SlideShare a Scribd company logo
1 of 23
Download to read offline
POSITIONING FOR
SUSTAINABLE
GROWTH
Second Quarter 2017
Financial Results
August 3, 2017
2
RIC: TSX NYSE
2
RICHMONT MINES
FORWARD-LOOKING STATEMENTS
This presentation contains forward-looking statements that include risks and uncertainties. When used in this presentation, the
words “estimate”, “projects”, “anticipate”, “expects”, “intend”, “believe”, “hope”, “may”, and similar expressions, as well as “will”, “shall”, and
other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current
expectations and apply only as of the date on which they were made. Except as required by law or regulation, Richmont Mines Inc.
(“Richmont” or the “Corporation”) undertakes no obligation and disclaims any responsibility to publicly update or revise any forward-
looking statements of information, whether as a result of new information, future events or otherwise. The factors that could cause actual
results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the
Canadian-U.S. exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and
production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may
be detailed from time to time in Richmont’s Annual Information Form and other public disclosure.
Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning Resources Estimates
The resource estimates in this presentation were prepared in accordance with National Instrument 43-101 Standards of Disclosure of
Mineral Projects (“NI 43-101”) adopted by the Canadian Securities Administrators. The requirements of NI 43-101 differ significantly from
the requirements of the United States Securities and Exchange Commission (the “SEC”). In this presentation, we use the terms
“Measured”, “Indicated” and “Inferred” Resources. Although these terms are recognized and required to be used in Canada, the
SEC does not recognize them. The SEC permits U.S. mining corporations, in their filings with the SEC, to disclose only those mineral
deposits that constitute “Reserves”. Under United States standards, mineralization may not be classified as a Reserve unless the
determination has been made that the mineralization could be economically and legally extracted at the time the determination is made.
United States investors should not assume that all or any portion of a Measured or Indicated Resource will ever be converted into
“Reserves”. Furthermore, “Inferred Resources” have a great amount of uncertainty as to their existence and whether they can be mined
economically or legally, and United States investors should not assume that “Inferred Resources” exist or can be legally or economically
mined, or that they will ever be upgraded to a more certain category.
For additional information regarding the Mineral Reserves and Resources referred to in this presentation, please refer to the press release
dated Jan. 31, 2017 reporting Richmont’s Mineral Reserve and Resource estimates as of Dec. 31, 2016.
An NI 43-101 Technical Report for the Island Gold Mine Expansion Case Preliminary Economic Assessment (“PEA”) is available on
www.sedar.com.
U.S. Investors are urged to consider the disclosure in our annual report on Form 40-F, File No. 001-14598, which may be obtained from
us or from the SEC’s web site: http://sec.gov/edgar.shtml.
(All amounts are in Canadian Dollars, unless otherwise indicated.)
3
RIC: TSX NYSE
3
Quarter ended
June 30, 2017
Six months ended
June 30, 2017 2017 Guidance
Gold produced (oz) 31,249 60,650 110,000 - 120,000
Cash costs per oz. (C$)(1) $725 $754 $835 - $885
AISC per oz. (C$)(1) $957 $1,031 $1,180 - $1,235
Cash costs per oz. (US$)(1,2) $539 $565 $640 - $680
AISC per oz. (US$)(1,2) $711 $773 $905 - $950
Company-wide Operational Highlights
 Strong Q2 production and cost performance driven by the Island Gold Mine
 Island Gold Mine reported another consecutive quarter of solid performance:
 Strong production at record low cash costs and AISC
 Record underground mine and mill productivities
 Island Gold positioned to meet, or beat, annual production and cost guidance
 Net free cash flow(1) of $19M (US$14M); Cash position increased to $96M (US$74M)
RICHMONT MINES
Q2 OPERATIONAL HIGHLIGHTS
All amounts are in Canadian Dollars unless otherwise indicated
(1) “Cash costs”, “all-in sustaining costs” (“AISC”) and “net free cash flow” are Non-IFRS measures. Refer to the Non-IFRS performance
measures contained in the Q2 2017 MD&A.
(2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
4
RIC: TSX NYSE
4
Island Gold:
 Expansion Case PEA supports a 1,100 tpd underground mine and mill expansion:
 Strong production growth of 22%
 Lowest-quartile industry cash costs
 Robust cash flow stream over initial 8-year Phase 1 period
 Recent exploration drilling intersected high-grade, wide mineralization in down
plunge extension of main Island Gold deposit
 Hole MH8-4: 19.85 g/t Au over 8.4 m (true width, assays capped at 70 g/t)
 Significant potential quality, high-grade resource growth
Other Highlights:
 Advancing the review of strategic alternatives for Quebec assets
RICHMONT MINES
Q2 HIGHLIGHTS
All amounts are in Canadian Dollars unless otherwise indicated
5
FINANCIAL HIGHLIGHTS
6
Quarter ended June 30
(in thousands, except per share amounts) 2017 2016
Revenue from mining operations (C$) $59,278 $40,618
Net earnings per share, basic (C$) $0.17 $0.04
Operating cash flow(1,2), per share (C$) $0.39 $0.19
Net free cash flow, per share (C$)(2,3) $0.30 $0.05
Revenue from mining operations (US$) $44,073 $31,521
Net earnings per share, basic (US$) $0.12 $0.03
Operating cash flow(1,2), per share (US$) $0.29 $0.15
Net free cash flow, per share (US$)(2,3) $0.22 $0.04
(1) Before changes in non-cash working capital
(2) Refer to the Non-IFRS performance measures section contained in the MD&A for the corresponding reporting period.
(3) Net free cash flow per share is comprised of the Corporation’s operating cash flow, after changes in non-cash working capital, less investments in property,
plant and equipment
RICHMONT MINES
Q2 FINANCIAL RESULTS
All amounts are in Canadian Dollars unless otherwise indicated
Q2 2017: Robust cash flow streams + strong cash position
(C$95.9M at June 30, 2017) even during a period of accelerated
investment in strategic expansion and exploration programs
7
RICHMONT MINES
Q2 CAPITAL EXPENDITURES & EXPLORATION
(in millions)
Quarter ended
June 30, 2017
Six months ended
June 30, 2017 2017 Guidance
Sustaining Capital (C$) $4.4 $10.2 $25 - $29
Expansion Capital (C$)(1) $6.0 $11.9 $33 - $35
Exploration & Project Evaluation (C$) $5.8 $10.1 $16 - $19
Sustaining Capital (US$)(2) $3.3 $7.6 $19 - $22
Expansion Capital (US$)(1,2) $4.5 $8.9 $25 - $27
Exploration & Project Evaluation (US$)(1,2) $4.4 $7.6 $12 - $14
(1) Expansion capital estimates for 2017 relate exclusively to the Island Gold Mine and are discretionary in nature. Ongoing deployment of project capital at the
Island Gold Mine is contingent a minimum sustaining gold price of C$1,550 per ounce. Expansion capital is exclusive of capital requirements related to a mill
expansion in 2018 as contemplated in the PEA.
(2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
 Capital expected to increase in H2 but remain within guidance
 Expansion capital primarily related to:
 Ongoing accelerated underground development ($3.5M)
 Mine and mill infrastructure ($2.1M)
 Strong cash position and cash flow streams expected to fund all capital requirements
All amounts are in Canadian Dollars unless otherwise indicated
8
OPERATIONS & OVERVIEW
9
Island Gold Mine
Quarter ended
June 30, 2017
Six months ended
June 30, 2017 2017 Guidance
Gold produced (oz) 26,110 49,882 87,000 - 93,000
Gold sold (oz) 29,534 52,183 -
Cash costs per ounce (C$)(1) $580 $618 $715 - $765
AISC per ounce (C$)(1) $677 $751 $945 - $995
Cash costs per ounce (US$)(1,2) $431 $463 $550 - $590
AISC per ounce (US$)(1,2) $503 $563 $725 - $765
(1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A.
(2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
ISLAND GOLD MINE
OPERATIONAL HIGHLIGHTS
 Solid quarter; strong production at record low cash costs and AISC
 Record underground productivity of 1,148 tpd
 Record mill productivity of 940 tpd; Mill head grade of 9.73 g/t gold
 Mill expected to achieve 1,100 tpd run rate in the latter part of 2018
 Long-hole stope mining in the first and second horizons; development in ore in third
horizon; Stoping in the lower grade extensions of third horizon expected in Q4
 Eastern portion of main ramp at 860m level; Western ramp development launched in Q2
 Underground development transitioning from contractors to internal workforce
All amounts are in Canadian Dollars unless otherwise indicated
10
Production Upside
(1) Refer to the Non-IFRS performance measures section contained in the MD&A of the corresponding financial
reporting period.
(2) 2017 amounts represents the high-end of production guidance and low-end of cash costs guidance (see
Feb. 2, 2017 Press Release).
(3) Estimated production, grade and average cash costs as outlined in May 29, 2017 PEA Press Release.
Underground Productivity
$0
$200
$400
$600
$800
$1,000
$1,200
0
20,000
40,000
60,000
80,000
100,000
120,000
CashCosts(C$)(1)
AnnualGoldProduction(oz)
Annual Gold Production (oz) Cash Costs (C$)(1)
0.00
2.00
4.00
6.00
8.00
10.00
0
200
400
600
800
1,000
1,200
Gramspertonne
Tonnesperday
Underground tpd Head Grade (g/t)
(4) 2015 productivity excludes a 3 week mine shutdown and a 2 week mill shutdown in the fourth quarter.
(5) Q3 2016 productivity excludes 16-day electrical upgrade shutdown of the underground mine
(6) Underground productivity is expected to average 1,000 tpd in 2017 with lower-grade underground ore
stockpiled for future processing.
ISLAND GOLD MINE
OPERATIONAL PERFORMANCE
Island Gold Mine
Quarter ended
June 30, 2017
Six months ended
June 30, 2017 2017 Guidance
Underground tpd 1,148 1,084 1,000(6)
Mill tpd 940 933 900
Head grade (g/t gold) 9.73 9.46 8.90
Recoveries (%) 97.6 97.1 96.5
Sustaining costs ($M) $2.9 $6.9 $19 - $22
Project costs ($M) $6.0 $11.9 $33 - $35
Non-sustaining exploration costs ($M) $4.9 $8.7 $14 - $16
All amounts are in Canadian Dollars unless otherwise indicated
11
First step in disciplined multi-phased strategy to maximize
productivity while maintaining minimum mine life of 8 years
Expansion Case PEA:
 Capital and cost effective
 use current infrastructure for low incremental expansion capital of C$28.2 M
 low industry cash costs and robust cash flow stream
 Supporting strong production
 22% projected growth
 mine the main area of interest over 4 horizons to 1,000 m maximum depth
Additional growth opportunities
 Only ~24% of Inferred Resources were incorporated
 +750k ounces Inferred Resources available for further growth
 Recent delineation/exploration success not captured
 PEA based on 2016 operational performance
 Potential for additional operational and cost optimization upside
Ramp-up to 1,100 tonnes per day currently advancing;
Mill anticipated to achieve target run rate in latter part of 2018
ISLAND GOLD MINE
EXPANSION CASE PEA – A DISCIPLINED APPROACH
12
RIC: TSX NYSE
12
ISLAND GOLD MINE
2017 DRILLING PROGRAM
620 m Level Planned
Explo. & Delineation Drift
840 m Level Planned
Explo. & Delineation Drift
GOUDREAULOCHALSH ISLAND EXT1 EXT2
- 500 m
- 1,500 m
W E
340 m Level
190 m Level
740 m Level
Explo. &
Delineation
Drift
- 1,000 m
200 m
Main
mineralized trend
2017 DEEP
EXPLORATION
DRILLING
36,000 m
Proven Reserves
Probable Reserves
Indicated Resources
Inferred Resources
Mineral Reserves and Resources
as of December 31, 2016)
2017
DELINEATION
DRILLING 7,000 m
2017 SURFACE/
UNDERGROUND
EXPLORATION
DRILLING
30,000 m
450 k oz inferred resources added in 2016 at $35/oz
GD-630-01
25.37/3.85
GD-620-01
19.74/1.4
Potential Extension
MH8-4
19.85/8.4
2017
DELINEATION
DRILLING
30,000 m
Ramps and Actual Development
Mined Out
Planned Development
GD-640-05
20.57/11.3 c.l.
MH2A-13
8.86/6.39
MH2A-12
11.67/9.42
GD-640-05-3
13.81/5.20 c.l.
Drill Hole Intersections
Au g/t / true width (m)
c.l. : Core length (m)
13
RIC: TSX NYSE
13
EXPANSION CASE
PEA AREA
ISLAND GOLD MINE
Deep Directional Exploration
Drilling Program Highlights
15,500mE
15,000mE
Dyke
- 1,500 m
- 1,000 m
100 m
840 m Level Planned
Explo. & Delineation Drift
MH8-3B
1.42/2.67
MH7 (C zone)
2.35/3.53
MH8-4
19.85/8.40
MH8-1C
0.62/3.01
Proven Reserves (2016/12/31)
Probable Reserves (2016/12/31)
Indicated Resources (2016/12/31)
Inferred Resources (2016/12/31)
Ramp and Actual Development
Mined Out
Planned Development
> 30
8.0 to 30.0
4.0 to 8.0
< 4.0
MH1-11 (C zone)
0.72/2.71
MH2A-13
8.86/6.39
MH2A-12
11.67/9.42
MH4-5
4.63/2.51
MH8
4.60/2.24
MH1-10
24.54/3.76
MH2A-10
6.16/11.58
MH7 (X zone)
17.85/1.68
MH1-11 (X zone)
20.78/1.28
Drilling results since March 30, 2017 press release
Drill Hole Intersections
Au g/t / true width (m)
c.l. : Core length (m)
DEEP DIRECTIONAL DRILLING
14
RIC: TSX NYSE
14
340 m Level
- 500 m
GD-640-04
7.38/3.27
EXPANSION CASE
PEA AREA
620 m Level Planned
Explo. & Delineation Drift
840 m Level Planned
Explo. & Delineation Drift
- 1000 mGD-640-05
20.57/11.3 c.l.
GD-640-05-1
10.16/5.74 c.l.
GD-620-01
19.74/1.4
GD-630-01
25.37/3.85
GD-640-05-1
16.10/8.33 c.l.
Proven Reserves (2016/12/31)
Probable Reserves (2016/12/31)
Indicated Resources (2016/12/31)
Inferred Resources (2016/12/31)
Ramp and Actual Development
Mined Out
Planned Development
100 m
> 30
8.0 to 30.0
4.0 to 8.0
< 4.0
ISLAND GOLD MINE
Eastern Lateral Exploration and
Infill Drilling Program
Drilling results since March 30, 2017 press release
340-588-30
14.15/2.91
340-588-40
23.10/2.40
GD-670-01
4.17/2.44
GD-690-01
15.39/0.89
GD-640-05-3
4.62/2.21
GD-640-05-5
58.34/0.43
GD-640-05-3
13.81/5.20 c.l.
340-588-52
16.16/2.35
340-588-47
16.08/2.18
340-588-45
14.71/2.59
340-588-50
12.52/3.00
Drill Hole Intersections
Au g/t / true width (m)
c.l. : Core length (m)
EASTERN
LATERAL
DRILLING
15
RIC: TSX NYSE
15
14,500mE
15,000mE
Dyke
- 1,000 m
100 m
EXPANSION CASE
PEA AREA
840 m Level Planned
Explo. & Delineation
Drift
860-517-08
45.20/3.27
635 m Level
740 m Level
ISLAND GOLD MINE
Expansion Case PEA Delineation
Drilling Program
Proven Reserves (2016/12/31)
Probable Reserves (2016/12/31)
Indicated Resources (2016/12/31)
Inferred Resources (2016/12/31)
Ramp and Actual Development
Mined Out
Planned Development
> 30
8.0 to 30.0
4.0 to 8.0
< 4.0
860-511-07
51.02/3.54
860-511-03
37.09/4.98
860-517-07
52.09/4.99
765-465-40
31.80/1.92
Drilling results since March 30, 2017 press release
Drill Hole Intersections
Au g/t / true width (m)
c.l. : Core length (m)
DRILLING IN PEA
16
ISLAND GOLD MINE
NEXT STEPS: ADDITIONAL GROWTH OPPORTUNITIES
Immediate
Operational
enhancements
► Ongoing implementation of enhanced operational efficiencies
► Cost reduction initiatives
► Supply chain optimization
Short-Term
Exploration and
Delineation Program
► Increase resource inventory to the east and at depth to a
minimum of 2Moz of total resources, including 1Moz of
reserves
Mid-Term
Phase 2 Expansion
< 5 years
► Additional mine infrastructure (ex. shaft) could allow increased
mining rates as new mining zones outside the PEA area (both
laterally and at depth) are incorporated in the PEA
► +2M oz of resources – further production growth profile over
10+ year mine life
Mid to
Long-Term
Unlocking the Full
Potential of the Island
Gold Deposit
► Increased resource inventory of the vertical extension at depth
(+2 km)
► Increased resource inventory along strike; +7 km east and
west
► Transforming Island Gold into a multi-million ounce deposit
Long-Term
Potential
Full Land Package
► Resource growth potential regionally outside the current
deposit area
► <15% of the main structure has been drilled to a depth of
1,000 m
17
Beaufor Mine
Quarter ended
June 30, 2017
Six months ended
June 30, 2017 2017 Guidance
Gold produced (oz) 5,139 10,768 23,000 - 27,000
Gold sold (oz) 5,506 11,385 -
Cash costs per ounce (C$)(1) $1,502 $1,380 $1,265 - $1,320
AISC per ounce (C$)(1) $1,791 $1,682 $1,540 - $1,590
Cash costs per ounce (US$)(1,2) $1,117 $1,034 $975 - $1,015
AISC per ounce (US$)(1,2) $1,332 $1,260 $1,185 - $1,225
Sustaining Costs ($M’s) $1.6 $3.5 $6 - $7
Underground tpd 339 346 -
Mill tonnes 31,414 61,423 -
Head grade (g/t gold) 5.21 5.60 -
Recoveries (%) 97.7 97.4 -
(1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A.
(2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
 Production impacted by lower grades and higher dilution in one Q Zone stope
 Mining flexibility expected to improve in H2 with additional ore from new parallel structures
 Production is expected ramp-up over the balance of the year
 Advancing review of strategic alternatives for Quebec assets
BEAUFOR MINE
OPERATIONAL HIGHLIGHTS
All amounts are in Canadian Dollars unless otherwise indicated
18
Q&A
19
Production and Cost Guidance
Capital Investment Guidance
2017 Operational Estimates
Island Gold Mine
2017 Guidance
Beaufor Mine
2017 Guidance
2017 Guidance
Gold Ounces Produced 87,000 - 93,000 23,000 - 27,000 110,000 - 120,000
Cash Costs per Ounce (C$)(1) $715 - $765 $1,265 - $1,320 $835 - $885
Corporate G&A per Ounce (C$) - - $105 - $110
All-in Sustaining Costs per Ounce (C$)(1) $945 - $995 $1,540 - $1,590 $1,180 - $1,235
Cash Costs per Ounce (US$)(1)(2) $550 - $590 $975 - $1,015 $640 - $680
Corporate G&A per Ounce (US$)(2) - - $80 - $85
All-in Sustaining Costs per Ounce (US$)(1)(2) $725 - $765 $1,185 - $1,225 $905 - $950
2017 Operational Estimates ($M)
Island Gold Mine
2017 Guidance
Beaufor Mine
2017 Guidance
2017 Guidance
Sustaining Capital (C$) $19 - $22 $6 - $7 $25 - $29
Expansion Capital (C$)(3) $33 - $35 - $33 - $35
Exploration & Project Evaluation (C$) $14 - $16 $2 - $3 $16 - $19
Sustaining Capital (US$)(2) $15 - $17 $5 - $6 $19 - $22
Expansion Capital (US$)(2)(3) $25 - $27 - $25 - $27
Exploration & Project Evaluation (US$)(2) $11 - $12 $1 - $2 $12 - $14
(1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A.
(2) Assuming an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
(3) Expansion capital estimates for 2017 relate exclusively to the Island Gold Mine and are discretionary in nature. Ongoing deployment of project capital at the Island Gold Mine is contingent upon the receipt of
a confirmatory Preliminary Economic Assessment (“PEA”) for 1,100 tonnes per day and a minimum sustaining gold price of C$1,550 per ounce. Expansion capital is exclusive of capital requirements related to
a mill expansion in 2018 as contemplated in the PEA.
RICHMONT MINES
2017 OPERATIONAL ESTIMATES
20
0
100
200
300
400
500
600
700
800
2012 2013 2014 2015 2016
MineralReserves(000’sounces)
Monique Beaufor Island Gold
Gold oz.
752,200
Island Gold Mine
reserve growth of
+34% in 2016
Gold oz.
44,920
2016 Reserve growth
 752,200 ounces of reserves (net of depletion)
with 11% increase in reserve grade to 9.17 g/t
 995,700 ounces (30% increase) of inferred
resources (net of conversion) with 20%
increase in grade to 10.18 g/t
 New resource blocks laterally to the east and
at depth below 1,000 metres
 Low discovery cost of ~$35/oz
ISLAND GOLD MINE
RESERVE & RESOURCE GROWTH
Exploration results support potential for resource growth
 New high-grade mineralization identified by recent exploration drilling
 ~800 m east of main Island Gold deposit
 Hole GD-640-05: 20.6 g/t gold over 11.3 m (core length)
Reserve growth potential in the higher grade fourth mining horizon
 Early results from delineation drilling completed within Expansion Case PEA area demonstrate
significant potential to further expand reserves at higher than current average grades.
All amounts are in Canadian Dollars unless otherwise indicated
21
W EGOUDREAULOCHALSH ISLAND EXT1 EXT2
- 1 000 m
- 500 m
Crown pillar
- 1 500 m
16000mE
620 m Level Planned
Exploration drift
Surface
200 m
Cut off
(4.0-4.35g/t Au / 2.0m)
217
60
30
15
7.5
0
Au Metal Factor
Grade (Au g/t, cut) x true width (m)
190 m Level
340 m Level
MH1-10
24.54/3.76
MH2A-10
6.16/11.58
740-465-20
24.56/3.85
GD-640-04
7.38/3.27
GD-620-01
19.74/1.4
GD-630-01
25.37/3.85
740-477-40
38.62/2.24
MH5-1A
9.27/5.93
NEW DISCOVERY
GD-640-05
20.57/11.3 c.l.
Drillhole Intersection
Au (cut 225 g/t)
Drillhole Intersection
Au (cut 70 g/t)
14500mE
860 m Level Planned
Exploration Drift
Dyke
740 m Level
Explo. & Delineation Drift
ISLAND GOLD MINE
C ZONE – GOLD METAL FACTOR (grade x true width)
March 31, 2017
22
RIC: TSX NYSE
22
New capping 225 g/t Au
Assays Island C Lower
ISLAND GOLD MINE
NEW CAPPING/ISLAND C LOWER ZONE July 6, 2016
23
RIC: TSX NYSE
23
New capping 225 g/t Au
Assays Island C LowerLog Normal Probability Plot
ISLAND GOLD MINE
NEW CAPPING/ISLAND C LOWER ZONE
December 31, 2016

More Related Content

What's hot

Corporate Update January 21, 2016
Corporate Update January 21, 2016Corporate Update January 21, 2016
Corporate Update January 21, 2016RichmontIR
 
Q1 17 investor presentation may 24 final
Q1 17 investor presentation may 24 finalQ1 17 investor presentation may 24 final
Q1 17 investor presentation may 24 finalkirklandlakegoldltd
 
17 04 04 european gold forum - zurich
17 04 04   european gold forum - zurich17 04 04   european gold forum - zurich
17 04 04 european gold forum - zurichrichmontminesinc2016
 
Royal gold presentation egf - final screen
Royal gold presentation   egf - final screenRoyal gold presentation   egf - final screen
Royal gold presentation egf - final screenRoyalGold
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation Karen Willoughby
 
03 03-16 red cloud pre-pdac showcase
03 03-16 red cloud pre-pdac showcase03 03-16 red cloud pre-pdac showcase
03 03-16 red cloud pre-pdac showcaseAdnet Communications
 
Kirkland lake gold investor presentation jan23 cibc final
Kirkland lake gold investor presentation jan23 cibc finalKirkland lake gold investor presentation jan23 cibc final
Kirkland lake gold investor presentation jan23 cibc finalkirklandlakegoldinc
 
Richmont Mines 2016 PDAC Presentation
Richmont Mines 2016 PDAC PresentationRichmont Mines 2016 PDAC Presentation
Richmont Mines 2016 PDAC PresentationAdnet Communications
 
Q4 and Full Year 2016 Results
Q4 and Full Year 2016 ResultsQ4 and Full Year 2016 Results
Q4 and Full Year 2016 ResultsGranColombiaGold
 
Newmarket Gold Inc - June 2016 Marketing Presentation
Newmarket Gold Inc - June 2016 Marketing PresentationNewmarket Gold Inc - June 2016 Marketing Presentation
Newmarket Gold Inc - June 2016 Marketing PresentationAdnet Communications
 
04 27-16-toronto-marketing
04 27-16-toronto-marketing04 27-16-toronto-marketing
04 27-16-toronto-marketingRichmontIR
 
NA Marketing Presentation
NA Marketing PresentationNA Marketing Presentation
NA Marketing PresentationRichmontIR
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 
Newmarket Gold Investor Presentation July 2016
Newmarket Gold Investor Presentation July 2016Newmarket Gold Investor Presentation July 2016
Newmarket Gold Investor Presentation July 2016Newmarket Gold Inc.
 
Island Gold Technical Session Expansion PEA - May 29, 2017
Island Gold Technical Session Expansion PEA - May 29, 2017Island Gold Technical Session Expansion PEA - May 29, 2017
Island Gold Technical Session Expansion PEA - May 29, 2017richmontminesinc2016
 

What's hot (20)

Corporate Update January 21, 2016
Corporate Update January 21, 2016Corporate Update January 21, 2016
Corporate Update January 21, 2016
 
Q1 17 investor presentation may 24 final
Q1 17 investor presentation may 24 finalQ1 17 investor presentation may 24 final
Q1 17 investor presentation may 24 final
 
17 04 04 european gold forum - zurich
17 04 04   european gold forum - zurich17 04 04   european gold forum - zurich
17 04 04 european gold forum - zurich
 
2016 agm presentation final
2016 agm presentation final2016 agm presentation final
2016 agm presentation final
 
10 18-16 new york marketing.pptx
10 18-16 new york marketing.pptx10 18-16 new york marketing.pptx
10 18-16 new york marketing.pptx
 
denver gold forum
denver gold forumdenver gold forum
denver gold forum
 
Royal gold presentation egf - final screen
Royal gold presentation   egf - final screenRoyal gold presentation   egf - final screen
Royal gold presentation egf - final screen
 
03 29-16-macquarie-marketing
03 29-16-macquarie-marketing03 29-16-macquarie-marketing
03 29-16-macquarie-marketing
 
06 21-16-texas-marketing
06 21-16-texas-marketing06 21-16-texas-marketing
06 21-16-texas-marketing
 
Probe Metals Corporate Presentation
 Probe Metals Corporate Presentation  Probe Metals Corporate Presentation
Probe Metals Corporate Presentation
 
03 03-16 red cloud pre-pdac showcase
03 03-16 red cloud pre-pdac showcase03 03-16 red cloud pre-pdac showcase
03 03-16 red cloud pre-pdac showcase
 
Kirkland lake gold investor presentation jan23 cibc final
Kirkland lake gold investor presentation jan23 cibc finalKirkland lake gold investor presentation jan23 cibc final
Kirkland lake gold investor presentation jan23 cibc final
 
Richmont Mines 2016 PDAC Presentation
Richmont Mines 2016 PDAC PresentationRichmont Mines 2016 PDAC Presentation
Richmont Mines 2016 PDAC Presentation
 
Q4 and Full Year 2016 Results
Q4 and Full Year 2016 ResultsQ4 and Full Year 2016 Results
Q4 and Full Year 2016 Results
 
Newmarket Gold Inc - June 2016 Marketing Presentation
Newmarket Gold Inc - June 2016 Marketing PresentationNewmarket Gold Inc - June 2016 Marketing Presentation
Newmarket Gold Inc - June 2016 Marketing Presentation
 
04 27-16-toronto-marketing
04 27-16-toronto-marketing04 27-16-toronto-marketing
04 27-16-toronto-marketing
 
NA Marketing Presentation
NA Marketing PresentationNA Marketing Presentation
NA Marketing Presentation
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 
Newmarket Gold Investor Presentation July 2016
Newmarket Gold Investor Presentation July 2016Newmarket Gold Investor Presentation July 2016
Newmarket Gold Investor Presentation July 2016
 
Island Gold Technical Session Expansion PEA - May 29, 2017
Island Gold Technical Session Expansion PEA - May 29, 2017Island Gold Technical Session Expansion PEA - May 29, 2017
Island Gold Technical Session Expansion PEA - May 29, 2017
 

Viewers also liked

August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016Adnet Communications
 
Island Gold Mine Technical Session Presentation
Island Gold Mine Technical Session PresentationIsland Gold Mine Technical Session Presentation
Island Gold Mine Technical Session Presentationrichmontminesinc2016
 
2014 Annual General Meeting Presentation
2014 Annual General Meeting Presentation2014 Annual General Meeting Presentation
2014 Annual General Meeting Presentationrichmontminesinc2016
 
First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016richmontminesinc2016
 
Annual Shareholders Meeting Presentation
Annual Shareholders Meeting PresentationAnnual Shareholders Meeting Presentation
Annual Shareholders Meeting Presentationrichmontminesinc2016
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentationrichmontminesinc2016
 
Island Gold Mine Site Visit Presentation
Island Gold Mine Site Visit PresentationIsland Gold Mine Site Visit Presentation
Island Gold Mine Site Visit Presentationrichmontminesinc2016
 
Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016richmontminesinc2016
 
2015 Guidance and Transformational Budget Presentation
2015 Guidance and Transformational Budget Presentation2015 Guidance and Transformational Budget Presentation
2015 Guidance and Transformational Budget Presentationrichmontminesinc2016
 
Richmont Mines July 21 Presentation
Richmont Mines July 21 PresentationRichmont Mines July 21 Presentation
Richmont Mines July 21 PresentationRichmontIR
 

Viewers also liked (20)

August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
August 2016 - Second Quarter 2016 Financial Results - August 8, 2016
 
European Marketing
European MarketingEuropean Marketing
European Marketing
 
Island Gold Mine Technical Session Presentation
Island Gold Mine Technical Session PresentationIsland Gold Mine Technical Session Presentation
Island Gold Mine Technical Session Presentation
 
Denver Gold Presentation 2012
Denver Gold Presentation 2012Denver Gold Presentation 2012
Denver Gold Presentation 2012
 
June 2015 Presentation
June 2015 PresentationJune 2015 Presentation
June 2015 Presentation
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver Marketing
 
17 01 18-19 td mining conference
17 01 18-19 td mining conference17 01 18-19 td mining conference
17 01 18-19 td mining conference
 
2016 Annual General Meeting
2016 Annual General Meeting2016 Annual General Meeting
2016 Annual General Meeting
 
2014 Annual General Meeting Presentation
2014 Annual General Meeting Presentation2014 Annual General Meeting Presentation
2014 Annual General Meeting Presentation
 
CIBC Conference Presentation
CIBC Conference PresentationCIBC Conference Presentation
CIBC Conference Presentation
 
First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016First Quarter 2016 Financial Results - May 12, 2016
First Quarter 2016 Financial Results - May 12, 2016
 
Corporate Update
Corporate UpdateCorporate Update
Corporate Update
 
Texas Marketing
Texas MarketingTexas Marketing
Texas Marketing
 
Annual Shareholders Meeting Presentation
Annual Shareholders Meeting PresentationAnnual Shareholders Meeting Presentation
Annual Shareholders Meeting Presentation
 
Q3 Webcast Presentation
Q3 Webcast PresentationQ3 Webcast Presentation
Q3 Webcast Presentation
 
17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation17 02 26 03 01 - bmo conference presentation
17 02 26 03 01 - bmo conference presentation
 
Island Gold Mine Site Visit Presentation
Island Gold Mine Site Visit PresentationIsland Gold Mine Site Visit Presentation
Island Gold Mine Site Visit Presentation
 
Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016Scotiabank Mining Conference – December 7, 2016
Scotiabank Mining Conference – December 7, 2016
 
2015 Guidance and Transformational Budget Presentation
2015 Guidance and Transformational Budget Presentation2015 Guidance and Transformational Budget Presentation
2015 Guidance and Transformational Budget Presentation
 
Richmont Mines July 21 Presentation
Richmont Mines July 21 PresentationRichmont Mines July 21 Presentation
Richmont Mines July 21 Presentation
 

Similar to 17 08 03 q2 2017 webcast

BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conferencerichmontminesinc2016
 
04.13 20.2016 european marketing
04.13 20.2016 european marketing04.13 20.2016 european marketing
04.13 20.2016 european marketingRichmontIR
 
08 09-16 montreal-marketing
08 09-16 montreal-marketing08 09-16 montreal-marketing
08 09-16 montreal-marketingRichmontIR
 
Richmont Mines London Marketing Presentation
Richmont Mines London Marketing PresentationRichmont Mines London Marketing Presentation
Richmont Mines London Marketing PresentationRichmontIR
 
2017 06-08 great-panther_silver_limited_corporate_presentation
2017 06-08 great-panther_silver_limited_corporate_presentation2017 06-08 great-panther_silver_limited_corporate_presentation
2017 06-08 great-panther_silver_limited_corporate_presentationGreat Panther Silver Limited
 
2017 06-16 great-panther_silver_limited_corporate_presentation
2017 06-16 great-panther_silver_limited_corporate_presentation2017 06-16 great-panther_silver_limited_corporate_presentation
2017 06-16 great-panther_silver_limited_corporate_presentationGreat Panther Silver Limited
 

Similar to 17 08 03 q2 2017 webcast (16)

17 06 07 nbf conference - toronto
17 06 07   nbf conference - toronto17 06 07   nbf conference - toronto
17 06 07 nbf conference - toronto
 
2016 PDAC Convention
2016 PDAC Convention2016 PDAC Convention
2016 PDAC Convention
 
Montreal and New York Marketing
Montreal and New York MarketingMontreal and New York Marketing
Montreal and New York Marketing
 
Red Cloud Pre-PDAC Showcase
Red Cloud Pre-PDAC ShowcaseRed Cloud Pre-PDAC Showcase
Red Cloud Pre-PDAC Showcase
 
Q4 2016 webcast presentation
Q4 2016 webcast presentationQ4 2016 webcast presentation
Q4 2016 webcast presentation
 
2.28.2016 bmo conference final
2.28.2016 bmo conference final2.28.2016 bmo conference final
2.28.2016 bmo conference final
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
04.13 20.2016 european marketing
04.13 20.2016 european marketing04.13 20.2016 european marketing
04.13 20.2016 european marketing
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
08 09-16 montreal-marketing
08 09-16 montreal-marketing08 09-16 montreal-marketing
08 09-16 montreal-marketing
 
Sales Desk Presentation
Sales Desk PresentationSales Desk Presentation
Sales Desk Presentation
 
NA Marketing Presentation
NA Marketing PresentationNA Marketing Presentation
NA Marketing Presentation
 
Richmont Mines London Marketing Presentation
Richmont Mines London Marketing PresentationRichmont Mines London Marketing Presentation
Richmont Mines London Marketing Presentation
 
London Marketing Presentation
London Marketing PresentationLondon Marketing Presentation
London Marketing Presentation
 
2017 06-08 great-panther_silver_limited_corporate_presentation
2017 06-08 great-panther_silver_limited_corporate_presentation2017 06-08 great-panther_silver_limited_corporate_presentation
2017 06-08 great-panther_silver_limited_corporate_presentation
 
2017 06-16 great-panther_silver_limited_corporate_presentation
2017 06-16 great-panther_silver_limited_corporate_presentation2017 06-16 great-panther_silver_limited_corporate_presentation
2017 06-16 great-panther_silver_limited_corporate_presentation
 

More from richmontminesinc2016

More from richmontminesinc2016 (9)

Alamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation finalAlamos acquisition of richmont presentation final
Alamos acquisition of richmont presentation final
 
11 14-16 ric european marketing
11 14-16 ric european marketing11 14-16 ric european marketing
11 14-16 ric european marketing
 
10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentation10 11-2016 q3 webcast presentation
10 11-2016 q3 webcast presentation
 
Denver Gold Presentation 2013
Denver Gold Presentation 2013Denver Gold Presentation 2013
Denver Gold Presentation 2013
 
DGF 2014 Presentation
DGF 2014 PresentationDGF 2014 Presentation
DGF 2014 Presentation
 
January 2015 Presentation
January 2015 PresentationJanuary 2015 Presentation
January 2015 Presentation
 
2014 Annual Meeting Presentation
2014 Annual Meeting Presentation2014 Annual Meeting Presentation
2014 Annual Meeting Presentation
 
Island Gold Site Visit
Island Gold Site VisitIsland Gold Site Visit
Island Gold Site Visit
 
Q2 2015 Overview Presentation
Q2 2015 Overview PresentationQ2 2015 Overview Presentation
Q2 2015 Overview Presentation
 

Recently uploaded

Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 

Recently uploaded (20)

Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Nehru Place ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Nehru Place ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls KolkataCall Girl Kolkata Sia 🤌  8250192130 🚀 Vip Call Girls Kolkata
Call Girl Kolkata Sia 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In Vasant Kunj 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In Vasant Kunj 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130  Available With RoomVIP Kolkata Call Girl Entally 👉 8250192130  Available With Room
VIP Kolkata Call Girl Entally 👉 8250192130 Available With Room
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 

17 08 03 q2 2017 webcast

  • 1. POSITIONING FOR SUSTAINABLE GROWTH Second Quarter 2017 Financial Results August 3, 2017
  • 2. 2 RIC: TSX NYSE 2 RICHMONT MINES FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements that include risks and uncertainties. When used in this presentation, the words “estimate”, “projects”, “anticipate”, “expects”, “intend”, “believe”, “hope”, “may”, and similar expressions, as well as “will”, “shall”, and other indications of future tense, are intended to identify forward-looking statements. The forward-looking statements are based on current expectations and apply only as of the date on which they were made. Except as required by law or regulation, Richmont Mines Inc. (“Richmont” or the “Corporation”) undertakes no obligation and disclaims any responsibility to publicly update or revise any forward- looking statements of information, whether as a result of new information, future events or otherwise. The factors that could cause actual results to differ materially from those indicated in such forward-looking statements include changes in the prevailing price of gold, the Canadian-U.S. exchange rate, grade of ore mined and unforeseen difficulties in mining operations that could affect revenue and production costs. Other factors such as uncertainties regarding government regulations could also affect the results. Other risks may be detailed from time to time in Richmont’s Annual Information Form and other public disclosure. Safe Harbor Statement & Cautionary Note to U.S. Investors Concerning Resources Estimates The resource estimates in this presentation were prepared in accordance with National Instrument 43-101 Standards of Disclosure of Mineral Projects (“NI 43-101”) adopted by the Canadian Securities Administrators. The requirements of NI 43-101 differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”). In this presentation, we use the terms “Measured”, “Indicated” and “Inferred” Resources. Although these terms are recognized and required to be used in Canada, the SEC does not recognize them. The SEC permits U.S. mining corporations, in their filings with the SEC, to disclose only those mineral deposits that constitute “Reserves”. Under United States standards, mineralization may not be classified as a Reserve unless the determination has been made that the mineralization could be economically and legally extracted at the time the determination is made. United States investors should not assume that all or any portion of a Measured or Indicated Resource will ever be converted into “Reserves”. Furthermore, “Inferred Resources” have a great amount of uncertainty as to their existence and whether they can be mined economically or legally, and United States investors should not assume that “Inferred Resources” exist or can be legally or economically mined, or that they will ever be upgraded to a more certain category. For additional information regarding the Mineral Reserves and Resources referred to in this presentation, please refer to the press release dated Jan. 31, 2017 reporting Richmont’s Mineral Reserve and Resource estimates as of Dec. 31, 2016. An NI 43-101 Technical Report for the Island Gold Mine Expansion Case Preliminary Economic Assessment (“PEA”) is available on www.sedar.com. U.S. Investors are urged to consider the disclosure in our annual report on Form 40-F, File No. 001-14598, which may be obtained from us or from the SEC’s web site: http://sec.gov/edgar.shtml. (All amounts are in Canadian Dollars, unless otherwise indicated.)
  • 3. 3 RIC: TSX NYSE 3 Quarter ended June 30, 2017 Six months ended June 30, 2017 2017 Guidance Gold produced (oz) 31,249 60,650 110,000 - 120,000 Cash costs per oz. (C$)(1) $725 $754 $835 - $885 AISC per oz. (C$)(1) $957 $1,031 $1,180 - $1,235 Cash costs per oz. (US$)(1,2) $539 $565 $640 - $680 AISC per oz. (US$)(1,2) $711 $773 $905 - $950 Company-wide Operational Highlights  Strong Q2 production and cost performance driven by the Island Gold Mine  Island Gold Mine reported another consecutive quarter of solid performance:  Strong production at record low cash costs and AISC  Record underground mine and mill productivities  Island Gold positioned to meet, or beat, annual production and cost guidance  Net free cash flow(1) of $19M (US$14M); Cash position increased to $96M (US$74M) RICHMONT MINES Q2 OPERATIONAL HIGHLIGHTS All amounts are in Canadian Dollars unless otherwise indicated (1) “Cash costs”, “all-in sustaining costs” (“AISC”) and “net free cash flow” are Non-IFRS measures. Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A. (2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.
  • 4. 4 RIC: TSX NYSE 4 Island Gold:  Expansion Case PEA supports a 1,100 tpd underground mine and mill expansion:  Strong production growth of 22%  Lowest-quartile industry cash costs  Robust cash flow stream over initial 8-year Phase 1 period  Recent exploration drilling intersected high-grade, wide mineralization in down plunge extension of main Island Gold deposit  Hole MH8-4: 19.85 g/t Au over 8.4 m (true width, assays capped at 70 g/t)  Significant potential quality, high-grade resource growth Other Highlights:  Advancing the review of strategic alternatives for Quebec assets RICHMONT MINES Q2 HIGHLIGHTS All amounts are in Canadian Dollars unless otherwise indicated
  • 6. 6 Quarter ended June 30 (in thousands, except per share amounts) 2017 2016 Revenue from mining operations (C$) $59,278 $40,618 Net earnings per share, basic (C$) $0.17 $0.04 Operating cash flow(1,2), per share (C$) $0.39 $0.19 Net free cash flow, per share (C$)(2,3) $0.30 $0.05 Revenue from mining operations (US$) $44,073 $31,521 Net earnings per share, basic (US$) $0.12 $0.03 Operating cash flow(1,2), per share (US$) $0.29 $0.15 Net free cash flow, per share (US$)(2,3) $0.22 $0.04 (1) Before changes in non-cash working capital (2) Refer to the Non-IFRS performance measures section contained in the MD&A for the corresponding reporting period. (3) Net free cash flow per share is comprised of the Corporation’s operating cash flow, after changes in non-cash working capital, less investments in property, plant and equipment RICHMONT MINES Q2 FINANCIAL RESULTS All amounts are in Canadian Dollars unless otherwise indicated Q2 2017: Robust cash flow streams + strong cash position (C$95.9M at June 30, 2017) even during a period of accelerated investment in strategic expansion and exploration programs
  • 7. 7 RICHMONT MINES Q2 CAPITAL EXPENDITURES & EXPLORATION (in millions) Quarter ended June 30, 2017 Six months ended June 30, 2017 2017 Guidance Sustaining Capital (C$) $4.4 $10.2 $25 - $29 Expansion Capital (C$)(1) $6.0 $11.9 $33 - $35 Exploration & Project Evaluation (C$) $5.8 $10.1 $16 - $19 Sustaining Capital (US$)(2) $3.3 $7.6 $19 - $22 Expansion Capital (US$)(1,2) $4.5 $8.9 $25 - $27 Exploration & Project Evaluation (US$)(1,2) $4.4 $7.6 $12 - $14 (1) Expansion capital estimates for 2017 relate exclusively to the Island Gold Mine and are discretionary in nature. Ongoing deployment of project capital at the Island Gold Mine is contingent a minimum sustaining gold price of C$1,550 per ounce. Expansion capital is exclusive of capital requirements related to a mill expansion in 2018 as contemplated in the PEA. (2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.  Capital expected to increase in H2 but remain within guidance  Expansion capital primarily related to:  Ongoing accelerated underground development ($3.5M)  Mine and mill infrastructure ($2.1M)  Strong cash position and cash flow streams expected to fund all capital requirements All amounts are in Canadian Dollars unless otherwise indicated
  • 9. 9 Island Gold Mine Quarter ended June 30, 2017 Six months ended June 30, 2017 2017 Guidance Gold produced (oz) 26,110 49,882 87,000 - 93,000 Gold sold (oz) 29,534 52,183 - Cash costs per ounce (C$)(1) $580 $618 $715 - $765 AISC per ounce (C$)(1) $677 $751 $945 - $995 Cash costs per ounce (US$)(1,2) $431 $463 $550 - $590 AISC per ounce (US$)(1,2) $503 $563 $725 - $765 (1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A. (2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar. ISLAND GOLD MINE OPERATIONAL HIGHLIGHTS  Solid quarter; strong production at record low cash costs and AISC  Record underground productivity of 1,148 tpd  Record mill productivity of 940 tpd; Mill head grade of 9.73 g/t gold  Mill expected to achieve 1,100 tpd run rate in the latter part of 2018  Long-hole stope mining in the first and second horizons; development in ore in third horizon; Stoping in the lower grade extensions of third horizon expected in Q4  Eastern portion of main ramp at 860m level; Western ramp development launched in Q2  Underground development transitioning from contractors to internal workforce All amounts are in Canadian Dollars unless otherwise indicated
  • 10. 10 Production Upside (1) Refer to the Non-IFRS performance measures section contained in the MD&A of the corresponding financial reporting period. (2) 2017 amounts represents the high-end of production guidance and low-end of cash costs guidance (see Feb. 2, 2017 Press Release). (3) Estimated production, grade and average cash costs as outlined in May 29, 2017 PEA Press Release. Underground Productivity $0 $200 $400 $600 $800 $1,000 $1,200 0 20,000 40,000 60,000 80,000 100,000 120,000 CashCosts(C$)(1) AnnualGoldProduction(oz) Annual Gold Production (oz) Cash Costs (C$)(1) 0.00 2.00 4.00 6.00 8.00 10.00 0 200 400 600 800 1,000 1,200 Gramspertonne Tonnesperday Underground tpd Head Grade (g/t) (4) 2015 productivity excludes a 3 week mine shutdown and a 2 week mill shutdown in the fourth quarter. (5) Q3 2016 productivity excludes 16-day electrical upgrade shutdown of the underground mine (6) Underground productivity is expected to average 1,000 tpd in 2017 with lower-grade underground ore stockpiled for future processing. ISLAND GOLD MINE OPERATIONAL PERFORMANCE Island Gold Mine Quarter ended June 30, 2017 Six months ended June 30, 2017 2017 Guidance Underground tpd 1,148 1,084 1,000(6) Mill tpd 940 933 900 Head grade (g/t gold) 9.73 9.46 8.90 Recoveries (%) 97.6 97.1 96.5 Sustaining costs ($M) $2.9 $6.9 $19 - $22 Project costs ($M) $6.0 $11.9 $33 - $35 Non-sustaining exploration costs ($M) $4.9 $8.7 $14 - $16 All amounts are in Canadian Dollars unless otherwise indicated
  • 11. 11 First step in disciplined multi-phased strategy to maximize productivity while maintaining minimum mine life of 8 years Expansion Case PEA:  Capital and cost effective  use current infrastructure for low incremental expansion capital of C$28.2 M  low industry cash costs and robust cash flow stream  Supporting strong production  22% projected growth  mine the main area of interest over 4 horizons to 1,000 m maximum depth Additional growth opportunities  Only ~24% of Inferred Resources were incorporated  +750k ounces Inferred Resources available for further growth  Recent delineation/exploration success not captured  PEA based on 2016 operational performance  Potential for additional operational and cost optimization upside Ramp-up to 1,100 tonnes per day currently advancing; Mill anticipated to achieve target run rate in latter part of 2018 ISLAND GOLD MINE EXPANSION CASE PEA – A DISCIPLINED APPROACH
  • 12. 12 RIC: TSX NYSE 12 ISLAND GOLD MINE 2017 DRILLING PROGRAM 620 m Level Planned Explo. & Delineation Drift 840 m Level Planned Explo. & Delineation Drift GOUDREAULOCHALSH ISLAND EXT1 EXT2 - 500 m - 1,500 m W E 340 m Level 190 m Level 740 m Level Explo. & Delineation Drift - 1,000 m 200 m Main mineralized trend 2017 DEEP EXPLORATION DRILLING 36,000 m Proven Reserves Probable Reserves Indicated Resources Inferred Resources Mineral Reserves and Resources as of December 31, 2016) 2017 DELINEATION DRILLING 7,000 m 2017 SURFACE/ UNDERGROUND EXPLORATION DRILLING 30,000 m 450 k oz inferred resources added in 2016 at $35/oz GD-630-01 25.37/3.85 GD-620-01 19.74/1.4 Potential Extension MH8-4 19.85/8.4 2017 DELINEATION DRILLING 30,000 m Ramps and Actual Development Mined Out Planned Development GD-640-05 20.57/11.3 c.l. MH2A-13 8.86/6.39 MH2A-12 11.67/9.42 GD-640-05-3 13.81/5.20 c.l. Drill Hole Intersections Au g/t / true width (m) c.l. : Core length (m)
  • 13. 13 RIC: TSX NYSE 13 EXPANSION CASE PEA AREA ISLAND GOLD MINE Deep Directional Exploration Drilling Program Highlights 15,500mE 15,000mE Dyke - 1,500 m - 1,000 m 100 m 840 m Level Planned Explo. & Delineation Drift MH8-3B 1.42/2.67 MH7 (C zone) 2.35/3.53 MH8-4 19.85/8.40 MH8-1C 0.62/3.01 Proven Reserves (2016/12/31) Probable Reserves (2016/12/31) Indicated Resources (2016/12/31) Inferred Resources (2016/12/31) Ramp and Actual Development Mined Out Planned Development > 30 8.0 to 30.0 4.0 to 8.0 < 4.0 MH1-11 (C zone) 0.72/2.71 MH2A-13 8.86/6.39 MH2A-12 11.67/9.42 MH4-5 4.63/2.51 MH8 4.60/2.24 MH1-10 24.54/3.76 MH2A-10 6.16/11.58 MH7 (X zone) 17.85/1.68 MH1-11 (X zone) 20.78/1.28 Drilling results since March 30, 2017 press release Drill Hole Intersections Au g/t / true width (m) c.l. : Core length (m) DEEP DIRECTIONAL DRILLING
  • 14. 14 RIC: TSX NYSE 14 340 m Level - 500 m GD-640-04 7.38/3.27 EXPANSION CASE PEA AREA 620 m Level Planned Explo. & Delineation Drift 840 m Level Planned Explo. & Delineation Drift - 1000 mGD-640-05 20.57/11.3 c.l. GD-640-05-1 10.16/5.74 c.l. GD-620-01 19.74/1.4 GD-630-01 25.37/3.85 GD-640-05-1 16.10/8.33 c.l. Proven Reserves (2016/12/31) Probable Reserves (2016/12/31) Indicated Resources (2016/12/31) Inferred Resources (2016/12/31) Ramp and Actual Development Mined Out Planned Development 100 m > 30 8.0 to 30.0 4.0 to 8.0 < 4.0 ISLAND GOLD MINE Eastern Lateral Exploration and Infill Drilling Program Drilling results since March 30, 2017 press release 340-588-30 14.15/2.91 340-588-40 23.10/2.40 GD-670-01 4.17/2.44 GD-690-01 15.39/0.89 GD-640-05-3 4.62/2.21 GD-640-05-5 58.34/0.43 GD-640-05-3 13.81/5.20 c.l. 340-588-52 16.16/2.35 340-588-47 16.08/2.18 340-588-45 14.71/2.59 340-588-50 12.52/3.00 Drill Hole Intersections Au g/t / true width (m) c.l. : Core length (m) EASTERN LATERAL DRILLING
  • 15. 15 RIC: TSX NYSE 15 14,500mE 15,000mE Dyke - 1,000 m 100 m EXPANSION CASE PEA AREA 840 m Level Planned Explo. & Delineation Drift 860-517-08 45.20/3.27 635 m Level 740 m Level ISLAND GOLD MINE Expansion Case PEA Delineation Drilling Program Proven Reserves (2016/12/31) Probable Reserves (2016/12/31) Indicated Resources (2016/12/31) Inferred Resources (2016/12/31) Ramp and Actual Development Mined Out Planned Development > 30 8.0 to 30.0 4.0 to 8.0 < 4.0 860-511-07 51.02/3.54 860-511-03 37.09/4.98 860-517-07 52.09/4.99 765-465-40 31.80/1.92 Drilling results since March 30, 2017 press release Drill Hole Intersections Au g/t / true width (m) c.l. : Core length (m) DRILLING IN PEA
  • 16. 16 ISLAND GOLD MINE NEXT STEPS: ADDITIONAL GROWTH OPPORTUNITIES Immediate Operational enhancements ► Ongoing implementation of enhanced operational efficiencies ► Cost reduction initiatives ► Supply chain optimization Short-Term Exploration and Delineation Program ► Increase resource inventory to the east and at depth to a minimum of 2Moz of total resources, including 1Moz of reserves Mid-Term Phase 2 Expansion < 5 years ► Additional mine infrastructure (ex. shaft) could allow increased mining rates as new mining zones outside the PEA area (both laterally and at depth) are incorporated in the PEA ► +2M oz of resources – further production growth profile over 10+ year mine life Mid to Long-Term Unlocking the Full Potential of the Island Gold Deposit ► Increased resource inventory of the vertical extension at depth (+2 km) ► Increased resource inventory along strike; +7 km east and west ► Transforming Island Gold into a multi-million ounce deposit Long-Term Potential Full Land Package ► Resource growth potential regionally outside the current deposit area ► <15% of the main structure has been drilled to a depth of 1,000 m
  • 17. 17 Beaufor Mine Quarter ended June 30, 2017 Six months ended June 30, 2017 2017 Guidance Gold produced (oz) 5,139 10,768 23,000 - 27,000 Gold sold (oz) 5,506 11,385 - Cash costs per ounce (C$)(1) $1,502 $1,380 $1,265 - $1,320 AISC per ounce (C$)(1) $1,791 $1,682 $1,540 - $1,590 Cash costs per ounce (US$)(1,2) $1,117 $1,034 $975 - $1,015 AISC per ounce (US$)(1,2) $1,332 $1,260 $1,185 - $1,225 Sustaining Costs ($M’s) $1.6 $3.5 $6 - $7 Underground tpd 339 346 - Mill tonnes 31,414 61,423 - Head grade (g/t gold) 5.21 5.60 - Recoveries (%) 97.7 97.4 - (1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A. (2) 2017 Guidance assumes an exchange rate of 1.30 Canadian dollars to 1.0 US dollar.  Production impacted by lower grades and higher dilution in one Q Zone stope  Mining flexibility expected to improve in H2 with additional ore from new parallel structures  Production is expected ramp-up over the balance of the year  Advancing review of strategic alternatives for Quebec assets BEAUFOR MINE OPERATIONAL HIGHLIGHTS All amounts are in Canadian Dollars unless otherwise indicated
  • 19. 19 Production and Cost Guidance Capital Investment Guidance 2017 Operational Estimates Island Gold Mine 2017 Guidance Beaufor Mine 2017 Guidance 2017 Guidance Gold Ounces Produced 87,000 - 93,000 23,000 - 27,000 110,000 - 120,000 Cash Costs per Ounce (C$)(1) $715 - $765 $1,265 - $1,320 $835 - $885 Corporate G&A per Ounce (C$) - - $105 - $110 All-in Sustaining Costs per Ounce (C$)(1) $945 - $995 $1,540 - $1,590 $1,180 - $1,235 Cash Costs per Ounce (US$)(1)(2) $550 - $590 $975 - $1,015 $640 - $680 Corporate G&A per Ounce (US$)(2) - - $80 - $85 All-in Sustaining Costs per Ounce (US$)(1)(2) $725 - $765 $1,185 - $1,225 $905 - $950 2017 Operational Estimates ($M) Island Gold Mine 2017 Guidance Beaufor Mine 2017 Guidance 2017 Guidance Sustaining Capital (C$) $19 - $22 $6 - $7 $25 - $29 Expansion Capital (C$)(3) $33 - $35 - $33 - $35 Exploration & Project Evaluation (C$) $14 - $16 $2 - $3 $16 - $19 Sustaining Capital (US$)(2) $15 - $17 $5 - $6 $19 - $22 Expansion Capital (US$)(2)(3) $25 - $27 - $25 - $27 Exploration & Project Evaluation (US$)(2) $11 - $12 $1 - $2 $12 - $14 (1) Refer to the Non-IFRS performance measures contained in the Q2 2017 MD&A. (2) Assuming an exchange rate of 1.30 Canadian dollars to 1.0 US dollar. (3) Expansion capital estimates for 2017 relate exclusively to the Island Gold Mine and are discretionary in nature. Ongoing deployment of project capital at the Island Gold Mine is contingent upon the receipt of a confirmatory Preliminary Economic Assessment (“PEA”) for 1,100 tonnes per day and a minimum sustaining gold price of C$1,550 per ounce. Expansion capital is exclusive of capital requirements related to a mill expansion in 2018 as contemplated in the PEA. RICHMONT MINES 2017 OPERATIONAL ESTIMATES
  • 20. 20 0 100 200 300 400 500 600 700 800 2012 2013 2014 2015 2016 MineralReserves(000’sounces) Monique Beaufor Island Gold Gold oz. 752,200 Island Gold Mine reserve growth of +34% in 2016 Gold oz. 44,920 2016 Reserve growth  752,200 ounces of reserves (net of depletion) with 11% increase in reserve grade to 9.17 g/t  995,700 ounces (30% increase) of inferred resources (net of conversion) with 20% increase in grade to 10.18 g/t  New resource blocks laterally to the east and at depth below 1,000 metres  Low discovery cost of ~$35/oz ISLAND GOLD MINE RESERVE & RESOURCE GROWTH Exploration results support potential for resource growth  New high-grade mineralization identified by recent exploration drilling  ~800 m east of main Island Gold deposit  Hole GD-640-05: 20.6 g/t gold over 11.3 m (core length) Reserve growth potential in the higher grade fourth mining horizon  Early results from delineation drilling completed within Expansion Case PEA area demonstrate significant potential to further expand reserves at higher than current average grades. All amounts are in Canadian Dollars unless otherwise indicated
  • 21. 21 W EGOUDREAULOCHALSH ISLAND EXT1 EXT2 - 1 000 m - 500 m Crown pillar - 1 500 m 16000mE 620 m Level Planned Exploration drift Surface 200 m Cut off (4.0-4.35g/t Au / 2.0m) 217 60 30 15 7.5 0 Au Metal Factor Grade (Au g/t, cut) x true width (m) 190 m Level 340 m Level MH1-10 24.54/3.76 MH2A-10 6.16/11.58 740-465-20 24.56/3.85 GD-640-04 7.38/3.27 GD-620-01 19.74/1.4 GD-630-01 25.37/3.85 740-477-40 38.62/2.24 MH5-1A 9.27/5.93 NEW DISCOVERY GD-640-05 20.57/11.3 c.l. Drillhole Intersection Au (cut 225 g/t) Drillhole Intersection Au (cut 70 g/t) 14500mE 860 m Level Planned Exploration Drift Dyke 740 m Level Explo. & Delineation Drift ISLAND GOLD MINE C ZONE – GOLD METAL FACTOR (grade x true width) March 31, 2017
  • 22. 22 RIC: TSX NYSE 22 New capping 225 g/t Au Assays Island C Lower ISLAND GOLD MINE NEW CAPPING/ISLAND C LOWER ZONE July 6, 2016
  • 23. 23 RIC: TSX NYSE 23 New capping 225 g/t Au Assays Island C LowerLog Normal Probability Plot ISLAND GOLD MINE NEW CAPPING/ISLAND C LOWER ZONE December 31, 2016