill - Middle Branch Drilling Buchans - 2018 Thrust Fault Ski Hill (basalt/ intermediate fragmentals) Geology Sandy Lake (prominent qtz rhyolite/ arkose/basalt) Diabase Buchans River (rhyolite/ m.sulphs./ basalt/ felsic tuffs Surface/ underground DDH & historic assays BRL DDH (2007-15) 2018 BRL drill hole N too shallow too shallow 3.1 m - 2.4% CBM 0.1% Cu, 0.7% Pb, 1.6% Zn, 7 g/t Ag 1.52 m - 4.9% CBM 0.3% Cu, 2.0% Pb, 2.6% Zn, 93 g/t Ag, 1.03 g/t Au 1.22 m - 17.7% CBM 0.2% Cu, 3.9% Pb, 13.7% Zn, 62 g/t Ag, 1.20 g/t Au 3.35 m - 21.7% CBM 2.6% Cu, 6.5% Pb, 12.6% Zn, 87 g/t Ag, 0.34 g/t Au 3.66 m - 11.2% CBM 0.5% Cu, 3.1% Pb, 7.7% Zn 0.46 m - 31.3% CBM 1.4% Cu, 8.6% Pb, 21.3% Zn, 219 g/t Ag, 2.74 g/t Au 0.24 m - 13.4% CBM (one sample) 1.6% Cu, 1.8% Pb, 10.0% Zn, 26 g/t Ag, 0.38 g/t Au H-18-3513 - Sandfill Prospect transported sulphides (assays released October 17, 2018) Upper Zone 7.0 m - 7.4%CBM - 0.69% Cu, 1.58% Pb, 5.15% Zn, 33.5 g/t Ag, & 0.21 g/t Au incl. 1.0 m - 23.6%CBM - 2.96% Cu, 5.13% Pb, 15.5% Zn, 96 g/t Ag & 0.27 g/t Au Lower Zone 3.1 m - 6.4%CBM - 0.22% Cu, 1.99% Pb, 4.19% Zn, 52.04 g/t Ag & 0.25 g/t Au incl. 1.0 m - 17.5%CBM - 0.56% Cu, 5.50% Pb, 11.40 % Zn, 153 g/t Ag & 0.70 g/t Au H-18-3522 - Middle Branch transported sulphides 0.30 m - 0.23% CBM - 0.07% Pb, 0.16% Zn, 162.8 g/t Ag & 0.054 g/t Au Sandfill (transported) H-18-3525 assays pending
  • 29. Daniels Pond deposit Bobbys Pond deposit District Opportunity BuchansResources
  • 30. Tulks North Property (VLSG) Advanced Exploration Opportunities Footwall volcanics Hanging wall volcanics Massive to semi-massive sulphides - Daniels – SW Zone Approximately 5 metres BuchansResources
  • 31. Bobbys Exploration Potential At Depth 0 m 100 m 200 m 300 m 400 m 500 m depth m Relative NSR Value High Low uncategorized resource block model (5x5 m blocks) Drilled Pierce Point Bobbys Deposit LONGITUDINAL VIEW (looking northwest) 100 m 100m BP-18-41 (600 m) Mass. pyrite over 0.85 m with visible base metal sulphides (assays pending) BP-18-40 (328 m) 10-15% pyrite with base metal sulphides over 14.8 m (assays pending) * 2018 program to include surveying of new and select historic drill holes by BHEM BuchansResources
  • 32. Excellent depth potential below 300 m 4 m blue shading & contours grade (Zn) x thickness (m) (contour interval 10 units & incl. 2008 drill results) drill hole pierce point SW Lens NE Lens 100 m 100m 100 m 200 m 300 m 400 m depth m DN-52 – 6.1 m 1.2% Zn, 0.2% Pb, 0.2% Cu, 8.4 g/t Ag 500 m 600 m 8 m 12 m 16 m 24 m 4 m 4 m Massive Pyrite Lobe Contoured True Thickness (m) 4 m 16 m proposed hole with Borehole TDEM search radius (~75 m) Indicated Resource Inferred Resource 2008 drill hole - post 2007 resource estimate (all holes returned low grade over width, but meet resource threshold >1% Zn) 500 m 600 m 700 m Daniels Exploration Potential At Depth BuchansResources DN-18-130 - 3.5 m semi-massive pyritic sulphides 1.5 m - 0.11% Cu, 0.65% Pb, 1.46% Zn, 24.5 g/t Ag & 0.33 g/t Au incl. 0.5 m - 0.15% Cu, 1.36% Pb, 2.67% Zn 46.6 g/t Ag & 0.23 g/t Au DN-18-131 8.6 m massive pyrite & 5.70 m semi- massive pyrite (assays pending) DN-18-132 ~2 m semi-massive pyritic sulphides (assays pending)
  • 33. Summary Buchans Project • substantial metal inventory with excellent potential for discovery of additional resources • underpinned by large, potentially open pitable resource - brownfields setting • excellent infrastructure - potential access to an existing mill Looking Forward • exploration results pending • drilling - Buchans “other targets” + Bobbys & Daniels deposits • borehole geophysical surveys • airborne SkyTEM surveys • pre-development-related results pending • updated resource - Lundberg (Q4)…appropriately consider higher-grade Lucky Strike remnants - may enhance open pit development • internal scoping study - identify optimum scenarios that could be incorporated into a new PEA THANK YOU Special thanks: Town of Buchans Department of Natural Resources - Buchans Core Library Department of Natural Resources - Junior Exploration Assistance Lucky Strike BuchansResources www.buchansresources.com