This document provides instructions for disassembling and assembling the final drive of a 325C FM excavator. It lists all required tools and provides detailed step-by-step instructions and illustrations for removing each component of the final drive and mounting it to a bench for disassembly. It also includes instructions for assembling the main housing components.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325C FM EXCAVATOR Y4P
Configuration: 325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
325C Forest Machines Machine Systems
Media Number -RENR5477-00 Publication Date -01/06/2004 Date Updated -11/06/2004
i02012672
Final Drive - Disassemble
SMCS - 4050-015
S/N - S3M1-UP
S/N - Y4P1-UP
Disassembly Procedure
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove".
Table 1
Required Tools
Tool Part Number Part Description Qty
A
3H-0468 Puller Plate 2
5F-7366 Forcing Screw 1
8B-7548 Push-Puller Tool Gp 1
8T-0070 Bolt 2
8T-3282 Hard Washer 2
1P-0520 Driver Gp 1
B 1U-8223 Lifting Sling 2
C 1P-2321 Combination Puller 1
D 4C-8358 Eyebolt 3
E 156-7100 Slide Hammer Puller Gp 1
1/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. M5x0.8x1.5 Bolt 1
F 10mm Drill 1
G 1P-7407 Eyebolt 2
H 199-6557 Spanner Socket 1
I 4C-8359 Eyebolt 2
J 127-8458 Final Drive Bench Ar 1
K 127-8468 Reaction Bar As 1
L
3S-6224 Electric Hydraulic Pump Gp 1
8T-0820 Hydraulic Pressure Gauge 1
3B-7722 Pipe Bushing 2
1P-2376 Quick Connect Coupler 2
1P-2377 Dust Plug 2
8F-0024 Hose As 2
M 128-4075 Shaft As 1
N 194-3885 Adapter Plate 1
Q 4C-8359 Eyebolt 2
R 1U-8758 Retaining Ring Pliers 1
S 1P-1863 Retaining Ring Pliers 1
T 1P-1859 Retaining Ring Pliers 1
2/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 1 g00903052
Personal injury can result from being struck by parts propelled by a
released spring force.
Make sure to wear all necessary protective equipment.
Follow the recommended procedure and use all recommended tooling to
release the spring force.
1. Install Tooling (A). Apply slight pressure to plate (1). Use Tooling (R) to remove retaining
ring (2) .
2. Carefully remove Tooling (A) .
3. Remove plate (1) .
4. Remove O-ring seal (3) .
Illustration 2 g00903050
5. Remove springs (4) .
6. Remove piston (5) .
3/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 9. Remove bottom brake plate (9) .
Illustration 6 g00903031
10. Turn over the final drive.
11. Attach Tooling (B). Use a suitable lifting device. Remove sprocket (10). The weight of
sprocket (10) is approximately 48 kg (106 lb).
12. Remove cover (11).
Illustration 7 g00903120
13. Remove sun gear (12). Remove planetary gear set (13). Use Tooling (S) to remove retaining
rings (14) .
5/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 8 g00903432
Typical example
a. Install Tooling (C). Remove gears (15) .
Illustration 9 g00903928
b. Cut a notch in the bearing cup. Remove one row of bearing rollers through the notch.
After the bearing rollers are out, the remaining parts will drop out. Remove the
retaining ring from the bearing cup.
6/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 10 g00903433
14. Remove planetary gear set (16) .
a. Use Tooling (T) to remove retaining rings (17) .
Illustration 11 g00903459
Typical example
b. Install Tooling (C). Remove gear (18) .
7/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 12 g01041922
15. Remove bolts (19) .
16. Use Tooling (T) to remove retainer ring (19A) .
Illustration 13 g00903471
17. Install Tooling (D). Use a suitable lifting device. The weight of planetary gear set (20) is
approximately 36 kg (80 lb).
8/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 14 g00903517
Illustration 15 g00903699
a. Install Tooling (C). Remove gear (21) .
b. Use Tooling (R) to remove retaining ring (22) .
Illustration 16 g00903703
18. Rotate ring (23) for one notch.
9/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. 19. Remove ring (23) .
Illustration 17 g00903711
20. Install Tooling (E) into dowel pin (24). Remove dowel pin (24) from locknut (25) .
Note: The threads for the nut will be damaged from the dowel pins.
21. Use Tooling (F) to drill the holes in order to remove the damaged threads.
127-8458 Final Drive Disassembly and Assembly Bench
Note: The following procedure is for the 127-8458 Final Drive Disassembly and Assembly
Bench .
Note: Refer to the Tool Operating Manual, NEHS0673 for further procedures concerning 127-
8458 Bench .
Illustration 18 g00910492
1. Remove the hoist from Tooling (Q) and attach four chains and a hoist to the upper half of
Tooling (J) .
10/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. 2. Remove the upper half of Tooling (J). The weight of the upper half is approximately 816 kg
(1800 lb).
3. Install Tooling (N) onto the lower half of Tooling (J). The weight of Tooling (N) is
approximately 100 kg (221 lb).
Illustration 19 g01042049
4. Fasten Tooling (Q) and a hoist to the final drive. Keep the hoist attached.
5. Fasten the final drive onto the lower half of Tooling (N).
Illustration 20 g00910490
6. Install bolts (27) in the final drive through adapter ring (26) .
11/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 21 g00910478
7. Fasten Tooling (G) and a hoist to Tooling (H) .
8. Lower Tooling (H) into the final drive. Make sure that the notches in nut (25) are aligned
with the keys on Tooling (H). The weight of Tooling (H) is approximately 45 kg (100 lb).
9. Remove Tooling (Q) and the hoist.
Illustration 22 g00910496
10. Place Tooling (K) onto Tooling (H) .
11. Fasten a hoist to the upper half of Tooling (J) and install the upper half of Tooling (J) to the
lower half of Tooling (J). Pin the two halves together.
12/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 23 g00910497
12. Attach Tooling (L) to the pressure reducing valve manifold, as shown.
13. Set the torque level for the bench to 2000 psi (14500 lb ft). Do not exceed this pressure.
Refer to the Tool Operating Manual, NEHS0673 for setting the torque level.
Illustration 24 g00910500
14. Place Tooling (M) through the bench and into Tooling (K) .
15. Remove locknut (25). The breakaway torque will vary. The nut will loosen usually at 1400
psi (10750 lb ft).
16. Fasten a hoist to the upper half of Tooling (J) .
17. Remove the upper half of Tooling (J) .
Disassembly Procedure for the Main Housing and the Motor
Housing
13/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 25 g01042049
1. Fasten Tooling (Q) and a hoist to main housing (29), as shown.
2. Separate the main housing (29) from the motor housing (30). The weight of the main
housing is approximately 123 kg (270 lb).
Note: Two outer races and one roller bearing will be removed with the main housing. The
other roller bearing and the two Duo-cone seal kits will remain with the motor housing.
3. Disassemble motor housing (30), as follows:
Illustration 26 g00910506
a. Use two screwdrivers and remove bearing (31) from the motor housing.
b. Remove the Duo-cone seal kit (32) from the motor housing.
14/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 27 g00910508
c. Remove the two backup rings and O-ring seal (33) from the motor housing.
4. Disassemble the main housing (29), as follows:
Illustration 28 g00910510
a. Remove bearing (34) from the main housing (29) .
15/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 29 g00910511
b. Turn main housing (29) over 180 degrees, as shown.
c. Remove seal (35) .
d. Remove bearing (36) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Jun 28 10:51:50 UTC+0800 2020
16/16325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325C FM EXCAVATOR Y4P
Configuration: 325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
325C Forest Machines Machine Systems
Media Number -RENR5477-00 Publication Date -01/06/2004 Date Updated -11/06/2004
i02013082
Final Drive - Assemble
SMCS - 4050-016
S/N - S3M1-UP
S/N - Y4P1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
3H-0468 Puller Plate 2
5F-7366 Forcing Screw 1
8B-7548 Push-Puller Tool Gp 1
8T-0070 Bolt 2
8T-3282 Hard Washer 2
1P-0520 Driver Gp 1
B 1U-8223 Lifting Sling 2
D 4C-8358 Eyebolt 3
G 1P-7407 Eyebolt 2
H 199-6557 Spanner Wrench As 1
J 127-8458 Final Drive Bench Ar 1
K 127-8468 Reaction Bar As 1
1/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. L
3S-6224 Electric Hydraulic Pump Gp 1
8T-0820 Hydraulic Pressure Gauge 1
3B-7722 Pipe Bushing 2
1P-2376 Quick Connect Coupler 2
1P-2377 Plug As 2
8F-0024 Hose As 2
M 128-4075 Shaft As 1
N 154-9315 Thread File 1
P 126-3994 Duo-Cone Seal Installer As 1
Q 4C-8359 Eyebolt 2
R 1U-8758 Retaining Ring Pliers 1
S 1P-1863 Retaining Ring Pliers 1
T 1P-1859 Retaining Ring Pliers 1
Assembly Procedure for the Main Housing
1. Assemble main housing (3), as follows:
Illustration 1 g00911498
a. Install bearing race (2) .
b. Install seal (1) .
2/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 2 g00911499
c. Turn main housing (3) over 180 degrees, as shown.
d. Install bearing (4) .
2. Assemble motor housing (6), as follows:
Illustration 3 g00911506
a. Install the two backup rings and O-ring seal (7) in the motor housing.
3/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 4 g00911509
b. Install bearing (8) .
c. Use Tooling (P) to install Duo-cone seal kit (9) .
Illustration 5 g01041013
3. Place main housing (3) on motor housing (6) .
4. Remove Tooling (Q) and the hoist.
4/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 6 g00913031
5. Use Tooling (N) to clean the threads that are on locknut (10) .
6. Install locknut (10) .
Illustration 7 g01041026
7. Fasten Tooling (G) and a hoist to Tooling (H) .
8. Lower Tooling (H) into the final drive. Make sure that the notches in locknut (10) are
aligned with the keys on Tooling (H). Tooling (H) weighs approximately 45 kg (100 lb).
Illustration 8 g01041033
9. Place Tooling (K) onto Tooling (H) .
10. Fasten a hoist to the upper half of Tooling (J) and install the upper half of Tooling (J) to the
lower half of Tooling (J). Pin the two halves together.
5/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 9 g01041040
11. Attach Tooling (L) to the pressure reducing valve manifold, as shown.
12. Set the torque level for the bench to 4000 N·m (2950 lb ft). Do not exceed this pressure.
Refer to the Tool Operating Manual, NEHS0673 for setting the torque level.
Illustration 10 g01041205
13. Place Tooling (M) through the bench and into Tooling (K) .
6/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 11 g01041252
14. Tighten locknut (10) to a torque of 4000 N·m (2950 lb ft).
15. Fasten a hoist to the upper half of Tooling (J) .
16. Remove the upper half of Tooling (J) .
Illustration 12 g00913936
17. Install dowel pin (11) into locknut (10) .
Note: Do not reuse the old holes for the dowel pins.
7/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 13 g00904392
18. Rotate ring (12) for one notch until the ring locks in place.
Illustration 14 g00904394
Illustration 15 g00904395
19. Use Tooling (R) to install retaining ring (15).
20. Install gears (14) .
8/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. 21. Use Tooling (T) to install retaining ring (13) .
Illustration 16 g01041256
22. Install Tooling (D) and a suitable lifting device to planetary gear (16). The weight of
planetary gear set (16) is approximately 36 kg (80 lb). Position the planetary gear set into
the housing.
Illustration 17 g00904396
23. Install bolts (17) .
9/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY 31...
2020/6/28https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 18 g00914441
24. Install gears (18) .
Illustration 19 g00904397
25. Install planetary gear set (19) .
a. Use Tooling (T) to install retaining ring (20) .
Illustration 20 g00904399
10/14325C FOREST SWING MACHINES Y4P00001-UP (MACHINE) POWERED BY ...