The document provides instructions for assembling a piston motor. It details 17 steps to install various parts like bearings, seals, springs, and retaining rings. Safety precautions are included to properly handle parts under spring tension. The assembly ends by installing the head and bolts.
The document provides instructions for assembling and disassembling various components of an excavator, including:
1. Assembling the piston motor by installing various parts like bearings, seals, springs, and retaining rings in 17 steps.
2. Installing the assembled piston motor and fan motor assembly along with attaching bolts and bending locking tabs.
3. Disassembling the hydraulic lockout control by removing retaining rings, levers, springs, and pins over 5 steps.
4. Reassembling the hydraulic lockout control by reversing the disassembly steps over 6 steps.
5. Installing the assembled hydraulic lockout control along with bolts, screws, and attaching
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...zatao0179249295
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It consists of detailed step-by-step procedures with accompanying illustrations, covering tasks like installing bearings and seals, installing retaining rings, and removing panels and bolts. Safety warnings are provided throughout to prevent injury from spring-loaded parts.
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...luanxianshi27
The document provides instructions for assembling and installing a hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps to assemble a piston motor, including installing various parts like bearings, seals, springs, and retaining rings. It then explains installing the assembled piston motor and attaching a fan motor assembly. Finally, it outlines installing the hydraulic lockout control unit with bolts, screws, and a cable strap.
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It consists of detailed step-by-step procedures with accompanying illustrations, covering tasks like installing bearings and seals, installing retaining rings, and removing panels and bolts. Safety warnings are provided throughout to prevent injury from spring-loaded parts.
The document provides instructions for assembling and installing a hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps to assemble a piston motor, including installing various parts like bearings, seals, springs, and retaining rings. It then details installing the assembled piston motor and attaching a fan motor assembly. Finally, it explains how to install the hydraulic lockout control unit with bolts and screws, and attaching a switch and cable strap.
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...cnp692569
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps for assembling the piston motor, including installing bearings, seals, springs, and retaining rings. It also describes removing and disassembling the hydraulic lockout control into individual parts and reassembling it. Safety precautions are provided for parts under spring tension.
Caterpillar Cat 312D L Excavator (Prefix RHL) Service Repair Manual (RHL00001...jdkskmdmdm
This document provides instructions for removing and installing the idler gear in the front gear group of a C4.2 engine. The removal procedure involves using various tools to remove the idler gear bolt, thrust plate, idler gear, bushing, and idler shaft. The installation procedure specifies cleaning parts and using tools to install the bushing, idler shaft, idler gear, thrust plate, washer, and idler gear bolt while ensuring proper gear alignment and backlash. Tolerances for backlash and clearances are provided.
This document provides instructions for disassembling and assembling the travel motor of 324E and 324E LN excavators. The disassembly process involves removing 28 components from the travel motor in 27 steps. The assembly process reverses the disassembly with 28 steps and provides guidance on cleaning, lubricating, and installing components in the correct orientation. Tools required include retaining ring pliers, drivers, pullers, and adapters to securely hold components during disassembly and assembly.
The document provides instructions for assembling and disassembling various components of an excavator, including:
1. Assembling the piston motor by installing various parts like bearings, seals, springs, and retaining rings in 17 steps.
2. Installing the assembled piston motor and fan motor assembly along with attaching bolts and bending locking tabs.
3. Disassembling the hydraulic lockout control by removing retaining rings, levers, springs, and pins over 5 steps.
4. Reassembling the hydraulic lockout control by reversing the disassembly steps over 6 steps.
5. Installing the assembled hydraulic lockout control along with bolts, screws, and attaching
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...zatao0179249295
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It consists of detailed step-by-step procedures with accompanying illustrations, covering tasks like installing bearings and seals, installing retaining rings, and removing panels and bolts. Safety warnings are provided throughout to prevent injury from spring-loaded parts.
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...luanxianshi27
The document provides instructions for assembling and installing a hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps to assemble a piston motor, including installing various parts like bearings, seals, springs, and retaining rings. It then explains installing the assembled piston motor and attaching a fan motor assembly. Finally, it outlines installing the hydraulic lockout control unit with bolts, screws, and a cable strap.
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It consists of detailed step-by-step procedures with accompanying illustrations, covering tasks like installing bearings and seals, installing retaining rings, and removing panels and bolts. Safety warnings are provided throughout to prevent injury from spring-loaded parts.
The document provides instructions for assembling and installing a hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps to assemble a piston motor, including installing various parts like bearings, seals, springs, and retaining rings. It then details installing the assembled piston motor and attaching a fan motor assembly. Finally, it explains how to install the hydraulic lockout control unit with bolts and screws, and attaching a switch and cable strap.
Caterpillar Cat 336D2 L Excavator (Prefix WDC) Service Repair Manual (WDC0000...cnp692569
The document provides instructions for assembling and disassembling components of a piston motor (hydraulic fan) and hydraulic lockout control on excavator models 336D2 and 336D2 L. It describes 17 steps for assembling the piston motor, including installing bearings, seals, springs, and retaining rings. It also describes removing and disassembling the hydraulic lockout control into individual parts and reassembling it. Safety precautions are provided for parts under spring tension.
Caterpillar Cat 312D L Excavator (Prefix RHL) Service Repair Manual (RHL00001...jdkskmdmdm
This document provides instructions for removing and installing the idler gear in the front gear group of a C4.2 engine. The removal procedure involves using various tools to remove the idler gear bolt, thrust plate, idler gear, bushing, and idler shaft. The installation procedure specifies cleaning parts and using tools to install the bushing, idler shaft, idler gear, thrust plate, washer, and idler gear bolt while ensuring proper gear alignment and backlash. Tolerances for backlash and clearances are provided.
This document provides instructions for disassembling and assembling the travel motor of 324E and 324E LN excavators. The disassembly process involves removing 28 components from the travel motor in 27 steps. The assembly process reverses the disassembly with 28 steps and provides guidance on cleaning, lubricating, and installing components in the correct orientation. Tools required include retaining ring pliers, drivers, pullers, and adapters to securely hold components during disassembly and assembly.
The document provides instructions for removing and installing various engine components on a Caterpillar 314D CR excavator, including:
1) Removing the idler gear from the front gear group by removing the bolt and washer securing it to the idler shaft and pulling it off using a puller tool.
2) Instructions specify ensuring timing marks are aligned before removal to maintain proper timing of gears.
3) Detailed steps and illustrations guide removal of additional components like the flywheel housing, crankshaft pulley, and crankshaft front seal. Tools and safety precautions are also listed.
The document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It describes:
1) Removing the electric starting motor, flywheel, and ring gear before removing the flywheel housing.
2) Using lifting tools to remove the flywheel housing bolts and separate the housing from the cylinder block.
3) Installing a new gasket and oil seal before reinstalling the flywheel housing with bolts and reattaching the flywheel and starting motor.
The document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists over 30 detailed steps to disassemble components like the final drive, travel motor barrel assembly, planetary gear assembly, counterbalance valve housing assembly, and more. Safety notices are provided throughout to warn of potential injuries from parts under spring tension or residual fluid pressure. Required tools include link brackets, a transmission repair stand, bolts, pullers, wrenches, and other equipment.
Caterpillar Cat 336D2 L Excavator (Prefix ZCT) Service Repair Manual (ZCT0000...jdkskmdmdm
This document provides disassembly and assembly instructions for the main hydraulic pump on a 336D2 L excavator. It lists 51 steps to fully disassemble the pump by removing components like bolts, covers, seals, springs, pistons, gears, and bearings. The corresponding 51 steps for assembly install these same components in reverse order, noting the tools required and proper installation of seals, bearings, and retaining rings. Precautions are included for released spring forces during disassembly and heating components during assembly.
Caterpillar Cat 330F L Excavator (Prefix GHT) Service Repair Manual (GHT00001...jdkskmdmdm
The document provides disassembly instructions for a 330F and 330F L excavator travel motor over 28 steps. It details removing components like the head, brake piston, rotating assembly, pistons, and seals. Tools include an adapter, nuts, threaded rod, eyebolts, drivers, and pullers. Safety notices warn of spring forces, pressurized air, and ensuring fluids are contained.
This document provides assembly instructions for repairing a hydraulic pump in 3 steps:
1. Install various internal components like bearings, seals, and pistons into the pump housing.
2. Attach the pump housing to the pump head and install additional external components.
3. Assemble the pump control mechanism by installing springs, pistons, and covers.
The document provides step-by-step instructions to disassemble a final drive assembly for excavator models 325D and 325D L. It begins by removing the final drive from the excavator and cleaning it. Then the cover is removed after fastening the final drive to a repair stand. Various internal components like gears, shafts, and seals are then dismantled from the housing using specialized tools over 30 detailed steps. Cleanliness is emphasized throughout to prevent dirt contamination during reassembly.
The document provides instructions for removing and installing various engine components on a Caterpillar 325D excavator including:
1. The flywheel, flywheel housing, crankshaft rear seal, and vibration damper and pulley. Tools and torque specifications are listed for each procedure.
2. Removing the crankshaft rear seal involves drilling holes in the seal and pulling it out with a slide hammer tool. Installing the new seal uses a seal installation tool.
3. Removing the flywheel housing first requires removing mounting bolts and the flywheel. Installing applies sealant and mounts the housing with bolts.
4. Instructions are provided to remove the crankshaft front
This document provides instructions for removing and installing various engine components on a Caterpillar 325C excavator, including:
- Removing and installing the flywheel, which requires the use of lifting tools and torque wrenches.
- Removing the crankshaft rear seal using drilling and hammering tools, and removing any wear sleeves.
- Installing the new crankshaft rear seal with a seal installer tool.
- Additional procedures for removing and installing components like the vibration damper, pulley, flywheel housing and rear seal carrier. Precise tools and cleaning of parts is emphasized.
This document provides instructions for disassembling and assembling the final drive of 325C and 325C L excavator models. The disassembly procedure involves removing over 30 individual parts from the final drive housing in a specific sequence. The assembly procedure instructs technicians to clean all parts thoroughly, apply lubricants where specified, and install over 30 parts into the final drive housing in the reverse order of disassembly using various tools. Technicians are advised to replace all seals, gaskets and O-rings during assembly and to keep all parts clean.
The document provides instructions for disassembling and assembling the piston motor (hydraulic fan) on 325C and 325C L excavator models. The disassembly procedure involves 22 steps to remove components like the key, cover, port plate, bearings, plugs, sleeves, pistons and housing. The assembly procedure describes 16 steps including pressing components, installing seals, pins and rings in the proper order and orientation to rebuild the piston motor. Cleanliness and applying a light oil film to parts is emphasized throughout.
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals, and more. Precautions are included to properly handle springs and ensure correct positioning of parts.
This document provides instructions for removing and installing various components of the crankshaft and flywheel housing on a 325C Excavator. It describes how to remove and install the flywheel, crankshaft rear seal, rear seal carrier, and flywheel housing. The procedures include lists of required tools and step-by-step instructions describing how to remove each component and install the replacement parts. Safety notices are provided to keep parts clean and contain fluids appropriately during the repair work.
The document provides instructions for removing and installing various components of a Caterpillar C4.2 engine, including the flywheel housing, crankshaft pulley, crankshaft front seal, and idler gear of the front gear group. The procedures include using various tools to remove bolts, nuts, seals, and other parts. Technicians are advised to keep components clean and contain fluids properly during disassembly and reassembly.
Caterpillar Cat 312D2 L Excavator (Prefix FAB) Service Repair Manual (FAB0000...jdkskmdmdm
This document provides instructions for disassembling various components of an excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists the required tools and outlines 16 steps to disassemble parts like the traction control valve, piston assemblies, springs, and seals. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized hydraulic fluid.
1) The document provides disassembly instructions for components of a 313D excavator including the final drive, travel motor, counterbalance valve, and traction control valve.
2) It lists required tools and safety precautions and provides a step-by-step process to remove each part, noting identification marks and order of components.
3) Detailed illustrations accompany each step to show how to remove components like sprockets, valves, springs, gears, plates, and seals. Proper handling and storage of fluids is also addressed.
Caterpillar Cat 312D2 L Excavator (Prefix EAB) Service Repair Manual (EAB0000...jdkskmdmdm
1. The document provides instructions for removing and installing the cylinder head and lifter group on a Caterpillar 3054C engine.
2. Key steps include draining fluids, removing components like the exhaust manifold and fuel injectors, then gradually loosening and removing cylinder head bolts.
3. Reinstallation requires cleaning surfaces, installing new gaskets, and tightening bolts in a specific sequence using torque wrenches and degree wheels to ensure proper torque.
Caterpillar Cat 312D2 L Excavator (Prefix DGF) Service Repair Manual (DGF0000...jdkskmdmdm
This document provides instructions for removing and installing a camshaft on a Caterpillar 3054C engine. The key steps are:
1. Remove the rocker shaft assembly, pushrods, and front housing.
2. Turn the engine upside down so the valve lifters are away from the camshaft.
3. Carefully remove the camshaft from the cylinder block.
4. Ensure the camshaft is clean and lubricated with oil before installing it in the reverse order of removal. Special care must be taken not to damage the lobes or bearings.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 312D2 GC excavator. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing components like sprockets, valves, gears, plates, seals and more. Safety notices are included to warn of hazards like hydraulic pressure, heavy lifting, and released spring forces. The extensive instructions allow for complete disassembly of the specified systems for inspection or repair.
This document provides instructions for removing and installing a crankshaft rear seal on a 3054C engine. The removal procedure involves taking out setscrews and the housing assembly. For installation, a new pre-assembled seal and housing is used. It is pushed onto the crankshaft flange using a plastic sleeve for protection. Setscrews are then tightened to secure it after alignment. Proper cleaning, handling and lubrication of parts is emphasized to prevent damage.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
The document provides instructions for removing and installing various engine components on a Caterpillar 314D CR excavator, including:
1) Removing the idler gear from the front gear group by removing the bolt and washer securing it to the idler shaft and pulling it off using a puller tool.
2) Instructions specify ensuring timing marks are aligned before removal to maintain proper timing of gears.
3) Detailed steps and illustrations guide removal of additional components like the flywheel housing, crankshaft pulley, and crankshaft front seal. Tools and safety precautions are also listed.
The document provides instructions for removing and installing a flywheel housing on a Caterpillar C4.2 engine. It describes:
1) Removing the electric starting motor, flywheel, and ring gear before removing the flywheel housing.
2) Using lifting tools to remove the flywheel housing bolts and separate the housing from the cylinder block.
3) Installing a new gasket and oil seal before reinstalling the flywheel housing with bolts and reattaching the flywheel and starting motor.
The document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 313D2 excavator. It lists over 30 detailed steps to disassemble components like the final drive, travel motor barrel assembly, planetary gear assembly, counterbalance valve housing assembly, and more. Safety notices are provided throughout to warn of potential injuries from parts under spring tension or residual fluid pressure. Required tools include link brackets, a transmission repair stand, bolts, pullers, wrenches, and other equipment.
Caterpillar Cat 336D2 L Excavator (Prefix ZCT) Service Repair Manual (ZCT0000...jdkskmdmdm
This document provides disassembly and assembly instructions for the main hydraulic pump on a 336D2 L excavator. It lists 51 steps to fully disassemble the pump by removing components like bolts, covers, seals, springs, pistons, gears, and bearings. The corresponding 51 steps for assembly install these same components in reverse order, noting the tools required and proper installation of seals, bearings, and retaining rings. Precautions are included for released spring forces during disassembly and heating components during assembly.
Caterpillar Cat 330F L Excavator (Prefix GHT) Service Repair Manual (GHT00001...jdkskmdmdm
The document provides disassembly instructions for a 330F and 330F L excavator travel motor over 28 steps. It details removing components like the head, brake piston, rotating assembly, pistons, and seals. Tools include an adapter, nuts, threaded rod, eyebolts, drivers, and pullers. Safety notices warn of spring forces, pressurized air, and ensuring fluids are contained.
This document provides assembly instructions for repairing a hydraulic pump in 3 steps:
1. Install various internal components like bearings, seals, and pistons into the pump housing.
2. Attach the pump housing to the pump head and install additional external components.
3. Assemble the pump control mechanism by installing springs, pistons, and covers.
The document provides step-by-step instructions to disassemble a final drive assembly for excavator models 325D and 325D L. It begins by removing the final drive from the excavator and cleaning it. Then the cover is removed after fastening the final drive to a repair stand. Various internal components like gears, shafts, and seals are then dismantled from the housing using specialized tools over 30 detailed steps. Cleanliness is emphasized throughout to prevent dirt contamination during reassembly.
The document provides instructions for removing and installing various engine components on a Caterpillar 325D excavator including:
1. The flywheel, flywheel housing, crankshaft rear seal, and vibration damper and pulley. Tools and torque specifications are listed for each procedure.
2. Removing the crankshaft rear seal involves drilling holes in the seal and pulling it out with a slide hammer tool. Installing the new seal uses a seal installation tool.
3. Removing the flywheel housing first requires removing mounting bolts and the flywheel. Installing applies sealant and mounts the housing with bolts.
4. Instructions are provided to remove the crankshaft front
This document provides instructions for removing and installing various engine components on a Caterpillar 325C excavator, including:
- Removing and installing the flywheel, which requires the use of lifting tools and torque wrenches.
- Removing the crankshaft rear seal using drilling and hammering tools, and removing any wear sleeves.
- Installing the new crankshaft rear seal with a seal installer tool.
- Additional procedures for removing and installing components like the vibration damper, pulley, flywheel housing and rear seal carrier. Precise tools and cleaning of parts is emphasized.
This document provides instructions for disassembling and assembling the final drive of 325C and 325C L excavator models. The disassembly procedure involves removing over 30 individual parts from the final drive housing in a specific sequence. The assembly procedure instructs technicians to clean all parts thoroughly, apply lubricants where specified, and install over 30 parts into the final drive housing in the reverse order of disassembly using various tools. Technicians are advised to replace all seals, gaskets and O-rings during assembly and to keep all parts clean.
The document provides instructions for disassembling and assembling the piston motor (hydraulic fan) on 325C and 325C L excavator models. The disassembly procedure involves 22 steps to remove components like the key, cover, port plate, bearings, plugs, sleeves, pistons and housing. The assembly procedure describes 16 steps including pressing components, installing seals, pins and rings in the proper order and orientation to rebuild the piston motor. Cleanliness and applying a light oil film to parts is emphasized throughout.
This document provides instructions for disassembling and assembling the travel motor of 324E L and 324E LN Excavator models. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing and installing components like the motor head, brake piston, rotating assembly, bearings, seals, and more. Precautions are included to properly handle springs and ensure correct positioning of parts.
This document provides instructions for removing and installing various components of the crankshaft and flywheel housing on a 325C Excavator. It describes how to remove and install the flywheel, crankshaft rear seal, rear seal carrier, and flywheel housing. The procedures include lists of required tools and step-by-step instructions describing how to remove each component and install the replacement parts. Safety notices are provided to keep parts clean and contain fluids appropriately during the repair work.
The document provides instructions for removing and installing various components of a Caterpillar C4.2 engine, including the flywheel housing, crankshaft pulley, crankshaft front seal, and idler gear of the front gear group. The procedures include using various tools to remove bolts, nuts, seals, and other parts. Technicians are advised to keep components clean and contain fluids properly during disassembly and reassembly.
Caterpillar Cat 312D2 L Excavator (Prefix FAB) Service Repair Manual (FAB0000...jdkskmdmdm
This document provides instructions for disassembling various components of an excavator, including the final drive, travel motor, counterbalance valve, and barrel assembly. It lists the required tools and outlines 16 steps to disassemble parts like the traction control valve, piston assemblies, springs, and seals. Safety notices are included to warn of potential injuries from parts propelled by springs or pressurized hydraulic fluid.
1) The document provides disassembly instructions for components of a 313D excavator including the final drive, travel motor, counterbalance valve, and traction control valve.
2) It lists required tools and safety precautions and provides a step-by-step process to remove each part, noting identification marks and order of components.
3) Detailed illustrations accompany each step to show how to remove components like sprockets, valves, springs, gears, plates, and seals. Proper handling and storage of fluids is also addressed.
Caterpillar Cat 312D2 L Excavator (Prefix EAB) Service Repair Manual (EAB0000...jdkskmdmdm
1. The document provides instructions for removing and installing the cylinder head and lifter group on a Caterpillar 3054C engine.
2. Key steps include draining fluids, removing components like the exhaust manifold and fuel injectors, then gradually loosening and removing cylinder head bolts.
3. Reinstallation requires cleaning surfaces, installing new gaskets, and tightening bolts in a specific sequence using torque wrenches and degree wheels to ensure proper torque.
Caterpillar Cat 312D2 L Excavator (Prefix DGF) Service Repair Manual (DGF0000...jdkskmdmdm
This document provides instructions for removing and installing a camshaft on a Caterpillar 3054C engine. The key steps are:
1. Remove the rocker shaft assembly, pushrods, and front housing.
2. Turn the engine upside down so the valve lifters are away from the camshaft.
3. Carefully remove the camshaft from the cylinder block.
4. Ensure the camshaft is clean and lubricated with oil before installing it in the reverse order of removal. Special care must be taken not to damage the lobes or bearings.
This document provides disassembly instructions for the final drive, travel motor, and counterbalance valve of a 312D2 GC excavator. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing components like sprockets, valves, gears, plates, seals and more. Safety notices are included to warn of hazards like hydraulic pressure, heavy lifting, and released spring forces. The extensive instructions allow for complete disassembly of the specified systems for inspection or repair.
This document provides instructions for removing and installing a crankshaft rear seal on a 3054C engine. The removal procedure involves taking out setscrews and the housing assembly. For installation, a new pre-assembled seal and housing is used. It is pushed onto the crankshaft flange using a plastic sleeve for protection. Setscrews are then tightened to secure it after alignment. Proper cleaning, handling and lubrication of parts is emphasized to prevent damage.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02415273
Piston Motor (Hydraulic Fan) - Assemble
SMCS - 1386-016-QP; 5058-016-FM; 5058-016-HFN
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
B 1P-1861 Retaining Ring Pliers 1
C 1P-0510 Driver Gp 1
Illustration 1 g01207288
1. Install bearing cup (29).
1/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 2 g01207286
2. Install lip seal (28).
3. Use Tooling (C) in order to install retaining ring (27).
Illustration 3 g01207624
4. Raise the temperature of bearing cone (26).
5. Install bearing cone (26) onto shaft (25).
Illustration 4 g01207285
6. Install shaft (25) and swashplate (24).
2/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 5 g01207283
Illustration 6 g01207284
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
7. Install shim (21), spring (22), and shim (23).
8. Use Tooling (C) and Tooling (B) in order to install retaining ring (19).
3/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 7 g01207282
9. Install pins (18).
Illustration 8 g01207281
10. Install bearing (17).
11. Install pistons (15) and retainer (16).
Illustration 9 g01207280
12. Install rotating group (14) and shim (13).
4/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 10 g01207279
13. Install bearing cone (12).
Illustration 11 g01207278
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
14. Install O-ring seal (11), poppet (10), spring (9), poppet (8), sleeve (7), and plug (6).
5/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 12 g01207276
15. Lower the temperature of bearing cup (5).
16. Install bearing cup (5), port plate (4), and O-ring seal (3).
Illustration 13 g01207275
Improper assembly of parts that are spring loaded can cause bodily
injury.
To prevent possible injury, follow the established assembly procedure
and wear protective equipment.
17. Install head (2) and bolts (1).
End By:
a. Install the piston motor. Refer to Disassembly and Assembly, "Piston Motor (Hydraulic
Fan) - Install".
6/7
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02415453
Piston Motor (Hydraulic Fan) - Install
SMCS - 1386-012-QP; 5058-012-FM
installation Procedure
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
Illustration 1 g01207418
1. Use a suitable lifting device to install piston motor (5). The weight of piston motor (5) is
approximately 23 kg (50 lb).
2. Install bolts (6).
1/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 2 g01207416
3. Use a suitable lifting device to reposition fan motor assembly (4), as shown. The weight of
fan motor assembly (4) is approximately 68 kg (150 lb).
Illustration 3 g01207415
4. Install hub (3) and bolts (2).
5. Bend locking tabs (1) over bolts (2).
End By:
a. Install the fan. Refer to Disassembly and Assembly, "Fan - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Aug 10 23:59:03 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02554917
Hydraulic Lockout Control - Remove
SMCS - 5001-011-LK
Removal Procedure
Illustration 1 g01187398
1. Remove screws (2) and panel (1).
1/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 2 g01278781
2. Remove screws (6). Cut cable strap (8) and place switch (7) aside.
3. Remove bolt (4), bolt (5), and hydraulic lockout control (3).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon Aug 10 23:59:59 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02378526
Hydraulic Lockout Control - Disassemble
SMCS - 5001-015-LK
Disassembly Procedure
Start By:
a. Remove the hydraulic lockout control. Refer to Disassembly and Assembly, "Hydraulic
Lockout Control - Remove".
Illustration 1 g01187382
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
1/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Follow the recommended procedure and use all recommended tooling to
release the spring force.
1. Remove retaining rings (1) and lever assembly (2).
2. Remove retaining ring (4), lever assembly (5), and spring (3).
Illustration 2 g01187383
3. Pull back cover (8) in order to remove pin (7) from pipe assembly (6).
Illustration 3 g01187385
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
2/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. 4. Remove pin (10) from pin (9).
5. Remove spring (11) from cover (12).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Aug 11 00:00:55 UTC+0800 2020
3/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02378527
Hydraulic Lockout Control - Assemble
SMCS - 5001-016-LK
Assembly Procedure
Illustration 1 g01187385
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
1/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 1. Install spring (11) to cover (12).
2. Install pin (10) to pin (9).
Illustration 2 g01187383
3. Install pin (7) to pipe assembly (6).
4. Slide cover (8) over pipe assembly (6).
Illustration 3 g01187382
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
5. Install spring (3), lever assembly (5), and retaining ring (4).
2/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. 6. Install lever assembly (2) and retaining rings (1).
End By:
a. Install the hydraulic lockout control. Refer to Disassembly and Assembly, "Hydraulic
Lockout Control - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Aug 11 00:01:51 UTC+0800 2020
3/3
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i07426591
Hydraulic Lockout Control - Install
SMCS - 5001-012-LK
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A - Loctite 243 -
Illustration 1 g01278781
1. Install hydraulic lockout control (3), bolt (4), and bolt (5).
2. Apply Tooling (A) to the threads of screws (6). Position switch assembly (7) and install
screws (6). Tighten screws (6) to a torque of 0.7 ± 0.1 N·m (6.2 ± 0.9 lb in). Attach cable
strap (8).
1/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 2 g01187398
3. Install panel (1) and screws (2).
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Aug 11 00:02:47 UTC+0800 2020
2/2
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 336D2 EXCAVATOR WDC
Configuration: 336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i02417256
Operator Console - Remove and Install
SMCS - 5258-010
Removal Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A FT-2674 Vacuum Cap 1
Start By:
a. Remove the seat. Refer to Disassembly and Assembly, "Seat - Remove".
Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for
installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this
helps to keep contaminants from entering the system.
1/9
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 1 g01208165
1. Remove plates (1) and (2).
Illustration 2 g01196137
2. Attach Tooling (A) and an air supply to the hydraulic oil tank. Apply 345 ± 70 kPa
(50 ± 10 psi) to Tooling (A).
2/9
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. 6. Disconnect harness assemblies (6).
Illustration 7 g01208204
7. Remove plate (8). Move floor mat (7) toward the front of the cab.
Illustration 8 g01208208
8. Remove bolts (9) from each side of the operator console. Pull hose assemblies (3) and (4)
through the floor of the cab. Hose assemblies (3) and (4) were removed in Steps 3 and 4.
Pull harness assemblies (5) and (6) through the floor of the cab. Harness assemblies (5) and
(6) were removed in Steps 5 and 6.
Note: If the machine is equipped with a radio, the antenna will need to be disconnected.
4/9
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 9 g01208250
9. Disconnect harness assembly (10).
Illustration 10 g01208252
10. Remove bolts (11) and operator console (12).
Installation Procedure
Table 2
Required Tools
Tool Part Number Part Description Qty
A FT-2674 Vacuum Cap 1
Illustration 11 g01208252
1. Install operator console (12) and bolts (11).
5/9
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Illustration 12 g01208250
2. Connect harness assembly (10).
Illustration 13 g01208208
3. Insert hose assemblies (3) and (4) through the hole in the cab floor. Insert harness
assemblies (5) and (6) through the holes in the cab floor. Hose assemblies (3) and (4) and
harness assemblies (5) and (6) will be connected in the following steps. Install bolts (9)
from each side of the operator console.
Note: If the machine is equipped with a radio, the antenna will need to be connected.
Illustration 14 g01208204
6/9
336D2 & 336D2 L Excavators WDC00001-UP (MACHINE) POWERED BY C9 Engi...
2020/8/11
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. 4. Move floor mat (7) toward the rear of the cab. Install plate (8).
Illustration 15 g01208202
5. Connect harness assemblies (6).
Illustration 16 g01208198
6. Connect harness assemblies (5).
Illustration 17 g01208191
7. Connect hose assemblies (4).
7/9