This document summarizes Pepper Construction's qualifications and experience for a potential project with Regina Dominican. Pepper has extensive experience with K-12 projects, having completed over $465 million worth in the past 5 years. The document outlines Pepper's proposed project team and provides details on their approach to estimating, scheduling, sustainability, technology usage, phasing and safety planning. Key aspects of Pepper's process include ongoing value analysis, a 4-month construction schedule, BIM coordination and a site-specific safety plan.
2. Pepper Overview
Project Team and Experience
Estimating
High Performance and Sustainability
Technology
Phasing and Logistics
Schedule
Quality / Constructability
Safety
01
02
03
04
06
07
08
09
05
3. 20+ projects
completed in the K-12 market
each year
$465 million
in K-12 projects completed in the
past five years
$2.79 billion
in LEED projects completed
Locations in Illinois, Indiana, Ohio and Wisconsin
Relationship focused
Founded 1927
Family owned
45 K-12 clients
across the state of Illinois
2020 revenue - $738 million
5. Type of construction New construction Renovations Renovations, addition Renovation
Active campus
Learning stair
New elevator
Façade
HVAC improvements
Security / Front Entrance
On time and on budget Yes Yes Yes Yes
New Trier Township High
School District 203
Winnetka School
District 36
Lake Forest Elementary
School District 67
Sunset Ridge School
District 29
6.
7. + Right Program
+ Right Cost
+ Right Quality
Keep the focus on
the students,
faculty and the
community.
9. Concept DD Documents
SD Documents CD Documents
Concept
Estimate
Schematic
Design
Estimate
Design
Development
Estimate
Construction
Documents
Estimate
Target Value Analysis
Preliminary Schedule
Building System
Analysis
Phasing + Logistics
Input from Subs
Long-lead awards
Bid Packages
Key
Information
Time
Architect
Pepper
Regina
Dominican
Value Analysis
+ Approval
Value Analysis
+ Approval
Value Analysis
+ Approval
11. Arriscraft
Renaissance Stone
• 12" Concrete Block Back Up Wall
• Waterproofing / Air Vapor Barrier
• Continuous Insulation
• Arriscraft Renaissance Stone
02
Clear Anodized High-Performance Glazed Aluminum
Framed Window Wall System with Standard Profiles
o 1" Dual Insulated Glass with Low-e Coating
Window Wall (up to 12’)
03
Brick Veneer
• 12" Concrete Block Back Up Wall
• Waterproofing / Air Vapor Barrier
• Continuous Insulation
• 4’ Brick Veneer
01
Clear Anodized High-Performance Glazed Aluminum
Framed Window Wall System with Standard Profiles
o 1" Dual Insulated Glass with Low-e Coating
Curtain Wall (up to 24’)
04
12. Brick Veneer $403,712
Arriscraft Renaissance Stone $516,800 $113,088
Window Wall $531,392 $127,680
Curtain Wall $608,000 $204,288
Total Costs Delta* premiums to brick
Evaluate ROI and
Ancillary Costs
01 Upfront construction cost
02 Maintenance cost
03 Mechanical system
04 Window shade
13.
14. Improved Indoor Air Quality
Nothing Hits the Floor
Healthy Materials Database
LED lighting and controls
Daylight harvesting
System commissioning
Improved insulation and envelope
Waste Management Plan
15. Federal
Up to $1.80 per SF rebate
State
Renewable energy rebate up to
50 cents per kWh or 50% of
strategy cost
Local
Utility rebates average 30 cents
per SF
23. • Relocation of educational space
• MEP infrastructure sequencing
• Clear separation of construction
• Noise mitigation
• Egress paths for students and staff
24.
25.
26. Programing & Design
Phase Planning
Budget Updates/Options
Cash Flow Analysis
Schedule Analysis
Constructability Review
BOT Updates
Bidding/GMP
Procurement/Lead-time
Construction 4 Month Schedule
Bid
18 week
N
o
v
-
2
2
D
e
c
-
2
2
Preconstruction Phase
Construction Phase
J
u
n
-
2
2
J
u
l
-
2
2
A
u
g
-
2
2
S
e
p
-
2
2
O
c
t
-
2
2
A
p
r
-
2
1
M
a
y
-
2
1
J
u
n
-
2
1
J
u
l
-
2
1
M
a
r
-
2
1
Construct Review
M
a
r
-
2
2
A
p
r
-
2
2
M
a
y
-
2
2
F
e
b
-
2
2
S
e
p
-
2
1
O
c
t
-
2
1
N
o
v
-
2
1
D
e
c
-
2
1
J
a
n
-
2
2
A
u
g
-
2
1
SD Documents DD Documents CD Documents
Phasing
Planning
Final Schedule
Final Phasing
SD Budget DD Budget CD Budget
Preliminary
Schedule
Cash Flow
Analysis
27. Programing & Design
Phase Planning
Budget Updates/Options
Cash Flow Analysis
Schedule Analysis
Constructability Review
BOT Updates
Bidding/GMP
Procurement/Lead-time
Construction
Preconstruction Phase
F
e
b
-
2
2
M
a
r
-
2
2
A
p
r
-
2
2
M
a
y
-
2
2
M
a
r
-
2
1
A
p
r
-
2
1
M
a
y
-
2
1
J
u
n
-
2
1
J
u
l
-
2
1
A
u
g
-
2
1
S
e
p
-
2
1
O
c
t
-
2
1
N
o
v
-
2
1
Preliminary
Schedule
Final Schedule
D
e
c
-
2
2
SD Documents
Phasing
Planning
Final Phasing
CD Documents
DD Documents
J
u
n
-
2
2
J
u
l
-
2
2
A
u
g
-
2
2
S
e
p
-
2
2
O
c
t
-
2
2
N
o
v
-
2
2
D
e
c
-
2
1
J
a
n
-
2
2
Construct Review
Bid
5 Month Schedule
18 week
SD Budget DD Budget CD Budget
Cash Flow
Analysis
Construction Phase
28. We have the resources and expertise
to deliver on-time and within budget.
Plan and re-plan for the unexpected
Early detection and intervention
Weekly schedule meetings with subcontractors
Daily team huddles with trade foreman
Provide weekly schedule updates to Regina
Dominican and the Design team
Buy-in
Company
Foreman
Workers
Schedule
Master Schedule Bid Manual
Pre-installation Meeting
Daily Huddles
29.
30. Our quality program
is led by forensic
architect Corey
Zussman, AIA
Constructability reviews
Eliminates change orders
Pre-installation meetings
Reduces RFI’s and saves time
Jobsite quality walks
Building it right the first time
01
02
03
We will create a project specific quality
plan for Regina Dominican.
35. Site-specific Safety Plan | Subs Safety Plan
| Background Checks | Collaboration and
Communication | Tradesmen Orientation
Students | Faculty and Staff | Parents
| Visitors | Community | Pepper
Workers | Subcontractors
Planning starts today and ends
when the job is complete
Who
How
When
Safety is our #1 priority