Near
 Eastern
               Pakistan (Islamic Republic of Pakistan)


                                                  Several violent incidents have         country. The population is 162
                                               occurred against American officials       million and growing at 2.0%
                                               and U.S. mission employees in             annually. Life expectancy is 63 years,
                                               Pakistan. On March 2, 2006, a suicide     and 60% of the population is under
                               ■
                                               attacker used a car bomb to crash into    the age of twenty-five. In October
                                               and kill an American diplomat and his     2005, a devastating earthquake
                                               driver outside the Consulate General      caused additional hardships for the
                                               in Karachi. In 2002, a suicide bomber     country and its citizens.
                                               detonated explosives in a church in
                                               Islamabad, killing two Americans          Recent Projects
                                               associated with the Embassy and
                                               three others. Other attacks in 2002
                                               and 2004 on the Consulate General
                                                                                         B    ecause of Pakistan’s significant
                                                                                              role in U.S. foreign policy and
                                                                                         the violence experienced by
                                               in Karachi were unsuccessful. Prior       Americans there, OBO has included
  Pakistan’s scheduled project sites include
Islamabad, Karachi, Lahore, and Peshawar.
                                               to 2002, deadly attacks against           the Embassy and the consulates in
                                               Americans occurred in 1997,               various improvement projects.
                                               1995, 1989, and 1979.
                                                                                         ■ Islamabad: Completed security
U.S. and Pakistan Relations                       The country struggles with a
                                                                                           upgrade to the Embassy in 2003

P    akistan is located in the Middle
     East, bordering the Arabian Sea,
India, Iran, Afghanistan, and China.
                                               variety of social and economic
                                               issues. With an annual per capita
                                               GDP of $2,200, the World Bank
                                                                                           and consolidated tenant agencies
                                                                                           on the Embassy compound
                                                                                           in 2004.
The U.S. Embassy in Pakistan is                considers Pakistan a low-income
located in Islamabad, and consulate
generals are located in Lahore,
Karachi, and Peshawar. Lahore and
Peshawar are both located within
                                                           Overview of Pakistan’s Scheduled Projects
170 miles of Islamabad. Karachi is
located on the southern border of                SITE              2007             2008             2009          TOTALS
Pakistan, on the Arabian Sea, about
                                                 Islamabad     • Major
700 miles south of the Embassy and                               rehabilitation
the other consulates.                                            $0,000,000                                      $0,000,000
   Historically, Pakistan has had
                                                 Karachi                          • Security
wide-ranging bilateral relations with                                               capital
the U.S. This relationship changed                                                  $0,000,000                   $0,000,000
significantly, however, once Pakistan
                                                 Lahore        • Security                        • Security
agreed to support the U.S. campaign                              upgrade                           capital
to eliminate the Taliban in Afghanistan                          $0,000,000                        $0,000,000    $0,000,000
and to join the U.S. in the Global War
on Terror. Since September 2001,                 Peshawar                         • Security
                                                                                    capital
Pakistan has provided extensive                                                     $00,000                      $0,000,000
assistance in the War on Terror by
capturing more than 600 al-Qaida                 TOTALS          $0,000,000         $0,000,000     $0,000,000    $0,000,000
members and their allies.
Near
                                           Eastern          U.S. Embassy:
                                                            Islamabad, Pakistan




                                                                                       Major Rehabilitation
                                                                                       Project
                                                                                       The HVAC system is over 20
                                                                                       years old. Post has completed
                                                                                       numerous minor repair projects
                                                                                       over many years to keep the
                                                                                       system functioning.
                                                                                          The scope and cost of a major
                                                                                       HVAC repair must be clarified
                                                                                       through a planning survey, which
                                                                                       requires extensive data collection
                                                                                       and analysis. Critical elements
          A new embassy compound is scheduled in FY 2012.                              of planning surveys often include
                                                                                       site and building surveys, conceptual
                                                                                       drawings, and preliminary cost
                                                                                       estimates. Upon completion of the
The Need                                                                               survey, the project will move
                                                                                       forward with a more clearly
T    he Department constructed
     the Embassy’s main building
in 1972. The building is located on
                                              exist regarding the maintenance
                                              and repair of the facilities.            defined scope and cost. The final
                                                                                       schedule for this project will be
a 31-acre site, which also contains                                                    established subject to funding
                                              Scheduled Projects                       availability.
the ambassador’s residence, staff
housing, and other general use                The Embassy is scheduled                 ■ HVAC Upgrade
buildings.                                    to receive:                                 $00,000
   The Embassy is not scheduled                                                           FY 2007
to receive an NEC, but concerns                                                           (see chart below)




                       Islamabad – OBC Upgrade HVAC – Projected Project Cost (000’s)

  Phase                            Prior Years               FY06               FY07           Outyears           Total

  Design/Construction               $00,000                 $0,000          $0,000              $0,000          $000,000
Near
                                       Eastern        Consulate General:
                                                      Lahore, Pakistan




                                                          Compound Security            Security Capital Project
                                                          Upgrade                      ■ New Embassy Compound
                                                          ■ FY 2007                      (NEC)
                                                            $0,000,000                   $0,000,000
                                                                                         FY 2012




    A new embassy compound is scheduled in FY 2012.


The Need                                                                    NEC Personnel

L   ahore borders India and lies close
    to the Kashmir region. Because
India and Pakistan have longstanding
                                                                   Lahore Projected Office Building
                                                                     Collocated Desk Personnel

tensions over the Kashmir region,              NEC Project Personnel          State           Other          Total
the Consulate faces significant
threats from violence and general
                                                  U.S. Staff                   000              00            000
civil unrest. In addition, terrorist
networks and drug trafficking from                Locally Engaged Staff        000              00            000
Afghanistan impact the Consulate’s
security environment.                             Total                        000              00            000

Projects
Considering Lahore’s significant                                          NEC Space and Cost
security concerns, the Consulate’s
current facilities are insufficient.                                        Size        Phase         Projected Costs
The grounds do not meet setback                                            (GSM)                         FY 2012
requirements, and DS cannot block
streets that surround the Consulate.           • New Office Building        00,000    Design/build       $0,000,000
   The Consulate is scheduled to
receive:                                       • General Services
                                                 Office/Warehouse           00,000    Construction       $0,000,000
(1) A New Embassy Compound
    (NEC) in FY 2012 as                        • Marine Security
    a Security Capital Project,                  Guard Quarters             00,000    Construction       $0,000,000
(2) An upgrade as part of the
    Compound Security Upgrade                  • Value Added Tax                                             $0,000
    Program, and
                                                  Total                                                $0,000,000

More Related Content

More from mfeKEG

Cho Part 2 Dr Leon Massage
Cho Part 2 Dr Leon MassageCho Part 2 Dr Leon Massage
Cho Part 2 Dr Leon MassagemfeKEG
 
Chevron Section1 V1
Chevron Section1 V1Chevron Section1 V1
Chevron Section1 V1mfeKEG
 
Connections And Roots
Connections And RootsConnections And Roots
Connections And RootsmfeKEG
 
Respiratory Poster3b
Respiratory Poster3bRespiratory Poster3b
Respiratory Poster3bmfeKEG
 
Process Steps
Process StepsProcess Steps
Process StepsmfeKEG
 
Display Banner
Display BannerDisplay Banner
Display BannermfeKEG
 
Flowchart
FlowchartFlowchart
FlowchartmfeKEG
 

More from mfeKEG (7)

Cho Part 2 Dr Leon Massage
Cho Part 2 Dr Leon MassageCho Part 2 Dr Leon Massage
Cho Part 2 Dr Leon Massage
 
Chevron Section1 V1
Chevron Section1 V1Chevron Section1 V1
Chevron Section1 V1
 
Connections And Roots
Connections And RootsConnections And Roots
Connections And Roots
 
Respiratory Poster3b
Respiratory Poster3bRespiratory Poster3b
Respiratory Poster3b
 
Process Steps
Process StepsProcess Steps
Process Steps
 
Display Banner
Display BannerDisplay Banner
Display Banner
 
Flowchart
FlowchartFlowchart
Flowchart
 

Pakistan Draftlayout

  • 1. Near Eastern Pakistan (Islamic Republic of Pakistan) Several violent incidents have country. The population is 162 occurred against American officials million and growing at 2.0% and U.S. mission employees in annually. Life expectancy is 63 years, Pakistan. On March 2, 2006, a suicide and 60% of the population is under ■ attacker used a car bomb to crash into the age of twenty-five. In October and kill an American diplomat and his 2005, a devastating earthquake driver outside the Consulate General caused additional hardships for the in Karachi. In 2002, a suicide bomber country and its citizens. detonated explosives in a church in Islamabad, killing two Americans Recent Projects associated with the Embassy and three others. Other attacks in 2002 and 2004 on the Consulate General B ecause of Pakistan’s significant role in U.S. foreign policy and the violence experienced by in Karachi were unsuccessful. Prior Americans there, OBO has included Pakistan’s scheduled project sites include Islamabad, Karachi, Lahore, and Peshawar. to 2002, deadly attacks against the Embassy and the consulates in Americans occurred in 1997, various improvement projects. 1995, 1989, and 1979. ■ Islamabad: Completed security U.S. and Pakistan Relations The country struggles with a upgrade to the Embassy in 2003 P akistan is located in the Middle East, bordering the Arabian Sea, India, Iran, Afghanistan, and China. variety of social and economic issues. With an annual per capita GDP of $2,200, the World Bank and consolidated tenant agencies on the Embassy compound in 2004. The U.S. Embassy in Pakistan is considers Pakistan a low-income located in Islamabad, and consulate generals are located in Lahore, Karachi, and Peshawar. Lahore and Peshawar are both located within Overview of Pakistan’s Scheduled Projects 170 miles of Islamabad. Karachi is located on the southern border of SITE 2007 2008 2009 TOTALS Pakistan, on the Arabian Sea, about Islamabad • Major 700 miles south of the Embassy and rehabilitation the other consulates. $0,000,000 $0,000,000 Historically, Pakistan has had Karachi • Security wide-ranging bilateral relations with capital the U.S. This relationship changed $0,000,000 $0,000,000 significantly, however, once Pakistan Lahore • Security • Security agreed to support the U.S. campaign upgrade capital to eliminate the Taliban in Afghanistan $0,000,000 $0,000,000 $0,000,000 and to join the U.S. in the Global War on Terror. Since September 2001, Peshawar • Security capital Pakistan has provided extensive $00,000 $0,000,000 assistance in the War on Terror by capturing more than 600 al-Qaida TOTALS $0,000,000 $0,000,000 $0,000,000 $0,000,000 members and their allies.
  • 2. Near Eastern U.S. Embassy: Islamabad, Pakistan Major Rehabilitation Project The HVAC system is over 20 years old. Post has completed numerous minor repair projects over many years to keep the system functioning. The scope and cost of a major HVAC repair must be clarified through a planning survey, which requires extensive data collection and analysis. Critical elements A new embassy compound is scheduled in FY 2012. of planning surveys often include site and building surveys, conceptual drawings, and preliminary cost estimates. Upon completion of the The Need survey, the project will move forward with a more clearly T he Department constructed the Embassy’s main building in 1972. The building is located on exist regarding the maintenance and repair of the facilities. defined scope and cost. The final schedule for this project will be a 31-acre site, which also contains established subject to funding Scheduled Projects availability. the ambassador’s residence, staff housing, and other general use The Embassy is scheduled ■ HVAC Upgrade buildings. to receive: $00,000 The Embassy is not scheduled FY 2007 to receive an NEC, but concerns (see chart below) Islamabad – OBC Upgrade HVAC – Projected Project Cost (000’s) Phase Prior Years FY06 FY07 Outyears Total Design/Construction $00,000 $0,000 $0,000 $0,000 $000,000
  • 3. Near Eastern Consulate General: Lahore, Pakistan Compound Security Security Capital Project Upgrade ■ New Embassy Compound ■ FY 2007 (NEC) $0,000,000 $0,000,000 FY 2012 A new embassy compound is scheduled in FY 2012. The Need NEC Personnel L ahore borders India and lies close to the Kashmir region. Because India and Pakistan have longstanding Lahore Projected Office Building Collocated Desk Personnel tensions over the Kashmir region, NEC Project Personnel State Other Total the Consulate faces significant threats from violence and general U.S. Staff 000 00 000 civil unrest. In addition, terrorist networks and drug trafficking from Locally Engaged Staff 000 00 000 Afghanistan impact the Consulate’s security environment. Total 000 00 000 Projects Considering Lahore’s significant NEC Space and Cost security concerns, the Consulate’s current facilities are insufficient. Size Phase Projected Costs The grounds do not meet setback (GSM) FY 2012 requirements, and DS cannot block streets that surround the Consulate. • New Office Building 00,000 Design/build $0,000,000 The Consulate is scheduled to receive: • General Services Office/Warehouse 00,000 Construction $0,000,000 (1) A New Embassy Compound (NEC) in FY 2012 as • Marine Security a Security Capital Project, Guard Quarters 00,000 Construction $0,000,000 (2) An upgrade as part of the Compound Security Upgrade • Value Added Tax $0,000 Program, and Total $0,000,000