1. De-fence Test Bays 1
1 @ A1
2 @ A1
Gas Test Pool
3 @ A1
Storage External View 1 Test Bays 2
4 @ A1
5 @ A1
6 @ A1
External View 2 External View 3 Test Bays 3
7 @ A1
8 @ A1
9 @ A1
PRELIMINARY
Revision Schedule INTEGRATED WORKSHOP FITOUT 3D Views
Oldfield Knott Architects Pty Ltd No.
E
F
Date
22.12.11
09.01.12
Description
Addition of Bollards & Deletion of Concrete Dado
Revised In Progress Structural Model
Cnr Belmont Ave and Leach Highway Project NumberProject Number
Kewdale
Date August 2011
The Royal Australian
567 Hay Street, Daglish, WA. 6008 G 10.01.12 Canopy Link from Base Build Design/drawn by Designer A002 rev.H
Institute of Architects Phone (08)9381 6788 . Fax (08) 9381 4619 PO Box 849, Subiaco, WA 6904 H 12.01.12 Revised Grids, Pallet Drawing Linked and Addition of Bike &
Smokers Enclosure for Cameron Australasia Pty Ltd Checked by Checker Scale
C:UsersachachadDocuments1114011140_Fitout_Local.rvt 12/01/2012 10:46:00 AM