4. THE CLUB
22 DIFFERENT SPORTS (GYMNASTICS, SWIMMING,
ATHLETICS, HANDBALL, BOXING,..)
13 250 TITLES ( DURING FIRST CENTURY )
6 000 ATHLETS
104 OLYMPIC ATHLETS
8 OLYMPIC GAMES MEDALS
21 EUROPEAN CUPS
18 FOOTBALL PORTUGUESE CHAMPIONSHIPS
5. 1998 : THE BOARD OF
DIRECTORS,
DECIDES TO DEVELOP A
STRUCTURAL PROJECT,
PREPARING
THE CLUB FOR NEW CENTURY
6. THE PROJECT :
• To remove the two training pitches from
Alvalade (near old stadium), to outside Lisbon
• To build a Training Center in Alcochete ( inside
a farm of 250 000 m2, 20 km south of Lisbon )
• To build Alvalade XXI on the area of old training
pitches ( new Stadium, Museum, Sports
Building, etc. )
• To demolish the old stadium and to sell this area
for the construction of offices and home
buildings
7. THE AIMS :
• TO OFFER BETTER TRAINING CONDITIONS TO
ATHLETS
• TO GIVE THE BEST SECURITY AND COMFORT
STANDARDS TO CUSTOMERS AND SPECTATORS
• TO ATTRACT NEW CONSUMER TARGETS:
CORPORATE AREA, FAMILIES ….
• TO INCREASE SERVICES QUALITY
• TO IMPROVE BUSINESS PROFITABILITY
18. JOSÉ ALVALADE STADIUM
• END OF CONSTRUCTION : JULY 2003
• BUILDING TERM : 30 MONTHS
• MANPOWER : 3 500 000 HOURS
• AVERAGE DAILY NUMBER OF WORKERS : 367 ( with a peak of
844 )
50. IN THE FIRST EIGHT SEASONS :
( 2003 / 2004 UNTIL 2010 / 2011 )
214 BIG EVENTS, including :
198 MATCHES OF SPORTING TEAM
•38 matches in UEFA competitions
•UEFA CUP FINAL 2004/2005
5 MATCHES OF EURO 2004 TOURNAMENT
4 MATCHES OF PORTUGUESE TEAM
4 CONCERTS – PHIL COLLINS, U2, ROLLING STONES,
AC/DC
5.647.496 SPECTATORS
( 2011/03/25 )
52. INVESTMENT
• STADIUM AND CAR PARKING 111.672.790 €
• ACCESSIBILITIES 9.492.468 €
_________________
121.165.258 €
53. FINANCING
SOURCES
• STATE SUPPORT ( 20,2% OF INVESTMENT):
– STADIUM AND PARKINGS: 17.907.917 €
– ACCESSIBILITIES: 6.626.872 €
__________________
TOTAL 24.534.789 €
• REMAINING INVESTMENT :
EQUITY CAPITAL + BANKING LOANS
54. FINANCING
SOURCES
• PORTUGUESE STATE SUPPORT :
STADIUM CONSTRUCTION
– CRITERIA : 25% OF SEAT REFERENCE COST
– SEAT REFERENCE COST CONSIDERED : € 1 300
– 25% OF SRC : € 325 / SEAT
– 50 455 SEATS X € 325 = € 16 397 875
– EFFECTIVE SEAT COST : € 1 600
55. STADIUM INVESTMENT SPLIT :
Videoscreens ( 2 )
Telecomunic. and sound system
Building automation system
Electron. security systems
Power generators ( 2 )
Electrical instal. and lighting
Fire fighting system
Elevators
Mechanical inst. and air condit.
Pitch
Fittings and seats
Roof
Concrete structure and stands
0
0
0
0
0
00
00
00
00
00
00
00
00
00
00
€
.0
.0
.0
.0
.0
.0
0.
0.
0.
0.
00
00
00
00
00
00
00
00
00
00
.0
.0
.0
.0
.0
.0
Excavation
2.
4.
6.
8.
10
12
14
16
18
20
€
€
€
€
€
€
€
€
€
€
56. ESTRATÉGIA SEGUIDA NAS
EMPREITADAS DAS ESPECIALIDADES:
– Empreitadas por áreas tecnologicamente homogéneas
–Preços máximos garantidos
–Solicitação de propostas alternativas ás dos cadernos de
encargos ( visando soluções tecnológicas mais avançadas,
menor investimento, menor custo de operação ou melhor
adequação á operação )
–Solicitação, em simultãneo, de propostas para a manutenção
60. PARADIGMAS DO MODELO DE GESTÃO
OPERACIONAL DO ESTÁDIO
– Estrutura interna de gestão e de controlo da
actividade
–Outsourcing das actividades de especialidade :
contratos de manutenção ( electromecânica, elevadores,
tv’s, videoscreens, segurança electrónica, torniquetes,
som e comunicações, cctv, bloqueadores de portas,
cobertura, c. civil, relvados e espaços verdes ....) e
contratos de segurança – estática e ARD’s, - limpeza,
RSU’s, hospitalidade, catering, etc
–Forte pendor da actividade preventiva ( planos de
manutenção mensal e rotinas de antes evento )
–Rigor na gestão – objectivo, a eficiência dos custos
61. ALGUNS DOS EQUIPAMENTOS TECNICOS
INSTALADOS
– 2 Postos de Seccionamento e de Transformação ( 10,3 MVA )
– 264 quadros eléctricos, 7 400 luminárias, iluminação do relvado através
de projectores de arranque a quente (168 x 2 000 W )
– Central de produção de água gelada ( 7 / 12 º C ), com 5 chillers ar /
água e uma potência de refrigeração de 6,5 MW
– Central de produção de água quente ( 90 / 70 º C ), com 3 + 2 caldeiras
de gás natural, num total de 6 MW de potência calorífica
– 145 UTA's , com uma capacidade de renovação de ar de 520 000 m3/h
– 14 elevadores
– 2 Centrais de Segurança
– Sistema de CCTV digital com 189 câmaras
– 80 torniquetes e 20 readers
– 2 videoscreens de 48 m2 cada um
– 300 aparelhos de TV
62.
63. SPM – Sporting Património e Marketing, SA
Sistema de Gestão Técnica Centralizada