What is Architectural BIM Service ?
Architectural BIM Service is a digital approach
to design and Drafting that involves creating
accurate and detailed 3D models of buildings
using Building Information Modeling (BIM)
software. This helps architects to better
understand the design, improve collaboration
among stakeholders, coordinate different
systems and components of the building,
perform various analysis, and create detailed
and accurate documentation.
Architectural BIM Service - Offshore Outsourcing India
Offshore Outsourcing India seamlessly
integrates IT and CAD-based services to
provide comprehensive solutions with our
advanced technological expertise, dedicated
engineers, and technicians. As a leading CAD-
based firm, we offer a wide range of BIM
services to the industry, driving us towards
success and glory. Our skilled and experienced
team of experts can handle complex projects
and minor improvisations with ease.
Our Architectural Services:
1. BIM Coordination Drawings
2. Architecture BIM Services
3. Structural BIM Services
4. HVAC BIM Services
5. Plumbing BIM Services
6. Electrical BIM Services
7. BIM 4D Modeling Services
8. BIM 5D Modeling Services
9. BIM Detailing
10. MEP BIM
BIM Coordination Drawings
BIM coordination drawings are 2D or 3D
representations of a building's systems
and components, created using Building
Information Modeling (BIM) software.
These drawings help ensure that all
elements of the building's design are
properly coordinated and clash-free before
construction begins. They also facilitate
collaboration among different
stakeholders, such as architects,
engineers, and contractors. BIM
coordination drawings can include
elements such as HVAC systems,
plumbing, electrical systems, and
structural elements.
Architecture BIM Services
Architecture BIM services are a set of
digital design and documentation solutions
that use Building Information Modeling
(BIM) technology to create and manage
architectural designs. These services
allow architects to design and visualize
their ideas in 3D, collaborate with other
project stakeholders, and generate
detailed documentation for construction.
Architecture BIM services can include
services such as BIM modeling, clash
detection, quantity takeoff, construction
documentation, and 3D visualization.
BIM 4D Modeling Services
BIM 4D modeling involves the integration
of a Design schedule with a 3D model of a
building. This allows stakeholders to
visualize the construction process and
identify potential conflicts and delays. By
simulating the Modelling sequence,
architects, engineers, and contractors can
optimize the construction process and
improve project coordination and
communication.
BIM 5D Modeling Services
BIM 5D modeling services are a type of
Building Information Modeling (BIM)
service that includes the dimension of cost
in addition to time and 3D geometry. It
allows project stakeholders to visualize
and track the cost of Modelling activities
over time. With 5D BIM modeling,
architects, engineers, and contractors can
improve project cost estimation accuracy,
track changes in real-time, and identify
potential cost overruns.
Our Process of Architectural BIM Service
● Illustrative Design
● Exterior and Interior view of the building
● 3D Visualization
● Intelligent Libraries
● Design Development of Elevations, floor plans , and building schemes
● Information of material specifications, quantities, time schedules, and costs
● Building Sections
● Circulation Details
● Details of Construction
Why Choose Us ?
● Improved Design Quality
● Efficient Deliverance
● Reduction of Risk Factors
● Enhanced design collaboration
● Cost effective prices
● Data Confidentiality
● Licensed and certified professionals
● Flexible business plans
Contact Information
Website : www.offshoreoutsourcing-india.com
Email : info@offshoreoutsourcing-india.com
Phone : + 1 (763) 270-8285
Architectural BIM Service.pptx

Architectural BIM Service.pptx

  • 1.
    Architectural BIM Service OFFSHOREOUTSOURCING - INDIA www.offshoreoutsourcing-india.com
  • 2.
    What is ArchitecturalBIM Service ? Architectural BIM Service is a digital approach to design and Drafting that involves creating accurate and detailed 3D models of buildings using Building Information Modeling (BIM) software. This helps architects to better understand the design, improve collaboration among stakeholders, coordinate different systems and components of the building, perform various analysis, and create detailed and accurate documentation.
  • 3.
    Architectural BIM Service- Offshore Outsourcing India Offshore Outsourcing India seamlessly integrates IT and CAD-based services to provide comprehensive solutions with our advanced technological expertise, dedicated engineers, and technicians. As a leading CAD- based firm, we offer a wide range of BIM services to the industry, driving us towards success and glory. Our skilled and experienced team of experts can handle complex projects and minor improvisations with ease.
  • 4.
    Our Architectural Services: 1.BIM Coordination Drawings 2. Architecture BIM Services 3. Structural BIM Services 4. HVAC BIM Services 5. Plumbing BIM Services 6. Electrical BIM Services 7. BIM 4D Modeling Services 8. BIM 5D Modeling Services 9. BIM Detailing 10. MEP BIM
  • 5.
    BIM Coordination Drawings BIMcoordination drawings are 2D or 3D representations of a building's systems and components, created using Building Information Modeling (BIM) software. These drawings help ensure that all elements of the building's design are properly coordinated and clash-free before construction begins. They also facilitate collaboration among different stakeholders, such as architects, engineers, and contractors. BIM coordination drawings can include elements such as HVAC systems, plumbing, electrical systems, and structural elements.
  • 6.
    Architecture BIM Services ArchitectureBIM services are a set of digital design and documentation solutions that use Building Information Modeling (BIM) technology to create and manage architectural designs. These services allow architects to design and visualize their ideas in 3D, collaborate with other project stakeholders, and generate detailed documentation for construction. Architecture BIM services can include services such as BIM modeling, clash detection, quantity takeoff, construction documentation, and 3D visualization.
  • 7.
    BIM 4D ModelingServices BIM 4D modeling involves the integration of a Design schedule with a 3D model of a building. This allows stakeholders to visualize the construction process and identify potential conflicts and delays. By simulating the Modelling sequence, architects, engineers, and contractors can optimize the construction process and improve project coordination and communication.
  • 8.
    BIM 5D ModelingServices BIM 5D modeling services are a type of Building Information Modeling (BIM) service that includes the dimension of cost in addition to time and 3D geometry. It allows project stakeholders to visualize and track the cost of Modelling activities over time. With 5D BIM modeling, architects, engineers, and contractors can improve project cost estimation accuracy, track changes in real-time, and identify potential cost overruns.
  • 9.
    Our Process ofArchitectural BIM Service ● Illustrative Design ● Exterior and Interior view of the building ● 3D Visualization ● Intelligent Libraries ● Design Development of Elevations, floor plans , and building schemes ● Information of material specifications, quantities, time schedules, and costs ● Building Sections ● Circulation Details ● Details of Construction
  • 10.
    Why Choose Us? ● Improved Design Quality ● Efficient Deliverance ● Reduction of Risk Factors ● Enhanced design collaboration ● Cost effective prices ● Data Confidentiality ● Licensed and certified professionals ● Flexible business plans
  • 11.
    Contact Information Website :www.offshoreoutsourcing-india.com Email : info@offshoreoutsourcing-india.com Phone : + 1 (763) 270-8285