Public Service Enterprise Group
    Edison Electric Institute
Annual Finance Committee Meeting
         Waldorf=Astoria
          May 21, 2008
Forward-Looking Statement

    Readers are cautioned that statements contained in this presentation about our and our subsidiaries' future performance, including future
    revenues, earnings, strategies, prospects and all other statements that are not purely historical, are forward-looking statements for purposes of
    the safe harbor provisions under The Private Securities Litigation Reform Act of 1995. Although we believe that our expectations are based on
    reasonable assumptions, we can give no assurance they will be achieved. The results or events predicted in these statements may differ
    materially from actual results or events. Factors which could cause results or events to differ from current expectations include, but are not
    limited to:

•   Adverse Changes in energy industry, policies and regulation, including market rules that may adversely affect our operating results.
•   Any inability of our energy transmission and distribution businesses to obtain adequate and timely rate relief and/or regulatory approvals from
    federal and/or state regulators.
•   Changes in federal and/or state environmental regulations that could increase our costs or limit operations of our generating units.
•   Changes in nuclear regulation and/or developments in the nuclear power industry generally, that could limit operations of our nuclear
    generating units.
•   Actions or activities at one of our nuclear units that might adversely affect our ability to continue to operate that unit or other units at the same
    site.
•   Any inability to balance our energy obligations, available supply and trading risks.
•   Any deterioration in our credit quality.
•   Any inability to realize anticipated tax benefits or retain tax credits.
•   Increases in the cost of or interruption in the supply of fuel and other commodities necessary to the operation of our generating units.
•   Delays or cost escalations in our construction and development activities.
•   Adverse capital market performance of our decommissioning and defined benefit plan trust funds.
•   Changes in technology and/or increased customer conservation.

    For further information, please refer to our Annual Report on Form 10-K, including Item 1A. Risk Factors, and subsequent reports on Form 10-
    Q and Form 8-K filed with the Securities and Exchange Commission. These documents address in further detail our business, industry issues
    and other factors that could cause actual results to differ materially from those indicated in this presentation. In addition, any forward-looking
    statements included herein represent our estimates only as of today and should not be relied upon as representing our estimates as of any
    subsequent date. While we may elect to update forward-looking statements from time to time, we specifically disclaim any obligation to do so,
    even if our estimates change, unless otherwise required by applicable securities laws.




                                                                                                                                                            2
GAAP Disclaimer

 PSEG presents Operating Earnings in addition to its Net Income reported
 in accordance with accounting principles generally accepted in the United
 States (GAAP). Operating Earnings is a non-GAAP financial measure that
 differs from Net Income because it excludes the impact of the sale of
 certain non-core domestic and international assets and costs stemming
 from the terminated merger agreement with Exelon Corporation. PSEG
 presents Operating Earnings because management believes that it is
 appropriate for investors to consider results excluding these items in
 addition to the results reported in accordance with GAAP. PSEG believes
 that the non-GAAP financial measure of Operating Earnings provides a
 consistent and comparable measure of performance of its businesses to
 help shareholders understand performance trends. This information is
 not intended to be viewed as an alternative to GAAP information. The last
 slide in this presentation includes a list of items excluded from Net Income
 to reconcile to Operating Earnings, with a reference to that slide included
 on each of the slides where the non-GAAP information appears. These
 slides are intended to be reviewed in conjunction with the oral
 presentation to which they relate.

                                                                                3
PSEG Overview
Tom O’Flynn
Executive Vice President and Chief Financial Officer - PSEG
President and Chief Operating Officer – PSEG Energy Holdings
Our platform …




                                                                                      Stable electric and gas    Redeployment of capital
                                       Major electric generation
                                                                                           distribution and         through the sale of
                                        company with 13,300
                                                                                      transmission company         international assets.
                                           MW of base-load,
                                                                                        rated top quartile for    Focused on managing
                                        intermediate and load
                                                                                         reliability providing      lease portfolio and
                                          following capability
                                                                                          service in mature       potential investment in
                                        operating in attractive
                                                                                      service territory in New         renewables.
                                       markets in the Northeast
                                                                                                Jersey.
                                       with operating control of
                                       additional 2,000 MW of
                                           capacity in Texas.


   2007 Operating
                                                      $949M*                                 $376M*                     $115M*
     Earnings:

    2008 Guidance:                        $1,040M - $1,140M                             $350M – $370M                $45M – $60M


           … provides earnings stability, multiple growth opportunities and
           substantial cash flow.                                                                                                           5
* See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
Our focus is to maximize benefits from existing assets …


    Operational           Regulatory and            Growth with
    Excellence          Market Environment        Manageable Risk

                                                  Maintain strong
                             Regulatory
Processes embedded                                 balance sheet
                        mechanisms in place
   throughout the                                    providing
                         supporting best-in-
organization on how                                opportunity to
                           class reliability
 to manage, operate                              deploy capital to
                        enhanced by market
   and invest with                               meet shareholder
                              dynamics
  excellence as the                                objectives for
                            encouraging
         goal                                       growth with
                             investment
                                                  reasonable risk




 … and build a substantial platform for ongoing growth.
                                                                     6
Major influences on business environment remain:


                                Infrastructure
   Climate Change                                       Capacity Needs
                                Requirements

                                                     • Capital investment in
• PSEG Power’s base-        • Significant new          coal fleet to meet
  load nuclear assets         transmission capital     environmental
  well situated in carbon     program to improve       requirements
  constrained                 reliability              maintains critical
  environment                                          infrastructure and
                                                       expands capability
• PSE&G pursuing
  investments in energy                              • Potential to leverage
  efficiency and                                       existing brownfield
  renewables                                           sites; potential for
                                                       new nuclear




 PSEG assets are well positioned to meet the needs of customers
 and shareholders in a challenging environment.                                7
We are continuing to improve operational practices and participate
in market design discussions …

                                   Goal is to maintain (at a minimum) operating
         Operational               capability of nuclear fleet at 90% capacity factor
         Excellence                Goal is to maintain (at a minimum) operating
                                   capability of nuclear fleet at 90% capacity factor
                                   PSE&G pursuing pilot programs in advanced metering
                                   and back office technology


                                   NJ enacted Regional Greenhouse Gas Initiative
       Regulatory and              (RGGI)
     Market Environment            Draft NJ Energy Master Plan released
                                   PSEG Power exposed to heat rate expansion, gas
                                   prices and carbon

                                   Bid for new peaking capacity not accepted
         Growth with               Pursuing RFPs in CT
       Manageable Risk             Awaiting RTEP decision on additional transmission
                                   PSE&G pursuing pilot programs to test energy
                                   efficiency and conservation
                                   Hope Creek uprate and Salem steam generator adding
                                   140MW

 … to support long-term growth and reliability.                                         8
Improved processes and investment …



                                                       2007 -2011:
                  $2,400                               CAGR: 2.1%




                  $2,200
   ($ millions)
      O&M




                  $2,000



                  $1,800
                           2007   2008   2009   2010   2011



… are expected to control the rate of growth in operating
expenses.                                                            9
Improved processes, markets and well-positioned assets …

                                                        Operating Earnings by Subsidiary


                                                                                               8% Growth
                                                                                                           $2.80 - $3.05
                                                                                      $2.71*                    45 - 60
                                                                                       115




                                            $1.73*
                                                                                                             1,040 - 1,140
            Holdings                             161                                   949



                                                 515
                Power


                                                                                       376                    350 - 370
                                                 262
              PSE&G
                                                (66)                                   (63)                   (15) - (10)
               Parent
                                               2006                                    2007                     2008

            … allowed us to meet our commitments to earnings growth as we
            also reduced balance sheet and international risk.                                                               10
* See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
Spending for the next four years …

                           $10.0
                                                                    Capital Expenditures

                            $8.0                                                           $ 7.3B


                            $6.0
              $ Billions




                                                         $ 4.5B
                            $4.0



                            $2.0



                            $0.0
                                                   2007 Forecast*                    2008 Forecast**
                                                    (2008 – 2011)                    (2008 – 2011)


                                                                                     PSEG Energy
                                   PSEG Power                         PSE&G                            Other
                                                                                       Holdings


          … has increased primarily at PSE&G to support growth strategy.
                                                                                                               11
* As per 2006 10-K
** As per 2007 10-K; also includes plans for PSEG Energy Holdings
PSEG’s financing capability has improved with forecasted
       discretionary cash expected to reach $3 billion …

                                                          PSEG Use of Cash
                               $15.0


                                                                        $3.0B        Discretionary Cash


                               $10.0                                                  Shareholder
                                                   $1.5 – $2.0B                        Dividend
                  $ Billions




                                         Debt
                                       Reduction


                                $5.0
                                                                                      Investment




                                $0.0
                                                    Forecast*           Forecast
                                                   (2008 –2011)       (2008 –2011)

           … supporting our growth initiatives, and providing financial
           flexibility to meet potential Resources’ tax liability.
                                                                                                          12
* As presented at 2007 March Analyst Conference
PSEG Power’s capital program


                                                            2007                   2008        2009   2010   2011



             2006 10-K                                      $584                   $626        $516   $527   $198
                  ($ millions)




             2007 10-K                                      $562                   $890        $675   $620   $430
                  ($ millions)




                Program focused on meeting environmental commitments,
               capital associated with new capacity ($500M)* and exploring
              the opportunity for new nuclear to improve the fleet’s reliability
                                     and performance.

*Forecast capital spending associated with new peaking could be lower than amount indicated.
                                                                                                                    13
At Power, strong cash generation and declining
                capital expenditures …


                                                                                                   Power Sources and Uses
                                Power Cash Flow
                                                                                                    (2008 – 2011 Forecast)
                                                        Net Cash
                                                          Flow
                                         Cash
             $2.0            Asset
                                       from Ops
                             Sales
                                                                                                            Incremental debt
                                                                                 $10.0                        capacity while
                                                                                                  Net
                                                                                                                                        Dividends
                                                                                                            maintaining target
                                                                                               Financing
                                                                                                                                        to Parent
             $1.0                                                                                            credit measures
                                                                                       $8.0
$ Billions




                                                                                       $6.0
             $0.0




                                                                          $ Billions
                                                                                              Cash from
                                                                                                Ops
                                                                                       $4.0
             ($1.0)                                                                                                                      Investments
                                       Declining Investments
                                                                                       $2.0

             ($2.0)
                                                                                       $0.0
                      2007      2008     2009        2010          2011
                                                                                                           Sources               Uses




                    … should result in substantial discretionary cash available to
                    PSEG for additional growth and/or share repurchases.                                                                        14
PSE&G’s capital program focused on improving reliability

                      2007        2008           2009       2010          2011   2012



                                5-year capital program: $3.0B
  2006 10-K


June 2007 10-Q                  5-year capital program: $4.1B


                                               5-year capital program: $5.3B
  2007 10-K



                                     PSE&G Rate Base ($ millions)
                                   2007 Actual           2012 Base Plan
                 Transmission            830                 2,240
                     Gas              2,240                  3,060
                   Electric           3,330                  4,900
                        TOTAL        $6,400                 $10,200
                                                                                        15
PSE&G’s capital program

                • Rate base growth supported by investment in new 500kV
                  lines to improve reliability ($900M) and upgrade of sub-
                  transmission system ($250M)
 Transmission
                • Received FERC approval for CWIP in rate base and 125 bps
                  adder to ROE on $600M - $650M Susquehanna line – base
                  ROE increased by 50 bps for membership in RTO.


                • Investments focused on improving customer support
 Electric and     enhancing efficiency and upgrading infrastructure
    Gas
                • Expect to file electric and gas rate case in 2009 with rates
 Distribution
                  effective in 2010


                • Future investment associated with meeting State energy
                  efficiency and renewable goals dependent on receiving
                  regulatory support before committing new capital, e.g.
    New
                  $550M investment budgeted for AMI
  Programs
                • BPU approved $105M investment in solar in April 2008 as
                  part of $225M capital investment program
                                                                                 16
At PSE&G, cash flow will be primarily directed towards
              attractive reinvestment opportunities.



                                   PSE&G Cash Flow                                                    PSE&G Sources and Uses
                                                                                                       (2008 – 2011 Forecast)
             $1.5
                                  Cash from
                                    Ops                                            $6.0
                       Net Cash                                                                                                 Dividends
                                                                                             Net
                         Flow                                                                                                   to Parent
                                                                                          Financing
             $0.5
$ Billions




                                                                                   $4.0




                                                                      $ Billions
                                                                                          Cash from
        ($0.5)                                                                                                                    Investments
                                                                                            Ops
                                                                                   $2.0



                                         Growing Investments
        ($1.5)                                                                     $0.0
                     2007         2008        2009   2010      2011                                    Sources           Uses




                    Modest dividends to the Parent are expected to continue as
                    PSE&G grows its asset base.
                                                                                                                                            17
At Holdings, asset sales could continue to be a significant
      source of cash in 2008.

                                                                    Holdings Sources and Uses*
                                                                      (2008 – 2011 Forecast)
                                      $1.2
                                             Net Financing



                                      $0.9
                                                                                                  Dividends to
                                               Asset
                                                                                                     Parent
                                               Sales
                         $ Billions




                                      $0.6

                                                Cash from
                                                                                                 Investments**
                                                  Ops
                                      $0.3



                                      $0.0
                                                                    Sources             Uses


            Flexibility exists to finance potential Resources’ tax liability.
* Forecast excludes potential for monetization of lease portfolio
                                                                                                                 18
** Investments exclude Intercompany loans.
At PSEG, we forecast $3.0B of discretionary cash through
 2011.

                                                                       Parent Sources and Uses
                                                                        (2008 – 2011 Forecast)
                 $6.0          Holdings
                               Dividend

                               PSE&G
                                                                                                         Discretionary
                              Dividend                                                           $3.0B      Cash*
                 $4.0
    $ Billions




                                 Power
                                Dividend
                 $2.0
                                                                                                          Shareholder
                                                                                                           Dividend



                 $0.0
                                                                    Sources                      Uses



    Cash flow from Power is the primary driver of discretionary cash.
*Forecast includes some use of cash to meet potential IRS tax liability.
                                                                                                                         19
Markets, assets and use of cash flow …

                                                                                                                        + 8 - 9%

                                                                                                     + 8 - 9%




                                                                                        $3.05 - $3.35
                                                                    $2.80 - $3.05
                                                $2.71


                    $1.73




                                                                               2008         2009
               2006 Operating               2007 Operating                                                      2010E              2011E
                                                                             Guidance     Guidance
                 Earnings*                    Earnings*

          … should continue to drive annual earnings guidance growth
          of 8 - 9%.                                                                                                                       20
* See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
Redeploying our $3.0B of discretionary cash towards
  additional growth and / or share repurchases …



                           + 8 – 9% Annual Growth
                                                             Discretionary Cash    Total Shareholder
                                                                                         Return
                                                                Annual Growth
                                                                     ≈ 3%               10 - 13%
           $2.80 - $3.05
Holdings                                            6 – 8%
              45 - 60
PSE&G                                                                                    Annual
            350 - 370
                                                                                     Dividend Yield
                                                                                          ≈ 3%
                                                                 Subsidiary
                                                    5 – 7%      Annual Growth
                                                                   5 – 7%
           1040 - 1140
 Power                                                                            “Discretionary Cash”
                                                                                   – Annual Growth /
                                                                                   Share Repurchases
                                                                                          ≈ 3%


 Parent    (15) – (10)
                                                    2011
              2008           2009         2010                                    Subsidiary Earnings
                                                                                    Annual Growth
                                                                                        5 – 7%



  … drives our Consolidated earnings growth rate resulting in a total
  shareholder return between 10 – 13%.                                                                   21
Our recent 10% dividend increase continues 100-year
      history of paying common dividends.
                                      $1.50
                 Dividend per Share




                                                                                            ?
                                                                              $1.29 *
                                                                          %
                                                                       10
                                      $1.25                        +

                                                               $1.17
                                                       $1.14
                                               $1.12




                                      $1.00
                                               2005    2006    2007            2008     2009E
                                      Payout
                                                63%    66%      43%             44%     40 – 50%
                                       Ratio


          Payout objective of 40 – 50% provides opportunity for growth with
          earnings.                                                                                22
* Indicated annual dividend rate
PSEG’s current stock price…

PSE&G                                                                                        Energy Holdings
2008 Earnings Guidance                           $350M - $370M
                                                                                             Book Equity Value/Share(1)                         $2.75
Indicative 2008 P/E Multiple                     13.5x – 14.0x
Resulting Value/Share                            $9.00 - $10.25/Share



               PSEG Power
               Stock Price as of 5/16/08 (per share)                                                    $42.50
               Less Indicative Value of PSE&G, Energy Holdings                                          $11.75 - $13.00
               Implied PSEG Power Value (per share)                                                     $29.50 - $30.75

               Implied Power Enterprise Value                                                           $17.9B - $18.6B

               Implied EV as a Multiple of:
                 2008 EBITDA                                                                            8.3x – 9.1x
                 Open EBITDA                                                                            6.4x – 7.1x
                    Plus $10 Carbon                                                                     6.0x – 6.6x
                   Plus $20 Carbon                                                                      5.6x – 6.2x


     (1) Excludes incremental value of Texas generating assets (2,000 MW of combined cycle capacity) and potential tax liability at Resources



  … implies a low valuation for PSEG Power.                                                                                                             23
Fitting the pieces together - PSEG value proposition


       PSEG well positioned in current business environment

            Process improvement programs support efforts to:
                     - maintain reliability
                     - control costs
                     - provide value to the customer

            Asset mix provides opportunities in attractive markets


            Strengthened balance sheet supports capital investment


            Return of cash to shareholders through dividends
            provides discipline to investment process

            Earnings growth and yield offer opportunity for double
            digit shareholder returns of 10 – 13%
                                                                     24
APPENDIX
PSEG Power
Right set of assets, right markets at the right time …

                                           Fuel Diversity – 2007
• Low-cost portfolio
                                             Total MW: 13,300
• Strong cash generator                           Oil                 Nuclear

                                                        8%
• Regional focus in competitive,                               26 %
                                                                                Pumped
  liquid markets                                                                Storage
                                                                                  1%
                                                                   18%
                                                    47 %
• Assets favorably located
                                                                             Coal
                                            Gas
    – Many units east of PJM constraints
    – Southern NEPOOL/ Connecticut
                                           Energy Produced - 2007
    – Near customers/load centers
                                             Total GWh: 53,200
• 80% of Fossil capacity has dual
                                                                   Nuclear
  fuel capabilities
                                                             54%                    Pumped
• Integrated generation and portfolio                                               Storage
                                                                                      1%
                                                                   19%
  management optimizes asset-                                                Gas
                                                         25%
  based revenues                                                         Oil 1%
                                                        Coal

… we continue to like the assets we have and their location.
                                                                                              27
Power’s assets along the dispatch curve …


                                                              Nuclear
                                                                                                                                                           National Park
                                                              Coal                                                                                           Sewaren 6
                    Dispatch Cost ($/MWh)

                                                                                                                                                             Mercer 3
                                                                                                                                                             Kearny 10-11
                                                              Combined Cycle

                                                                                                                                                           Burlington 8-9-11
                                                              Steam

                                                                                                                                                      Edison 1-2-3
                                                              GT Peaking
                                                                                                                                                      Essex 10-11-12
                                                                                                                              New
                                                                                                                              Haven                 Linden 5-8 / Essex 9
                                                                                                                   Bergen 1
                                                                                                                                            Burlington 12 / Kearny 12
                                                                                                     Linden 1,2
                                                                                                                              Yards
                                                                           Keystone                                                   Sewaren 1-4
                                                                                                                              Creek
                                                                         Conemaugh                                                    Hudson 1
                                                              Peach                                                    BEC
                                                                                               Hudson 2
                                                                                  Bridgeport
                                                              Bottom
                                                  Hope                                                            Bergen 2
                                                                     Salem
                                                  Creek
                                                                                                      Mercer1, 2

                                            Illustrative
                                                           Baseload units                      Load following units                          Peaking units
Energy Revenue                                                        X                                       X                                        X
Capacity Revenue                                                      X                                       X                                        X
Ancillary Revenue                                                                                             X                                        X

Dual Fuel                                                                                                     X                                        X

Nuclear CF                                                      90% to 92%
Coal CF                                                         85% to 90%                                50% to 70%
Combined Cycle CF                                                                                         30% to 50%
Peaking CF                                                                                                                                      2% to 10%

    … position the company to serve full requirement load contracts.                                                                                                           28
We have some major 2008 initiatives …


      Hope Creek Uprate               Salem Steam Generator Outage

• NRC approved Hope Creek’s          • Unit 2 outage concluded
  extended power uprate                within 58 days – on time
  license amendment in May
                                     • $148 million (PS share)
  2008
                                       multi-year project
• Work to support extended
                                     • 15 MW uprate (PS share)
  power uprate largely
                                       expected for 2008 summer
  completed in 2007
                                       run
• 125 MW uprate expected for
  2008 summer run


          INPO Assessments
            Hope Creek           Salem         Corporate
  … that will drive value for years to come.
                                                                     29
Fossil operations contribute to earnings …


                Total Fossil Output                 A Diverse 9,800 MW Fleet (MW)
                          (GWh)
                                                     Coal                  2,350
30,000
                                                Combined Cycle             3,150
                                                Steam / Peaking            4,300
25,000


                                                     Right Assets – Right Location
20,000

                                                           • Fuel diversity
                                                        • Technical diversity
15,000              `

                                                         • Near load centers
10,000

                                                 Operation of 2,000 MW Texas Portfolio
 5,000
                                                      • Shared best practices
                                                          • Leverage scale
    0
         2004      2005           2006   2007




     … through a low-cost portfolio in which the majority of the output is
     from coal facilities.
                                                                                         30
Through our ongoing focus on operational excellence …


                 Total Power Output (GWh)
      60,000
                                                                  A Diverse 13,300 MW Fleet
      50,000
                                                                Nuclear               3,500
      40,000                                                      Coal                2,350
                                                             Combined Cycle           3,150
GWh




      30,000

                                                             Peaking / Steam          4,300
      20,000

      10,000                                                         Strong Performance

          0                                                     • Continued growth in output
               2004        2005           2006        2007
                                                                • Improved fleet performance
                                  Year
                 Nuclear   Coal      CC      Peaking/Steam




 … we are expanding the output of our existing fleet.
                                                                                               31
Power’s eastern coal plants are in the right areas …

                                     System Interface



   Coal Units       Capacity (MW)
                                                                 Bridgeport Harbor 3 3
                                                                 Bridgeport Harbor
    Hudson 2             558
   Mercer 1&2            648                               Hudson 2
                                                           Hudson 2

   Bridgeport            372
                                                         Mercer1 & 2
                                                         Mercer 1&2
     Total              1,578




 Power’s New Jersey coal units are     Power is also making considerable
  mid-merit, with capacity factors      investments beyond the pollution
      averaging 50% to 60%.            control facilities for its coal assets.

… and after capital investments, anticipate increased capacity factors.
                                                                                    32
Power market dynamics …


                            On-Peak Versus Gas                                 Off-Peak Versus Coal
        $/MWh                                           $/MB           $/MWh                                           $/MB
 $100                                                          $20   $80                                                      $8

    $80
                                                               $15   $60                                                      $6
    $60
                                                               $10   $40                                                      $4
    $40
                                                               $5    $20                                                      $2
    $20

      $0                                                       $0     $0                                                      $0
                2004          2005   2006     2007   2008                  2004      2005       2006         2007   2008
                                                      Est                                                            Est
             PJM Western Hub On-Peak Prices           Gas $/MB             PJM Western Hub Off-Peak Prices            Coal $/MB




    … have led to stronger electricity prices both on-peak and off-peak.
                                                                                                                                  33
Note: Forward prices as of 4/28/08
Rising coal and natural gas prices have driven LMPs ...
                         Central Appalachian Coal ($/Ton)                                                                Natural Gas Henry Hub ($/MMbtu)
 $90                                                                                          $10.0

                                                                                               $9.5
 $80
                                                                                               $9.0

 $70
                                                                                               $8.5

                                                                                               $8.0
 $60

                                                                                               $7.5
 $50
                                                                                               $7.0

 $40                                                                                           $6.5
                             07




                                          7
                 7




                                                                                          8
    07




                                                                  07



                                                                                08
                                                      07




                                                                                                                         07




                                                                                                                                   7
                                                                                                               7




                                                                                                                                                                             8
                                                                                                      07




                                                                                                                                                             07



                                                                                                                                                                    08
                                      l-0




                                                                                                                                                 07
                -0




                                                                                         -0




                                                                                                                               l-0
                                                                                                              -0




                                                                                                                                                                            -0
                            -




                                                                  v-
                                                     p-
   n-




                                                                                n-
                         ay
             ar




                                                                                      ar




                                                                                                                         -




                                                                                                                                                         v-
                                                                                                                                             p-
                                                                                                 n-




                                                                                                                                                                    n-
                                     Ju




                                                                                                                      ay
                                                                                                           ar




                                                                                                                                                                         ar
                                                                 No




                                                                                                                              Ju
 Ja




                                                                              Ja
                                                 Se
             M




                                                                                      M




                                                                                                                                                        No
                                                                                               Ja




                                                                                                                                                                  Ja
                                                                                                                                            Se
                         M




                                                                                                           M




                                                                                                                                                                         M
                                                                                                                     M
                                              2009        2010        2011                                                           2009        2010    2011


                                                                                                                   On Peak Heat Rate Expansion (MMbtu/MWh)
                 Electric PJM Western Hub RTC Price ($/MWh)
                                                                                               10.5
   $80


   $75
                                                                                               10.0


   $70
                                                                                                9.5

   $65

                                                                                                9.0
   $60


                                                                                                8.5
   $55
                                                                                                                         07




                                                                                                                                   7
                                                                                                               7




                                                                                                                                                                             8
                                                                                                                                                         07
                                                                                                      07




                                                                                                                                                                    08
                                                                                                                                             07
                               07




                                          7
                     7




                                                                                          8
                                                                      07
        07




                                                                                 08
                                                      07




                                                                                                                               l-0
                                                                                                              -0




                                                                                                                                                                            -0
                                       l-0
                    -0




                                                                                         -0




                                                                                                                         -




                                                                                                                                                         v-
                                                                                                  n-




                                                                                                                                             p-




                                                                                                                                                                    n-
                                -




                                                                                                                      ay
                                                                  v-




                                                                                                           ar




                                                                                                                                                                         ar
     n-




                                                      p-




                                                                                n-




                                                                                                                              Ju
                             ay
                 ar




                                                                                      ar
                                     Ju




                                                                                                                                                        No
                                                                                                Ja




                                                                                                                                                                  Ja
                                                                                                                                            Se
                                                                 No




                                                                                                           M




                                                                                                                                                                         M
   Ja




                                                                              Ja
                                                     Se




                                                                                                                     M
              M




                                                                                      M
                         M




                                                                                                                                     2009        2010    2011
                                              2009        2010         2011


          … and this trend may continue.
                                                                                                                                                                                 34
Note: Forward prices as of 4/28/08
As policymakers are looking to reduce CO2 emissions …
                          Estimated Impact of Carbon Prices on Energy Prices
                                       and on Power’s EBITDA
               $35

               $30
                                                                                     $800




                                                                                            EBITDA ($M)
               $25
       $/MWh




                                                                                     $600
               $20

               $15                                                                   $400

               $10
                                                                                     $200
                $5

                $0                                                                    $0
                     $0      $5    $10   $15   $20   $25   $30   $35   $40     $45
                                                 ($/Ton)

         The diversity of the portfolio makes Power well positioned to capture value
        in a wide range of potential regulatory outcomes, with about half of Power’s
          revenue increase expected to remain in EBITDA after the cost of carbon
                                           credits.

… Power stands in good position based on its low carbon fleet.
                                                                                                          35
Through the new capacity constructs, and repricing at
market prices …
       Power’s capacity is located in three Northeast markets.

                                                  NE
                                                        NY   Total Capacity 13,300MW
                                                             (~ 1,000 - 1,500 MW under RMR)


                           PJM




 The RPM Auction to date has provided strong price signals in PJM.

                                                  Delivery Year ($MW/Day)
                2008                           2009                    2010 / 2011
          Zones $38-41/KW-yr / 2008
                          2007                2008 / 2009  2009 / 2010    2010                2011 / 2012
                                               $49-51/KW-yr            $56-60/KW-yr
     Eastern MAAC*         $197.67             $148.80      $191.32        $174.29             $110.00
            MAAC                       ---        ---           $191.32 (a)     $174.29        $110.00
      Rest of Pool                   $40.80    $111.92          $102.04         $174.29        $110.00
      * Majority of Power’s assets
      (a) – includes APS



… Power expects to maintain strong margins.                                                                 36
Power’s fleet diversity and location ...

                                       Market Perspective – BGS Auction Results


   Increase in Full Requirements Component Due to:
            Increased Congestion (East/West Basis)
                                                                                            Full Requirements
                                                                                $111.50
                Increase in Capacity Markets/RPM
                                                          $102.51     $98.88                • Ancillary services
          Volatility in Market Increases Risk Premium
                                                                                            • Capacity
                                                                                            • Congestion
                                                                                ~ $43       • Load shape
                                                           ~ $32      ~ $41
                                              $65.41                                        • RECs
                                                                                            • Transmission
         $55.59                  $55.05
                                                                                            • Risk premium
                                              ~ $21
                                  ~ $18
           ~ $21
                                                                                             Round the Clock
                                                                                $68 - $71
                                                                      $58-$60
                                                          $67 - $70                             PJM West
                                              $44 - $46
                                  $36 - $37
          $33 - $34
                                                                                             Forward Energy
                                                                                                  Price

              2003                    2004      2005        2006       2007      2008
          … has enabled successful participation in each BGS auction and
          cushioned customer impacts.
                                                                                                            37
Note: BGS prices reflect PSE&G Zone
Power’s hedging program provides near-term stability from
        market volatility …

                                                                                      Contracted Energy                                                          Power has
                                                         100%                                                                                $80
                                                                                                                                                               contracted for a
                                nuclear output
                                % of coal and                           % sold
                                                                                                                                                                considerable
                                                                         (left
                                                         75%                                                                Price




                                                                                                                                                       $/MWh
                                                                        scale)
                                                                                                                                                                percent of its
                                                                                                                            (right
                                                         50%                                                                                 $70
                                                                                                                            scale)
                                                                                                                                                               output over the
                                                                                                                                                               next three years
                                                         25%
                                                                                                                                                                at increasing
                                                          0%                                                                                 $60
                                                                                                                                                                    prices.
                                                                         2008              2009            2010             2011
    Estimated impact of
    $10/MWh PJM West
     around the clock                                                $0.01 - $0.02     $0.04 - $0.10   $0.15 - $0.45    $0.30 - $0.70
       price change*
          ($/share)
                                                                                      Contracted Capacity
                                                                                                                                                                  The pricing for
                                                           100%                                                                         $200
                                                                                                                                                                most of Power’s
                                         % of capacity




                                                                                                                                                   $/MW-day
                                                            75%                                                                         $150
                                                                                                                                                               capacity has been
                                                                                                                         Price
                                                                                                                         (right
                                                                                                                                                               fixed through May
                                                                                                                         scale)
                                                            50%                                                                         $100
                                                                           % sold                                                                               of 2011, by virtue
                                                                            (left
                                                                                                                                                                of the completed
                                                            25%                                                                         $50
                                                                           scale)
                                                                                                                                                                 auctions in PJM
                                                                0%                                                                      $0
     Estimated impact of                                                                                                                                             and NE.
                                                                            2008            2009           2010           2011
     $30/MW-day capacity
        price change*                                                 $0.00 - $0.01    $0.00 - $0.01   $0.00 - $0.01   $0.05 - $0.15
           ($/share)
                  … while remaining open to long-term market forces.                                                                                                                 38
* Assuming normal market commodity correlations
While nuclear fuel was volatile during 2007 …

                     Historical and Contracted Nuclear Fuel Cost
               $10


               $8


               $6
       $/MWh




               $4


               $2


               $0
                      2004   2005   2006   2007   2008   2009   2010   2011



                                                         Contracted




 … Power’s hedging strategy has mitigated market price
 increases, with 100% hedged through 2011.
                                                                              39
Power has contracts for supply of its coal through 2010 …


                                          Coal Output
               18,000




               12,000
                                                          Total Output
         GWH




                                 Hedged
                6,000
                                  Coal




                   0
                   2008              2009               2010                  2011
                                                                         Percent coal hedged as
                        85-95%        75-85%             55-65%             of Feb. 15th, 2008




… and after installation of pollution control equipment, Power
anticipates increasing flexibility in fuel choices.
                                                                                                  40
Regional Greenhouse Gas Initiative (RGGI)

• Cooperative effort by Northeast states to
  design a regional cap-and-trade program
                                                    RGGI
  to reduce carbon dioxide (CO2)
  emissions
                                                    States                            ME
    – Full participants – CT, MA, MD, ME, NH, VT,
      NY, NJ, RI, and DE
                                                                       VT
    – Observers – PA, DC, and Eastern Canadian
                                                                            NH
      Provinces and New Brunswick
                                                             NY
• Timeline                                                              MA
                                                                       CT
    – April 2003 process proposed by Governor
                                                     PA
      Pataki                                                                RI
                                                              NJ
    – 2003 – 2006 – Stakeholder process
    – December 20, 2005 Final 7 state MOU             MD
                                                                                 Participating States
    – March 23, 2006 – Draft Model Rule                           DE
    – August 15, 2006 – Final Model Rule &                                       Observer States
      amended MOU
    – 2007-2008 – State level adoption
    – First RGGI allowance auction September
      2008
    – January 1, 2009 – Implementation
                                                                                                   41
The RGGI cap shows headroom…

• Affected Sources                                                                                  Forecast CO2 Emissions vs. RGGI Cap
                                                                                                  (Ten RGGI States, Actuals through 2007)
  – Fossil fired electric generating units                                  200
    with a capacity of 25 megawatts
                                                                                     Historical CO2                 RGGI Cap
    (MW) and larger                                                                    Emissions
                                                                            190



• Targets and Timing                                                        180




                                             CO2 (millions of short tons)
  – Three-year compliance periods
                                                                            170
    with the first running from 2009-                                                                                    Range of emissions
    2011.
                                                                            160
  – Stabilization of CO2 emissions at
    recent levels through 2015 (~188                                        150
    million tons per year).
                                                                                         Actual                                  Projected
  – Achieve a 10% reduction of CO2                                          140

    emissions below recent levels by
    2019.                                                                   130

                                                                              00 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019
  – This translates into ~13% reduction                                     20   2   2   2   2   2   2   2   2   2   2   2   2   2   2   2   2   2   2   2

    below 1990 levels or ~35%
    reduction from BAU levels by 2020.




…when viewed in comparison to historical emissions.                                                                                                            42
RGGI’s CO2 pricing projections…


                    $10


                    $8
  $/Ton (Nominal)




                    $6


                    $4


                    $2


                    $0
                          2009     2011      2013   2015   2017   2019        2021       2023     2025



                                 RGGI - ICF Base                  RGGI - ICF Base (Rev. Oct-06)



…reflect moderate prices, based on the headroom in the
cap.                                                                                                     43
Operational improvements and recontracting in
current markets …

                                Gross Margin ($/MWh)


              $60




              $40




              $20




               $0
                    2005      2006    2007   2008E   2009E   2010E     2011E



   Hedged Energy           Unhedged Energy           Hedged Capacity           Unhedged Capacity




… are expected to drive continued increases in Power’s gross
margin.
                                                                                                   44
Power’s open EBITDA is approximately $2.6 - $2.8 billion …
              $3.0




                                                                                                                                    EBITDA
                                                                                                Assumption            Sensitivity
                                                                                                                                    Impact
              $2.5
                                                                                Capacity      ~ $60 - $65/KW-yr
                                                                                                                      $10/KW-yr     ~ $120M
                                                                                           (~ $165 - $178/MW-day)

                                                                                               ~ $69 - 73/MWh
                                                                                Energy                                              ~ $40M
                                                                                                                      $1/MWh
                                                                                                 (PJM-West)
              $2.0
                                                                                  Fuel     Gas ~$8.50 to $9.00/MB
 $ Billions




                                                                                           Coal ~ $2.85 to $3.15/MB

                                                                                 O&M            ~ $1.0 – 1.05B


              $1.5

                                                                                   2008 Forecasted EBITDA $2.05B - $2.25B



              $1.0


                 … which will vary depending upon market drivers.
                                                                                                                                              45
* Open EBITDA reflects unhedged results of Power at market prices shown above
PSE&G
PSE&G operates in an attractive market …
                                                                             KEY:


                      3rd
• NJ is ranked     nationally in personal                                       COMBINED ELECTRIC &
                                                                                GAS TERRITORIES
                                                                                ELECTRIC TERRITORY


  income per capita                                                            GAS TERRITORY




• Mid-Atlantic ReliabilityOne Award winner
  six years running
                                                                                    N




• Solid regulatory relationships on traditional                                 W       E


                                                                                    S




  utility matters

Transmission Statistics (12/31/07)
                                         Historical Annual Load Growth       Projected Annual Load Growth
  Network Circuit
                    Billing Peak (MW)
      Miles                                         2003-2007                         2008 - 2012
       1,429              10,378*                     1.3%                                       1.4%
                                                                                *Billing Peak includes adjustment for Voltage Reduction
Electric and Gas Distribution Statistics (12/31/07)
                                                              Historical Annual                 Projected Annual
                               Electric Sales and Gas Sold      Load Growth                       Load Growth
                                     and Transported
                Customers
                                                                  2003-2007                        2008 - 2012
 Electric       2.1 Million             44,709 GWh                  1.6%                                    1.0%
 Gas            1.7 Million          3,502 M Therms                 (0.2%)                                  0.4%

… and through a disciplined capital allocation process has become
a recognized leader in delivering safe and reliable service.
                                                                                                                                          47
By 2018, NJ’s load is expected to grow by 4,000 MW …

                Projects to NJ                                                                                                                Projects to NY
                                                               2008-2018 NJ Summer Peak
                                                               Annual Growth Rate = 1.8%
         • PSEG’s evaluation of                                                                                                      • The Neptune HVDC project (685
                                                                                                                                       MW) connecting Sayreville to
           the proposed backbone
                                                                                                                                       Long Island
           transmission projects:

                                                                                                                                     • The Linden VFT project (330
             • Northern 500kV
                                                                                                                                       MW) connecting Linden to
               route into Jefferson
                                                                                                                                       Staten Island
               and Roseland
                                                                                                                                     • The Bergen O66 project (670
             • Central 765kV route
                                                                                                                                       MW) connecting Bergen to
               into Deans
                                                                                                                                       ConEd's West 49th Street
                                                                                                                                       substation
             • Southern 500kV
               route into Salem
                                                                                                                                     • The Bergen Q75 project (1,200
                                                                                                                                       MW) connecting Bergen to
                                                                                                                                       ConEd's West 49th Street
                                                                                                                                       substation

                                                                                                                                     • Linden S104 project (200 MW)
                                                                                                                                       connecting Linden to Goethals

                Total Import                                                                                                                 Total Export
                 Capability                                                                                                                   Capability
                ~ 5,000 MW                                                                                                                   ~ 3,100 MW
        … yet the net import capability into NJ is only increasing by ~1,900 MW
        indicating need for additional generation, DSM or transmission imports
        requiring RTEP investment.
                                                                                                                                                                     48
Sources: Imports: PSE&G Estimates; Exports: PJM 2008 Regional Transmission Expansion Plan; and Load Growth: PJM 2008 Load Forecast Report
Transmission opportunities will require substantial
deployment of capital.
Transmission Growth
• PJM approval was received for the $600-$650
  million Susquehanna to Roseland line in October
  2007
      – Siting and permitting process underway
                                                                                    Jefferson   Roseland
      – FERC approved Incentive rate filing:
                                                                            Branchburg
            • 125 BPS adder to ROE
            • 100% CWIP in Rate Base
                                                                                           Deans
                                                                     I-765
• FERC approval of the MAPP projects also mandates
                                                                     Interstate
  an additional $100 million of capital at Salem/Hope
                                                                                                Smithburg
                                                                     Project
  Creek (2014-2015)
• FERC approval of Sub Transmission to
  Transmission system reliability investments
                                                                 New Freedom
  represents about $250 million through 2012, post-
  2012 ~$60 million/year
• Other approved RTEP projects ~$250 million also                    Hope Creek
  contribute meaningfully to improved reliability and                Salem
                                                           MAPP
  earnings growth
                                                           Project
• Backbone projects are in preliminary stages but
  present real opportunity to improve reliability
  throughout the state, with the potential investment of
  ~ $1.5B through 2015
 When coupled with formula rate design and additional incentives, it
 will provide current return on forecasted capital expenditures
 thereby improving profitability.                                                                           49
RGGI enabling legislation was signed into law in January
2008.

  • Section 13 of the RGGI Law permits utilities to invest and/or
    offer programs in renewables, conservation and energy
    efficiency
     – The BPU will be adopting rules and regulations to determine utility
       participation and the mechanisms for recovery of costs, which must be
       completed during May/June 2008
  • Active Filings
     – Carbon Abatement
         • $5 million pilot program intended to demonstrate PSE&G capabilities
     – AMI
         • $15 million pilot program for advanced two-way communications. Potential
           $600 million in capital through 2013
     – Solar Initiative
         • $105 million pilot program to finance installation of PV Solar. Potential
           PSE&G market up to $1.8 billion assuming 2% Solar RPS through 2020


Our three pilot programs will prove our capabilities at reducing
carbon in an economic manner.

                                                                                       50
Even with our planned investments, delivery prices to
        customers ...


                                                                                                                                                                            Gas
                                                                        Electricity
                                                              2007-2012 Growth = 0.7%                                                                              2007-2012 Growth = 1.4%
                                                                  Inflation = 2.1%                                                                                     Inflation = 2.1%
                                               8.00
             Average cents/kWh, 500 kWh Bill




                                                                                                                                                           0.60




                                                                                                                         Average $/therm, 100 therm Bill
                                                                                                  6.8
                                                                                                                                                                                             0.48
                                                                                                                                                                             0.45
                                                                Transmission
                                                                                                                                                                  0.42
                                                                               5.5
                                                            5.1                                                                                            0.40

                                               4.00

                                                                                                                                                           0.20
                                                         Distribution




                                               0.00                                                                                                        0.00
                                                           2007                2012           2007                                                                2007       2012       2007
                                                                                             Regional                                                                                  Regional
                                                                                             Average                                                                                   Average
                                                      Source: Rates from PSE&G, NYPSC and PAPUC; Inflation from Moody’s Economy.com, February 2008




           … are expected to grow less than inflation.

                                                                                                                                                                                                    51
Note: 2007 Rates are based on tariff rates in effect on December 31, 2007; Regional Average may not include Electric Transmission for all firms.
PSEG Energy Holdings
Holdings’ portfolio has a diverse asset base . . .

        •      Two businesses focused on maximizing value of existing investments
        •      $45M - $60M projected 2008 operating earnings contribution
                   •       ~ 55% of earnings from Resources
                   •       ~ 45% of earnings from Global, targeting no international exposure by 2009

                           2007 Operating Earnings*                                                    2008 Guidance - Operating Earnings
                                                                                                                $ 45M - $60M
                                           $ 115M
                                                                      Two 1,000 MW CCGT‘s
                                                                    22% in Central Texas (South Zone)
                                                                      1
                                                                      1 in West Texas
                                                     Texas
                                                    Merchant
                                                                                                                           Texas
                                                   Generation
                                                                                                                          Merchant
                                                                                                                         Generation
                                                        22%
                              PSEG
                                                                                                                           25%
                            Resources                                                                          PSEG
               49%             49%                                                                           Resources
                                                         Chile & Peru
                                                                                                                           Other US
                                                                                                                56%
                                                         Distribution
                                                                                                                          Generation
                                                                                      Two companies sold
                                                                              17%
                                                              17%                                                            19%
                                                                                      in 2007. SAESA in
                                                                                           Disc Ops.
                                                 Other US
                                                Generation
                                                      12%                 ~390MW owned in
  86% of the portfolio is
                                                                              CA, HI, NH
                                                           12%
    in energy-related
                                                                            fully contracted
    leveraged leases


      … with improved stability.
                                                                                                                                            53
* See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting
public serviceenterprise group EEIMeeting

More Related Content

What's hot

public serviceenterprise group investor factsheet 08
public serviceenterprise group investor factsheet 08public serviceenterprise group investor factsheet 08
public serviceenterprise group investor factsheet 08finance20
 
Finning cibc whistler conference final
Finning cibc whistler conference finalFinning cibc whistler conference final
Finning cibc whistler conference finalFinningInternational
 
Finningpresentation uk sep 2011_final
Finningpresentation uk sep 2011_finalFinningpresentation uk sep 2011_final
Finningpresentation uk sep 2011_finalFinningInternational
 
pepco 2006JulyInvestorMeetings
pepco 2006JulyInvestorMeetingspepco 2006JulyInvestorMeetings
pepco 2006JulyInvestorMeetingsfinance41
 
first energyWallStreetAccess_121407_new
first energyWallStreetAccess_121407_newfirst energyWallStreetAccess_121407_new
first energyWallStreetAccess_121407_newfinance21
 
American Electric Power Q1 2012 Earnings Presentation
American Electric Power Q1 2012 Earnings Presentation American Electric Power Q1 2012 Earnings Presentation
American Electric Power Q1 2012 Earnings Presentation American Electric Power
 

What's hot (7)

public serviceenterprise group investor factsheet 08
public serviceenterprise group investor factsheet 08public serviceenterprise group investor factsheet 08
public serviceenterprise group investor factsheet 08
 
Finning cibc whistler conference final
Finning cibc whistler conference finalFinning cibc whistler conference final
Finning cibc whistler conference final
 
Finningpresentation uk sep 2011_final
Finningpresentation uk sep 2011_finalFinningpresentation uk sep 2011_final
Finningpresentation uk sep 2011_final
 
phi AR07
phi AR07phi AR07
phi AR07
 
pepco 2006JulyInvestorMeetings
pepco 2006JulyInvestorMeetingspepco 2006JulyInvestorMeetings
pepco 2006JulyInvestorMeetings
 
first energyWallStreetAccess_121407_new
first energyWallStreetAccess_121407_newfirst energyWallStreetAccess_121407_new
first energyWallStreetAccess_121407_new
 
American Electric Power Q1 2012 Earnings Presentation
American Electric Power Q1 2012 Earnings Presentation American Electric Power Q1 2012 Earnings Presentation
American Electric Power Q1 2012 Earnings Presentation
 

Similar to public serviceenterprise group EEIMeeting

public serviceenterprise group UBS061808
public serviceenterprise group UBS061808public serviceenterprise group UBS061808
public serviceenterprise group UBS061808finance20
 
public serviceenterprise group Bank of America
public serviceenterprise group Bank of Americapublic serviceenterprise group Bank of America
public serviceenterprise group Bank of Americafinance20
 
public serviceenterprise group CapReOFlynn
public serviceenterprise group CapReOFlynnpublic serviceenterprise group CapReOFlynn
public serviceenterprise group CapReOFlynnfinance20
 
public serviceenterprise group Morgan Stanley FINAL
public serviceenterprise group Morgan Stanley FINALpublic serviceenterprise group Morgan Stanley FINAL
public serviceenterprise group Morgan Stanley FINALfinance20
 
public serviceenterprise group Lehman
public serviceenterprise group  Lehmanpublic serviceenterprise group  Lehman
public serviceenterprise group Lehmanfinance20
 
public serviceenterprise group CapReIzzo
public serviceenterprise group CapReIzzopublic serviceenterprise group CapReIzzo
public serviceenterprise group CapReIzzofinance20
 
public serviceenterprise group ML Pres
public serviceenterprise group ML Prespublic serviceenterprise group ML Pres
public serviceenterprise group ML Presfinance20
 
public serviceenterprise group _Deutsche
public serviceenterprise group _Deutschepublic serviceenterprise group _Deutsche
public serviceenterprise group _Deutschefinance20
 
.integrysgroup09/2008_companyupdate
.integrysgroup09/2008_companyupdate.integrysgroup09/2008_companyupdate
.integrysgroup09/2008_companyupdatefinance26
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08finance20
 
public serviceenterprise groupinvestor_factsheet08
public serviceenterprise groupinvestor_factsheet08public serviceenterprise groupinvestor_factsheet08
public serviceenterprise groupinvestor_factsheet08finance20
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08finance20
 
public serviceenterprise group Investor investor_factsheet 08
public serviceenterprise group Investor investor_factsheet 08public serviceenterprise group Investor investor_factsheet 08
public serviceenterprise group Investor investor_factsheet 08finance20
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08finance20
 
pepco Presentation081706
pepco Presentation081706pepco Presentation081706
pepco Presentation081706finance41
 
energy future holindings _062805
energy future holindings _062805energy future holindings _062805
energy future holindings _062805finance29
 
energy future holindings 062805
energy future holindings 062805energy future holindings 062805
energy future holindings 062805finance29
 
.integrysgroup 04/10/2008_slides
.integrysgroup 04/10/2008_slides.integrysgroup 04/10/2008_slides
.integrysgroup 04/10/2008_slidesfinance26
 
.integrysgroup 05/08/2008_slides
.integrysgroup 05/08/2008_slides.integrysgroup 05/08/2008_slides
.integrysgroup 05/08/2008_slidesfinance26
 
.integrysgroup 03/25/2008_slides
.integrysgroup 03/25/2008_slides.integrysgroup 03/25/2008_slides
.integrysgroup 03/25/2008_slidesfinance26
 

Similar to public serviceenterprise group EEIMeeting (20)

public serviceenterprise group UBS061808
public serviceenterprise group UBS061808public serviceenterprise group UBS061808
public serviceenterprise group UBS061808
 
public serviceenterprise group Bank of America
public serviceenterprise group Bank of Americapublic serviceenterprise group Bank of America
public serviceenterprise group Bank of America
 
public serviceenterprise group CapReOFlynn
public serviceenterprise group CapReOFlynnpublic serviceenterprise group CapReOFlynn
public serviceenterprise group CapReOFlynn
 
public serviceenterprise group Morgan Stanley FINAL
public serviceenterprise group Morgan Stanley FINALpublic serviceenterprise group Morgan Stanley FINAL
public serviceenterprise group Morgan Stanley FINAL
 
public serviceenterprise group Lehman
public serviceenterprise group  Lehmanpublic serviceenterprise group  Lehman
public serviceenterprise group Lehman
 
public serviceenterprise group CapReIzzo
public serviceenterprise group CapReIzzopublic serviceenterprise group CapReIzzo
public serviceenterprise group CapReIzzo
 
public serviceenterprise group ML Pres
public serviceenterprise group ML Prespublic serviceenterprise group ML Pres
public serviceenterprise group ML Pres
 
public serviceenterprise group _Deutsche
public serviceenterprise group _Deutschepublic serviceenterprise group _Deutsche
public serviceenterprise group _Deutsche
 
.integrysgroup09/2008_companyupdate
.integrysgroup09/2008_companyupdate.integrysgroup09/2008_companyupdate
.integrysgroup09/2008_companyupdate
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08
 
public serviceenterprise groupinvestor_factsheet08
public serviceenterprise groupinvestor_factsheet08public serviceenterprise groupinvestor_factsheet08
public serviceenterprise groupinvestor_factsheet08
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08
 
public serviceenterprise group Investor investor_factsheet 08
public serviceenterprise group Investor investor_factsheet 08public serviceenterprise group Investor investor_factsheet 08
public serviceenterprise group Investor investor_factsheet 08
 
public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08public serviceenterprise group investor_factsheet08
public serviceenterprise group investor_factsheet08
 
pepco Presentation081706
pepco Presentation081706pepco Presentation081706
pepco Presentation081706
 
energy future holindings _062805
energy future holindings _062805energy future holindings _062805
energy future holindings _062805
 
energy future holindings 062805
energy future holindings 062805energy future holindings 062805
energy future holindings 062805
 
.integrysgroup 04/10/2008_slides
.integrysgroup 04/10/2008_slides.integrysgroup 04/10/2008_slides
.integrysgroup 04/10/2008_slides
 
.integrysgroup 05/08/2008_slides
.integrysgroup 05/08/2008_slides.integrysgroup 05/08/2008_slides
.integrysgroup 05/08/2008_slides
 
.integrysgroup 03/25/2008_slides
.integrysgroup 03/25/2008_slides.integrysgroup 03/25/2008_slides
.integrysgroup 03/25/2008_slides
 

More from finance20

pg& e crop 2008 VotingResults
pg& e crop 2008 VotingResultspg& e crop 2008 VotingResults
pg& e crop 2008 VotingResultsfinance20
 
pg& e crop 2008 ProxyStatement
pg& e crop 2008 ProxyStatementpg& e crop 2008 ProxyStatement
pg& e crop 2008 ProxyStatementfinance20
 
pg & e crop 2004 Proxy Statement
pg & e crop 2004 Proxy Statementpg & e crop 2004 Proxy Statement
pg & e crop 2004 Proxy Statementfinance20
 
pg & e crop 2005 Proxy Statement
pg & e crop 2005 Proxy Statementpg & e crop 2005 Proxy Statement
pg & e crop 2005 Proxy Statementfinance20
 
pg & e crop 2006 Proxy Statement
pg & e crop 2006 Proxy Statementpg & e crop 2006 Proxy Statement
pg & e crop 2006 Proxy Statementfinance20
 
pg & e crop 2007 Proxy Statement
pg & e crop 2007 Proxy Statementpg & e crop 2007 Proxy Statement
pg & e crop 2007 Proxy Statementfinance20
 
pg & e crop 2008 Proxy Statement
pg & e crop 2008 Proxy Statementpg & e crop 2008 Proxy Statement
pg & e crop 2008 Proxy Statementfinance20
 
pg & e crop 2003 Annual Report
pg & e crop 2003 Annual Reportpg & e crop 2003 Annual Report
pg & e crop 2003 Annual Reportfinance20
 
pg & e crop 2004 Annual Report
pg & e crop 2004 Annual Reportpg & e crop 2004 Annual Report
pg & e crop 2004 Annual Reportfinance20
 
pg & e crop 2005 Annual Report
pg & e crop 2005 Annual Reportpg & e crop 2005 Annual Report
pg & e crop 2005 Annual Reportfinance20
 
pg & e crop 2006 Annual Report
pg & e crop 2006 Annual Reportpg & e crop 2006 Annual Report
pg & e crop 2006 Annual Reportfinance20
 
pg & e crop 2007 Annual Report
pg & e crop 2007 Annual Reportpg & e crop 2007 Annual Report
pg & e crop 2007 Annual Reportfinance20
 
waste management Groundwater_Well
waste management Groundwater_Wellwaste management Groundwater_Well
waste management Groundwater_Wellfinance20
 
waste management Gas_Probe
waste management Gas_Probewaste management Gas_Probe
waste management Gas_Probefinance20
 
waste management Anatomy of a Landfill
waste management Anatomy of a Landfillwaste management Anatomy of a Landfill
waste management Anatomy of a Landfillfinance20
 
waste management Waste By Rail
waste management Waste By Railwaste management Waste By Rail
waste management Waste By Railfinance20
 
waste management Flyer
waste management Flyerwaste management Flyer
waste management Flyerfinance20
 
waste management Renewable_Energy_Brochure
waste management Renewable_Energy_Brochurewaste management Renewable_Energy_Brochure
waste management Renewable_Energy_Brochurefinance20
 
waste management WM RA FactSheet
waste management WM RA FactSheetwaste management WM RA FactSheet
waste management WM RA FactSheetfinance20
 
waste management 2003 annual
waste management 2003 annualwaste management 2003 annual
waste management 2003 annualfinance20
 

More from finance20 (20)

pg& e crop 2008 VotingResults
pg& e crop 2008 VotingResultspg& e crop 2008 VotingResults
pg& e crop 2008 VotingResults
 
pg& e crop 2008 ProxyStatement
pg& e crop 2008 ProxyStatementpg& e crop 2008 ProxyStatement
pg& e crop 2008 ProxyStatement
 
pg & e crop 2004 Proxy Statement
pg & e crop 2004 Proxy Statementpg & e crop 2004 Proxy Statement
pg & e crop 2004 Proxy Statement
 
pg & e crop 2005 Proxy Statement
pg & e crop 2005 Proxy Statementpg & e crop 2005 Proxy Statement
pg & e crop 2005 Proxy Statement
 
pg & e crop 2006 Proxy Statement
pg & e crop 2006 Proxy Statementpg & e crop 2006 Proxy Statement
pg & e crop 2006 Proxy Statement
 
pg & e crop 2007 Proxy Statement
pg & e crop 2007 Proxy Statementpg & e crop 2007 Proxy Statement
pg & e crop 2007 Proxy Statement
 
pg & e crop 2008 Proxy Statement
pg & e crop 2008 Proxy Statementpg & e crop 2008 Proxy Statement
pg & e crop 2008 Proxy Statement
 
pg & e crop 2003 Annual Report
pg & e crop 2003 Annual Reportpg & e crop 2003 Annual Report
pg & e crop 2003 Annual Report
 
pg & e crop 2004 Annual Report
pg & e crop 2004 Annual Reportpg & e crop 2004 Annual Report
pg & e crop 2004 Annual Report
 
pg & e crop 2005 Annual Report
pg & e crop 2005 Annual Reportpg & e crop 2005 Annual Report
pg & e crop 2005 Annual Report
 
pg & e crop 2006 Annual Report
pg & e crop 2006 Annual Reportpg & e crop 2006 Annual Report
pg & e crop 2006 Annual Report
 
pg & e crop 2007 Annual Report
pg & e crop 2007 Annual Reportpg & e crop 2007 Annual Report
pg & e crop 2007 Annual Report
 
waste management Groundwater_Well
waste management Groundwater_Wellwaste management Groundwater_Well
waste management Groundwater_Well
 
waste management Gas_Probe
waste management Gas_Probewaste management Gas_Probe
waste management Gas_Probe
 
waste management Anatomy of a Landfill
waste management Anatomy of a Landfillwaste management Anatomy of a Landfill
waste management Anatomy of a Landfill
 
waste management Waste By Rail
waste management Waste By Railwaste management Waste By Rail
waste management Waste By Rail
 
waste management Flyer
waste management Flyerwaste management Flyer
waste management Flyer
 
waste management Renewable_Energy_Brochure
waste management Renewable_Energy_Brochurewaste management Renewable_Energy_Brochure
waste management Renewable_Energy_Brochure
 
waste management WM RA FactSheet
waste management WM RA FactSheetwaste management WM RA FactSheet
waste management WM RA FactSheet
 
waste management 2003 annual
waste management 2003 annualwaste management 2003 annual
waste management 2003 annual
 

Recently uploaded

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfGale Pooley
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingMaristelaRamos12
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptxFinTech Belgium
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 

Recently uploaded (20)

Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
The Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdfThe Economic History of the U.S. Lecture 20.pdf
The Economic History of the U.S. Lecture 20.pdf
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
Quarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of MarketingQuarter 4- Module 3 Principles of Marketing
Quarter 4- Module 3 Principles of Marketing
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 

public serviceenterprise group EEIMeeting

  • 1. Public Service Enterprise Group Edison Electric Institute Annual Finance Committee Meeting Waldorf=Astoria May 21, 2008
  • 2. Forward-Looking Statement Readers are cautioned that statements contained in this presentation about our and our subsidiaries' future performance, including future revenues, earnings, strategies, prospects and all other statements that are not purely historical, are forward-looking statements for purposes of the safe harbor provisions under The Private Securities Litigation Reform Act of 1995. Although we believe that our expectations are based on reasonable assumptions, we can give no assurance they will be achieved. The results or events predicted in these statements may differ materially from actual results or events. Factors which could cause results or events to differ from current expectations include, but are not limited to: • Adverse Changes in energy industry, policies and regulation, including market rules that may adversely affect our operating results. • Any inability of our energy transmission and distribution businesses to obtain adequate and timely rate relief and/or regulatory approvals from federal and/or state regulators. • Changes in federal and/or state environmental regulations that could increase our costs or limit operations of our generating units. • Changes in nuclear regulation and/or developments in the nuclear power industry generally, that could limit operations of our nuclear generating units. • Actions or activities at one of our nuclear units that might adversely affect our ability to continue to operate that unit or other units at the same site. • Any inability to balance our energy obligations, available supply and trading risks. • Any deterioration in our credit quality. • Any inability to realize anticipated tax benefits or retain tax credits. • Increases in the cost of or interruption in the supply of fuel and other commodities necessary to the operation of our generating units. • Delays or cost escalations in our construction and development activities. • Adverse capital market performance of our decommissioning and defined benefit plan trust funds. • Changes in technology and/or increased customer conservation. For further information, please refer to our Annual Report on Form 10-K, including Item 1A. Risk Factors, and subsequent reports on Form 10- Q and Form 8-K filed with the Securities and Exchange Commission. These documents address in further detail our business, industry issues and other factors that could cause actual results to differ materially from those indicated in this presentation. In addition, any forward-looking statements included herein represent our estimates only as of today and should not be relied upon as representing our estimates as of any subsequent date. While we may elect to update forward-looking statements from time to time, we specifically disclaim any obligation to do so, even if our estimates change, unless otherwise required by applicable securities laws. 2
  • 3. GAAP Disclaimer PSEG presents Operating Earnings in addition to its Net Income reported in accordance with accounting principles generally accepted in the United States (GAAP). Operating Earnings is a non-GAAP financial measure that differs from Net Income because it excludes the impact of the sale of certain non-core domestic and international assets and costs stemming from the terminated merger agreement with Exelon Corporation. PSEG presents Operating Earnings because management believes that it is appropriate for investors to consider results excluding these items in addition to the results reported in accordance with GAAP. PSEG believes that the non-GAAP financial measure of Operating Earnings provides a consistent and comparable measure of performance of its businesses to help shareholders understand performance trends. This information is not intended to be viewed as an alternative to GAAP information. The last slide in this presentation includes a list of items excluded from Net Income to reconcile to Operating Earnings, with a reference to that slide included on each of the slides where the non-GAAP information appears. These slides are intended to be reviewed in conjunction with the oral presentation to which they relate. 3
  • 4. PSEG Overview Tom O’Flynn Executive Vice President and Chief Financial Officer - PSEG President and Chief Operating Officer – PSEG Energy Holdings
  • 5. Our platform … Stable electric and gas Redeployment of capital Major electric generation distribution and through the sale of company with 13,300 transmission company international assets. MW of base-load, rated top quartile for Focused on managing intermediate and load reliability providing lease portfolio and following capability service in mature potential investment in operating in attractive service territory in New renewables. markets in the Northeast Jersey. with operating control of additional 2,000 MW of capacity in Texas. 2007 Operating $949M* $376M* $115M* Earnings: 2008 Guidance: $1,040M - $1,140M $350M – $370M $45M – $60M … provides earnings stability, multiple growth opportunities and substantial cash flow. 5 * See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
  • 6. Our focus is to maximize benefits from existing assets … Operational Regulatory and Growth with Excellence Market Environment Manageable Risk Maintain strong Regulatory Processes embedded balance sheet mechanisms in place throughout the providing supporting best-in- organization on how opportunity to class reliability to manage, operate deploy capital to enhanced by market and invest with meet shareholder dynamics excellence as the objectives for encouraging goal growth with investment reasonable risk … and build a substantial platform for ongoing growth. 6
  • 7. Major influences on business environment remain: Infrastructure Climate Change Capacity Needs Requirements • Capital investment in • PSEG Power’s base- • Significant new coal fleet to meet load nuclear assets transmission capital environmental well situated in carbon program to improve requirements constrained reliability maintains critical environment infrastructure and expands capability • PSE&G pursuing investments in energy • Potential to leverage efficiency and existing brownfield renewables sites; potential for new nuclear PSEG assets are well positioned to meet the needs of customers and shareholders in a challenging environment. 7
  • 8. We are continuing to improve operational practices and participate in market design discussions … Goal is to maintain (at a minimum) operating Operational capability of nuclear fleet at 90% capacity factor Excellence Goal is to maintain (at a minimum) operating capability of nuclear fleet at 90% capacity factor PSE&G pursuing pilot programs in advanced metering and back office technology NJ enacted Regional Greenhouse Gas Initiative Regulatory and (RGGI) Market Environment Draft NJ Energy Master Plan released PSEG Power exposed to heat rate expansion, gas prices and carbon Bid for new peaking capacity not accepted Growth with Pursuing RFPs in CT Manageable Risk Awaiting RTEP decision on additional transmission PSE&G pursuing pilot programs to test energy efficiency and conservation Hope Creek uprate and Salem steam generator adding 140MW … to support long-term growth and reliability. 8
  • 9. Improved processes and investment … 2007 -2011: $2,400 CAGR: 2.1% $2,200 ($ millions) O&M $2,000 $1,800 2007 2008 2009 2010 2011 … are expected to control the rate of growth in operating expenses. 9
  • 10. Improved processes, markets and well-positioned assets … Operating Earnings by Subsidiary 8% Growth $2.80 - $3.05 $2.71* 45 - 60 115 $1.73* 1,040 - 1,140 Holdings 161 949 515 Power 376 350 - 370 262 PSE&G (66) (63) (15) - (10) Parent 2006 2007 2008 … allowed us to meet our commitments to earnings growth as we also reduced balance sheet and international risk. 10 * See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
  • 11. Spending for the next four years … $10.0 Capital Expenditures $8.0 $ 7.3B $6.0 $ Billions $ 4.5B $4.0 $2.0 $0.0 2007 Forecast* 2008 Forecast** (2008 – 2011) (2008 – 2011) PSEG Energy PSEG Power PSE&G Other Holdings … has increased primarily at PSE&G to support growth strategy. 11 * As per 2006 10-K ** As per 2007 10-K; also includes plans for PSEG Energy Holdings
  • 12. PSEG’s financing capability has improved with forecasted discretionary cash expected to reach $3 billion … PSEG Use of Cash $15.0 $3.0B Discretionary Cash $10.0 Shareholder $1.5 – $2.0B Dividend $ Billions Debt Reduction $5.0 Investment $0.0 Forecast* Forecast (2008 –2011) (2008 –2011) … supporting our growth initiatives, and providing financial flexibility to meet potential Resources’ tax liability. 12 * As presented at 2007 March Analyst Conference
  • 13. PSEG Power’s capital program 2007 2008 2009 2010 2011 2006 10-K $584 $626 $516 $527 $198 ($ millions) 2007 10-K $562 $890 $675 $620 $430 ($ millions) Program focused on meeting environmental commitments, capital associated with new capacity ($500M)* and exploring the opportunity for new nuclear to improve the fleet’s reliability and performance. *Forecast capital spending associated with new peaking could be lower than amount indicated. 13
  • 14. At Power, strong cash generation and declining capital expenditures … Power Sources and Uses Power Cash Flow (2008 – 2011 Forecast) Net Cash Flow Cash $2.0 Asset from Ops Sales Incremental debt $10.0 capacity while Net Dividends maintaining target Financing to Parent $1.0 credit measures $8.0 $ Billions $6.0 $0.0 $ Billions Cash from Ops $4.0 ($1.0) Investments Declining Investments $2.0 ($2.0) $0.0 2007 2008 2009 2010 2011 Sources Uses … should result in substantial discretionary cash available to PSEG for additional growth and/or share repurchases. 14
  • 15. PSE&G’s capital program focused on improving reliability 2007 2008 2009 2010 2011 2012 5-year capital program: $3.0B 2006 10-K June 2007 10-Q 5-year capital program: $4.1B 5-year capital program: $5.3B 2007 10-K PSE&G Rate Base ($ millions) 2007 Actual 2012 Base Plan Transmission 830 2,240 Gas 2,240 3,060 Electric 3,330 4,900 TOTAL $6,400 $10,200 15
  • 16. PSE&G’s capital program • Rate base growth supported by investment in new 500kV lines to improve reliability ($900M) and upgrade of sub- transmission system ($250M) Transmission • Received FERC approval for CWIP in rate base and 125 bps adder to ROE on $600M - $650M Susquehanna line – base ROE increased by 50 bps for membership in RTO. • Investments focused on improving customer support Electric and enhancing efficiency and upgrading infrastructure Gas • Expect to file electric and gas rate case in 2009 with rates Distribution effective in 2010 • Future investment associated with meeting State energy efficiency and renewable goals dependent on receiving regulatory support before committing new capital, e.g. New $550M investment budgeted for AMI Programs • BPU approved $105M investment in solar in April 2008 as part of $225M capital investment program 16
  • 17. At PSE&G, cash flow will be primarily directed towards attractive reinvestment opportunities. PSE&G Cash Flow PSE&G Sources and Uses (2008 – 2011 Forecast) $1.5 Cash from Ops $6.0 Net Cash Dividends Net Flow to Parent Financing $0.5 $ Billions $4.0 $ Billions Cash from ($0.5) Investments Ops $2.0 Growing Investments ($1.5) $0.0 2007 2008 2009 2010 2011 Sources Uses Modest dividends to the Parent are expected to continue as PSE&G grows its asset base. 17
  • 18. At Holdings, asset sales could continue to be a significant source of cash in 2008. Holdings Sources and Uses* (2008 – 2011 Forecast) $1.2 Net Financing $0.9 Dividends to Asset Parent Sales $ Billions $0.6 Cash from Investments** Ops $0.3 $0.0 Sources Uses Flexibility exists to finance potential Resources’ tax liability. * Forecast excludes potential for monetization of lease portfolio 18 ** Investments exclude Intercompany loans.
  • 19. At PSEG, we forecast $3.0B of discretionary cash through 2011. Parent Sources and Uses (2008 – 2011 Forecast) $6.0 Holdings Dividend PSE&G Discretionary Dividend $3.0B Cash* $4.0 $ Billions Power Dividend $2.0 Shareholder Dividend $0.0 Sources Uses Cash flow from Power is the primary driver of discretionary cash. *Forecast includes some use of cash to meet potential IRS tax liability. 19
  • 20. Markets, assets and use of cash flow … + 8 - 9% + 8 - 9% $3.05 - $3.35 $2.80 - $3.05 $2.71 $1.73 2008 2009 2006 Operating 2007 Operating 2010E 2011E Guidance Guidance Earnings* Earnings* … should continue to drive annual earnings guidance growth of 8 - 9%. 20 * See page 63 for Items excluded from Net Income to reconcile to Operating Earnings
  • 21. Redeploying our $3.0B of discretionary cash towards additional growth and / or share repurchases … + 8 – 9% Annual Growth Discretionary Cash Total Shareholder Return Annual Growth ≈ 3% 10 - 13% $2.80 - $3.05 Holdings 6 – 8% 45 - 60 PSE&G Annual 350 - 370 Dividend Yield ≈ 3% Subsidiary 5 – 7% Annual Growth 5 – 7% 1040 - 1140 Power “Discretionary Cash” – Annual Growth / Share Repurchases ≈ 3% Parent (15) – (10) 2011 2008 2009 2010 Subsidiary Earnings Annual Growth 5 – 7% … drives our Consolidated earnings growth rate resulting in a total shareholder return between 10 – 13%. 21
  • 22. Our recent 10% dividend increase continues 100-year history of paying common dividends. $1.50 Dividend per Share ? $1.29 * % 10 $1.25 + $1.17 $1.14 $1.12 $1.00 2005 2006 2007 2008 2009E Payout 63% 66% 43% 44% 40 – 50% Ratio Payout objective of 40 – 50% provides opportunity for growth with earnings. 22 * Indicated annual dividend rate
  • 23. PSEG’s current stock price… PSE&G Energy Holdings 2008 Earnings Guidance $350M - $370M Book Equity Value/Share(1) $2.75 Indicative 2008 P/E Multiple 13.5x – 14.0x Resulting Value/Share $9.00 - $10.25/Share PSEG Power Stock Price as of 5/16/08 (per share) $42.50 Less Indicative Value of PSE&G, Energy Holdings $11.75 - $13.00 Implied PSEG Power Value (per share) $29.50 - $30.75 Implied Power Enterprise Value $17.9B - $18.6B Implied EV as a Multiple of: 2008 EBITDA 8.3x – 9.1x Open EBITDA 6.4x – 7.1x Plus $10 Carbon 6.0x – 6.6x Plus $20 Carbon 5.6x – 6.2x (1) Excludes incremental value of Texas generating assets (2,000 MW of combined cycle capacity) and potential tax liability at Resources … implies a low valuation for PSEG Power. 23
  • 24. Fitting the pieces together - PSEG value proposition PSEG well positioned in current business environment Process improvement programs support efforts to: - maintain reliability - control costs - provide value to the customer Asset mix provides opportunities in attractive markets Strengthened balance sheet supports capital investment Return of cash to shareholders through dividends provides discipline to investment process Earnings growth and yield offer opportunity for double digit shareholder returns of 10 – 13% 24
  • 27. Right set of assets, right markets at the right time … Fuel Diversity – 2007 • Low-cost portfolio Total MW: 13,300 • Strong cash generator Oil Nuclear 8% • Regional focus in competitive, 26 % Pumped liquid markets Storage 1% 18% 47 % • Assets favorably located Coal Gas – Many units east of PJM constraints – Southern NEPOOL/ Connecticut Energy Produced - 2007 – Near customers/load centers Total GWh: 53,200 • 80% of Fossil capacity has dual Nuclear fuel capabilities 54% Pumped • Integrated generation and portfolio Storage 1% 19% management optimizes asset- Gas 25% based revenues Oil 1% Coal … we continue to like the assets we have and their location. 27
  • 28. Power’s assets along the dispatch curve … Nuclear National Park Coal Sewaren 6 Dispatch Cost ($/MWh) Mercer 3 Kearny 10-11 Combined Cycle Burlington 8-9-11 Steam Edison 1-2-3 GT Peaking Essex 10-11-12 New Haven Linden 5-8 / Essex 9 Bergen 1 Burlington 12 / Kearny 12 Linden 1,2 Yards Keystone Sewaren 1-4 Creek Conemaugh Hudson 1 Peach BEC Hudson 2 Bridgeport Bottom Hope Bergen 2 Salem Creek Mercer1, 2 Illustrative Baseload units Load following units Peaking units Energy Revenue X X X Capacity Revenue X X X Ancillary Revenue X X Dual Fuel X X Nuclear CF 90% to 92% Coal CF 85% to 90% 50% to 70% Combined Cycle CF 30% to 50% Peaking CF 2% to 10% … position the company to serve full requirement load contracts. 28
  • 29. We have some major 2008 initiatives … Hope Creek Uprate Salem Steam Generator Outage • NRC approved Hope Creek’s • Unit 2 outage concluded extended power uprate within 58 days – on time license amendment in May • $148 million (PS share) 2008 multi-year project • Work to support extended • 15 MW uprate (PS share) power uprate largely expected for 2008 summer completed in 2007 run • 125 MW uprate expected for 2008 summer run INPO Assessments Hope Creek Salem Corporate … that will drive value for years to come. 29
  • 30. Fossil operations contribute to earnings … Total Fossil Output A Diverse 9,800 MW Fleet (MW) (GWh) Coal 2,350 30,000 Combined Cycle 3,150 Steam / Peaking 4,300 25,000 Right Assets – Right Location 20,000 • Fuel diversity • Technical diversity 15,000 ` • Near load centers 10,000 Operation of 2,000 MW Texas Portfolio 5,000 • Shared best practices • Leverage scale 0 2004 2005 2006 2007 … through a low-cost portfolio in which the majority of the output is from coal facilities. 30
  • 31. Through our ongoing focus on operational excellence … Total Power Output (GWh) 60,000 A Diverse 13,300 MW Fleet 50,000 Nuclear 3,500 40,000 Coal 2,350 Combined Cycle 3,150 GWh 30,000 Peaking / Steam 4,300 20,000 10,000 Strong Performance 0 • Continued growth in output 2004 2005 2006 2007 • Improved fleet performance Year Nuclear Coal CC Peaking/Steam … we are expanding the output of our existing fleet. 31
  • 32. Power’s eastern coal plants are in the right areas … System Interface Coal Units Capacity (MW) Bridgeport Harbor 3 3 Bridgeport Harbor Hudson 2 558 Mercer 1&2 648 Hudson 2 Hudson 2 Bridgeport 372 Mercer1 & 2 Mercer 1&2 Total 1,578 Power’s New Jersey coal units are Power is also making considerable mid-merit, with capacity factors investments beyond the pollution averaging 50% to 60%. control facilities for its coal assets. … and after capital investments, anticipate increased capacity factors. 32
  • 33. Power market dynamics … On-Peak Versus Gas Off-Peak Versus Coal $/MWh $/MB $/MWh $/MB $100 $20 $80 $8 $80 $15 $60 $6 $60 $10 $40 $4 $40 $5 $20 $2 $20 $0 $0 $0 $0 2004 2005 2006 2007 2008 2004 2005 2006 2007 2008 Est Est PJM Western Hub On-Peak Prices Gas $/MB PJM Western Hub Off-Peak Prices Coal $/MB … have led to stronger electricity prices both on-peak and off-peak. 33 Note: Forward prices as of 4/28/08
  • 34. Rising coal and natural gas prices have driven LMPs ... Central Appalachian Coal ($/Ton) Natural Gas Henry Hub ($/MMbtu) $90 $10.0 $9.5 $80 $9.0 $70 $8.5 $8.0 $60 $7.5 $50 $7.0 $40 $6.5 07 7 7 8 07 07 08 07 07 7 7 8 07 07 08 l-0 07 -0 -0 l-0 -0 -0 - v- p- n- n- ay ar ar - v- p- n- n- Ju ay ar ar No Ju Ja Ja Se M M No Ja Ja Se M M M M 2009 2010 2011 2009 2010 2011 On Peak Heat Rate Expansion (MMbtu/MWh) Electric PJM Western Hub RTC Price ($/MWh) 10.5 $80 $75 10.0 $70 9.5 $65 9.0 $60 8.5 $55 07 7 7 8 07 07 08 07 07 7 7 8 07 07 08 07 l-0 -0 -0 l-0 -0 -0 - v- n- p- n- - ay v- ar ar n- p- n- Ju ay ar ar Ju No Ja Ja Se No M M Ja Ja Se M M M M 2009 2010 2011 2009 2010 2011 … and this trend may continue. 34 Note: Forward prices as of 4/28/08
  • 35. As policymakers are looking to reduce CO2 emissions … Estimated Impact of Carbon Prices on Energy Prices and on Power’s EBITDA $35 $30 $800 EBITDA ($M) $25 $/MWh $600 $20 $15 $400 $10 $200 $5 $0 $0 $0 $5 $10 $15 $20 $25 $30 $35 $40 $45 ($/Ton) The diversity of the portfolio makes Power well positioned to capture value in a wide range of potential regulatory outcomes, with about half of Power’s revenue increase expected to remain in EBITDA after the cost of carbon credits. … Power stands in good position based on its low carbon fleet. 35
  • 36. Through the new capacity constructs, and repricing at market prices … Power’s capacity is located in three Northeast markets. NE NY Total Capacity 13,300MW (~ 1,000 - 1,500 MW under RMR) PJM The RPM Auction to date has provided strong price signals in PJM. Delivery Year ($MW/Day) 2008 2009 2010 / 2011 Zones $38-41/KW-yr / 2008 2007 2008 / 2009 2009 / 2010 2010 2011 / 2012 $49-51/KW-yr $56-60/KW-yr Eastern MAAC* $197.67 $148.80 $191.32 $174.29 $110.00 MAAC --- --- $191.32 (a) $174.29 $110.00 Rest of Pool $40.80 $111.92 $102.04 $174.29 $110.00 * Majority of Power’s assets (a) – includes APS … Power expects to maintain strong margins. 36
  • 37. Power’s fleet diversity and location ... Market Perspective – BGS Auction Results Increase in Full Requirements Component Due to: Increased Congestion (East/West Basis) Full Requirements $111.50 Increase in Capacity Markets/RPM $102.51 $98.88 • Ancillary services Volatility in Market Increases Risk Premium • Capacity • Congestion ~ $43 • Load shape ~ $32 ~ $41 $65.41 • RECs • Transmission $55.59 $55.05 • Risk premium ~ $21 ~ $18 ~ $21 Round the Clock $68 - $71 $58-$60 $67 - $70 PJM West $44 - $46 $36 - $37 $33 - $34 Forward Energy Price 2003 2004 2005 2006 2007 2008 … has enabled successful participation in each BGS auction and cushioned customer impacts. 37 Note: BGS prices reflect PSE&G Zone
  • 38. Power’s hedging program provides near-term stability from market volatility … Contracted Energy Power has 100% $80 contracted for a nuclear output % of coal and % sold considerable (left 75% Price $/MWh scale) percent of its (right 50% $70 scale) output over the next three years 25% at increasing 0% $60 prices. 2008 2009 2010 2011 Estimated impact of $10/MWh PJM West around the clock $0.01 - $0.02 $0.04 - $0.10 $0.15 - $0.45 $0.30 - $0.70 price change* ($/share) Contracted Capacity The pricing for 100% $200 most of Power’s % of capacity $/MW-day 75% $150 capacity has been Price (right fixed through May scale) 50% $100 % sold of 2011, by virtue (left of the completed 25% $50 scale) auctions in PJM 0% $0 Estimated impact of and NE. 2008 2009 2010 2011 $30/MW-day capacity price change* $0.00 - $0.01 $0.00 - $0.01 $0.00 - $0.01 $0.05 - $0.15 ($/share) … while remaining open to long-term market forces. 38 * Assuming normal market commodity correlations
  • 39. While nuclear fuel was volatile during 2007 … Historical and Contracted Nuclear Fuel Cost $10 $8 $6 $/MWh $4 $2 $0 2004 2005 2006 2007 2008 2009 2010 2011 Contracted … Power’s hedging strategy has mitigated market price increases, with 100% hedged through 2011. 39
  • 40. Power has contracts for supply of its coal through 2010 … Coal Output 18,000 12,000 Total Output GWH Hedged 6,000 Coal 0 2008 2009 2010 2011 Percent coal hedged as 85-95% 75-85% 55-65% of Feb. 15th, 2008 … and after installation of pollution control equipment, Power anticipates increasing flexibility in fuel choices. 40
  • 41. Regional Greenhouse Gas Initiative (RGGI) • Cooperative effort by Northeast states to design a regional cap-and-trade program RGGI to reduce carbon dioxide (CO2) emissions States ME – Full participants – CT, MA, MD, ME, NH, VT, NY, NJ, RI, and DE VT – Observers – PA, DC, and Eastern Canadian NH Provinces and New Brunswick NY • Timeline MA CT – April 2003 process proposed by Governor PA Pataki RI NJ – 2003 – 2006 – Stakeholder process – December 20, 2005 Final 7 state MOU MD Participating States – March 23, 2006 – Draft Model Rule DE – August 15, 2006 – Final Model Rule & Observer States amended MOU – 2007-2008 – State level adoption – First RGGI allowance auction September 2008 – January 1, 2009 – Implementation 41
  • 42. The RGGI cap shows headroom… • Affected Sources Forecast CO2 Emissions vs. RGGI Cap (Ten RGGI States, Actuals through 2007) – Fossil fired electric generating units 200 with a capacity of 25 megawatts Historical CO2 RGGI Cap (MW) and larger Emissions 190 • Targets and Timing 180 CO2 (millions of short tons) – Three-year compliance periods 170 with the first running from 2009- Range of emissions 2011. 160 – Stabilization of CO2 emissions at recent levels through 2015 (~188 150 million tons per year). Actual Projected – Achieve a 10% reduction of CO2 140 emissions below recent levels by 2019. 130 00 001 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 017 018 019 – This translates into ~13% reduction 20 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 below 1990 levels or ~35% reduction from BAU levels by 2020. …when viewed in comparison to historical emissions. 42
  • 43. RGGI’s CO2 pricing projections… $10 $8 $/Ton (Nominal) $6 $4 $2 $0 2009 2011 2013 2015 2017 2019 2021 2023 2025 RGGI - ICF Base RGGI - ICF Base (Rev. Oct-06) …reflect moderate prices, based on the headroom in the cap. 43
  • 44. Operational improvements and recontracting in current markets … Gross Margin ($/MWh) $60 $40 $20 $0 2005 2006 2007 2008E 2009E 2010E 2011E Hedged Energy Unhedged Energy Hedged Capacity Unhedged Capacity … are expected to drive continued increases in Power’s gross margin. 44
  • 45. Power’s open EBITDA is approximately $2.6 - $2.8 billion … $3.0 EBITDA Assumption Sensitivity Impact $2.5 Capacity ~ $60 - $65/KW-yr $10/KW-yr ~ $120M (~ $165 - $178/MW-day) ~ $69 - 73/MWh Energy ~ $40M $1/MWh (PJM-West) $2.0 Fuel Gas ~$8.50 to $9.00/MB $ Billions Coal ~ $2.85 to $3.15/MB O&M ~ $1.0 – 1.05B $1.5 2008 Forecasted EBITDA $2.05B - $2.25B $1.0 … which will vary depending upon market drivers. 45 * Open EBITDA reflects unhedged results of Power at market prices shown above
  • 46. PSE&G
  • 47. PSE&G operates in an attractive market … KEY: 3rd • NJ is ranked nationally in personal COMBINED ELECTRIC & GAS TERRITORIES ELECTRIC TERRITORY income per capita GAS TERRITORY • Mid-Atlantic ReliabilityOne Award winner six years running N • Solid regulatory relationships on traditional W E S utility matters Transmission Statistics (12/31/07) Historical Annual Load Growth Projected Annual Load Growth Network Circuit Billing Peak (MW) Miles 2003-2007 2008 - 2012 1,429 10,378* 1.3% 1.4% *Billing Peak includes adjustment for Voltage Reduction Electric and Gas Distribution Statistics (12/31/07) Historical Annual Projected Annual Electric Sales and Gas Sold Load Growth Load Growth and Transported Customers 2003-2007 2008 - 2012 Electric 2.1 Million 44,709 GWh 1.6% 1.0% Gas 1.7 Million 3,502 M Therms (0.2%) 0.4% … and through a disciplined capital allocation process has become a recognized leader in delivering safe and reliable service. 47
  • 48. By 2018, NJ’s load is expected to grow by 4,000 MW … Projects to NJ Projects to NY 2008-2018 NJ Summer Peak Annual Growth Rate = 1.8% • PSEG’s evaluation of • The Neptune HVDC project (685 MW) connecting Sayreville to the proposed backbone Long Island transmission projects: • The Linden VFT project (330 • Northern 500kV MW) connecting Linden to route into Jefferson Staten Island and Roseland • The Bergen O66 project (670 • Central 765kV route MW) connecting Bergen to into Deans ConEd's West 49th Street substation • Southern 500kV route into Salem • The Bergen Q75 project (1,200 MW) connecting Bergen to ConEd's West 49th Street substation • Linden S104 project (200 MW) connecting Linden to Goethals Total Import Total Export Capability Capability ~ 5,000 MW ~ 3,100 MW … yet the net import capability into NJ is only increasing by ~1,900 MW indicating need for additional generation, DSM or transmission imports requiring RTEP investment. 48 Sources: Imports: PSE&G Estimates; Exports: PJM 2008 Regional Transmission Expansion Plan; and Load Growth: PJM 2008 Load Forecast Report
  • 49. Transmission opportunities will require substantial deployment of capital. Transmission Growth • PJM approval was received for the $600-$650 million Susquehanna to Roseland line in October 2007 – Siting and permitting process underway Jefferson Roseland – FERC approved Incentive rate filing: Branchburg • 125 BPS adder to ROE • 100% CWIP in Rate Base Deans I-765 • FERC approval of the MAPP projects also mandates Interstate an additional $100 million of capital at Salem/Hope Smithburg Project Creek (2014-2015) • FERC approval of Sub Transmission to Transmission system reliability investments New Freedom represents about $250 million through 2012, post- 2012 ~$60 million/year • Other approved RTEP projects ~$250 million also Hope Creek contribute meaningfully to improved reliability and Salem MAPP earnings growth Project • Backbone projects are in preliminary stages but present real opportunity to improve reliability throughout the state, with the potential investment of ~ $1.5B through 2015 When coupled with formula rate design and additional incentives, it will provide current return on forecasted capital expenditures thereby improving profitability. 49
  • 50. RGGI enabling legislation was signed into law in January 2008. • Section 13 of the RGGI Law permits utilities to invest and/or offer programs in renewables, conservation and energy efficiency – The BPU will be adopting rules and regulations to determine utility participation and the mechanisms for recovery of costs, which must be completed during May/June 2008 • Active Filings – Carbon Abatement • $5 million pilot program intended to demonstrate PSE&G capabilities – AMI • $15 million pilot program for advanced two-way communications. Potential $600 million in capital through 2013 – Solar Initiative • $105 million pilot program to finance installation of PV Solar. Potential PSE&G market up to $1.8 billion assuming 2% Solar RPS through 2020 Our three pilot programs will prove our capabilities at reducing carbon in an economic manner. 50
  • 51. Even with our planned investments, delivery prices to customers ... Gas Electricity 2007-2012 Growth = 0.7% 2007-2012 Growth = 1.4% Inflation = 2.1% Inflation = 2.1% 8.00 Average cents/kWh, 500 kWh Bill 0.60 Average $/therm, 100 therm Bill 6.8 0.48 0.45 Transmission 0.42 5.5 5.1 0.40 4.00 0.20 Distribution 0.00 0.00 2007 2012 2007 2007 2012 2007 Regional Regional Average Average Source: Rates from PSE&G, NYPSC and PAPUC; Inflation from Moody’s Economy.com, February 2008 … are expected to grow less than inflation. 51 Note: 2007 Rates are based on tariff rates in effect on December 31, 2007; Regional Average may not include Electric Transmission for all firms.
  • 53. Holdings’ portfolio has a diverse asset base . . . • Two businesses focused on maximizing value of existing investments • $45M - $60M projected 2008 operating earnings contribution • ~ 55% of earnings from Resources • ~ 45% of earnings from Global, targeting no international exposure by 2009 2007 Operating Earnings* 2008 Guidance - Operating Earnings $ 45M - $60M $ 115M Two 1,000 MW CCGT‘s 22% in Central Texas (South Zone) 1 1 in West Texas Texas Merchant Texas Generation Merchant Generation 22% PSEG 25% Resources PSEG 49% 49% Resources Chile & Peru Other US 56% Distribution Generation Two companies sold 17% 17% 19% in 2007. SAESA in Disc Ops. Other US Generation 12% ~390MW owned in 86% of the portfolio is CA, HI, NH 12% in energy-related fully contracted leveraged leases … with improved stability. 53 * See page 63 for Items excluded from Net Income to reconcile to Operating Earnings