SlideShare a Scribd company logo
1 of 18
Download to read offline
Service Information
Document Title: Function Group: Information Type: Date:
Power transmission,
description
400 Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Power transmission, description
The excavator's power transmission is a generic name of all components that transmit motive force to perform the various
functions of the excavator. The mechanical power from the engine transmitted via the pump coupling is converted to
hydraulic power by the main pumps. Hydraulic power from the main pump goes to the travel motors, slew motor and
hydraulic cylinders via the main control valve, where it is converted back to mechanical power, that actuates the travel
action, slew action and attachments. The reduction gears of the planetary mechanisms convert the high speed rotation of
the hydraulic motor into low speed, high torque rotating force, at the track unit / sprocket for travel, and at the slew unit /
ring gear for slewing. The center passage 360° rotating unit allows high pressure hydraulic flow from the main control valve
to the track motors. The unit rotates with the superstructure without twisting hoses therefore oil flow is not obstructed by
slewing.
Service Information
Document Title: Function Group: Information Type: Date:
Function description Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Function description
Track gearbox consists of a two stage planetary mechanism that converts the high speed rotation of the hydraulic motor,
into low speed, high torque rotating force at the sprocket hub.
See .
990 Hydraulic diagram, travel
Gearbox, torque flow
The power transmitted from the hydraulic motor output shaft is transmitted to the 1st stage sun gear → spline of 1st carrier
→ 2nd sun gear → 2nd planetary gear → ring gear.
At this time, the reduction ratio of reduction gear is as follows :
Reduction ratio
1st reduction ratio
i1 = ((Zs1 + Zr) · (Zs2 + Zr) / (Zs1 · Zs2)) - 1
Figure 1
Track gearbox, torque flow



Zs1 = No. of tooth of 1st sun gear
Zs2 = No. of tooth of 2nd sun gear
Zr = No. of tooth of ring gear
Service Information
Document Title: Function Group: Information Type: Date:
Track gearbox, description Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Track gearbox, description
Track gearbox consists of a two stage planetary mechanism that converts the high speed rotation of the hydraulic motor,
into low speed, high torque rotating force at the sprocket hub.
Figure 1
2 stage planetary gearbox
1.
2.
3.
4.
Track motor
No.1 planetary gear assembly
No.2 planetary gear assembly
Ring gear
Figure 2
Port connections
1.
2.
3.
4.
5.
Oil filling port (PF 3/4)
Oil level check port (PF 3/4)
Oil drain port (PF 3/4)
High speed
Low speed
Port connections
Port symbol Port size Port
(A), (B) 1-5/16-12UN Oil supply (Return)
(P2), (P3) PT 1/4 Pressure check
(P5) PT 1/8 Brake release pressure
(P) 7/16-20UNF Displacement changeover valve oil supply
(D1), (D2) 3/4-16UNF Motor drain
Rotational direction
View from E axis Inlet Outlet
Clockwise A B
Counterclockwise B A
Figure 3
Track gearbox, sectional view
1 Housing 13 No.2 needle bearing 25 No.1 pin
2 Angular bearing 14 Thrust washer 26 Spring pin
3 Seal 15 No.2 pin 27 No.1 sun gear
4 Shim 16 Spring pin 28 Cover
5 Retainer 17 Thrust ring 29 Pad (thrust)
6 Screw 18 No.1 planetary gear assembly 30 Screw
7 Parallel pin 19 No.1 carrier 31 Screw
8 Ring gear 20 No.2 sun gear 32 Plug
9 Coupling 21 Retaining ring gear 33 Name plate
10 No.2 planetary gear assembly 22 No.1 planetary gear 34 O-ring
11 No.2 carrier 23 No.1 needle bearing
12 No.2 planetary gear 24 Thrust washer
Figure 4
Track gearbox, exploded view
The power transmitted from the hydraulic motor output shaft is transmitted to the 1st stage sun gear (27) → spline of 1st
carrier (19) → 2nd sun gear (20) → 2nd planetary gear (12) → ring gear (8).
Figure 5
Track gearbox, torque flow
At this time, the reduction ratio of reduction gear is as follows:
(1) 1st reduction ratio
i1 = ((Zs1 + Zr) · (Zs2 + Zr) / (Zs1 · Zs2)) - 1



Zs1 = No. of tooth of 1st sun gear
Zs2 = No. of tooth of 2nd sun gear
Zr = No. of tooth of ring gear
Service Information
Document Title: Function Group: Information Type: Date:
Track gearbox,
troubleshooting
Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Track gearbox, troubleshooting
Track gearbox, troubleshooting
Gearbox does not rotate. Motor overloaded. Reduce the load.
Gearbox is damaged. Replace the gearbox.
Oil leakage from mating joint
surfaces.
Liquid gasket improperly applied. Disassembly and re-apply.
Mating surface damaged. Repair or replace.
Loosen screws. Tighten to specified torque.
Loosen plug. Tighten to specified torque.
Casing leakage. Cracks or pin holes. Replace the housing.
Cover damaged. Replace the cover.
Track gearbox, troubleshooting
Floating seal leakage. Sliding surface worn. Replace the floating seal
assembly.
O-ring distorted.
Abnormal operating temperature. Insufficient gear oil. Refill to specified level.
Gear or bearing damaged. Replace the gearbox.
Hydraulic and gear oil mixed. Replace the motor oil seal.
Abnormal operating sound. Gearbox is damaged. Replace the gearbox.
Service Information
Document Title: Function Group: Information Type: Date:
Track gearbox,
maintenance standard
Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Track gearbox, maintenance standard
Track gearbox, maintenance standard
The parts are precision finished and must be handled carefully.
Keep the parts of the planetary carrier (s) together, do not mix the bearings, gears, pins and thrust washers.
Seals
Replace the seals and O-rings, although they appear not damaged.
Part replacement criteria
Replace all parts that appear damaged or are not within the allowable value.
Replace some parts in sets, i.e. gears, bearings, pins and thrust washers.
Remove air in the track motor before operating.
1.
2.
3.
4.
5.
6.
7.
Check that the gearbox axis is horizontal. Rotate the gearbox housing until the drain plug is on the bottom of the
vertical axis of the end cover.
The gearbox is supplied with oil plugs (draining, filling and level) equipped with an hole that allows the air to bleed.
NOTE!
Remove the oil plugs with care. When the gearbox is warm, the air inside can be pressurized and this can cause
their strongly expulsion towards the worker.
Loose with caution the plugs (2~3 rounds) counterclockwise.
Clean the plug to be sure that the air bleed hole is not obstructed.
Wait a few seconds to allow the pressurized air to bleed from the gearbox.
Remove the plugs and let the oil flow in a large enough container; in order to facilitate the draining must be oil still
warm.
Wait a few minutes until all the oil is drained and then proceed to screw on the plugs.
Proceed with the oil fill-up following the procedures given.
NOTE!
Never mix mineral oils with synthetic oils and vice versa.
Do not dispose of the oil in the natural environment but be careful to eliminate it in compliance with the relative rules and
regulations that govern locally.
Tightening torque plug. See track gearbox, description.
Part replacement criteria
No. Part Condition Allowable value
8
12
20
22
27
Ring gear
No.2 planetary gear
No.2 sun gear
No.1 planetary gear
No.1 sun gear
The tooth surface is pitted or non uniformly
worn.
The gear is cracked.
Area rate: within 5%
23 Needle bearing Fitting/flaking of the balls, rollers or races.
13
2
Needle bearing
Angular bearing
Does not rotate smoothly by hand.
3 Seal Rust or damage on sliding face.
O-ring distorted or damaged.
15
25
No.2 pin
No.1 pin
The pin is cracked, galled or pitted.
24
14
Thrust washer Excessively worn on the face area.
General tools
General tools
No. Item Size Quantity
1 Socket wrench 19 mm (0.75 inch) 1
2 L wrench 5 mm (0.2 inch)
10 mm (0.39 inch)
12 mm (0.47 inch)
1
3 Torque wrench 39 ~ 177 Nm (29 ~ 130 lbf ft) 1
4 Eye bolt PF 3/4
M10
M12
2
5 Plastic hammer Approximately L = 300 ~ 500 mm (11.8 ~ 19.7 inch) 1
6 Screwdriver Approximately L = 200 mm (7.9 inch) 1
7 Depth gauge
(Vernier calliper)
Range approximately 300 mm (11.8 inch)
Minimum scale 0.01 mm (0.00039 inch)
1
Track gearbox, precautions for operation
Installation
Figure 2
Mounting location
A.
B.
Main body mounted area
Sprocket mounted area





Check that the mating mount surfaces are clean.
Check that the motor is positioned correctly in the frame.
If the gearbox to frame fit is tight, draw the assembly into the frame evenly with the mounting screws.
Tighten the screws in a crisscross pattern in several stages to the specified torque.
Apply these same precautions when mounting the sprocket.
Tightening torque
Tightening torque
Item Quantity Thread size Tightening torque
Reduction screw (A) 30 M16 (P2.0) 265 ±29.4 Nm (195 ±22 lbf ft)
Sprocket screw (B) 22 M16 (P2.0) 265 ±29.4 Nm (195 ±22 lbf ft)
NOTE!
The screws must be 10.9 KS strength classification or above.
Lubricating oil
NOTICE
Prior to operating the travel function, fill the gearbox with the specified oil to the correct level.
NOTE!
Gear oil specification
Use a gear oil equivalent to API classification GL–4 or GL–5, SAE 90.
Gear oil replacement period



First (initial) oil replacement: 500 operating hours
Subsequent oil replacement: 2000 operating hours
After maintenance (initial): 250 operating hours
NOTE!
Regardless of the operating hours the gear oil must be replaced at least once per year.
NOTE!
Do not mix different types, classifications or brands of oil.
NOTE!
Drain the gear oil while it is still warm to flush out any contaminants.
Gear oil replacement procedure
Figure 3
Oil replacement location
1.
2.
3.
Fill port
Level check port
Drain port




Rotate the gearbox until the drain plug and the fill plug are on the vertical axis.
Remove the 3 plugs in the end cover and drain the oil into a suitable container.
Ensure that the drain plug O-ring is not damaged, then install the plug and torque to specification.
Refill the gearbox through the fill port until oil exits from the level check port.
 Ensure that the O-ring on each plug is not damaged, then install the plugs and torque to specification.
NOTE!
Oil capacity: see .
4311 Track gearbox, specifications
Operating checks





Check the oil level prior to operating the travel function.
Check for oil leakage on the gearbox assembly.
Check for loose mounting screws.
Check for abnormal sound or vibration while rotating.
Check for any abnormal temperature increase after operating for a short time.
WARNING
The temperature of the case is high just after running. Use a thermometer to measure. Do not touch directly by hand
to prevent a burn injury.
NOTE!
The temperature of the case must be lower than 90 °C, during continuous operation.
Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
Service Information
Document Title: Function Group: Information Type: Date:
Track unit, replacing Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Track unit, replacing
Op nbr 431-127
1. Park the machine in the service position F, see .
091 Service positions
2. 


When the engine is running, the hydraulic line is under high pressure. Stop the engine, and remove the
residual pressure inside the hydraulic line by operating the control lever smoothly for 3 ~ 4 times with
ignition switch at "ON" position.
Remove the residual pressure inside the hydraulic tank by pressing the air breather on the hydraulic tank.
After disconnecting the hose, install a plug to prevent oil leakage and contamination.
3. Remove the track shoes over the master pin and remove the pin to split the track chain. Insert a bar into the track
link to guide the track assembly. Rotate the track backward to remove the track chain from the drive sprocket.
See to remove the master pin and the track chain.
7753 Track chain assembly, removing
4. Raise sprocket (4) and insert block (3) between track frame (2) and link (1) to support the undercarriage.
Figure 1
Removal, sprocket
1.
2.
3.
4.
5.
Track link
Track frame
Wood block
Sprocket
Screws
5. Remove screws (5) rotating sprocket (4) and remove sprocket (4) carefully.
6. Remove screws (1) and motor cover (2).
Figure 2
Removal, motor cover
1.
2.
Screws
Motor cover
7. Remove track motor high pressure hoses (1).
Figure 3
Removal, hoses
1.
2.
3.
High pressure hoses
Drain hose
2nd speed hose
8. Remove track motor drain hose (2).
9. Remove track motor 2nd speed hose (3).
10. Remove fittings (1).
Figure 4
Removal, fittings
1. Fittings
11. Hold the track unit with hoist (1) and remove mounting screws (2) of the track unit from track frame (3).
Figure 5
Removal, mounting screws
1.
2.
3.
Hoist
Screws
Track frame
12. Lift track unit (2) with hoist (1), and lower to the workbench safely.
Figure 6
Removal, track unit
1. Hoist
2. Track unit
13. Install a new track unit in reverse order of the removal procedure.
14. Lift the track chain onto the drive sprocket, insert a bar into the track link to guide the track assembly. Rotate the
track forward until the master pin link is at the idler. Install the master pin and the track shoes.
See to install the master pin and the track chain.
7753 Track chain assembly, installing
Service Information
Document Title: Function Group: Information Type: Date:
Track gearbox, replacing
cover
Service Information 2015/9/21
Profile:
EXC, EC210C LR [GB]
Track gearbox, replacing cover
Op nbr 431-117
1. Park the machine in the service position B, see .
091 Service positions
Rotate the gearbox until the drain plug and fill plug are on the vertical axis.
2. Remove the 3 plugs on the cover and drain the oil into a suitable container.
NOTE!
Oil capacity: 5.8 liters (1.5 US gal)
Figure 1
Removal, plugs
1.
2.
3.
Fill port
Level check port
Drain port
3. Remove gearbox cover screws (1).
Figure 2
Removal, screws
1. Screw
4. Thread two screws (2) into gearbox (3) to hold fall cover (4).

More Related Content

What's hot

Ybr125 manual completo
Ybr125 manual completoYbr125 manual completo
Ybr125 manual completoLuiz Carlos
 
CASE 580N TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580N TRACTOR LOADER BACKHOE Service Repair ManualCASE 580N TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580N TRACTOR LOADER BACKHOE Service Repair Manualuekdjkm jksemmd
 
manual de motor iveco cursor
manual de motor iveco cursormanual de motor iveco cursor
manual de motor iveco cursorTomas Cisterna
 
CASE 580SN TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580SN TRACTOR LOADER BACKHOE Service Repair ManualCASE 580SN TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580SN TRACTOR LOADER BACKHOE Service Repair Manualhsemmd uksjemd
 
Toyota bt reflex rre160 reach forklift reach trucks service repair manual
Toyota bt reflex rre160 reach forklift reach trucks service repair manualToyota bt reflex rre160 reach forklift reach trucks service repair manual
Toyota bt reflex rre160 reach forklift reach trucks service repair manualfujsjefjkskfmsme
 
Manual actros mpii
Manual actros mpiiManual actros mpii
Manual actros mpiiJose Delgado
 
Cummins shop manual c series engines
Cummins shop manual c series enginesCummins shop manual c series engines
Cummins shop manual c series enginesArvind Negi
 
Manual de serviço cg125 titan ks es cg125 cargo aliment
Manual de serviço cg125 titan ks es cg125 cargo alimentManual de serviço cg125 titan ks es cg125 cargo aliment
Manual de serviço cg125 titan ks es cg125 cargo alimentThiago Huari
 
Manual de serviço xlx250 r (1986) mskb7861p-s supl xlx250r
Manual de serviço xlx250 r (1986)   mskb7861p-s supl xlx250rManual de serviço xlx250 r (1986)   mskb7861p-s supl xlx250r
Manual de serviço xlx250 r (1986) mskb7861p-s supl xlx250rThiago Huari
 
Manual de serviço cg125 titan ks es cg125 cargo infgeral
Manual de serviço cg125 titan ks es cg125 cargo infgeralManual de serviço cg125 titan ks es cg125 cargo infgeral
Manual de serviço cg125 titan ks es cg125 cargo infgeralThiago Huari
 
Manual de serviço nx350 motor
Manual de serviço nx350 motorManual de serviço nx350 motor
Manual de serviço nx350 motorThiago Huari
 
Transmision automatica TOYOTA
Transmision automatica TOYOTATransmision automatica TOYOTA
Transmision automatica TOYOTAHéctor Chire
 
Volvo ec210 c ld ec210cld excavator service repair manual
Volvo ec210 c ld ec210cld excavator service repair manualVolvo ec210 c ld ec210cld excavator service repair manual
Volvo ec210 c ld ec210cld excavator service repair manualfjjsekksekmm
 
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...fujsefkskekmm
 
Manual de serviço cg125 cg125 ml (1983) informac
Manual de serviço cg125 cg125 ml (1983) informacManual de serviço cg125 cg125 ml (1983) informac
Manual de serviço cg125 cg125 ml (1983) informacThiago Huari
 

What's hot (20)

Ybr125 manual completo
Ybr125 manual completoYbr125 manual completo
Ybr125 manual completo
 
CASE 580N TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580N TRACTOR LOADER BACKHOE Service Repair ManualCASE 580N TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580N TRACTOR LOADER BACKHOE Service Repair Manual
 
manual de motor iveco cursor
manual de motor iveco cursormanual de motor iveco cursor
manual de motor iveco cursor
 
CASE 580SN TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580SN TRACTOR LOADER BACKHOE Service Repair ManualCASE 580SN TRACTOR LOADER BACKHOE Service Repair Manual
CASE 580SN TRACTOR LOADER BACKHOE Service Repair Manual
 
Toyota bt reflex rre160 reach forklift reach trucks service repair manual
Toyota bt reflex rre160 reach forklift reach trucks service repair manualToyota bt reflex rre160 reach forklift reach trucks service repair manual
Toyota bt reflex rre160 reach forklift reach trucks service repair manual
 
Manual actros mpii
Manual actros mpiiManual actros mpii
Manual actros mpii
 
Heui
HeuiHeui
Heui
 
Howo sinotruk Wiring Diagrams
Howo sinotruk Wiring DiagramsHowo sinotruk Wiring Diagrams
Howo sinotruk Wiring Diagrams
 
Cummins shop manual c series engines
Cummins shop manual c series enginesCummins shop manual c series engines
Cummins shop manual c series engines
 
Manual o&m bomag
Manual o&m bomagManual o&m bomag
Manual o&m bomag
 
Manual de serviço cg125 titan ks es cg125 cargo aliment
Manual de serviço cg125 titan ks es cg125 cargo alimentManual de serviço cg125 titan ks es cg125 cargo aliment
Manual de serviço cg125 titan ks es cg125 cargo aliment
 
Manual de serviço xlx250 r (1986) mskb7861p-s supl xlx250r
Manual de serviço xlx250 r (1986)   mskb7861p-s supl xlx250rManual de serviço xlx250 r (1986)   mskb7861p-s supl xlx250r
Manual de serviço xlx250 r (1986) mskb7861p-s supl xlx250r
 
Manual de serviço cg125 titan ks es cg125 cargo infgeral
Manual de serviço cg125 titan ks es cg125 cargo infgeralManual de serviço cg125 titan ks es cg125 cargo infgeral
Manual de serviço cg125 titan ks es cg125 cargo infgeral
 
Manual de serviço nx350 motor
Manual de serviço nx350 motorManual de serviço nx350 motor
Manual de serviço nx350 motor
 
Transmision automatica TOYOTA
Transmision automatica TOYOTATransmision automatica TOYOTA
Transmision automatica TOYOTA
 
CATÁLOGO AUTOLINEA
CATÁLOGO AUTOLINEACATÁLOGO AUTOLINEA
CATÁLOGO AUTOLINEA
 
Volvo ec210 c ld ec210cld excavator service repair manual
Volvo ec210 c ld ec210cld excavator service repair manualVolvo ec210 c ld ec210cld excavator service repair manual
Volvo ec210 c ld ec210cld excavator service repair manual
 
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...
Caterpillar cat 3054 c industrial engine (prefix 334) service repair manual (...
 
Manual de serviço cg125 cg125 ml (1983) informac
Manual de serviço cg125 cg125 ml (1983) informacManual de serviço cg125 cg125 ml (1983) informac
Manual de serviço cg125 cg125 ml (1983) informac
 
sensores c9 y c7.pdf
sensores c9 y c7.pdfsensores c9 y c7.pdf
sensores c9 y c7.pdf
 

More from fjjsekksekmm

Volvo g710 b motor grader service repair manual
Volvo g710 b motor grader service repair manualVolvo g710 b motor grader service repair manual
Volvo g710 b motor grader service repair manualfjjsekksekmm
 
Volvo ec700 c ld ec700cld excavator service repair manual
Volvo ec700 c ld ec700cld excavator service repair manualVolvo ec700 c ld ec700cld excavator service repair manual
Volvo ec700 c ld ec700cld excavator service repair manualfjjsekksekmm
 
Volvo ec700 c l ec700cl excavator service repair manual
Volvo ec700 c l ec700cl excavator service repair manualVolvo ec700 c l ec700cl excavator service repair manual
Volvo ec700 c l ec700cl excavator service repair manualfjjsekksekmm
 
Volvo ec700 b lc ec700blc excavator service repair manual
Volvo ec700 b lc ec700blc excavator service repair manualVolvo ec700 b lc ec700blc excavator service repair manual
Volvo ec700 b lc ec700blc excavator service repair manualfjjsekksekmm
 
Volvo ec360 b nlc ec360bnlc excavator service repair manual
Volvo ec360 b nlc ec360bnlc excavator service repair manualVolvo ec360 b nlc ec360bnlc excavator service repair manual
Volvo ec360 b nlc ec360bnlc excavator service repair manualfjjsekksekmm
 
Volvo ec210 b nlc ec210bnlc excavator service repair manual
Volvo ec210 b nlc ec210bnlc excavator service repair manualVolvo ec210 b nlc ec210bnlc excavator service repair manual
Volvo ec210 b nlc ec210bnlc excavator service repair manualfjjsekksekmm
 
Volvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manualVolvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manualfjjsekksekmm
 
Volvo ec140 lc ec140 lc excavator service repair manual
Volvo ec140 lc ec140 lc excavator service repair manualVolvo ec140 lc ec140 lc excavator service repair manual
Volvo ec140 lc ec140 lc excavator service repair manualfjjsekksekmm
 
Hitachi zaxis 230 excavator service repair manual
Hitachi zaxis 230 excavator service repair manualHitachi zaxis 230 excavator service repair manual
Hitachi zaxis 230 excavator service repair manualfjjsekksekmm
 
Hitachi zaxis 225 usrlc excavator service repair manual
Hitachi zaxis 225 usrlc excavator service repair manualHitachi zaxis 225 usrlc excavator service repair manual
Hitachi zaxis 225 usrlc excavator service repair manualfjjsekksekmm
 
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manual
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manualHitachi zaxis 135 us 3 class hydraulic excavator service repair manual
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manualfjjsekksekmm
 
Case tr320 compact track loader operation manual
Case tr320 compact track loader operation manualCase tr320 compact track loader operation manual
Case tr320 compact track loader operation manualfjjsekksekmm
 
Case sr200 skid steer loader operation manual
Case sr200 skid steer loader operation manualCase sr200 skid steer loader operation manual
Case sr200 skid steer loader operation manualfjjsekksekmm
 
Case 750 l tier 3 crawler dozer operator manual
Case 750 l tier 3 crawler dozer operator manualCase 750 l tier 3 crawler dozer operator manual
Case 750 l tier 3 crawler dozer operator manualfjjsekksekmm
 
Bobcat 943 hydrostatic pump component service repair manual sn all
Bobcat 943 hydrostatic pump component service repair manual sn allBobcat 943 hydrostatic pump component service repair manual sn all
Bobcat 943 hydrostatic pump component service repair manual sn allfjjsekksekmm
 
Volvo sd116 dx single drum roller service repair manual
Volvo sd116 dx single drum roller service repair manualVolvo sd116 dx single drum roller service repair manual
Volvo sd116 dx single drum roller service repair manualfjjsekksekmm
 
Volvo sd110 single drum roller service repair manual
Volvo sd110 single drum roller service repair manualVolvo sd110 single drum roller service repair manual
Volvo sd110 single drum roller service repair manualfjjsekksekmm
 
Volvo sd77 f single drum roller service repair manual
Volvo sd77 f single drum roller service repair manualVolvo sd77 f single drum roller service repair manual
Volvo sd77 f single drum roller service repair manualfjjsekksekmm
 
Mc cormick xtx145 tractor operator manual
Mc cormick xtx145 tractor operator manualMc cormick xtx145 tractor operator manual
Mc cormick xtx145 tractor operator manualfjjsekksekmm
 
Mc cormick mc95 tractor operator manual
Mc cormick mc95 tractor operator manualMc cormick mc95 tractor operator manual
Mc cormick mc95 tractor operator manualfjjsekksekmm
 

More from fjjsekksekmm (20)

Volvo g710 b motor grader service repair manual
Volvo g710 b motor grader service repair manualVolvo g710 b motor grader service repair manual
Volvo g710 b motor grader service repair manual
 
Volvo ec700 c ld ec700cld excavator service repair manual
Volvo ec700 c ld ec700cld excavator service repair manualVolvo ec700 c ld ec700cld excavator service repair manual
Volvo ec700 c ld ec700cld excavator service repair manual
 
Volvo ec700 c l ec700cl excavator service repair manual
Volvo ec700 c l ec700cl excavator service repair manualVolvo ec700 c l ec700cl excavator service repair manual
Volvo ec700 c l ec700cl excavator service repair manual
 
Volvo ec700 b lc ec700blc excavator service repair manual
Volvo ec700 b lc ec700blc excavator service repair manualVolvo ec700 b lc ec700blc excavator service repair manual
Volvo ec700 b lc ec700blc excavator service repair manual
 
Volvo ec360 b nlc ec360bnlc excavator service repair manual
Volvo ec360 b nlc ec360bnlc excavator service repair manualVolvo ec360 b nlc ec360bnlc excavator service repair manual
Volvo ec360 b nlc ec360bnlc excavator service repair manual
 
Volvo ec210 b nlc ec210bnlc excavator service repair manual
Volvo ec210 b nlc ec210bnlc excavator service repair manualVolvo ec210 b nlc ec210bnlc excavator service repair manual
Volvo ec210 b nlc ec210bnlc excavator service repair manual
 
Volvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manualVolvo ec210 b lr ec210blr excavator service repair manual
Volvo ec210 b lr ec210blr excavator service repair manual
 
Volvo ec140 lc ec140 lc excavator service repair manual
Volvo ec140 lc ec140 lc excavator service repair manualVolvo ec140 lc ec140 lc excavator service repair manual
Volvo ec140 lc ec140 lc excavator service repair manual
 
Hitachi zaxis 230 excavator service repair manual
Hitachi zaxis 230 excavator service repair manualHitachi zaxis 230 excavator service repair manual
Hitachi zaxis 230 excavator service repair manual
 
Hitachi zaxis 225 usrlc excavator service repair manual
Hitachi zaxis 225 usrlc excavator service repair manualHitachi zaxis 225 usrlc excavator service repair manual
Hitachi zaxis 225 usrlc excavator service repair manual
 
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manual
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manualHitachi zaxis 135 us 3 class hydraulic excavator service repair manual
Hitachi zaxis 135 us 3 class hydraulic excavator service repair manual
 
Case tr320 compact track loader operation manual
Case tr320 compact track loader operation manualCase tr320 compact track loader operation manual
Case tr320 compact track loader operation manual
 
Case sr200 skid steer loader operation manual
Case sr200 skid steer loader operation manualCase sr200 skid steer loader operation manual
Case sr200 skid steer loader operation manual
 
Case 750 l tier 3 crawler dozer operator manual
Case 750 l tier 3 crawler dozer operator manualCase 750 l tier 3 crawler dozer operator manual
Case 750 l tier 3 crawler dozer operator manual
 
Bobcat 943 hydrostatic pump component service repair manual sn all
Bobcat 943 hydrostatic pump component service repair manual sn allBobcat 943 hydrostatic pump component service repair manual sn all
Bobcat 943 hydrostatic pump component service repair manual sn all
 
Volvo sd116 dx single drum roller service repair manual
Volvo sd116 dx single drum roller service repair manualVolvo sd116 dx single drum roller service repair manual
Volvo sd116 dx single drum roller service repair manual
 
Volvo sd110 single drum roller service repair manual
Volvo sd110 single drum roller service repair manualVolvo sd110 single drum roller service repair manual
Volvo sd110 single drum roller service repair manual
 
Volvo sd77 f single drum roller service repair manual
Volvo sd77 f single drum roller service repair manualVolvo sd77 f single drum roller service repair manual
Volvo sd77 f single drum roller service repair manual
 
Mc cormick xtx145 tractor operator manual
Mc cormick xtx145 tractor operator manualMc cormick xtx145 tractor operator manual
Mc cormick xtx145 tractor operator manual
 
Mc cormick mc95 tractor operator manual
Mc cormick mc95 tractor operator manualMc cormick mc95 tractor operator manual
Mc cormick mc95 tractor operator manual
 

Recently uploaded

VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...Garima Khatri
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaMalviyaNagarCallGirl
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai Motor Group
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call GirlsAyesha Khan
 
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agency
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable AgencyVip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agency
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agencyoolala9823
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personshivangimorya083
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一hnfusn
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsappssapnasaifi408
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCRsoniya singh
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technologyquickpartslimitlessm
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptDineshKumar4165
 
John Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualJohn Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualExcavator
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024AHOhOops1
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agencyHyundai Motor Group
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607dollysharma2066
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一fjjhfuubb
 

Recently uploaded (20)

VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
VIP Mumbai Call Girls Thakur village Just Call 9920874524 with A/C Room Cash ...
 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRC
 
Call Girls in Karachi | +923081633338 | Karachi Call Girls
Call Girls in Karachi  | +923081633338 | Karachi Call GirlsCall Girls in Karachi  | +923081633338 | Karachi Call Girls
Call Girls in Karachi | +923081633338 | Karachi Call Girls
 
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agency
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable AgencyVip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agency
Vip Sonam Hire Hot and Sexy Ahmedabad Call Girls from the Most Reliable Agency
 
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Jama Masjid (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 personDelhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
Delhi Call Girls Saket 9711199171 ☎✔👌✔ Full night Service for more than 1 person
 
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
如何办理(UQ毕业证书)昆士兰大学毕业证毕业证成绩单原版一比一
 
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /WhatsappsBeautiful Vip  Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
Beautiful Vip Call Girls Punjabi Bagh 9711199012 Call /Whatsapps
 
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Shaheen Bagh 🔝 Delhi NCR
 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
 
Innovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC TechnologyInnovating Manufacturing with CNC Technology
Innovating Manufacturing with CNC Technology
 
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.pptUNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
UNIT-1-VEHICLE STRUCTURE AND ENGINES.ppt
 
John Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair ManualJohn Deere Tractors 5515 Diagnostic Repair Manual
John Deere Tractors 5515 Diagnostic Repair Manual
 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024
 
2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency2024 TOP 10 most fuel-efficient vehicles according to the US agency
2024 TOP 10 most fuel-efficient vehicles according to the US agency
 
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
 
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
( Best ) Genuine Call Girls In Mandi House =DELHI-| 8377087607
 
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
定制昆士兰大学毕业证(本硕)UQ学位证书原版一比一
 
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
 

Volvo ec210 c lr ec210clr excavator service repair manual

  • 1. Service Information Document Title: Function Group: Information Type: Date: Power transmission, description 400 Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Power transmission, description The excavator's power transmission is a generic name of all components that transmit motive force to perform the various functions of the excavator. The mechanical power from the engine transmitted via the pump coupling is converted to hydraulic power by the main pumps. Hydraulic power from the main pump goes to the travel motors, slew motor and hydraulic cylinders via the main control valve, where it is converted back to mechanical power, that actuates the travel action, slew action and attachments. The reduction gears of the planetary mechanisms convert the high speed rotation of the hydraulic motor into low speed, high torque rotating force, at the track unit / sprocket for travel, and at the slew unit / ring gear for slewing. The center passage 360° rotating unit allows high pressure hydraulic flow from the main control valve to the track motors. The unit rotates with the superstructure without twisting hoses therefore oil flow is not obstructed by slewing.
  • 2. Service Information Document Title: Function Group: Information Type: Date: Function description Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Function description Track gearbox consists of a two stage planetary mechanism that converts the high speed rotation of the hydraulic motor, into low speed, high torque rotating force at the sprocket hub. See . 990 Hydraulic diagram, travel Gearbox, torque flow The power transmitted from the hydraulic motor output shaft is transmitted to the 1st stage sun gear → spline of 1st carrier → 2nd sun gear → 2nd planetary gear → ring gear. At this time, the reduction ratio of reduction gear is as follows : Reduction ratio 1st reduction ratio i1 = ((Zs1 + Zr) · (Zs2 + Zr) / (Zs1 · Zs2)) - 1 Figure 1 Track gearbox, torque flow    Zs1 = No. of tooth of 1st sun gear Zs2 = No. of tooth of 2nd sun gear Zr = No. of tooth of ring gear
  • 3. Service Information Document Title: Function Group: Information Type: Date: Track gearbox, description Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Track gearbox, description Track gearbox consists of a two stage planetary mechanism that converts the high speed rotation of the hydraulic motor, into low speed, high torque rotating force at the sprocket hub. Figure 1 2 stage planetary gearbox 1. 2. 3. 4. Track motor No.1 planetary gear assembly No.2 planetary gear assembly Ring gear
  • 4. Figure 2 Port connections 1. 2. 3. 4. 5. Oil filling port (PF 3/4) Oil level check port (PF 3/4) Oil drain port (PF 3/4) High speed Low speed Port connections Port symbol Port size Port (A), (B) 1-5/16-12UN Oil supply (Return) (P2), (P3) PT 1/4 Pressure check (P5) PT 1/8 Brake release pressure (P) 7/16-20UNF Displacement changeover valve oil supply (D1), (D2) 3/4-16UNF Motor drain Rotational direction View from E axis Inlet Outlet Clockwise A B Counterclockwise B A
  • 5. Figure 3 Track gearbox, sectional view 1 Housing 13 No.2 needle bearing 25 No.1 pin 2 Angular bearing 14 Thrust washer 26 Spring pin 3 Seal 15 No.2 pin 27 No.1 sun gear 4 Shim 16 Spring pin 28 Cover 5 Retainer 17 Thrust ring 29 Pad (thrust) 6 Screw 18 No.1 planetary gear assembly 30 Screw 7 Parallel pin 19 No.1 carrier 31 Screw 8 Ring gear 20 No.2 sun gear 32 Plug 9 Coupling 21 Retaining ring gear 33 Name plate 10 No.2 planetary gear assembly 22 No.1 planetary gear 34 O-ring 11 No.2 carrier 23 No.1 needle bearing 12 No.2 planetary gear 24 Thrust washer
  • 6. Figure 4 Track gearbox, exploded view The power transmitted from the hydraulic motor output shaft is transmitted to the 1st stage sun gear (27) → spline of 1st carrier (19) → 2nd sun gear (20) → 2nd planetary gear (12) → ring gear (8). Figure 5 Track gearbox, torque flow At this time, the reduction ratio of reduction gear is as follows: (1) 1st reduction ratio i1 = ((Zs1 + Zr) · (Zs2 + Zr) / (Zs1 · Zs2)) - 1    Zs1 = No. of tooth of 1st sun gear Zs2 = No. of tooth of 2nd sun gear Zr = No. of tooth of ring gear
  • 7. Service Information Document Title: Function Group: Information Type: Date: Track gearbox, troubleshooting Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Track gearbox, troubleshooting Track gearbox, troubleshooting Gearbox does not rotate. Motor overloaded. Reduce the load. Gearbox is damaged. Replace the gearbox. Oil leakage from mating joint surfaces. Liquid gasket improperly applied. Disassembly and re-apply. Mating surface damaged. Repair or replace. Loosen screws. Tighten to specified torque. Loosen plug. Tighten to specified torque. Casing leakage. Cracks or pin holes. Replace the housing. Cover damaged. Replace the cover. Track gearbox, troubleshooting Floating seal leakage. Sliding surface worn. Replace the floating seal assembly. O-ring distorted. Abnormal operating temperature. Insufficient gear oil. Refill to specified level.
  • 8. Gear or bearing damaged. Replace the gearbox. Hydraulic and gear oil mixed. Replace the motor oil seal. Abnormal operating sound. Gearbox is damaged. Replace the gearbox.
  • 9. Service Information Document Title: Function Group: Information Type: Date: Track gearbox, maintenance standard Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Track gearbox, maintenance standard Track gearbox, maintenance standard The parts are precision finished and must be handled carefully. Keep the parts of the planetary carrier (s) together, do not mix the bearings, gears, pins and thrust washers. Seals Replace the seals and O-rings, although they appear not damaged. Part replacement criteria Replace all parts that appear damaged or are not within the allowable value. Replace some parts in sets, i.e. gears, bearings, pins and thrust washers. Remove air in the track motor before operating. 1. 2. 3. 4. 5. 6. 7. Check that the gearbox axis is horizontal. Rotate the gearbox housing until the drain plug is on the bottom of the vertical axis of the end cover. The gearbox is supplied with oil plugs (draining, filling and level) equipped with an hole that allows the air to bleed. NOTE! Remove the oil plugs with care. When the gearbox is warm, the air inside can be pressurized and this can cause their strongly expulsion towards the worker. Loose with caution the plugs (2~3 rounds) counterclockwise. Clean the plug to be sure that the air bleed hole is not obstructed. Wait a few seconds to allow the pressurized air to bleed from the gearbox. Remove the plugs and let the oil flow in a large enough container; in order to facilitate the draining must be oil still warm. Wait a few minutes until all the oil is drained and then proceed to screw on the plugs. Proceed with the oil fill-up following the procedures given. NOTE! Never mix mineral oils with synthetic oils and vice versa. Do not dispose of the oil in the natural environment but be careful to eliminate it in compliance with the relative rules and regulations that govern locally. Tightening torque plug. See track gearbox, description. Part replacement criteria No. Part Condition Allowable value 8 12 20 22 27 Ring gear No.2 planetary gear No.2 sun gear No.1 planetary gear No.1 sun gear The tooth surface is pitted or non uniformly worn. The gear is cracked. Area rate: within 5% 23 Needle bearing Fitting/flaking of the balls, rollers or races.
  • 10. 13 2 Needle bearing Angular bearing Does not rotate smoothly by hand. 3 Seal Rust or damage on sliding face. O-ring distorted or damaged. 15 25 No.2 pin No.1 pin The pin is cracked, galled or pitted. 24 14 Thrust washer Excessively worn on the face area. General tools General tools No. Item Size Quantity 1 Socket wrench 19 mm (0.75 inch) 1 2 L wrench 5 mm (0.2 inch) 10 mm (0.39 inch) 12 mm (0.47 inch) 1 3 Torque wrench 39 ~ 177 Nm (29 ~ 130 lbf ft) 1 4 Eye bolt PF 3/4 M10 M12 2 5 Plastic hammer Approximately L = 300 ~ 500 mm (11.8 ~ 19.7 inch) 1 6 Screwdriver Approximately L = 200 mm (7.9 inch) 1 7 Depth gauge (Vernier calliper) Range approximately 300 mm (11.8 inch) Minimum scale 0.01 mm (0.00039 inch) 1 Track gearbox, precautions for operation Installation Figure 2 Mounting location A. B. Main body mounted area Sprocket mounted area      Check that the mating mount surfaces are clean. Check that the motor is positioned correctly in the frame. If the gearbox to frame fit is tight, draw the assembly into the frame evenly with the mounting screws. Tighten the screws in a crisscross pattern in several stages to the specified torque. Apply these same precautions when mounting the sprocket. Tightening torque Tightening torque
  • 11. Item Quantity Thread size Tightening torque Reduction screw (A) 30 M16 (P2.0) 265 ±29.4 Nm (195 ±22 lbf ft) Sprocket screw (B) 22 M16 (P2.0) 265 ±29.4 Nm (195 ±22 lbf ft) NOTE! The screws must be 10.9 KS strength classification or above. Lubricating oil NOTICE Prior to operating the travel function, fill the gearbox with the specified oil to the correct level. NOTE! Gear oil specification Use a gear oil equivalent to API classification GL–4 or GL–5, SAE 90. Gear oil replacement period    First (initial) oil replacement: 500 operating hours Subsequent oil replacement: 2000 operating hours After maintenance (initial): 250 operating hours NOTE! Regardless of the operating hours the gear oil must be replaced at least once per year. NOTE! Do not mix different types, classifications or brands of oil. NOTE! Drain the gear oil while it is still warm to flush out any contaminants. Gear oil replacement procedure Figure 3 Oil replacement location 1. 2. 3. Fill port Level check port Drain port     Rotate the gearbox until the drain plug and the fill plug are on the vertical axis. Remove the 3 plugs in the end cover and drain the oil into a suitable container. Ensure that the drain plug O-ring is not damaged, then install the plug and torque to specification. Refill the gearbox through the fill port until oil exits from the level check port.
  • 12.  Ensure that the O-ring on each plug is not damaged, then install the plugs and torque to specification. NOTE! Oil capacity: see . 4311 Track gearbox, specifications Operating checks      Check the oil level prior to operating the travel function. Check for oil leakage on the gearbox assembly. Check for loose mounting screws. Check for abnormal sound or vibration while rotating. Check for any abnormal temperature increase after operating for a short time. WARNING The temperature of the case is high just after running. Use a thermometer to measure. Do not touch directly by hand to prevent a burn injury. NOTE! The temperature of the case must be lower than 90 °C, during continuous operation.
  • 13. Thank you very much for your reading. Please Click Here. Then Get COMPLETE MANUAL. NO WAITING NOTE: If there is no response to click on the link above, please download the PDF document first and then click on it.
  • 14. Service Information Document Title: Function Group: Information Type: Date: Track unit, replacing Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Track unit, replacing Op nbr 431-127 1. Park the machine in the service position F, see . 091 Service positions 2.    When the engine is running, the hydraulic line is under high pressure. Stop the engine, and remove the residual pressure inside the hydraulic line by operating the control lever smoothly for 3 ~ 4 times with ignition switch at "ON" position. Remove the residual pressure inside the hydraulic tank by pressing the air breather on the hydraulic tank. After disconnecting the hose, install a plug to prevent oil leakage and contamination. 3. Remove the track shoes over the master pin and remove the pin to split the track chain. Insert a bar into the track link to guide the track assembly. Rotate the track backward to remove the track chain from the drive sprocket. See to remove the master pin and the track chain. 7753 Track chain assembly, removing 4. Raise sprocket (4) and insert block (3) between track frame (2) and link (1) to support the undercarriage. Figure 1 Removal, sprocket 1. 2. 3. 4. 5. Track link Track frame Wood block Sprocket Screws 5. Remove screws (5) rotating sprocket (4) and remove sprocket (4) carefully. 6. Remove screws (1) and motor cover (2).
  • 15. Figure 2 Removal, motor cover 1. 2. Screws Motor cover 7. Remove track motor high pressure hoses (1). Figure 3 Removal, hoses 1. 2. 3. High pressure hoses Drain hose 2nd speed hose 8. Remove track motor drain hose (2). 9. Remove track motor 2nd speed hose (3). 10. Remove fittings (1).
  • 16. Figure 4 Removal, fittings 1. Fittings 11. Hold the track unit with hoist (1) and remove mounting screws (2) of the track unit from track frame (3). Figure 5 Removal, mounting screws 1. 2. 3. Hoist Screws Track frame 12. Lift track unit (2) with hoist (1), and lower to the workbench safely. Figure 6 Removal, track unit 1. Hoist
  • 17. 2. Track unit 13. Install a new track unit in reverse order of the removal procedure. 14. Lift the track chain onto the drive sprocket, insert a bar into the track link to guide the track assembly. Rotate the track forward until the master pin link is at the idler. Install the master pin and the track shoes. See to install the master pin and the track chain. 7753 Track chain assembly, installing
  • 18. Service Information Document Title: Function Group: Information Type: Date: Track gearbox, replacing cover Service Information 2015/9/21 Profile: EXC, EC210C LR [GB] Track gearbox, replacing cover Op nbr 431-117 1. Park the machine in the service position B, see . 091 Service positions Rotate the gearbox until the drain plug and fill plug are on the vertical axis. 2. Remove the 3 plugs on the cover and drain the oil into a suitable container. NOTE! Oil capacity: 5.8 liters (1.5 US gal) Figure 1 Removal, plugs 1. 2. 3. Fill port Level check port Drain port 3. Remove gearbox cover screws (1). Figure 2 Removal, screws 1. Screw 4. Thread two screws (2) into gearbox (3) to hold fall cover (4).