POSSIBILITIES OF HYDROPOWER POTENTIAL UTILIZATION OF THE TISA RIVER DAM IN NO...Aleksandar Zivkovic
The dam on the Tisa River in New Becej was built in 1977. When designing the dam, and later the possibility of building a hydroelectric power plant, as part of the hydraulic structure, was discussed. The potential exists primarily from runoff, Qsr, which amounts to approximately 800 m3/s and available head, which varies from 1.75 to 4.5 meters. The price of electricity during the construction of the dam was not competitive, and for this reason the idea for parallel construction of the dam and power plant was abandoned. Today the situation is favorable, and there have been technical capabilities, some new types of turbines, which make the entire project financially justified. This paper presents one possible solution of hydropower installation in the dam spillways.
Manual para los 100 primeros días tras el diagnóstico del autismoHatsep Sen
Es un manual dirigido a las familias de niños con TGD, para ayudarlas a situarse tras el diagnóstico del autismo, informándolas sobre cuestiones tan básicas y a la vez de tan necesario conocimiento para ellas como:
- ¿Qué es el autismo?
- Definición y síntomas del autismo
- Cómo debe manejar la familia el diagnóstico
- Qué derechos tienen y qué servicios pueden reclamar
- Tratamiento para el autismo
- Plan de seguridad para niños con autismo
Podéis encontrar más información y materiales sobre este tema en Aprendiendo desde mi ventana http://aprendiendodesdemiventana.blogspot.com/
POSSIBILITIES OF HYDROPOWER POTENTIAL UTILIZATION OF THE TISA RIVER DAM IN NO...Aleksandar Zivkovic
The dam on the Tisa River in New Becej was built in 1977. When designing the dam, and later the possibility of building a hydroelectric power plant, as part of the hydraulic structure, was discussed. The potential exists primarily from runoff, Qsr, which amounts to approximately 800 m3/s and available head, which varies from 1.75 to 4.5 meters. The price of electricity during the construction of the dam was not competitive, and for this reason the idea for parallel construction of the dam and power plant was abandoned. Today the situation is favorable, and there have been technical capabilities, some new types of turbines, which make the entire project financially justified. This paper presents one possible solution of hydropower installation in the dam spillways.
Manual para los 100 primeros días tras el diagnóstico del autismoHatsep Sen
Es un manual dirigido a las familias de niños con TGD, para ayudarlas a situarse tras el diagnóstico del autismo, informándolas sobre cuestiones tan básicas y a la vez de tan necesario conocimiento para ellas como:
- ¿Qué es el autismo?
- Definición y síntomas del autismo
- Cómo debe manejar la familia el diagnóstico
- Qué derechos tienen y qué servicios pueden reclamar
- Tratamiento para el autismo
- Plan de seguridad para niños con autismo
Podéis encontrar más información y materiales sobre este tema en Aprendiendo desde mi ventana http://aprendiendodesdemiventana.blogspot.com/