Se tiene lasiguiente bomba centrifuga de un reflujo de columna. La bomba succiona desde el recipiente E-
202 y descarga a dos torres C-201 y C-202. Estimar presiones Ps, Pd, P Dif, Cabezal de bombeo y Potencias.
CALCULO CARGA DIF
VIAA VIA B
12,25
8,75
2 2
SUB Total 14,25 10,75
10 10
139,7 85,7
24,273 58,17749
188,22 164,6275
92,71 92,71
95,52 71,92
247,92 186,6736
𝑷𝒅 = 𝑷𝒓𝒆𝒄 + 𝑷(𝒄 𝑳𝒊𝒒) + 𝑷 𝑭𝒓𝒊𝒄𝒊𝒐𝒏
+∆𝑷 𝒆𝒒𝒖𝒊𝒑𝒐𝒔 + 𝑽𝒂𝒍𝒗 + 𝑨𝒄𝒄
∆𝑷 = 𝑷𝒅 − 𝑷(𝒔)
250 Ft
350 Ft
5.
OPERATING CONDITIONS LIQUID
gpm Rated gpm Type Or Name Of Liquid
Other gpm Pumping Temperature
/ psia Normal 107 °F Max °F Min °F
psia Vapor Pressure 85 psia @ 0 °F
psi Relative Density (Specific Gravity):
ft ft Normal 0,89 Max Min
HP 3 ft. above floor
level
Specific Heat, Cp BTU/lb-°F
(3.1.2) Viscosity 0,2 cP @ 0 °F
(3.1.3) Max. Viscosity cP @ °F
Interm. (Starts/Day) Corrosive/Erosive Agent (2.11.1.8)
Chloride Concentration (PPM) --- (3.5.2.6)
H2S Concentration (PPM):
(2.11.1.11
)
Liquids:
Toxic Flammable
Other
250 300
92,71
188,22
95,52
247,92 39,37
Mezcla Hidro
HOJA DE DATOS