This project built a wood revetment 500 feet from the toe of the Steelhead haven landslide thereby reducing fine sediment inputs into the North Fork Stillaguamish. A sediment retention pond was also constructed to capture surface erosion off of the landslide, also reducing fine sediment inputs into the North Fork Stillaguamish River.
This project built a wood revetment 500 feet from the toe of the Steelhead haven landslide thereby reducing fine sediment inputs into the North Fork Stillaguamish. A sediment retention pond was also constructed to capture surface erosion off of the landslide, also reducing fine sediment inputs into the North Fork Stillaguamish River.