1. 1. Additional cameras…(Bridge – main entrance- cashier office – 34th floor service lift – VIP
entrance – Reception desk – 3th floor server room).Waiting for a wireless solution
2. Salto system (waiting for the quotation) done already.
3. EEP to be prepared ASAP to enable us to train our ERT(to be discussed with the safety team)
Whenever you receive a sample from gulf crafts for the escape routes plan I need to verify if
there is no mistakes before it get approved.
4. FM200 gas to be installed at CCTV& the fire panel system (need to provide Mr. Haitam with a
document which can approve the necessity of this job from civil defense)To install fm200 or
remove the sprinkler system.
5. Hotel Access control (all visitors, contractors, suppliers, etc…) need to register themselves in the
security check point by showing their ID and the security will issue a specific pass which will be
according to the place where the job should be done for example. We will have two kind of
budges with different colors back of house budge in blue and guest area yellow pass and while
security patrolling they can recognize easily who is allowed to work in that area without
interrupting his job….
The same thing for visitors and suppliers etc…
6. Work permit it has been discussed with Mr.Piyal and Mr.Sherif that in case if some companies
have an important work to do… an internal work permit will be issued through engineering
department after the approval of Mr. Foltin or Mr.Sherif of course.
7. ERT training will include the firefightingand the emergency evacuation procedures.
8. Elsafe will be handed over to security once we receive the PDA device… Mr. Sherif to follow up.
9. Salto System will be handed over to IT for master keys issuing record.
10. Hotel keyswill be handed over to security.
11. Emergency line 5762 or 7777
12. Security guardswill be changed soon by some Arabic speaking
13. The barrier of the roundabout will be opened forever