This document provides guidance for architecture students on developing their thesis projects. It discusses choosing a topic and problem area, formulating goals and objectives, determining the scope and limitations of the study, and the importance of the thesis. Key points covered include identifying an architectural problem to solve; conducting background research; outlining goals to address the problem through an architectural solution; defining what will and won't be covered within available resources and time constraints; and discussing how the thesis could potentially benefit architecture or society. The document emphasizes establishing a clear direction and focus for the thesis from the introduction onward, and relating all aspects of the study back to achieving an architectural outcome.