SlideShare a Scribd company logo
1 of 25
Download to read offline
PUBLIC MEETING
INVESTORS AND ANALYSTS
    DECEMBER 18 2006
DISCLAIMER


This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the
Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange
Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are
often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or
“intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking
statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates.
By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific.
The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements
may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on
these forward-looking statements as a number of factors could cause future results to differ materially from these statements.
Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely
basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes
in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking
statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events.
MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which
can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other
jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S.
Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent
registration or an applicable exemption from such registration requirements.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without
MMX’s prior written consent.




                                                                                                                              Investor Relations
                                                                                                      Rodolfo Landim – Investor Relations Officer
                                                                                                                       Elizabeth Cruz – Manager
                                                                                                                              Gina Pinto - Analyst
                                                                                                              Tel. 55 21 2555-5634 / 5558/ 5563
                                                                                                                                 ri@mmx.com.br
                                                                                                                       http://www.mmx.com.br/ri
COMPANY PROFILE                   COMPANY OVERVIEW




MMX was created by a team of mining specialists led by Eike Batista

Experienced management team

Majority of members of the Board of Directors are independent

Independent Audit Committee

Focus on iron ore provided by high-quality products

Integrated mining operations and metallic plants connected to independent
logistics, structured in self-sufficient systems

Health, safety, environmental and social responsibility

Listed in the Novo Mercado - BOVESPA




                                                                            1
COMPANY PROFILE           BOARD OF DIRECTORS & EXECUTIVE
                                                           OFFICERS


                               Eike Batista – Chairman & CEO

    Board of Directors                                    Board of Executive Officers
                                                    Rodolfo Landim – Executive President and
Michael Stephen Vitton                               IR Director

Eliezer Batista                                     Adriano Vaz – Administrative and HSEC
                                                     Director
  Independent Members:                              Dalton Nosé – Chief Operating Officer,
                                                     Metallics
Gilberto Sayão
                                                    Joaquim Martino – Chief Operating Officer,
Hans Mende                                            Mining
                                                    Paulo Gouvêa – General Counsel
José Luiz Alqueres
                                                    Ricardo Antunes – Commercial Director
Peter Nathanial
                                                    Rudolph Ihns – Chief Financial Officer
Raphael de Almeida Magalhães
                                                          Audit Commitee
Samir Zraick                                                   Samir Zraick
                                                               Carlos José da Silva Azevedo
   Special Advisor:
                                                               Rivadávia Carsalade Herbster Gusmão
Amaury Temporal
                                                                                                     2
COMPANY PROFILE                                 CORPORATE STRUCTURE




                 70%                    70%                      70%                100%


             MMX                      MMX                    MMX
                                                                                  MMX
            Corumbá                  Amapá                 Minas-Rio
                                 (Mine+Railway+Port)      (Mine+Pipeline+Port)   Metallics

        (30% Centennial Asset   (30% Centennial Asset   (30% Centennial Asset
              Corumbá)                Amapá)                 Minas-Rio)




Definitive Share Purchase Agreement signed with Cleveland Cliffs for the purchase of
Centennial Asset´s 30% stake in MMX Amapá for US$ 133 million (approximately 39%
premium over IPO value).

Centennial Asset is negotiating with strategic partners its 30% stake interest in MMX
Corumbá and MMX Minas-Rio.
                                                                                             3
COMPANY PROFILE                   MMXM3 IN NOVO MERCADO - BOVESPA


                                                                       Stock Trading Evolution
  Successful IPO                                                       Price     Number of         Volume      Market
                                                                       (US$)       Trades        Traded (3) Cap. (3)
                                                                               (daily average) (daily average)
       R$ 1,119 million (US$ 509 million)              July (1)         377           19              5.3       1,433
                                                       August           381            1              1.7       1,449
                                                       September        375            2              0.2       1,426
       1,373,000 subscribed shares                     October          373            2              0.2       1,420
                                                       November         414            4              1.2       1,575
                                                       December (2)     417            3              1.0       1,587

                                                 (1)    Negotiation started on July 24
                                                 (2)    As of December 13
                                                 (3)    In US$ millions




  Capital Stock – 3,803,878 common shares                                       Geographic Distribution

Controlling                          FreeFloat
                                                                                         19%         24%
Shareholder and
                                                                                                                    Brazil
Management
                                                                                 11%                                United States

                                                                                                                    Canada

                                                                                                                    EU
                                                                                               46%

                                                                                                                             4
COMPANY PROFILE                     MMX IN THE CAPITAL MARKET



              Target Price for MMXM3                                Stock Split Program
Firm Name                  Target Price   Last Update       Date                            Ratio
ABN Amro                      $606        Nov 10, 2006      January 2007                    2 → 1 share
Credit Suisse                 $756        Nov 29, 2006
Itau Corretora       Buy      $568        Oct 26, 2006      July 2007                       2 → 1 share
Banco Pactual S.A.            $625        Sept 13, 2006
                                                            January 2008                   10 → 1 share
Macquarie                     $696         Nov 3, 2006
Average                       $650                          MMXM3 = price per share, minimum lot of 100 shares.
Premium To Current             56%



Listing in Canada – Toronto Stock Exchange:

    Auditing of MMX Systems´ resources and mineral reserves under way – Canadian
    Standard NI-43.101 – disclosure is expected for 1Q07;

    3Q06 USGAAP Financial Statements to be reported in December;

    Level I Global Depositary Receipts (GDR) Program approved by CVM in December 2006 -
    GDR per Common Share ratio of 40:1 - estimated GDR CAD$12 (Dec 13 prices).



                                                                                                                  5
COMPANY PROFILE        MMX INTEGRATED SYSTEMS



MMX Integrated Systems develop and operate iron
ore mines, pig iron and semi-finished plants and a
pelletizing plant.
                                                           MMX Amapá System
                                                            Iron Ore Fines: 6.5 Mtpy
                                                            Pig Iron:       2.0 Mtpy
                                                            Semi-finished: 0.5 Mtpy



                                                            MMX Minas-Rio System
                                                              Iron Ore:       26.6 Mtpy
                                                              Pellets:         7.0 Mtpy


        MMX Corumbá System
           Iron Ore:        4.9 Mtpy
           Pig Iron:        0.4 Mtpy                         Engineer Eliezer Batista
           Semi-finished:   0.5 Mtpy                         Natural Reserve




                                                                                          6
COMPANY PROFILE                   IRON ORE RESOURCES AND RESERVES


MMX Corumbá System
Mine 63 – expected production: lump (85%) and sinter feed (15%)
Drilling performed: 3,611 meters as of November 2006
Of the 21 mining rights, 3 were researched as of September 2006 (2 measured)


                                                                    GEOLOGICAL RESOURCES – as of ÁPROJECT
                                                                                 RESOURCES CORUMB 31, 2006
                                                                                                 March
MMX Amapá System
                                                                                     Resource
 Long term (20 years) supply contract with Gulf Industrial           Area AREA     Classification   Tonnage (MT)
Investment Co. (GIIC) for 6.5 Mtpy
 Drilling performed: 28,254 meters as of November 2006              Mine 63          Indicated          65
 Of the 18 mining rights, 3 were researched and measured
                                                                  Taboca and         Indicated         220
                                                                  Vila do Meio        Inferred         155

MMX Minas-Rio System                                             Itapanhoacanga
                                                                                    Indicated          408
                                                                                     Inferred          159
 Pellet feed production to begin in 2009
                                                                 João Monlevade       Inferred         147
 Drilling performed: 19,736 meters as of November 2006
                                                                                 TOTAL                 1,154
 Of the 27 mining rights, 12 were researched as of November
2006 (5 measured)




                                                                                                               7
OPERATIONAL STATUS                                     MMX PROJECTS TIMELINE




Vertically Integrated High Value-Added Projects

                                                                                                                                    37
                                                                                                                  31

                                                                                                 19


  Production of iron ore (Mt)
                                                                                 9
   Production of pig iron (Mt)
                                                                  4                                                    1.5                1.5 1.0
   Production of semi-finished (Mt)                                                   0.7 0.1          1.3 0.5                1.0
                                                  1                     0.2

   2003              2004           2005           2006               2007           2008             2009             2010              2011
                                 Engineering;   Amapá             Start-up                                        Start-up Pellet
                                                                                 Start-up Mini   Start-up Minas   Plant
       Asset acquisition         beginning of   Railway           Amapá Mine     Mill Corumbá    -Rio System      Minas-Rio
                                 drilling       Concession                                                        System

                                 Start-up       Minas-Rio:        Start-up       Start-up Pig    Start-up Mini
                                 Corumbá        drilling of new   Pig Iron       Iron Amapá      Mill Amapá
                                 Mine           areas             Corumbá

                                                                  Beginning of
                                                                  Pipeline and
                                                                  Port
                                                                  construction




                                                                                                                                                    8
OPERATIONAL STATUS                 ENVIRONMENTAL PERMITTING TIMELINE



MMX Systems
Corumbá
Mine and processing
Pig Iron Mill
Mini Mill

Amapá
Mine and processing
Port
Pig Iron Mill
Mini Mill

Minas-Rio
Mine and processing
Pipeline
Port
Pellet Plant

                      2005   Q1    Q2   Q3    Q4   Q1    Q2     Q3   Q4   Q1   Q2   Q3    Q4   Q1   Q2     Q3   Q4   Q1   Q2
                                     2006                  2007                 2008                    2009          2010




                                                                                       PERMIT GRANTED
      Preliminary License – approves project studies
                                                                                       PERMIT EXPECTED
      Construction License – authorizes infra-structure works
      Operational Start-up

                                                                                                                             9
OPERATIONAL STATUS                  CAPEX DISBURSEMENT TIMETABLE




        CAPEX – By System (US$ million)                                          CAPEX – By Activity (US$ million)
                 2006       2007     2008     2009 - 2013 Total (*)
                                                                                                                                  2,377
Corumbá              88        93        23          -         220
 Mine                42        13       -            -          72
 Metallics           46        80        23          -         148
Amapá                87       294      382          153        915
                                                                                                                                       1,225
 Mine                60        54       38          -          152
 Logistics           21        59       40          -          120                                    995
                                                                                     828
 Metallics            5       181      304          153        643
                                                                                                            543
Minas-Rio           134       772     1,133         427      2,466                         330                       283 297
                                                                      254
 Mine               100       282       348         241        971          54
 Logistics           31       420       569          42      1,062
 Pellet Plant         3        70       216         144        433
                                                                       2006           2007              2008        2009 - 2013   Total (*)
Total               308     1,158     1,538         580      3,602                               Mine & logistics    Metallics
(*) includes 2005 figures




     As of September 2006, expenditure of US$ 64.5 million.
     Disbursement timetable under review, payments carried over to 2007 (approximately US$129 million).




                                                                                                                                               10
OPERATIONAL STATUS                                               FINANCING




Financing in progress to carry out execution of Business Plan

                                            US$ million

              Project                  CAPEX               Financing (1)                Lenders                Status
                                                                                                                 (1)
                                                                                                               Status         Term

  Mine                                  2,378                 1,744                ABC/Unibanco/
    Corumbá                               72                    26                Itaú BBA/BNDES               Disbursed      3 years
    Amapá                                273                   200                  Itaú BBA, ABC          Firm Commitment   7/10 years
    Minas-Rio                           2,033                 1,518          Unibanco/Syndicate/BNDES         US$ 50 mm      12 years
                                                                                                              Bridge Loan

  Metallics                             1,224                  985
                                                                                                             US$50 mm
   Corumbá                               148                   150                    Credit Suisse          Bridge Loan      7 years
   Amapá                                 643                   510                 Itaú BBA/BNDES                 -          10 years
   Minas-Rio (Pellet Plant)              433                   325                 Itaú BBA/BNDES                 -          10 years


      TOTAL                             3,602                 2,729


(1)    Expected Weighted Average Cost of Borrowing: Libor + 1,5%, assuming 50% funding by BNDES.




                                                                                                                                        11
MMX SYSTEMS EVOLUTION              MMX CORUMBÁ SYSTEM



  Mine currently operating under Federal Environmental
License




               Mine 63 – Industrial Plant

                                                                              12
MMX SYSTEMS EVOLUTION         MMX CORUMBÁ SYSTEM


  Construction License granted for pig iron plant,
construction of mini blast furnaces initiated in
September




             Pig Iron Plant Construction
                                                                          13
MMX SYSTEMS EVOLUTION             MMX CORUMBÁ SYSTEM


   MMX has already initiated charcoal supply program for the pig
iron plant.




                      Eucalyptus Plantation
                                                                   14
MMX SYSTEMS EVOLUTION          MMX AMAPÁ SYSTEM




  Mine Construction License granted, leveling
and dam works to be completed by December
2006, 100% of key equipment for the operation
under contract with firm delivery dates.




                                                                   15
MMX SYSTEMS EVOLUTION         MMX AMAPÁ SYSTEM



  Railway    Operating   License     granted,
progress in equipment and railway repairs and
acquisition;

  Santana Port – Preliminary Environmental
License granted, construction to begin at
1Q07.




                                                                   16
MMX SYSTEMS EVOLUTION                 MMX MINAS-RIO SYSTEM


Serra do Sapo: additional resources to be measured




                                                                            17
MMX SYSTEMS EVOLUTION                  MMX MINAS-RIO SYSTEM


  Pipeline with approximately 525 km, passing by 32 municipalities;

  Environmental impact study in approval process by IBAMA, Preliminary License
expected dor 1Q07;

  Detailed topography concluded, right of way to be concluded in mid 2007.




                                                                                 18
MMX SYSTEMS EVOLUTION              MMX MINAS-RIO SYSTEM



        Environmental impact study in approval process by FEEMA, Preliminary License expected
     for late December 2006.




               Process Area,
      Filtering Area and Pellet Plant
                                                                  Loading capacity: 10.000 t/h

                                                                  Draft: 21 m
                                                      Storage     Maximum size of vessels: 220.000 t
Administrative
  Services                                                        Storage capacity: 2.6 million t

                                                                  Back area: 1.5 million m²
                                        Açu Port
                                          Açu beach



                                                                  AÇU SUPER PORT




                                                                                                       19
MMX SYSTEMS               ENVIRONMENTAL RESPONSABILITY


  Eliezer Batista Natural Reserve – MMX´s commitment with environmental
preservation, 20 thousand hectars in the most preserved area in South Pantanal.




                                                                                  20
COMPANY PROFILE                  MULTIPLYING VALUE




                          Health, Safety,
                          Environmental
                           and Social
                          Responsibility              Long term
  Integrated and
   independent                                         supply
     logistics                                      relationships




Low production                                    High value-added
    cost at                                      projects, vertically
  competitive                                        integrated
    capital
  expenditure
     levels                   High quality
                               products



                                                                        21
Presentation – meeting with analysts

More Related Content

Similar to Presentation – meeting with analysts

Similar to Presentation – meeting with analysts (20)

Presentation stee
Presentation   steePresentation   stee
Presentation stee
 
Corporate presentation nov 06 – mmx integrated...
Corporate presentation nov 06 – mmx integrated...Corporate presentation nov 06 – mmx integrated...
Corporate presentation nov 06 – mmx integrated...
 
Apimec meeting 2007
Apimec meeting 2007Apimec meeting 2007
Apimec meeting 2007
 
September 8 2011 final
September 8 2011 finalSeptember 8 2011 final
September 8 2011 final
 
F&M Presentation October 2012
F&M Presentation October 2012F&M Presentation October 2012
F&M Presentation October 2012
 
F&M Corporate Presentation May 2012
F&M Corporate Presentation May 2012F&M Corporate Presentation May 2012
F&M Corporate Presentation May 2012
 
September 14 2011 final
September 14 2011 finalSeptember 14 2011 final
September 14 2011 final
 
F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012
 
F&M Corporate Presentation June 2012
F&M Corporate Presentation June 2012F&M Corporate Presentation June 2012
F&M Corporate Presentation June 2012
 
March 2012
March 2012March 2012
March 2012
 
February 2012
February 2012February 2012
February 2012
 
February 2012
February 2012February 2012
February 2012
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
November 8 2011
November 8 2011November 8 2011
November 8 2011
 
March 2012
March 2012March 2012
March 2012
 
March 2012
March 2012March 2012
March 2012
 
F&m april 2012
F&m april 2012F&m april 2012
F&m april 2012
 
November 8 2011 final revised
November 8 2011 final revisedNovember 8 2011 final revised
November 8 2011 final revised
 
Presentation of the new business plan
Presentation of the new business planPresentation of the new business plan
Presentation of the new business plan
 
Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009Corporate presentation follow up – january 2009
Corporate presentation follow up – january 2009
 

More from mmxriweb

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
mmxriweb
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
mmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
mmxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
mmxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
mmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
mmxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
mmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
mmxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
mmxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
mmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
mmxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
mmxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
mmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
mmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
mmxriweb
 

More from mmxriweb (20)

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 

Recently uploaded

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Recently uploaded (20)

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Presentation – meeting with analysts

  • 1. PUBLIC MEETING INVESTORS AND ANALYSTS DECEMBER 18 2006
  • 2.
  • 3. DISCLAIMER This presentation relating to MMX Mineração e Metálicos S.A. (“MMX”) includes “forward-looking statements”, as that term is defined in the Private Securities Litigation Reform Act of 1995, in Section 27A of the Securities Act of 1933 and Section 21E of the U.S. Securities Exchange Act of 1934. All statements other than statements of historical facts are statements that could be deemed forward-looking statements and are often characterized by the use of words such as “projects”, “expects”, “anticipates”, “intends”, “plans”, “believes”, “estimates”, “may”, “will”, or “intends”, or by discussions or comments about our objectives, strategy, plans or intentions and results of operations. Forward-looking statements include projections regarding our operating capacity, operating expenditures, capital expenditures and start-up dates. By their nature, these forward-looking statements involve numerous assumptions, uncertainties and opportunities, both general and specific. The risk exists that these statements may not be fulfilled or, even if they are fulfilled, the results or developments described in such statements may not be indicative of results or developments in future periods. We caution participants of this presentation not to place undue reliance on these forward-looking statements as a number of factors could cause future results to differ materially from these statements. Forward-looking statements may be influenced in particular by factors such as the ability to obtain all required regulatory approvals on a timely basis or at all, exploration for mineral resources and reserves, difficulty in converting geological resources into mineral reserves, and changes in economic, political and regulatory conditions. We caution that the foregoing list is not exhaustive. When relying on forward-looking statements to make decisions, investors should carefully consider these factors as well as other uncertainties and events. MMX does not undertake to update our forward-looking statements unless required by law. This presentation is neither an offer to sell (which can only be made pursuant to definitive offering documents) nor a solicitation of an offer to buy any securities in the United States, or any other jurisdiction. The securities referred to herein have not been registered in any jurisdiction, and in particular, will not be registered under the U.S. Securities Act of 1933, as amended, or any applicable state securities laws and may not be offered or sold in the United States absent registration or an applicable exemption from such registration requirements. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent. Investor Relations Rodolfo Landim – Investor Relations Officer Elizabeth Cruz – Manager Gina Pinto - Analyst Tel. 55 21 2555-5634 / 5558/ 5563 ri@mmx.com.br http://www.mmx.com.br/ri
  • 4. COMPANY PROFILE COMPANY OVERVIEW MMX was created by a team of mining specialists led by Eike Batista Experienced management team Majority of members of the Board of Directors are independent Independent Audit Committee Focus on iron ore provided by high-quality products Integrated mining operations and metallic plants connected to independent logistics, structured in self-sufficient systems Health, safety, environmental and social responsibility Listed in the Novo Mercado - BOVESPA 1
  • 5. COMPANY PROFILE BOARD OF DIRECTORS & EXECUTIVE OFFICERS Eike Batista – Chairman & CEO Board of Directors Board of Executive Officers Rodolfo Landim – Executive President and Michael Stephen Vitton IR Director Eliezer Batista Adriano Vaz – Administrative and HSEC Director Independent Members: Dalton Nosé – Chief Operating Officer, Metallics Gilberto Sayão Joaquim Martino – Chief Operating Officer, Hans Mende Mining Paulo Gouvêa – General Counsel José Luiz Alqueres Ricardo Antunes – Commercial Director Peter Nathanial Rudolph Ihns – Chief Financial Officer Raphael de Almeida Magalhães Audit Commitee Samir Zraick Samir Zraick Carlos José da Silva Azevedo Special Advisor: Rivadávia Carsalade Herbster Gusmão Amaury Temporal 2
  • 6. COMPANY PROFILE CORPORATE STRUCTURE 70% 70% 70% 100% MMX MMX MMX MMX Corumbá Amapá Minas-Rio (Mine+Railway+Port) (Mine+Pipeline+Port) Metallics (30% Centennial Asset (30% Centennial Asset (30% Centennial Asset Corumbá) Amapá) Minas-Rio) Definitive Share Purchase Agreement signed with Cleveland Cliffs for the purchase of Centennial Asset´s 30% stake in MMX Amapá for US$ 133 million (approximately 39% premium over IPO value). Centennial Asset is negotiating with strategic partners its 30% stake interest in MMX Corumbá and MMX Minas-Rio. 3
  • 7. COMPANY PROFILE MMXM3 IN NOVO MERCADO - BOVESPA Stock Trading Evolution Successful IPO Price Number of Volume Market (US$) Trades Traded (3) Cap. (3) (daily average) (daily average) R$ 1,119 million (US$ 509 million) July (1) 377 19 5.3 1,433 August 381 1 1.7 1,449 September 375 2 0.2 1,426 1,373,000 subscribed shares October 373 2 0.2 1,420 November 414 4 1.2 1,575 December (2) 417 3 1.0 1,587 (1) Negotiation started on July 24 (2) As of December 13 (3) In US$ millions Capital Stock – 3,803,878 common shares Geographic Distribution Controlling FreeFloat 19% 24% Shareholder and Brazil Management 11% United States Canada EU 46% 4
  • 8. COMPANY PROFILE MMX IN THE CAPITAL MARKET Target Price for MMXM3 Stock Split Program Firm Name Target Price Last Update Date Ratio ABN Amro $606 Nov 10, 2006 January 2007 2 → 1 share Credit Suisse $756 Nov 29, 2006 Itau Corretora Buy $568 Oct 26, 2006 July 2007 2 → 1 share Banco Pactual S.A. $625 Sept 13, 2006 January 2008 10 → 1 share Macquarie $696 Nov 3, 2006 Average $650 MMXM3 = price per share, minimum lot of 100 shares. Premium To Current 56% Listing in Canada – Toronto Stock Exchange: Auditing of MMX Systems´ resources and mineral reserves under way – Canadian Standard NI-43.101 – disclosure is expected for 1Q07; 3Q06 USGAAP Financial Statements to be reported in December; Level I Global Depositary Receipts (GDR) Program approved by CVM in December 2006 - GDR per Common Share ratio of 40:1 - estimated GDR CAD$12 (Dec 13 prices). 5
  • 9. COMPANY PROFILE MMX INTEGRATED SYSTEMS MMX Integrated Systems develop and operate iron ore mines, pig iron and semi-finished plants and a pelletizing plant. MMX Amapá System Iron Ore Fines: 6.5 Mtpy Pig Iron: 2.0 Mtpy Semi-finished: 0.5 Mtpy MMX Minas-Rio System Iron Ore: 26.6 Mtpy Pellets: 7.0 Mtpy MMX Corumbá System Iron Ore: 4.9 Mtpy Pig Iron: 0.4 Mtpy Engineer Eliezer Batista Semi-finished: 0.5 Mtpy Natural Reserve 6
  • 10. COMPANY PROFILE IRON ORE RESOURCES AND RESERVES MMX Corumbá System Mine 63 – expected production: lump (85%) and sinter feed (15%) Drilling performed: 3,611 meters as of November 2006 Of the 21 mining rights, 3 were researched as of September 2006 (2 measured) GEOLOGICAL RESOURCES – as of ÁPROJECT RESOURCES CORUMB 31, 2006 March MMX Amapá System Resource Long term (20 years) supply contract with Gulf Industrial Area AREA Classification Tonnage (MT) Investment Co. (GIIC) for 6.5 Mtpy Drilling performed: 28,254 meters as of November 2006 Mine 63 Indicated 65 Of the 18 mining rights, 3 were researched and measured Taboca and Indicated 220 Vila do Meio Inferred 155 MMX Minas-Rio System Itapanhoacanga Indicated 408 Inferred 159 Pellet feed production to begin in 2009 João Monlevade Inferred 147 Drilling performed: 19,736 meters as of November 2006 TOTAL 1,154 Of the 27 mining rights, 12 were researched as of November 2006 (5 measured) 7
  • 11. OPERATIONAL STATUS MMX PROJECTS TIMELINE Vertically Integrated High Value-Added Projects 37 31 19 Production of iron ore (Mt) 9 Production of pig iron (Mt) 4 1.5 1.5 1.0 Production of semi-finished (Mt) 0.7 0.1 1.3 0.5 1.0 1 0.2 2003 2004 2005 2006 2007 2008 2009 2010 2011 Engineering; Amapá Start-up Start-up Pellet Start-up Mini Start-up Minas Plant Asset acquisition beginning of Railway Amapá Mine Mill Corumbá -Rio System Minas-Rio drilling Concession System Start-up Minas-Rio: Start-up Start-up Pig Start-up Mini Corumbá drilling of new Pig Iron Iron Amapá Mill Amapá Mine areas Corumbá Beginning of Pipeline and Port construction 8
  • 12. OPERATIONAL STATUS ENVIRONMENTAL PERMITTING TIMELINE MMX Systems Corumbá Mine and processing Pig Iron Mill Mini Mill Amapá Mine and processing Port Pig Iron Mill Mini Mill Minas-Rio Mine and processing Pipeline Port Pellet Plant 2005 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 2006 2007 2008 2009 2010 PERMIT GRANTED Preliminary License – approves project studies PERMIT EXPECTED Construction License – authorizes infra-structure works Operational Start-up 9
  • 13. OPERATIONAL STATUS CAPEX DISBURSEMENT TIMETABLE CAPEX – By System (US$ million) CAPEX – By Activity (US$ million) 2006 2007 2008 2009 - 2013 Total (*) 2,377 Corumbá 88 93 23 - 220 Mine 42 13 - - 72 Metallics 46 80 23 - 148 Amapá 87 294 382 153 915 1,225 Mine 60 54 38 - 152 Logistics 21 59 40 - 120 995 828 Metallics 5 181 304 153 643 543 Minas-Rio 134 772 1,133 427 2,466 330 283 297 254 Mine 100 282 348 241 971 54 Logistics 31 420 569 42 1,062 Pellet Plant 3 70 216 144 433 2006 2007 2008 2009 - 2013 Total (*) Total 308 1,158 1,538 580 3,602 Mine & logistics Metallics (*) includes 2005 figures As of September 2006, expenditure of US$ 64.5 million. Disbursement timetable under review, payments carried over to 2007 (approximately US$129 million). 10
  • 14. OPERATIONAL STATUS FINANCING Financing in progress to carry out execution of Business Plan US$ million Project CAPEX Financing (1) Lenders Status (1) Status Term Mine 2,378 1,744 ABC/Unibanco/ Corumbá 72 26 Itaú BBA/BNDES Disbursed 3 years Amapá 273 200 Itaú BBA, ABC Firm Commitment 7/10 years Minas-Rio 2,033 1,518 Unibanco/Syndicate/BNDES US$ 50 mm 12 years Bridge Loan Metallics 1,224 985 US$50 mm Corumbá 148 150 Credit Suisse Bridge Loan 7 years Amapá 643 510 Itaú BBA/BNDES - 10 years Minas-Rio (Pellet Plant) 433 325 Itaú BBA/BNDES - 10 years TOTAL 3,602 2,729 (1) Expected Weighted Average Cost of Borrowing: Libor + 1,5%, assuming 50% funding by BNDES. 11
  • 15. MMX SYSTEMS EVOLUTION MMX CORUMBÁ SYSTEM Mine currently operating under Federal Environmental License Mine 63 – Industrial Plant 12
  • 16. MMX SYSTEMS EVOLUTION MMX CORUMBÁ SYSTEM Construction License granted for pig iron plant, construction of mini blast furnaces initiated in September Pig Iron Plant Construction 13
  • 17. MMX SYSTEMS EVOLUTION MMX CORUMBÁ SYSTEM MMX has already initiated charcoal supply program for the pig iron plant. Eucalyptus Plantation 14
  • 18. MMX SYSTEMS EVOLUTION MMX AMAPÁ SYSTEM Mine Construction License granted, leveling and dam works to be completed by December 2006, 100% of key equipment for the operation under contract with firm delivery dates. 15
  • 19. MMX SYSTEMS EVOLUTION MMX AMAPÁ SYSTEM Railway Operating License granted, progress in equipment and railway repairs and acquisition; Santana Port – Preliminary Environmental License granted, construction to begin at 1Q07. 16
  • 20. MMX SYSTEMS EVOLUTION MMX MINAS-RIO SYSTEM Serra do Sapo: additional resources to be measured 17
  • 21. MMX SYSTEMS EVOLUTION MMX MINAS-RIO SYSTEM Pipeline with approximately 525 km, passing by 32 municipalities; Environmental impact study in approval process by IBAMA, Preliminary License expected dor 1Q07; Detailed topography concluded, right of way to be concluded in mid 2007. 18
  • 22. MMX SYSTEMS EVOLUTION MMX MINAS-RIO SYSTEM Environmental impact study in approval process by FEEMA, Preliminary License expected for late December 2006. Process Area, Filtering Area and Pellet Plant Loading capacity: 10.000 t/h Draft: 21 m Storage Maximum size of vessels: 220.000 t Administrative Services Storage capacity: 2.6 million t Back area: 1.5 million m² Açu Port Açu beach AÇU SUPER PORT 19
  • 23. MMX SYSTEMS ENVIRONMENTAL RESPONSABILITY Eliezer Batista Natural Reserve – MMX´s commitment with environmental preservation, 20 thousand hectars in the most preserved area in South Pantanal. 20
  • 24. COMPANY PROFILE MULTIPLYING VALUE Health, Safety, Environmental and Social Responsibility Long term Integrated and independent supply logistics relationships Low production High value-added cost at projects, vertically competitive integrated capital expenditure levels High quality products 21