SlideShare a Scribd company logo
1 of 2
File Name: fe2
Locality: lap.unram
Note:
Meas. type: Manual
Meas. mode: Combined
Cal./Depth: F-1m,Hi
Meas. time: 2.0 s
Probe: CMD-4
x [m] y [m] Cond.[mS/m] Inphase [ppt] Error [%] Note
0.0 0.0 25.00 1.37 0.4
0.0 10.0 24.21 1.71 0.0
0.0 20.0 22.25 1.25 0.1
0.0 30.0 20.87 1.72 0.1
0.0 40.0 20.19 1.45 0.0
0.0 50.0 19.23 0.26 0.2
0.0 60.0 18.85 1.38 0.4
0.0 70.0 18.11 0.89 1.2
0.0 80.0 18.35 1.60 0.0
0.0 90.0 19.61 3.08 0.2
0.0 100.0 21.20 1.18 0.9
10.0 100.0 20.03 1.62 1.0
10.0 90.0 19.30 1.81 0.0
10.0 80.0 19.37 1.83 0.2
10.0 70.0 19.74 2.53 0.4
10.0 60.0 19.53 3.22 0.3 m
10.0 50.0 19.37 2.02 0.3
10.0 40.0 20.73 1.51 0.0
10.0 40.0 21.52 1.85 0.4
10.0 20.0 21.52 1.79 0.5
10.0 10.0 23.89 2.72 0.0
10.0 0.0 21.08 3.38 0.1
20.0 0.0 20.52 2.19 0.6
20.0 10.0 23.16 1.84 0.0
20.0 20.0 22.33 0.90 0.4
20.0 30.0 22.02 2.32 0.0
20.0 40.0 23.38 1.87 0.0
20.0 50.0 23.14 2.94 0.2
20.0 60.0 21.77 2.21 0.2
20.0 70.0 20.13 0.95 0.3
20.0 80.0 19.97 0.72 0.0
20.0 90.0 19.46 0.50 0.2
20.0 100.0 19.85 1.99 0.4

More Related Content

Viewers also liked

6 maila b eraikuntzak
6 maila b eraikuntzak6 maila b eraikuntzak
6 maila b eraikuntzakmarianeulza
 
Manual jorge-castaño (1)
Manual jorge-castaño (1)Manual jorge-castaño (1)
Manual jorge-castaño (1)JorgeElCrack
 
Startup Weekend Los Angeles
Startup Weekend Los AngelesStartup Weekend Los Angeles
Startup Weekend Los Angelesstartuplawyer
 
MIPA 2010 - Start with the Horse
MIPA 2010 - Start with the HorseMIPA 2010 - Start with the Horse
MIPA 2010 - Start with the HorseMr. Taylor
 
6 maila a eraikuntzak
6 maila a eraikuntzak6 maila a eraikuntzak
6 maila a eraikuntzakmarianeulza
 
Contratacion informatica - Trabajo
Contratacion informatica - TrabajoContratacion informatica - Trabajo
Contratacion informatica - TrabajoLEOCEY
 
Duchenne Muscular Dystrophy
Duchenne Muscular DystrophyDuchenne Muscular Dystrophy
Duchenne Muscular DystrophyMyzak
 
How to sell through storytelling
How to sell through storytellingHow to sell through storytelling
How to sell through storytellingStyla
 
Euskal iñauteriak proiektua
Euskal iñauteriak proiektua Euskal iñauteriak proiektua
Euskal iñauteriak proiektua Trumoi
 
Referal system ppt (presntation lecture)
Referal system ppt (presntation lecture)Referal system ppt (presntation lecture)
Referal system ppt (presntation lecture)Abubakr Y. Ibrahim
 

Viewers also liked (15)

6 maila b eraikuntzak
6 maila b eraikuntzak6 maila b eraikuntzak
6 maila b eraikuntzak
 
Manual jorge-castaño (1)
Manual jorge-castaño (1)Manual jorge-castaño (1)
Manual jorge-castaño (1)
 
Startup Weekend Los Angeles
Startup Weekend Los AngelesStartup Weekend Los Angeles
Startup Weekend Los Angeles
 
MIPA 2010 - Start with the Horse
MIPA 2010 - Start with the HorseMIPA 2010 - Start with the Horse
MIPA 2010 - Start with the Horse
 
Ideate assignment vesna
Ideate assignment vesnaIdeate assignment vesna
Ideate assignment vesna
 
6 maila a eraikuntzak
6 maila a eraikuntzak6 maila a eraikuntzak
6 maila a eraikuntzak
 
Contratacion informatica - Trabajo
Contratacion informatica - TrabajoContratacion informatica - Trabajo
Contratacion informatica - Trabajo
 
Duchenne Muscular Dystrophy
Duchenne Muscular DystrophyDuchenne Muscular Dystrophy
Duchenne Muscular Dystrophy
 
134 work break break down structure
134 work break break down structure134 work break break down structure
134 work break break down structure
 
How to sell through storytelling
How to sell through storytellingHow to sell through storytelling
How to sell through storytelling
 
Euskal iñauteriak proiektua
Euskal iñauteriak proiektua Euskal iñauteriak proiektua
Euskal iñauteriak proiektua
 
Turner syndrome
Turner syndromeTurner syndrome
Turner syndrome
 
Referal system ppt (presntation lecture)
Referal system ppt (presntation lecture)Referal system ppt (presntation lecture)
Referal system ppt (presntation lecture)
 
Referral System
Referral SystemReferral System
Referral System
 
Sites
SitesSites
Sites
 

Aku

  • 1. File Name: fe2 Locality: lap.unram Note: Meas. type: Manual Meas. mode: Combined Cal./Depth: F-1m,Hi Meas. time: 2.0 s Probe: CMD-4 x [m] y [m] Cond.[mS/m] Inphase [ppt] Error [%] Note 0.0 0.0 25.00 1.37 0.4 0.0 10.0 24.21 1.71 0.0 0.0 20.0 22.25 1.25 0.1 0.0 30.0 20.87 1.72 0.1 0.0 40.0 20.19 1.45 0.0 0.0 50.0 19.23 0.26 0.2 0.0 60.0 18.85 1.38 0.4 0.0 70.0 18.11 0.89 1.2 0.0 80.0 18.35 1.60 0.0 0.0 90.0 19.61 3.08 0.2 0.0 100.0 21.20 1.18 0.9 10.0 100.0 20.03 1.62 1.0 10.0 90.0 19.30 1.81 0.0 10.0 80.0 19.37 1.83 0.2 10.0 70.0 19.74 2.53 0.4 10.0 60.0 19.53 3.22 0.3 m 10.0 50.0 19.37 2.02 0.3
  • 2. 10.0 40.0 20.73 1.51 0.0 10.0 40.0 21.52 1.85 0.4 10.0 20.0 21.52 1.79 0.5 10.0 10.0 23.89 2.72 0.0 10.0 0.0 21.08 3.38 0.1 20.0 0.0 20.52 2.19 0.6 20.0 10.0 23.16 1.84 0.0 20.0 20.0 22.33 0.90 0.4 20.0 30.0 22.02 2.32 0.0 20.0 40.0 23.38 1.87 0.0 20.0 50.0 23.14 2.94 0.2 20.0 60.0 21.77 2.21 0.2 20.0 70.0 20.13 0.95 0.3 20.0 80.0 19.97 0.72 0.0 20.0 90.0 19.46 0.50 0.2 20.0 100.0 19.85 1.99 0.4