1.	 Company Background & Global Experience...................................................................................................03
2.	 Recently Completed Projects...............................................................................................................................09
3.	 Our Design Methodology......................................................................................................................................16
4.	 Key Personnel ............................................................................................................................................................23
Appendix – Recent International Projects............................................................................................................26
Table of contents
1.	 Company Background & Global Experience
13th Beach, Beach Course, Mornington Peninsula
Hole 16
AwardwinninggolfcoursearchitectTony
Cashmore formed Cashmore Golf Design
(CGD)inAustralia30yearsago.Withadeep
passionforgolf,andenjoyingasuccessful
international career as an architect, Tony
saw a need for professionally-designed
golf courses which respect site values,
in answering the growth in residential
golf course estates and resort projects
being developed at the time.
The success ofTony’s early projects led to
engagements from many private Clubs
and owners of pay-for-play golf venues
to undertake revisions to their courses
and clubhouses, often amounting to
full masterplanning and extensions to
existing golf terrains and buildings.
1.	 Company Background & Global Experience
5
Tony Cashmore has lectured in course design and
construction methods, including engineering, drainage,
and irrigation techniques, and is the President of the
Society of Australian Golf Course Architects.
1.	 Company Background & Global Experience
1.	 Company Background & Global Experience
CGD have been involved with over 70 golf courses internationally.
Our global experience has armed us with a wealth of problem-solving
techniques, across an incredibly diverse range of terrains and we are
well equipped to provide design solutions for golf courses planned
anywhere in the world.
CGD is being sought out by developers from all over the world,
because of our award winning courses that have gained international
recognition and our reputation for delivering the highest quality
golf courses at affordable prices, on time and on budget.
7
1.	 Company Background & Global Experience
CGD is well equipped and has vast experience in designing and documenting masterplans for the interface of beautiful golf courses
withinthebroadercommunity. Carefulattentionispaidtoensuringasenseofcommunityismaintainedthroughtheentiredevelopment.
The masterplanning process we undertake will address in great detail all routing, planning and technical matters required to respect
all other existing elements, and those being developed. Our long experience in masterplanning of the entire golf related development
is often what sets us apart from our competitors. We understand the importance of careful planning of the interface between the golf
course, its clubhouse and any planned residential, resort or other developments.
CGD’s specialist capabilities include:
•	 Golf Course Planning, Design and Construction
Monitoring
•	 Masterplanning for Resort and Residential
Facilities
•	 Landscape Design for golf related developments
•	 Environmentally sustainable design
•	 Advice on Golf Clubhouse Design
7
1.	 Company Background & Global Experience
Another key differentiation between our company and most
other golf design groups is that Tony Cashmore remains the
major designer and supervisor for construction for each project,
whereas other‘name’companies normally have assistants develop
the course design, and attend site during construction.
8
2.	 Cashmore Golf Design Projects
Henley Golf Course, Wonga Park
Hole 5
2.	 Cashmore Golf Design Projects
Longmu Bay International Resort
Hainan, China
Preliminary Concept Plan for
Proposed 54-Hole Golf Course
10
11
2.	 Cashmore Golf Design Projects
Project Name:	 13th Beach – Beach and Creek Courses
Country:	 Australia
Location within Country:	 Barwon Heads
Description of project: 	 Two 18-hole championship golf courses that support a diverse range of
residential villas, units and apartments and a major clubhouse complex
planned by CGD. The Creek course was designed in conjunction with
6-time major winner Nick Faldo
Accolades/Awards:	 Beach Course – ranked number 7 in Australia’s Top 100 Public Access
Courses
Project Name:	 The Dunes Golf Links
Country:	 Australia
Location within Country:	 Rye, Mornington Peninsula
Description of project: 	 18-hole championship golf course in sand dune country on the famed
Mornington Peninsula. The Dunes is a true links course in Australia and
represents one of the finest golfing experiences for players of all abilities.
The project was delivered on time and below budget.
Accolades/Awards:	 Ranked number 5 in Australia’s Top 100 Public Access Courses
Project Name:	 Henley Course at the Heritage Golf and Country Club
Country:	 Australia
Location within Country:	 (Greater) Melbourne
Description of project: 	 18-hole private golf course to complement an existing 18-hole golf
course and residential estate
Accolades/Awards:	 In first year ranked in Top 100 Australian Golf Courses
12
2.	 Cashmore Golf Design Projects
Project Name:	 Forest Resort
Country:	 Australia
Location within Country:	 Creswick
Description of project: 	 18-hole private and resort golf course to complement a resort/hotel and
residential estate development
Project Name:	 Montenegro National Resort
Country:	 Montenegro
Location within Country:	 Igalo
Description of project: 	 36-hole golf complex, teaching academy, mixed use resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Rodo Plantation
Country:	 Uruguay
Location within Country:	 Rinco de Carrasco
Description of project: 	 36-hole golf complex, mixed use resort, casino
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Permitting/Approval
13
2.	 Cashmore Golf Design Projects
Project Name:	 The Bell Tower
Country:	 Greece
Location within Country:	 Agiorgitiko, Arcadia
Description of project: 	 18-hole residential golf complex and mixed use resort
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Frenchman Springs
Country:	 USA
Location within Country:	 Grant County, Washington
Description of project: 	 36-hole residential golf complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Choctaw Nation Resort
Country:	 USA
Location within Country:	 Durant, Oklahoma
Description of project: 	 18-hole links golf course and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
14
2.	 Cashmore Golf Design Projects
Project Name:	 Sweetgrass Golf Club
Country:	 USA
Location within Country:	 Harrisville, Upper Peninsula
Description of project: 	 18-hole links golf course and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Royal Ranches Tangiers
Country:	 Morocco
Location within Country:	 Tangiers
Description of project: 	 18-hole residential golf complex and mixed use resort
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Royal Ranches Equestrian Club
Country:	 Morocco
Location within Country:	 Marrakesh
Description of project: 	 18-hole residential golf complex and mixed use resort
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
15
2.	 Cashmore Golf Design Projects
Project Name:	 The Villa Son My Golf and Residential Resort
Country:	 Vietnam
Location within Country:	 Ham Tan Dist, Binh Thuan Province
Description of project: 	 27-hole golf course, residential and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
Project Name:	 Sam Son Beach Resort
Country:	 Vietnam
Location within Country:	 Sam Son Beach, Thanh Hoa
Description of project: 	 27-hole golf course, residential and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Final stages of Masterplan design
Project Name:	 Jade Lake International
Country:	 China
Location within Country:	 Beijing
Description of project: 	 18-hole golf course, residential and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course Architectural services including
construction supervision
Status of project:	 Construction complete
3.	 Our Design Methodology
The Dunes, Mornington Peninsula
Hole 13
17
3.	 Our Design Methodology
Our approach to golf course design is simple: to allow the flow of the
landonanysitetodeterminethecourseroutingasnaturallyaspossible,
and then to use all available ground elements – ridges, swales, spurs,
trees and vistas to create golf holes with great individuality, visual
beauty, and strategic flexibility.
We like to touch the land gently, and construct elements as broadly
as possible, so that the finished terrain looks as though it was always
there in nature, waiting to be mown; to bring golfers to tees in such a
way that the next golf hole is suddenly exposed as a ‘vision splendid’
for them, with everything laid out beautifully before them; and to have
golfers of all skill and strength levels, having a drink in the clubhouse
after their game, wanting to come back again and again, because the
golf was fun, fascinating and satisfying.
Our approach to client service is similarly flexible and open minded.
Many of our previous clients have become close personal friends. This
has occurred as we like to work very closely with our clients and adopt
a very flexible attitude in our approach to delivering our services. We
listen carefully to our client’s wishes and are always willing to respond
to changing requirements.
Over the past 30 years, we have developed our proven methodology
for the design and implementation process of golf course related
projects. Our comprehensive 8 Stage Design Process, distinguishes
us from other companies and ensures the best possible golf course is
created for every site.
18
3.	 Our Design Methodology
TheCGD8-StageDesignProcessisoutlinedbelowandcanbetailoredto
suitthespecificneedsofourclients. Thisprocesswillensurecompletion
of deliverables outlined in the Invitation to Tender Document under
Scope of Works for Package A.
Stage 1: Preliminary Discussions
•	 Create open communication channels so that your needs
are clearly detailed and formulated into a brief.
•	 Ensure we understand what you need, the timeframes
you require and the expected budgets for the project.
Stage 2: Concept Planning
•	 Prepare initial ideas and concept plans for the site.
•	 Participate in additional meetings with various
stakeholders to establish further ideas of what may be
required.
•	 Respond quickly in preparing drawings and delivering
presentations that are often required by the client project
team and local Government.
•	 Provide advice on other aspects of the project including
general landscaping, building and villa concepts, road
infrastructure, construction methods and delivery.
19
3.	 Our Design Methodology
Stage 3: Design Development
•	 Present additional design options and refine concept
plans to reflect further thinking
•	 Seekfinalfeedbackandsupportfromyourteamsothatthe
final design ideas and concepts meet all requirements.
•	 Achieve final sign-off of all concept designs from you and
your key stakeholders.
Stage 4: Masterplan
•	 Achieving this stage indicates that the Design
Development has been successful and that the plans are
finalized.
•	 We provide detailed reports on our overall site planning
methodology and how the planned golf course will
integrate with its surroundings.
•	 Detailed Masterplan drawings are prepared and
provided to your team and other key stakeholders such
as Government representatives.
•	 These Masterplans are formally agreed so we can
commence detailed construction documentation.
20
3.	 Our Design Methodology
Stage 5: Detailed Documentation
•	 It has often been said that our construction documentation is the
best in the industry.
•	 We prepare precise construction plans (all with GPS coordinates)
that are used extensively in the construction of your new course.
•	 Our documentation includes greens, tees and bunker plans down
to 0.25m contour intervals.
•	 We provide a detailed Construction Specification report that
describes the materials and standards that will be required for each
part of the construction process. This specification can be used to
issue tenders.
Stage 6: Construction Monitoring
•	 Inordertoensuredeliveryofthebestpossibleoutcomeforourclient,
it is essential that we monitor the construction of the project.
•	 This is achieved through regular site visits by one (or more) of our
senior golf architects. The timing of these visits is determined after
development of the construction program. This helps to identify
the likely timing of key milestones throughout the process at which
point site visits will be necessary. We remain flexible in the timing
of our visits.
•	 Theregularityofoursitevisitssetsusapartfromourcompetition.   We
find a regular presence on site often leads to substantial reductions
in construction costs and delivers wonderful golf courses.
21
3.	 Our Design Methodology
Stage 7: Grow-in Consultation
•	 In consultation with your appointed Superintendent, we proactively visit your golf course during and following the construction of
your project.
•	 Each site visit is followed up with a comprehensive report of our findings and includes recommendations.
22
3.	 Our Design Methodology
Stage 8: Opening
•	 A very rewarding stage of the process.  We will be
on-hand to celebrate the opening of your grand
vision and assist with any opening or promotional
speeches.
Tony Cashmore and Nick Faldo, at the opening
of their collaborative design effort, the 13th
Beach Creek Course in Victoria, Australia
4.	 Key Personnel
13th Beach Creek Course, Barwon Heads
Hole 6
24
4.	 Key Personnel
Of importance to the Client’s selection of an architect will be an
assessment of the experience of the principal, his long success in
designing strategically flexible and beautiful courses which remain
sensitivetoparticularsiteconditions.Inaddition,thequalityanddiverse
talents of professional people in his team are vital in the preparation of
design solutions.
We have that demonstrated experience and such qualified personnel.
Tony Cashmore, B.Arch (Melbourne)
•	 Established the company after several years of designing
golf courses and residential and golf course estates here
and in France.
•	 Over 35 years of experience in designing over 40 new
courses, and designing and documenting
	 masterplans for some 30 existing courses, here and
abroad.
•	 President of the Society of Australian Golf Course
Architects.
•	 Member RAIA (Royal Australian Institute of Architects)
•	 Member Kew Golf Club 50 years
Cameron MacKellar, B.Arch (1st Class Honours), MA
Environmental Design
•	 CGD US Business Manager
•	 6 years involvement with golf course design.  
•	 Expert development of golf courses with an
environmentally sensitive focus.
•	 Extensive experience in design development, detail
design and preparation of planning approval and
construction documentation for golf course projects.
•	 Member USGA (United States Golf Association)
•	 Associate Member RAIA (Royal Australian Institute of
Architects)
•	 Member GAM (Golf Association of Michigan)
•	 USGBC LEED Certified – Energy & Environmental
Design
•	 Member Grange Golf Club, Adelaide, Australia
•	 Previous projects include:
1.	 Sweetgrass GC, USA			
2.	 Meadowbrook CC, USA
3.	 French Lick GC, USA			
4.	 Roseland Golf & Curling Club, Canada
5.	 Royal Ranches Equestrian Golf Resort, Morocco
25
4.	 Key Personnel
Ray Cashmore, B. Arts, Dip. Ed., Cert. Horticulture
•	 Brother of Tony and has worked with Tony over the past
15 years in a part-time, consultant and now a full-time
role.
•	 Extensive experience in design development, detail
design and construction supervision for golf course
projects.
•	 Member Barwon Heads Golf Club
•	 Previous projects include:
1.	 The Dunes, Australia			
2.	 13th Beach, Australia
3.	 SevenValley, South Korea		
4.	 The International, China
		 5.	 Foshan, China	
Todd Hyland, B.Ec, Grad. Dip. Applied Finance & Investment,
Grad Dip. Landscape Architecture.
•	 5 years involvement with golf course and landscape
design.
•	 Extensive experience in design development, detail
design and preparation of planning approval and
construction documentation for golf course projects.
•	 Member Kew Golf Club 15 years
•	 Previous projects include:
1.	 Henley, Australia			
2.	 Forest Resort, Australia
3.	 Seven Valley, South Korea		
4.	 The International, China
5.	 Foshan, China	
These are the key personnel who would be involved in the design and construction supervision process for the Project.
James Cashmore, Director CGD, will act as the Business Relationship Manager throughout the project and will ensure client satisfaction at all
times. Our team will also include experienced CAD drafts people, graphic designers and administration staff.
Appendix
Recent International Projects
27
Project Name:	 Montenegro National Resort
Country:	 Montenegro
Location within Country:	 Igalo
Description of project: 	 36-holegolfcomplex,teachingacademy,mixeduseresortcomplex
Description of Services to be provided:	 Site Masterplanning, full Golf Course Architectural services including construction supervision
Status of project:	 Final Masterplan awaiting approval
Montenegro
28
Uruguay
Project Name:	 Rodo Plantation
Country:	 Uruguay
Location within Country:	 Rinco de Carrasco
Description of project: 	 36-hole golf complex, mixed use resort, casino
Description of Services to be provided:	 Site Masterplanning, full Golf Course Architectural services including construction supervision
Status of project:	 Permitting/Approval
29
USA
Project Name:	 Choctaw Nation Resort
Country:	 USA
Location within Country:	 Durant, Oklahoma
Description of project: 	 18-hole links golf course
and resort complex
Description of Services
to be provided:	 Site Masterplanning, full Golf Course
Architectural services including
construction supervision
Status of project:	 Final Masterplan awaiting approval
30
Vietnam
Project Name:	 The Villa Son My Golf and Residential Resort
Country:	 Vietnam
Location within Country:	 Ham Tan Dist, Binh Thuan Province
Description of project: 	 27-hole golf course, residential and resort complex
Description of Services to be provided:	 Site Masterplanning, full Golf Course Architectural services including construction supervision
Status of project:	 Final Masterplan awaiting approval
31
South Korea
Project Name:	 Seven Valley Golf Club
Country:	 South Korea
Location within Country:	 Daegu
Description of project: 	 18-hole private golf course (9 holes to be
completed as Stage 2)
Description of Services
to be provided:	 Full Golf Course Architectural services
including construction supervision
Status of project:	 Construction commenced March 2008
32
China
Project Name:	 Jade Lake International
Country:	 China
Location within Country:	 Beijing
Description of project: 	 18-hole golf course, residential and resort complex
Description of Services to be provided:	 Site Masterplanning, full Golf Course Architectural services including construction supervision
Status of project:	 Construction complete

More Related Content

Viewers also liked

Mtda update mcel 2014
Mtda update mcel 2014Mtda update mcel 2014
Mtda update mcel 2014
Ryan Schrenk
 
MCEL Connect Credit Recovery 2011
MCEL Connect Credit Recovery 2011MCEL Connect Credit Recovery 2011
MCEL Connect Credit Recovery 2011
Ryan Schrenk
 
Guia para atom
Guia para atomGuia para atom
Guia para atom
R Moura Ribeiro
 
Merle Norman By Epic
Merle Norman By EpicMerle Norman By Epic
Merle Norman By Epic
JeffMoore
 
Kim Kardashian Fleet Media
Kim Kardashian Fleet MediaKim Kardashian Fleet Media
Kim Kardashian Fleet Media
JeffMoore
 
Un presente para navegar
Un presente para navegarUn presente para navegar
Un presente para navegar
semillerostic
 
How to get started with edready montana spring 2015
How to get started with edready montana spring 2015How to get started with edready montana spring 2015
How to get started with edready montana spring 2015
Ryan Schrenk
 
Msca presentation
Msca presentationMsca presentation
Msca presentation
Ryan Schrenk
 
Vss 2011 credit recovery model
Vss 2011 credit recovery modelVss 2011 credit recovery model
Vss 2011 credit recovery model
Ryan Schrenk
 
GM Event Presented By KWIK ZIP
GM Event   Presented By KWIK ZIPGM Event   Presented By KWIK ZIP
GM Event Presented By KWIK ZIP
JeffMoore
 
Building Natural Gas Consumer Markets
Building Natural Gas Consumer MarketsBuilding Natural Gas Consumer Markets
Building Natural Gas Consumer Markets
rclevejr
 
La actitud-mental-positiva-como-parte-del-exito
La actitud-mental-positiva-como-parte-del-exitoLa actitud-mental-positiva-como-parte-del-exito
La actitud-mental-positiva-como-parte-del-exitoEnzo Fusco
 
Apple Store, London 2009 02 25
Apple Store, London 2009 02 25Apple Store, London 2009 02 25
Apple Store, London 2009 02 25
ProjectWizards
 

Viewers also liked (14)

Mtda update mcel 2014
Mtda update mcel 2014Mtda update mcel 2014
Mtda update mcel 2014
 
MCEL Connect Credit Recovery 2011
MCEL Connect Credit Recovery 2011MCEL Connect Credit Recovery 2011
MCEL Connect Credit Recovery 2011
 
Guia para atom
Guia para atomGuia para atom
Guia para atom
 
Merle Norman By Epic
Merle Norman By EpicMerle Norman By Epic
Merle Norman By Epic
 
Formative assessmenta
Formative assessmentaFormative assessmenta
Formative assessmenta
 
Kim Kardashian Fleet Media
Kim Kardashian Fleet MediaKim Kardashian Fleet Media
Kim Kardashian Fleet Media
 
Un presente para navegar
Un presente para navegarUn presente para navegar
Un presente para navegar
 
How to get started with edready montana spring 2015
How to get started with edready montana spring 2015How to get started with edready montana spring 2015
How to get started with edready montana spring 2015
 
Msca presentation
Msca presentationMsca presentation
Msca presentation
 
Vss 2011 credit recovery model
Vss 2011 credit recovery modelVss 2011 credit recovery model
Vss 2011 credit recovery model
 
GM Event Presented By KWIK ZIP
GM Event   Presented By KWIK ZIPGM Event   Presented By KWIK ZIP
GM Event Presented By KWIK ZIP
 
Building Natural Gas Consumer Markets
Building Natural Gas Consumer MarketsBuilding Natural Gas Consumer Markets
Building Natural Gas Consumer Markets
 
La actitud-mental-positiva-como-parte-del-exito
La actitud-mental-positiva-como-parte-del-exitoLa actitud-mental-positiva-como-parte-del-exito
La actitud-mental-positiva-como-parte-del-exito
 
Apple Store, London 2009 02 25
Apple Store, London 2009 02 25Apple Store, London 2009 02 25
Apple Store, London 2009 02 25
 

Similar to Cashmore International Golf Design

GRC International Golf Design
GRC International Golf DesignGRC International Golf Design
GRC International Golf Design
Global Resort Corporation
 
The hemisphere 2&3 bedroom suite ppt
The hemisphere   2&3 bedroom suite pptThe hemisphere   2&3 bedroom suite ppt
The hemisphere 2&3 bedroom suite ppt
thehemisphere_life_curated
 
Resume Updated 2016 - RSB
Resume Updated 2016 - RSBResume Updated 2016 - RSB
Resume Updated 2016 - RSBRuben Bernal
 
Somnio portfolio 09.23.09
Somnio portfolio   09.23.09Somnio portfolio   09.23.09
Somnio portfolio 09.23.09Matt Squires
 
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
Sherine Milad
 
2017 MacKellar Golf Design
2017 MacKellar Golf Design2017 MacKellar Golf Design
2017 MacKellar Golf Design
Cameron MacKellar
 
Josh Nolke Resume
Josh Nolke ResumeJosh Nolke Resume
Josh Nolke ResumeJosh Nolke
 
Josh Nolke Resume
Josh Nolke ResumeJosh Nolke Resume
Josh Nolke ResumeJosh Nolke
 
Stoney nakoda resort 4
Stoney nakoda resort 4Stoney nakoda resort 4
Stoney nakoda resort 4Matt Squires
 
Stoney nakoda resort 3
Stoney nakoda resort 3Stoney nakoda resort 3
Stoney nakoda resort 3Matt Squires
 
Stoney nakoda resort
Stoney nakoda resortStoney nakoda resort
Stoney nakoda resortMatt Squires
 
Stoney nakoda resort 2
Stoney nakoda resort 2Stoney nakoda resort 2
Stoney nakoda resort 2Matt Squires
 
Millennium geomatics logo
Millennium geomatics logoMillennium geomatics logo
Millennium geomatics logoMatt Squires
 
Ct Cv
Ct CvCt Cv
Ct Cv
catgcd59
 
Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper
Vamsi Putta
 

Similar to Cashmore International Golf Design (20)

GRC International Golf Design
GRC International Golf DesignGRC International Golf Design
GRC International Golf Design
 
The hemisphere 2&3 bedroom suite ppt
The hemisphere   2&3 bedroom suite pptThe hemisphere   2&3 bedroom suite ppt
The hemisphere 2&3 bedroom suite ppt
 
Resume Updated 2016 - RSB
Resume Updated 2016 - RSBResume Updated 2016 - RSB
Resume Updated 2016 - RSB
 
Somnio portfolio 09.23.09
Somnio portfolio   09.23.09Somnio portfolio   09.23.09
Somnio portfolio 09.23.09
 
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
Hotels designed by " DESIGNERS Consultants" in Egypt and various African Coun...
 
Chakradhara Rao_CV
Chakradhara Rao_CVChakradhara Rao_CV
Chakradhara Rao_CV
 
2017 MacKellar Golf Design
2017 MacKellar Golf Design2017 MacKellar Golf Design
2017 MacKellar Golf Design
 
Josh Nolke Resume
Josh Nolke ResumeJosh Nolke Resume
Josh Nolke Resume
 
Josh Nolke Resume
Josh Nolke ResumeJosh Nolke Resume
Josh Nolke Resume
 
Stoney nakoda resort 4
Stoney nakoda resort 4Stoney nakoda resort 4
Stoney nakoda resort 4
 
Stoney nakoda resort 3
Stoney nakoda resort 3Stoney nakoda resort 3
Stoney nakoda resort 3
 
CV
CVCV
CV
 
Stoney nakoda resort
Stoney nakoda resortStoney nakoda resort
Stoney nakoda resort
 
Stoney nakoda resort 2
Stoney nakoda resort 2Stoney nakoda resort 2
Stoney nakoda resort 2
 
Millennium geomatics logo
Millennium geomatics logoMillennium geomatics logo
Millennium geomatics logo
 
MDF profile
MDF profileMDF profile
MDF profile
 
Sublatus logo
Sublatus logoSublatus logo
Sublatus logo
 
Ct Cv
Ct CvCt Cv
Ct Cv
 
Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper Building/villa plan 2 floors Term paper
Building/villa plan 2 floors Term paper
 
Design Report
Design ReportDesign Report
Design Report
 

Cashmore International Golf Design

  • 1. CASHMORE GOLF DESIGN SERVICES February 2009
  • 2. 2 1. Company Background & Global Experience...................................................................................................03 2. Recently Completed Projects...............................................................................................................................09 3. Our Design Methodology......................................................................................................................................16 4. Key Personnel ............................................................................................................................................................23 Appendix – Recent International Projects............................................................................................................26 Table of contents
  • 3. 1. Company Background & Global Experience 13th Beach, Beach Course, Mornington Peninsula Hole 16
  • 4. AwardwinninggolfcoursearchitectTony Cashmore formed Cashmore Golf Design (CGD)inAustralia30yearsago.Withadeep passionforgolf,andenjoyingasuccessful international career as an architect, Tony saw a need for professionally-designed golf courses which respect site values, in answering the growth in residential golf course estates and resort projects being developed at the time. The success ofTony’s early projects led to engagements from many private Clubs and owners of pay-for-play golf venues to undertake revisions to their courses and clubhouses, often amounting to full masterplanning and extensions to existing golf terrains and buildings. 1. Company Background & Global Experience
  • 5. 5 Tony Cashmore has lectured in course design and construction methods, including engineering, drainage, and irrigation techniques, and is the President of the Society of Australian Golf Course Architects. 1. Company Background & Global Experience
  • 6. 1. Company Background & Global Experience CGD have been involved with over 70 golf courses internationally. Our global experience has armed us with a wealth of problem-solving techniques, across an incredibly diverse range of terrains and we are well equipped to provide design solutions for golf courses planned anywhere in the world. CGD is being sought out by developers from all over the world, because of our award winning courses that have gained international recognition and our reputation for delivering the highest quality golf courses at affordable prices, on time and on budget.
  • 7. 7 1. Company Background & Global Experience CGD is well equipped and has vast experience in designing and documenting masterplans for the interface of beautiful golf courses withinthebroadercommunity. Carefulattentionispaidtoensuringasenseofcommunityismaintainedthroughtheentiredevelopment. The masterplanning process we undertake will address in great detail all routing, planning and technical matters required to respect all other existing elements, and those being developed. Our long experience in masterplanning of the entire golf related development is often what sets us apart from our competitors. We understand the importance of careful planning of the interface between the golf course, its clubhouse and any planned residential, resort or other developments. CGD’s specialist capabilities include: • Golf Course Planning, Design and Construction Monitoring • Masterplanning for Resort and Residential Facilities • Landscape Design for golf related developments • Environmentally sustainable design • Advice on Golf Clubhouse Design 7
  • 8. 1. Company Background & Global Experience Another key differentiation between our company and most other golf design groups is that Tony Cashmore remains the major designer and supervisor for construction for each project, whereas other‘name’companies normally have assistants develop the course design, and attend site during construction. 8
  • 9. 2. Cashmore Golf Design Projects Henley Golf Course, Wonga Park Hole 5
  • 10. 2. Cashmore Golf Design Projects Longmu Bay International Resort Hainan, China Preliminary Concept Plan for Proposed 54-Hole Golf Course 10
  • 11. 11 2. Cashmore Golf Design Projects Project Name: 13th Beach – Beach and Creek Courses Country: Australia Location within Country: Barwon Heads Description of project: Two 18-hole championship golf courses that support a diverse range of residential villas, units and apartments and a major clubhouse complex planned by CGD. The Creek course was designed in conjunction with 6-time major winner Nick Faldo Accolades/Awards: Beach Course – ranked number 7 in Australia’s Top 100 Public Access Courses Project Name: The Dunes Golf Links Country: Australia Location within Country: Rye, Mornington Peninsula Description of project: 18-hole championship golf course in sand dune country on the famed Mornington Peninsula. The Dunes is a true links course in Australia and represents one of the finest golfing experiences for players of all abilities. The project was delivered on time and below budget. Accolades/Awards: Ranked number 5 in Australia’s Top 100 Public Access Courses Project Name: Henley Course at the Heritage Golf and Country Club Country: Australia Location within Country: (Greater) Melbourne Description of project: 18-hole private golf course to complement an existing 18-hole golf course and residential estate Accolades/Awards: In first year ranked in Top 100 Australian Golf Courses
  • 12. 12 2. Cashmore Golf Design Projects Project Name: Forest Resort Country: Australia Location within Country: Creswick Description of project: 18-hole private and resort golf course to complement a resort/hotel and residential estate development Project Name: Montenegro National Resort Country: Montenegro Location within Country: Igalo Description of project: 36-hole golf complex, teaching academy, mixed use resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Rodo Plantation Country: Uruguay Location within Country: Rinco de Carrasco Description of project: 36-hole golf complex, mixed use resort, casino Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Permitting/Approval
  • 13. 13 2. Cashmore Golf Design Projects Project Name: The Bell Tower Country: Greece Location within Country: Agiorgitiko, Arcadia Description of project: 18-hole residential golf complex and mixed use resort Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Frenchman Springs Country: USA Location within Country: Grant County, Washington Description of project: 36-hole residential golf complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Choctaw Nation Resort Country: USA Location within Country: Durant, Oklahoma Description of project: 18-hole links golf course and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval
  • 14. 14 2. Cashmore Golf Design Projects Project Name: Sweetgrass Golf Club Country: USA Location within Country: Harrisville, Upper Peninsula Description of project: 18-hole links golf course and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Royal Ranches Tangiers Country: Morocco Location within Country: Tangiers Description of project: 18-hole residential golf complex and mixed use resort Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Royal Ranches Equestrian Club Country: Morocco Location within Country: Marrakesh Description of project: 18-hole residential golf complex and mixed use resort Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval
  • 15. 15 2. Cashmore Golf Design Projects Project Name: The Villa Son My Golf and Residential Resort Country: Vietnam Location within Country: Ham Tan Dist, Binh Thuan Province Description of project: 27-hole golf course, residential and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Project Name: Sam Son Beach Resort Country: Vietnam Location within Country: Sam Son Beach, Thanh Hoa Description of project: 27-hole golf course, residential and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final stages of Masterplan design Project Name: Jade Lake International Country: China Location within Country: Beijing Description of project: 18-hole golf course, residential and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Construction complete
  • 16. 3. Our Design Methodology The Dunes, Mornington Peninsula Hole 13
  • 17. 17 3. Our Design Methodology Our approach to golf course design is simple: to allow the flow of the landonanysitetodeterminethecourseroutingasnaturallyaspossible, and then to use all available ground elements – ridges, swales, spurs, trees and vistas to create golf holes with great individuality, visual beauty, and strategic flexibility. We like to touch the land gently, and construct elements as broadly as possible, so that the finished terrain looks as though it was always there in nature, waiting to be mown; to bring golfers to tees in such a way that the next golf hole is suddenly exposed as a ‘vision splendid’ for them, with everything laid out beautifully before them; and to have golfers of all skill and strength levels, having a drink in the clubhouse after their game, wanting to come back again and again, because the golf was fun, fascinating and satisfying. Our approach to client service is similarly flexible and open minded. Many of our previous clients have become close personal friends. This has occurred as we like to work very closely with our clients and adopt a very flexible attitude in our approach to delivering our services. We listen carefully to our client’s wishes and are always willing to respond to changing requirements. Over the past 30 years, we have developed our proven methodology for the design and implementation process of golf course related projects. Our comprehensive 8 Stage Design Process, distinguishes us from other companies and ensures the best possible golf course is created for every site.
  • 18. 18 3. Our Design Methodology TheCGD8-StageDesignProcessisoutlinedbelowandcanbetailoredto suitthespecificneedsofourclients. Thisprocesswillensurecompletion of deliverables outlined in the Invitation to Tender Document under Scope of Works for Package A. Stage 1: Preliminary Discussions • Create open communication channels so that your needs are clearly detailed and formulated into a brief. • Ensure we understand what you need, the timeframes you require and the expected budgets for the project. Stage 2: Concept Planning • Prepare initial ideas and concept plans for the site. • Participate in additional meetings with various stakeholders to establish further ideas of what may be required. • Respond quickly in preparing drawings and delivering presentations that are often required by the client project team and local Government. • Provide advice on other aspects of the project including general landscaping, building and villa concepts, road infrastructure, construction methods and delivery.
  • 19. 19 3. Our Design Methodology Stage 3: Design Development • Present additional design options and refine concept plans to reflect further thinking • Seekfinalfeedbackandsupportfromyourteamsothatthe final design ideas and concepts meet all requirements. • Achieve final sign-off of all concept designs from you and your key stakeholders. Stage 4: Masterplan • Achieving this stage indicates that the Design Development has been successful and that the plans are finalized. • We provide detailed reports on our overall site planning methodology and how the planned golf course will integrate with its surroundings. • Detailed Masterplan drawings are prepared and provided to your team and other key stakeholders such as Government representatives. • These Masterplans are formally agreed so we can commence detailed construction documentation.
  • 20. 20 3. Our Design Methodology Stage 5: Detailed Documentation • It has often been said that our construction documentation is the best in the industry. • We prepare precise construction plans (all with GPS coordinates) that are used extensively in the construction of your new course. • Our documentation includes greens, tees and bunker plans down to 0.25m contour intervals. • We provide a detailed Construction Specification report that describes the materials and standards that will be required for each part of the construction process. This specification can be used to issue tenders. Stage 6: Construction Monitoring • Inordertoensuredeliveryofthebestpossibleoutcomeforourclient, it is essential that we monitor the construction of the project. • This is achieved through regular site visits by one (or more) of our senior golf architects. The timing of these visits is determined after development of the construction program. This helps to identify the likely timing of key milestones throughout the process at which point site visits will be necessary. We remain flexible in the timing of our visits. • Theregularityofoursitevisitssetsusapartfromourcompetition. We find a regular presence on site often leads to substantial reductions in construction costs and delivers wonderful golf courses.
  • 21. 21 3. Our Design Methodology Stage 7: Grow-in Consultation • In consultation with your appointed Superintendent, we proactively visit your golf course during and following the construction of your project. • Each site visit is followed up with a comprehensive report of our findings and includes recommendations.
  • 22. 22 3. Our Design Methodology Stage 8: Opening • A very rewarding stage of the process. We will be on-hand to celebrate the opening of your grand vision and assist with any opening or promotional speeches. Tony Cashmore and Nick Faldo, at the opening of their collaborative design effort, the 13th Beach Creek Course in Victoria, Australia
  • 23. 4. Key Personnel 13th Beach Creek Course, Barwon Heads Hole 6
  • 24. 24 4. Key Personnel Of importance to the Client’s selection of an architect will be an assessment of the experience of the principal, his long success in designing strategically flexible and beautiful courses which remain sensitivetoparticularsiteconditions.Inaddition,thequalityanddiverse talents of professional people in his team are vital in the preparation of design solutions. We have that demonstrated experience and such qualified personnel. Tony Cashmore, B.Arch (Melbourne) • Established the company after several years of designing golf courses and residential and golf course estates here and in France. • Over 35 years of experience in designing over 40 new courses, and designing and documenting masterplans for some 30 existing courses, here and abroad. • President of the Society of Australian Golf Course Architects. • Member RAIA (Royal Australian Institute of Architects) • Member Kew Golf Club 50 years Cameron MacKellar, B.Arch (1st Class Honours), MA Environmental Design • CGD US Business Manager • 6 years involvement with golf course design. • Expert development of golf courses with an environmentally sensitive focus. • Extensive experience in design development, detail design and preparation of planning approval and construction documentation for golf course projects. • Member USGA (United States Golf Association) • Associate Member RAIA (Royal Australian Institute of Architects) • Member GAM (Golf Association of Michigan) • USGBC LEED Certified – Energy & Environmental Design • Member Grange Golf Club, Adelaide, Australia • Previous projects include: 1. Sweetgrass GC, USA 2. Meadowbrook CC, USA 3. French Lick GC, USA 4. Roseland Golf & Curling Club, Canada 5. Royal Ranches Equestrian Golf Resort, Morocco
  • 25. 25 4. Key Personnel Ray Cashmore, B. Arts, Dip. Ed., Cert. Horticulture • Brother of Tony and has worked with Tony over the past 15 years in a part-time, consultant and now a full-time role. • Extensive experience in design development, detail design and construction supervision for golf course projects. • Member Barwon Heads Golf Club • Previous projects include: 1. The Dunes, Australia 2. 13th Beach, Australia 3. SevenValley, South Korea 4. The International, China 5. Foshan, China Todd Hyland, B.Ec, Grad. Dip. Applied Finance & Investment, Grad Dip. Landscape Architecture. • 5 years involvement with golf course and landscape design. • Extensive experience in design development, detail design and preparation of planning approval and construction documentation for golf course projects. • Member Kew Golf Club 15 years • Previous projects include: 1. Henley, Australia 2. Forest Resort, Australia 3. Seven Valley, South Korea 4. The International, China 5. Foshan, China These are the key personnel who would be involved in the design and construction supervision process for the Project. James Cashmore, Director CGD, will act as the Business Relationship Manager throughout the project and will ensure client satisfaction at all times. Our team will also include experienced CAD drafts people, graphic designers and administration staff.
  • 27. 27 Project Name: Montenegro National Resort Country: Montenegro Location within Country: Igalo Description of project: 36-holegolfcomplex,teachingacademy,mixeduseresortcomplex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval Montenegro
  • 28. 28 Uruguay Project Name: Rodo Plantation Country: Uruguay Location within Country: Rinco de Carrasco Description of project: 36-hole golf complex, mixed use resort, casino Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Permitting/Approval
  • 29. 29 USA Project Name: Choctaw Nation Resort Country: USA Location within Country: Durant, Oklahoma Description of project: 18-hole links golf course and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval
  • 30. 30 Vietnam Project Name: The Villa Son My Golf and Residential Resort Country: Vietnam Location within Country: Ham Tan Dist, Binh Thuan Province Description of project: 27-hole golf course, residential and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Final Masterplan awaiting approval
  • 31. 31 South Korea Project Name: Seven Valley Golf Club Country: South Korea Location within Country: Daegu Description of project: 18-hole private golf course (9 holes to be completed as Stage 2) Description of Services to be provided: Full Golf Course Architectural services including construction supervision Status of project: Construction commenced March 2008
  • 32. 32 China Project Name: Jade Lake International Country: China Location within Country: Beijing Description of project: 18-hole golf course, residential and resort complex Description of Services to be provided: Site Masterplanning, full Golf Course Architectural services including construction supervision Status of project: Construction complete