This document provides an existing earthing layout diagram for Tusuka Processing Ltd. Unit 2. The diagram shows two earth pits that are 150 feet deep connected to copper busbars of various sizes that distribute earthing throughout the facility. Key equipment like the ozon machines and transformer are connected to the earthing system. The layout was designed by Munzurul Kader and checked by Maruf Rayhan and approved by MD. Serajul Islam.