ESTIMADO DE COSTO EN CALZADURA
 DIMENSIONES DEL PIQUE:                                                                                                                  LONGITUDES EN TERRENO:
       ALTO:                          1        M                                                                                      L1 :               9 M.                           L5:              0
     ANCHO:                           1        M                                                                                      L2 :              20                              L6:              0
 PROF.PIQUE:                         0.6       M                                                                                      L3 :              22                              L7:              0
INCREMENTO:                          0.3       M                                                                                      L4 :              11                              L8:              0


                                                                     AREA (1-4):     208.71 M2
                                                                    PERIMETRO:           62 M
 PARTIDAS QUE INTERVIENEN                                                                                  ↓↓ PROFUNDIDAD DE EXCAVACION ↓↓
                                                                         P.U            1           2             3               4             5                6                  7            8
EXCAVACION MANUAL EN TERRENO NORMAL                                       28           0.80        1.60          2.40            3.20         4.00              4.80              5.60         6.40
EXCAVACION MANUAL DE PIQUE P/ CALZADURA                                   36.6         0.60        1.50          2.70            4.20         6.00              8.10              10.50        13.20
ELIMINACION DE MATERIAL EXCEDENTE                                         19.6         1.82        4.03          6.63            9.62         13.00             16.77             20.93        25.48
ENCOFRADO DE CALZADURA                                                   19.36         1.00        2.00          3.00            4.00         5.00              6.00              7.00         8.00
CONCRETO EN CALZADURA                                                     150          0.60        1.50          2.70            4.20         6.00              8.10              10.50        13.20
                                                                          S/.         189.39      442.41     759.05          1,139.31        1,583.20       2,090.71             2,661.85     3,296.61
                                                                        PROF.          1M         2M             3M              4M           5M                6M                7M           8M




                                                               L1         L2           L3          L4            L5              L6            L7                L8
                                                               9          20           22          11             0               0             0                0
                                   PROF. (m)                   ↓          ↓            ↓           ↓             ↓               ↓             ↓                 ↓
        PROFUNDIDAD DE CALZADURA




                                      1             189.39    1704.53     3787.84      4166.62     2083.31            0.00            0.00          0.00              0.00
                                      2             442.41    3981.67     8848.16      9732.98     4866.49            0.00            0.00          0.00              0.00
                                      3             759.05    6831.43    15180.96     16699.06     8349.53            0.00            0.00          0.00              0.00
                                      4            1139.31   10253.81    22786.24     25064.86    12532.43            0.00            0.00          0.00              0.00
                                      5            1583.20   14248.80    31664.00     34830.40    17415.20            0.00            0.00          0.00              0.00
                                      6            2090.71   18816.41    41814.24     45995.66    22997.83            0.00            0.00          0.00              0.00
                                      7            2661.85   23956.63    53236.96     58560.66    29280.33            0.00            0.00          0.00              0.00
                                      8            3296.61   29669.47    65932.16     72525.38    36262.69            0.00            0.00          0.00              0.00




                                               PRECIOS TOTALES                                               PROFUNDIDAD VS. COSTO
                                   PROF. (m)   A PROF. INDICADA                     S/. 200,000.00
                                                                                                                                        y = 1972.x2 + 9770x - 6E-117, S/. 165,034.58
                                      1             S/. 11,742.30                       1        ######
        PROFUNDIDAD DE CALZADURA




                                                                                    S/. 150,000.00                                                 R² = 1
                                      2             S/. 27,429.30                       2        ######                                                                           6, S/. 129,624.14
                                      3             S/. 47,060.98                        3    ######
                                                                                    S/. 100,000.00                                                                   5, S/. 98,158.40
                                      4             S/. 70,637.34                       4        ######                                                  4, S/. 70,637.34
                                      5             S/. 98,158.40                    S/. 5
                                                                                         50,000.00
                                                                                              ######                                        3, S/. 47,060.98
                                      6            S/. 129,624.14                       6        ######                           2, S/. 27,429.30
                                                                                                                        1, S/. 11,742.30
                                      7            S/. 165,034.58                       7 S/. 0.00
                                                                                              ######
                                      8            S/. 204,389.70                       8          0
                                                                                              ######                         2                      4                        6                  8


                                                                                      PROF:             3.4 M.               COSTO:            S/. 56,014.32

More Related Content

What's hot

What's hot (6)

Obermeyer Case Xavier Lehnhoff
Obermeyer Case Xavier LehnhoffObermeyer Case Xavier Lehnhoff
Obermeyer Case Xavier Lehnhoff
 
Go Ahead for F&O Report 19 March 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 19 March 2013 Mansukh Investment and Trading SolutionGo Ahead for F&O Report 19 March 2013 Mansukh Investment and Trading Solution
Go Ahead for F&O Report 19 March 2013 Mansukh Investment and Trading Solution
 
Go Ahead for F&O Report 31 October 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 31 October 2012-Mansukh Investment and Trading Solution Go Ahead for F&O Report 31 October 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 31 October 2012-Mansukh Investment and Trading Solution
 
NMCE Trading Report -08/01/2010
NMCE Trading Report -08/01/2010NMCE Trading Report -08/01/2010
NMCE Trading Report -08/01/2010
 
Ts fr 101_r00 typical number of roof legs
Ts fr 101_r00 typical number of roof legsTs fr 101_r00 typical number of roof legs
Ts fr 101_r00 typical number of roof legs
 
Floating structures
Floating structuresFloating structures
Floating structures
 

Similar to Calzadura

VaR of Operational Risk
VaR of Operational RiskVaR of Operational Risk
VaR of Operational RiskRahmat Mulyana
 
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사dongwoo
 
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...Mansukh Investment & Trading Solutions
 
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading SolutionMansukh Investment & Trading Solutions
 
Key Supports & Resistances of F&O scrips with change in open interest on dail...
Key Supports & Resistances of F&O scrips with change in open interest on dail...Key Supports & Resistances of F&O scrips with change in open interest on dail...
Key Supports & Resistances of F&O scrips with change in open interest on dail...Mansukh Investment & Trading Solutions
 
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading SolutionMansukh Investment & Trading Solutions
 

Similar to Calzadura (20)

VaR of Operational Risk
VaR of Operational RiskVaR of Operational Risk
VaR of Operational Risk
 
F&O Report 30 January 2012-Mansukh Investment and Trading Solution
F&O Report 30 January 2012-Mansukh Investment and Trading SolutionF&O Report 30 January 2012-Mansukh Investment and Trading Solution
F&O Report 30 January 2012-Mansukh Investment and Trading Solution
 
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사
20091228 Itfind 2009년 국내 휴대폰 이용 현황 실태 조사
 
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...
Go Ahead for F&O Report 01 November 2012-Mansukh Investment and Trading Solut...
 
F&O Report 20 January 2012-Mansukh Investment and Trading Solution
F&O Report 20 January 2012-Mansukh Investment and Trading SolutionF&O Report 20 January 2012-Mansukh Investment and Trading Solution
F&O Report 20 January 2012-Mansukh Investment and Trading Solution
 
F&O Report 07 Febuary 2012-Mansukh Investment and Trading Solution
 F&O Report 07 Febuary 2012-Mansukh Investment and Trading Solution F&O Report 07 Febuary 2012-Mansukh Investment and Trading Solution
F&O Report 07 Febuary 2012-Mansukh Investment and Trading Solution
 
F&O Report 24 January 2012-Mansukh Investment and Trading Solution
F&O Report 24 January 2012-Mansukh Investment and Trading SolutionF&O Report 24 January 2012-Mansukh Investment and Trading Solution
F&O Report 24 January 2012-Mansukh Investment and Trading Solution
 
Go-ahead for Future Trades -Insights for 29 June
Go-ahead for Future Trades -Insights for 29 JuneGo-ahead for Future Trades -Insights for 29 June
Go-ahead for Future Trades -Insights for 29 June
 
Go Ahead for F&O Report 17 April 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 April 2012-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 17 April 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 April 2012-Mansukh Investment and Trading Solution
 
Future levels 30.10.12
Future levels 30.10.12Future levels 30.10.12
Future levels 30.10.12
 
7 oct future
7 oct future7 oct future
7 oct future
 
Go Ahead for F&O Report 30 March 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 30 March 2012-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 30 March 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 30 March 2012-Mansukh Investment and Trading Solution
 
Go Ahead for F&O Report 21 March 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 21 March 2012-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 21 March 2012-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 21 March 2012-Mansukh Investment and Trading Solution
 
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 16 November 2011-Mansukh Investment and Trading Solution
 
F&O Report 01 Febuary 2012-Mansukh Investment and Trading Solution
F&O Report 01 Febuary 2012-Mansukh Investment and Trading SolutionF&O Report 01 Febuary 2012-Mansukh Investment and Trading Solution
F&O Report 01 Febuary 2012-Mansukh Investment and Trading Solution
 
F&O Report 09 Febuary 2012-Mansukh Investment and Trading Solution
F&O Report 09 Febuary 2012-Mansukh Investment and Trading SolutionF&O Report 09 Febuary 2012-Mansukh Investment and Trading Solution
F&O Report 09 Febuary 2012-Mansukh Investment and Trading Solution
 
Key Supports & Resistances of F&O scrips with change in open interest on dail...
Key Supports & Resistances of F&O scrips with change in open interest on dail...Key Supports & Resistances of F&O scrips with change in open interest on dail...
Key Supports & Resistances of F&O scrips with change in open interest on dail...
 
Go-ahead for Future Trades -Insights for 31 DEC
Go-ahead for Future Trades -Insights for 31 DECGo-ahead for Future Trades -Insights for 31 DEC
Go-ahead for Future Trades -Insights for 31 DEC
 
Go-ahead for Future Trades -Insights for 15 DEC
Go-ahead for Future Trades -Insights for 15 DECGo-ahead for Future Trades -Insights for 15 DEC
Go-ahead for Future Trades -Insights for 15 DEC
 
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading SolutionGo Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading Solution
Go Ahead for F&O Report 17 November 2011-Mansukh Investment and Trading Solution
 

More from edd Apellidos

More from edd Apellidos (20)

Propuesta de participacion 2016 hlcia
Propuesta de participacion 2016 hlciaPropuesta de participacion 2016 hlcia
Propuesta de participacion 2016 hlcia
 
Registro de participacion 2016 hlcia
Registro de participacion 2016 hlciaRegistro de participacion 2016 hlcia
Registro de participacion 2016 hlcia
 
Perfecionamiento del contrato 2016 hlcia
Perfecionamiento del contrato 2016 hlciaPerfecionamiento del contrato 2016 hlcia
Perfecionamiento del contrato 2016 hlcia
 
S
SS
S
 
Riesgos
RiesgosRiesgos
Riesgos
 
Estado de proyecto eav
Estado de proyecto eavEstado de proyecto eav
Estado de proyecto eav
 
Datos inmueble
Datos inmuebleDatos inmueble
Datos inmueble
 
Valuacion eqp.
Valuacion eqp.Valuacion eqp.
Valuacion eqp.
 
Valuacion de automovil
Valuacion de automovilValuacion de automovil
Valuacion de automovil
 
Costo en transporte
Costo en transporteCosto en transporte
Costo en transporte
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
 
Costo en edificacion x m2
Costo en edificacion x m2Costo en edificacion x m2
Costo en edificacion x m2
 
Proyeccion de pagos
Proyeccion de pagosProyeccion de pagos
Proyeccion de pagos
 
Guia codigos en facturas
Guia codigos en facturasGuia codigos en facturas
Guia codigos en facturas
 
Evaluacion....
Evaluacion....Evaluacion....
Evaluacion....
 
Alq. equipo
Alq. equipoAlq. equipo
Alq. equipo
 
Snip 2011
Snip 2011Snip 2011
Snip 2011
 
Riesgos
RiesgosRiesgos
Riesgos
 
Informacion inicial
Informacion inicialInformacion inicial
Informacion inicial
 
Diseño muro de contencion ca
Diseño muro de contencion caDiseño muro de contencion ca
Diseño muro de contencion ca
 

Calzadura

  • 1. ESTIMADO DE COSTO EN CALZADURA DIMENSIONES DEL PIQUE: LONGITUDES EN TERRENO: ALTO: 1 M L1 : 9 M. L5: 0 ANCHO: 1 M L2 : 20 L6: 0 PROF.PIQUE: 0.6 M L3 : 22 L7: 0 INCREMENTO: 0.3 M L4 : 11 L8: 0 AREA (1-4): 208.71 M2 PERIMETRO: 62 M PARTIDAS QUE INTERVIENEN ↓↓ PROFUNDIDAD DE EXCAVACION ↓↓ P.U 1 2 3 4 5 6 7 8 EXCAVACION MANUAL EN TERRENO NORMAL 28 0.80 1.60 2.40 3.20 4.00 4.80 5.60 6.40 EXCAVACION MANUAL DE PIQUE P/ CALZADURA 36.6 0.60 1.50 2.70 4.20 6.00 8.10 10.50 13.20 ELIMINACION DE MATERIAL EXCEDENTE 19.6 1.82 4.03 6.63 9.62 13.00 16.77 20.93 25.48 ENCOFRADO DE CALZADURA 19.36 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 CONCRETO EN CALZADURA 150 0.60 1.50 2.70 4.20 6.00 8.10 10.50 13.20 S/. 189.39 442.41 759.05 1,139.31 1,583.20 2,090.71 2,661.85 3,296.61 PROF. 1M 2M 3M 4M 5M 6M 7M 8M L1 L2 L3 L4 L5 L6 L7 L8 9 20 22 11 0 0 0 0 PROF. (m) ↓ ↓ ↓ ↓ ↓ ↓ ↓ ↓ PROFUNDIDAD DE CALZADURA 1 189.39 1704.53 3787.84 4166.62 2083.31 0.00 0.00 0.00 0.00 2 442.41 3981.67 8848.16 9732.98 4866.49 0.00 0.00 0.00 0.00 3 759.05 6831.43 15180.96 16699.06 8349.53 0.00 0.00 0.00 0.00 4 1139.31 10253.81 22786.24 25064.86 12532.43 0.00 0.00 0.00 0.00 5 1583.20 14248.80 31664.00 34830.40 17415.20 0.00 0.00 0.00 0.00 6 2090.71 18816.41 41814.24 45995.66 22997.83 0.00 0.00 0.00 0.00 7 2661.85 23956.63 53236.96 58560.66 29280.33 0.00 0.00 0.00 0.00 8 3296.61 29669.47 65932.16 72525.38 36262.69 0.00 0.00 0.00 0.00 PRECIOS TOTALES PROFUNDIDAD VS. COSTO PROF. (m) A PROF. INDICADA S/. 200,000.00 y = 1972.x2 + 9770x - 6E-117, S/. 165,034.58 1 S/. 11,742.30 1 ###### PROFUNDIDAD DE CALZADURA S/. 150,000.00 R² = 1 2 S/. 27,429.30 2 ###### 6, S/. 129,624.14 3 S/. 47,060.98 3 ###### S/. 100,000.00 5, S/. 98,158.40 4 S/. 70,637.34 4 ###### 4, S/. 70,637.34 5 S/. 98,158.40 S/. 5 50,000.00 ###### 3, S/. 47,060.98 6 S/. 129,624.14 6 ###### 2, S/. 27,429.30 1, S/. 11,742.30 7 S/. 165,034.58 7 S/. 0.00 ###### 8 S/. 204,389.70 8 0 ###### 2 4 6 8 PROF: 3.4 M. COSTO: S/. 56,014.32