Principal dimensions
Consultancy SMIT anchor
handling tug/supply vessels
70-ton bollard pull
AHTS
70.90 m
63.00 m
16.00 m
7.00 m
5.60 m
2x Wärtsilä, type 6R32
2x 2 460 kW
2x Lips CPP in nozzle
2x 1 200 kW
2x 540 kW
1x 150 kW
2x 550 kW
1x 500 kW
120-ton bollard pull
AHTS
70.90 m
63.00 m
16.00 m
7.00 m
5.60 m
2x Wärtsilä, type 9R32
2x 3 280 kW
2x Lips CPP in nozzle
2x 1 200 kW
2x 540 kW
1x 150 kW
2x 550 kW
1x 500 kW
Length overall
Length between perpendiculars
Breadth moulded
Depth moulded
Design draught
Main engines
Output
Propellers
Shaft generators
Auxiliary generators
Emergency generator
Bow thrusters:
Stern thruster
During the last quarter of 2003, Vuyk Engineering Rotterdam was contracted by
Smit Engineering - part of the SMIT Group - to review a basic design for a
dynamically positioned anchor handling tug/supply vessel (AHTS), providing a
basis for modular upgrading to diving support, oil recovery and other duties.
In the first phase, SMIT intended to order two 70-ton bollard pull vessels and one
120-ton bollard pull AHTS.
After an international tender, resulting in offers from yards in The Netherlands,
Norway, Spain and Singapore, Smit Transport & Heavy Lift B.V. ordered in March
2004 two 70-ton bp AHTS from the Keppel Singmarine yard in Singapore with an
option for two 120-ton bp AHTS. In July 2004 Smit exercised its option to build this
vessel.
VER project 03.344
Introduction
Machinery
Vuyk Engineering Rotterdam B.V.
Naval architects, Marine engineers, Consultants
P.O. Box 1, De Linie 7
2900 AA Capelle aan den IJssel
Phone +31 (0)10 450 25 00
Fax +31 (0)10 458 72 45
Email vuyk@vuykrotterdam.com
Website www.vuykrotterdam.com Values are for presentation only
Consultancy SMIT anchor
handling tug/supply vessels
All photos courtesy URS of Antwerp, Belgium
Classification
VER scope of work
All vessels are certfied by American Bureau of Shipping for the class notation:
A1(e), Offshore Support Vessel, Anchor Handling Towing Vessel, AMS,
ACCU, FiFi Class 1, +DPS-2
The first AHTS - named 'Smit Kamara' - has been contracted by the Nederlandse
Aardolie Maatschappij B.V.'(NAM) for a 5-year charter period.
The second 70-ton bollard pull AHTS - named 'Smit Komodo' - shall also be fitted
as Diving Support Vessel. For this purpose this vessel shall have two 850 kW bow
thrusters and two 550 kW stern thrusters, enhancing dynamic positioning
capabilities. Furthermore the vessel can accommodate 50 persons instead of 42
persons.
The 'Smit Komodo'' will be deployed on a long -term charter in Egypt and the 120
ton bollard pull 'Smit Nicobar', which is due for delivery June 2006 and will start a
charter in Sakhalin, Russia.
On March 31, 2006 SMIT announced that they have reached an agreement for the
purchase of seven newly built work vessels from Hadi H. Al-Hammam Est. of
Saudi Arabia. These vessels of approximately 75 tons bp are a modified version of
the 'Smit Kamara' and 'Smit Komodo'' The first two vessels of this new series will
be delivered during 2006 and the last one is expected to be delivered in 2008.
They will be managed by the SMIT Singapore organisation.
VER project 03.344
Speed
Bollard pull
Cargo deck area
Fire Fighting Class
Winch brake force
pull force
Winch drum capacity
Accommodation
70-ton bollard pull
AHTS
14.5 kn
83 ton
450 m²
Fi-Fi 1
225 ton
150 ton
2x 1 000 m x 58 mm
42 persons
120-ton bollard pull
AHTS
14.5 kn
120 ton
450 m²
Fi-Fi 1
400 ton
150 ton
2x 1 300 m x 68 mm
1x 1 800 m x 68 mm
42 persons
Performance
Capacity
Vuyk Engineering Rotterdam assisted Smit Engineering to compare the various
shipyards offers in technical and commercial way and made ship motion
calculations to advise for the correct configuration of main propulsion, bow and
stern thruster to obtain the DP-2 class notation.

More Related Content

Similar to 03.344 - Consultancy_AHTS Smit.PDF

Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04
reboostende
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15
reboostende
 
E profiil references
E profiil referencesE profiil references
E profiil references
heavyindustry
 
SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
Paul Heinrich
 
technical_specification_cs_wave_sentinel
technical_specification_cs_wave_sentineltechnical_specification_cs_wave_sentinel
technical_specification_cs_wave_sentinelTsonko Tsonev
 
Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016
Business Finland
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07
reboostende
 
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDFHans Tompot
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier
 
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
IRJET Journal
 
Industrial Projects Department Netherlands
Industrial Projects Department NetherlandsIndustrial Projects Department Netherlands
Industrial Projects Department NetherlandsMaria Verbeek
 
Pin
PinPin
Cer
CerCer
Business Potential detail.pptx
Business Potential detail.pptxBusiness Potential detail.pptx
Business Potential detail.pptx
Ragesh Karimbil
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
CCILVN
 

Similar to 03.344 - Consultancy_AHTS Smit.PDF (20)

WORLD CARGO NEWS
WORLD CARGO NEWS WORLD CARGO NEWS
WORLD CARGO NEWS
 
Rebo general 2015-05-04
Rebo general 2015-05-04Rebo general 2015-05-04
Rebo general 2015-05-04
 
Integrity A 3 leaflet
Integrity A 3 leafletIntegrity A 3 leaflet
Integrity A 3 leaflet
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15
 
Spotlight 1Astander
Spotlight 1AstanderSpotlight 1Astander
Spotlight 1Astander
 
E profiil references
E profiil referencesE profiil references
E profiil references
 
SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
 
technical_specification_cs_wave_sentinel
technical_specification_cs_wave_sentineltechnical_specification_cs_wave_sentinel
technical_specification_cs_wave_sentinel
 
Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016Germany_Current activities at Northern Germany shipyards 2016
Germany_Current activities at Northern Germany shipyards 2016
 
Rebo general presentation 2014-07
Rebo general presentation 2014-07Rebo general presentation 2014-07
Rebo general presentation 2014-07
 
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF
01.244 - Inland_cruise_vessel_Prins_Willem-Alexander.PDF
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's Resume
 
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
Boom Structural Design and Static Finite Element Analysis for a 1000tons Shee...
 
Industrial Projects Department Netherlands
Industrial Projects Department NetherlandsIndustrial Projects Department Netherlands
Industrial Projects Department Netherlands
 
Portfolio L
Portfolio LPortfolio L
Portfolio L
 
Pin
PinPin
Pin
 
Cer
CerCer
Cer
 
Spotlight2 MTG D
Spotlight2 MTG DSpotlight2 MTG D
Spotlight2 MTG D
 
Business Potential detail.pptx
Business Potential detail.pptxBusiness Potential detail.pptx
Business Potential detail.pptx
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 

03.344 - Consultancy_AHTS Smit.PDF

  • 1. Vuyk Engineering Rotterdam B.V. Naval architects, Marine engineers, Consultants P.O. Box 1, De Linie 7 2900 AA Capelle aan den IJssel Phone +31 (0)10 450 25 00 Fax +31 (0)10 458 72 45 Email vuyk@vuykrotterdam.com Website www.vuykrotterdam.com Values are for presentation only Principal dimensions Consultancy SMIT anchor handling tug/supply vessels 70-ton bollard pull AHTS 70.90 m 63.00 m 16.00 m 7.00 m 5.60 m 2x Wärtsilä, type 6R32 2x 2 460 kW 2x Lips CPP in nozzle 2x 1 200 kW 2x 540 kW 1x 150 kW 2x 550 kW 1x 500 kW 120-ton bollard pull AHTS 70.90 m 63.00 m 16.00 m 7.00 m 5.60 m 2x Wärtsilä, type 9R32 2x 3 280 kW 2x Lips CPP in nozzle 2x 1 200 kW 2x 540 kW 1x 150 kW 2x 550 kW 1x 500 kW Length overall Length between perpendiculars Breadth moulded Depth moulded Design draught Main engines Output Propellers Shaft generators Auxiliary generators Emergency generator Bow thrusters: Stern thruster During the last quarter of 2003, Vuyk Engineering Rotterdam was contracted by Smit Engineering - part of the SMIT Group - to review a basic design for a dynamically positioned anchor handling tug/supply vessel (AHTS), providing a basis for modular upgrading to diving support, oil recovery and other duties. In the first phase, SMIT intended to order two 70-ton bollard pull vessels and one 120-ton bollard pull AHTS. After an international tender, resulting in offers from yards in The Netherlands, Norway, Spain and Singapore, Smit Transport & Heavy Lift B.V. ordered in March 2004 two 70-ton bp AHTS from the Keppel Singmarine yard in Singapore with an option for two 120-ton bp AHTS. In July 2004 Smit exercised its option to build this vessel. VER project 03.344 Introduction Machinery
  • 2. Vuyk Engineering Rotterdam B.V. Naval architects, Marine engineers, Consultants P.O. Box 1, De Linie 7 2900 AA Capelle aan den IJssel Phone +31 (0)10 450 25 00 Fax +31 (0)10 458 72 45 Email vuyk@vuykrotterdam.com Website www.vuykrotterdam.com Values are for presentation only Consultancy SMIT anchor handling tug/supply vessels All photos courtesy URS of Antwerp, Belgium Classification VER scope of work All vessels are certfied by American Bureau of Shipping for the class notation: A1(e), Offshore Support Vessel, Anchor Handling Towing Vessel, AMS, ACCU, FiFi Class 1, +DPS-2 The first AHTS - named 'Smit Kamara' - has been contracted by the Nederlandse Aardolie Maatschappij B.V.'(NAM) for a 5-year charter period. The second 70-ton bollard pull AHTS - named 'Smit Komodo' - shall also be fitted as Diving Support Vessel. For this purpose this vessel shall have two 850 kW bow thrusters and two 550 kW stern thrusters, enhancing dynamic positioning capabilities. Furthermore the vessel can accommodate 50 persons instead of 42 persons. The 'Smit Komodo'' will be deployed on a long -term charter in Egypt and the 120 ton bollard pull 'Smit Nicobar', which is due for delivery June 2006 and will start a charter in Sakhalin, Russia. On March 31, 2006 SMIT announced that they have reached an agreement for the purchase of seven newly built work vessels from Hadi H. Al-Hammam Est. of Saudi Arabia. These vessels of approximately 75 tons bp are a modified version of the 'Smit Kamara' and 'Smit Komodo'' The first two vessels of this new series will be delivered during 2006 and the last one is expected to be delivered in 2008. They will be managed by the SMIT Singapore organisation. VER project 03.344 Speed Bollard pull Cargo deck area Fire Fighting Class Winch brake force pull force Winch drum capacity Accommodation 70-ton bollard pull AHTS 14.5 kn 83 ton 450 m² Fi-Fi 1 225 ton 150 ton 2x 1 000 m x 58 mm 42 persons 120-ton bollard pull AHTS 14.5 kn 120 ton 450 m² Fi-Fi 1 400 ton 150 ton 2x 1 300 m x 68 mm 1x 1 800 m x 68 mm 42 persons Performance Capacity Vuyk Engineering Rotterdam assisted Smit Engineering to compare the various shipyards offers in technical and commercial way and made ship motion calculations to advise for the correct configuration of main propulsion, bow and stern thruster to obtain the DP-2 class notation.