This document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Removing the final drive assembly and marking parts for reinstallation.
2. Using lifting devices and tools to remove gears, shafts, bearings, and housings.
3. Cleaning all parts thoroughly before assembly. The assembly process involves pressing bearings into place and using shims to set the proper bearing preload.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the travel motor on a 390F excavator model. It involves 40 steps to disassemble the various components of the travel motor including removing seals, springs, plates, pistons, and bearings. The assembly section outlines 31 steps to reinstall these components in reverse order while ensuring proper cleaning and alignment of parts. Precision tools are required and safety precautions mentioned to avoid injury from spring forces.
Caterpillar Cat 374D L Excavator (Prefix PJA) Service Repair Manual (PJA00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 374D L Excavator. It describes 34 steps to disassemble the final drive by removing components like the ring gear, carrier assemblies, gears, shafts and seals. It then describes 8 steps for assembling the final drive, which involves cleaning parts, pressing in bearings and pins, installing housings and determining the correct shim number based on bearing preload measurements. The document contains detailed illustrations and lists required tools for each step.
Este documento contiene instrucciones para operar y mantener una máquina. Explica los números de la máquina, las señales de seguridad, cómo subirse y bajarse de la máquina, cómo operar la estación del operador, cómo conducir y operar la máquina, cómo transportarla, el mantenimiento requerido y las especificaciones técnicas.
Caterpillar Cat 374F L Excavator (Prefix DNM) Service Repair Manual (DNM00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive on a 374F L Excavator. It lists the required tools and presents a step-by-step process to remove and install over 35 individual parts. Key steps include removing the ring gear, carrier assemblies, gears and shafts, and separating the main housing from the motor housing. Proper cleaning and application of sealant is emphasized throughout reassembly.
The document provides instructions for disassembling and assembling the travel motor of a 345C L EXCAVATOR. It lists 31 steps to disassemble the various components of the travel motor using different tools. These components include the head, plates, seals, pins, brake piston, disks, rotating group, shaft assembly, barrels, seals, and more. It emphasizes cleaning parts and marking components to ensure proper reassembly.
More Related Content
Similar to Caterpillar Cat 325D LN Excavator (Prefix PKE) Service Repair Manual (PKE00001 and up).pdf
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Similar to Caterpillar Cat 325D LN Excavator (Prefix PKE) Service Repair Manual (PKE00001 and up).pdf (16)
Caterpillar Cat 390F L Excavator (Prefix FEH) Service Repair Manual (FEH00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the travel motor on a 390F excavator model. It involves 40 steps to disassemble the various components of the travel motor including removing seals, springs, plates, pistons, and bearings. The assembly section outlines 31 steps to reinstall these components in reverse order while ensuring proper cleaning and alignment of parts. Precision tools are required and safety precautions mentioned to avoid injury from spring forces.
Caterpillar Cat 374D L Excavator (Prefix PJA) Service Repair Manual (PJA00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 374D L Excavator. It describes 34 steps to disassemble the final drive by removing components like the ring gear, carrier assemblies, gears, shafts and seals. It then describes 8 steps for assembling the final drive, which involves cleaning parts, pressing in bearings and pins, installing housings and determining the correct shim number based on bearing preload measurements. The document contains detailed illustrations and lists required tools for each step.
Este documento contiene instrucciones para operar y mantener una máquina. Explica los números de la máquina, las señales de seguridad, cómo subirse y bajarse de la máquina, cómo operar la estación del operador, cómo conducir y operar la máquina, cómo transportarla, el mantenimiento requerido y las especificaciones técnicas.
Caterpillar Cat 374F L Excavator (Prefix DNM) Service Repair Manual (DNM00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive on a 374F L Excavator. It lists the required tools and presents a step-by-step process to remove and install over 35 individual parts. Key steps include removing the ring gear, carrier assemblies, gears and shafts, and separating the main housing from the motor housing. Proper cleaning and application of sealant is emphasized throughout reassembly.
The document provides instructions for disassembling and assembling the travel motor of a 345C L EXCAVATOR. It lists 31 steps to disassemble the various components of the travel motor using different tools. These components include the head, plates, seals, pins, brake piston, disks, rotating group, shaft assembly, barrels, seals, and more. It emphasizes cleaning parts and marking components to ensure proper reassembly.
Caterpillar Cat 345C L Hydraulic Excavator (Prefix GPH) Service Repair Manual...f8usiejdkmdd
This document provides instructions for disassembling and assembling the travel motor of a 345C L Hydraulic Excavator. The disassembly procedure involves 31 steps to remove components like the head, plates, disks, rotating group, seals and more. The assembly procedure involves 13 steps and notes to clean parts, apply lubricant, set proper measurements and orientations when reinstalling components like the washers, spacers and seals. Special tools are listed for tasks like removing bearings and installing seals.
The document provides instructions for disassembling and assembling the travel motor of an excavator model 345B. It lists 31 steps to disassemble parts like the head, plates, seals, pistons, and housing. It then lists 27 steps to reassemble these parts in reverse order, making sure to clean parts and apply lubricant. Proper installation of seals, washers, and keys is emphasized.
This document provides instructions for disassembling and assembling the swing drive of a 340F Excavator. The disassembly procedure involves removing 27 parts from the swing drive including the cover, sun gear, carrier assembly, planetary gears, ring gear, pinion shaft, and bearings. The assembly procedure instructs installing lip seals and bearings on the cage and pinion shaft before lowering the cage over the pinion shaft and installing the bearing.
This document provides instructions for removing and installing an exhaust manifold and inlet and exhaust valves on a 325-A FM L EXCAVATOR 7LM. It describes:
1) Removing the bolts, exhaust manifold, and gaskets from the cylinder head to remove the exhaust manifold.
2) Installing new gaskets and mounting the exhaust manifold to the cylinder head, applying anti-seize compound and torqueing bolts.
3) Removing inlet and exhaust valves by compressing springs, removing retainers and springs, and removing seals and valves.
This document provides instructions for removing and installing a cylinder head on an excavator. It begins by listing other components that must first be removed, such as the fuel filter base, governor, fuel linkage, and manifolds. The removal procedure then instructs technicians to attach a lifting device to the cylinder head and remove bolts holding it to the cylinder block before removing the gasket. The installation procedure lists cleaning the mating surfaces and applying lubricant to the gasket before positioning the head and torquing the bolts to specifications.
Caterpillar Cat 385C L Excavator (Prefix T2E) Service Repair Manual (T2E00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 385C L Excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. The assembly process reverses the disassembly steps and provides additional details on cleaning, lubricating, and setting bearing preloads using shims. Proper tools and lifting devices are required due to the large size and weight of many components. Cleanliness is emphasized throughout to prevent damage to precision parts from contaminants.
This document provides instructions for removing and installing the front gear group of a C18 engine. The removal procedure involves removing 14 bolts, plates, gears and seals. Special care must be taken to mark gear orientations and not turn the crankshaft during removal. The installation procedure details cleaning components, applying thread lock compound, installing 14 gears, plates and seals in the correct order and orientation, and adjusting backlash. Proper removal and installation is important to avoid engine damage.
This document provides instructions for disassembling and assembling the travel motor on a 390F excavator model. It involves over 40 steps to fully disassemble the travel motor by removing components like the head, relief valves, pistons, plates, seals, bearings, and housing. Special tools are required and safety precautions must be followed when removing spring-loaded or heavy parts. The assembly process reverses the disassembly steps and requires cleaning and lubricating parts before reinstallation.
Caterpillar Cat 385C L Excavator (Prefix EDA) Service Repair Manual (EDA00001...f8usiejdkmdd
This document provides instructions for disassembling and assembling the final drive of a 385C L Excavator. It lists the required tools and parts. The disassembly process involves removing over 30 components from the final drive housing in a specific sequence, including carrier assemblies, sun gears, planetary gear sets, and seals. The assembly process reverses the disassembly steps and provides notes on cleaning, inspecting, lubricating, and installing replacement parts as needed.
A Guide to a Winning Interview June 2024Bruce Bennett
This webinar is an in-depth review of the interview process. Preparation is a key element to acing an interview. Learn the best approaches from the initial phone screen to the face-to-face meeting with the hiring manager. You will hear great answers to several standard questions, including the dreaded “Tell Me About Yourself”.
Jill Pizzola's Tenure as Senior Talent Acquisition Partner at THOMSON REUTERS...dsnow9802
Jill Pizzola's tenure as Senior Talent Acquisition Partner at THOMSON REUTERS in Marlton, New Jersey, from 2018 to 2023, was marked by innovation and excellence.
Job Finding Apps Everything You Need to Know in 2024SnapJob
SnapJob is revolutionizing the way people connect with work opportunities and find talented professionals for their projects. Find your dream job with ease using the best job finding apps. Discover top-rated apps that connect you with employers, provide personalized job recommendations, and streamline the application process. Explore features, ratings, and reviews to find the app that suits your needs and helps you land your next opportunity.
Leadership Ambassador club Adventist modulekakomaeric00
Aims to equip people who aspire to become leaders with good qualities,and with Christian values and morals as per Biblical teachings.The you who aspire to be leaders should first read and understand what the ambassador module for leadership says about leadership and marry that to what the bible says.Christians sh
5 Common Mistakes to Avoid During the Job Application Process.pdfAlliance Jobs
The journey toward landing your dream job can be both exhilarating and nerve-wracking. As you navigate through the intricate web of job applications, interviews, and follow-ups, it’s crucial to steer clear of common pitfalls that could hinder your chances. Let’s delve into some of the most frequent mistakes applicants make during the job application process and explore how you can sidestep them. Plus, we’ll highlight how Alliance Job Search can enhance your local job hunt.
Resumes, Cover Letters, and Applying OnlineBruce Bennett
This webinar showcases resume styles and the elements that go into building your resume. Every job application requires unique skills, and this session will show you how to improve your resume to match the jobs to which you are applying. Additionally, we will discuss cover letters and learn about ideas to include. Every job application requires unique skills so learn ways to give you the best chance of success when applying for a new position. Learn how to take advantage of all the features when uploading a job application to a company’s applicant tracking system.
2. Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
Start By:
a. Start by removing the final drive. Refer to Disassembly and Assembly, "Final Drive -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A). The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1).
3/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
Illustration 3 g00892888
5. Remove bolts (3) and gear (4). Check plate (6). Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2).
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5).
4/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 5 g00892930
7. Remove gear (8) and spacer (9).
Illustration 6 g00892965
8. Use Tooling (C) to remove retaining ring (10). Remove washer (11) and gear (12). Remove
bearing assembly (13) and washer (14).
9. Repeat Step 8 for the other two gear assemblies.
Illustration 7 g00892968
10. Remove retaining ring (15).
5/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 8 g00892975
11. Remove carrier assembly (16).
Illustration 9 g01389804
12. Use a suitable press to remove the shafts from carrier assembly (16).
Illustration 10 g00892977
6/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 13. Remove gear (17) and spacer (18).
Illustration 11 g00892997
14. Use Tooling (D) and a suitable lifting device to remove planetary carrier (19). The weight of
planetary carrier (19) is approximately 48 kg (105 lb).
Illustration 12 g00893019
15. Remove retaining ring (21). Lift planetary carrier (19) off sun gear (20).
Illustration 13 g00896860
16. Drive spring pin (23) into planetary shaft (22).
7/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 14 g00893043
17. Remove planetary shaft (22). Use a suitable punch to remove spring pin (23) from planetary
shaft (22).
Illustration 15 g00896863
18. Remove washers (24) and bearing (25) from planetary gear (26).
19. Repeat Steps 16 through 18 for the other two planetary gears.
Illustration 16 g01842853
20. Remove gear (27). Remove spacer (27A).
8/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 17 g01842974
21. Use two people to remove carrier assembly (28). The weight of carrier assembly (28) is
approximately 38 kg (85 lb).
Illustration 18 g01843140
22. Drive spring pin (30) into shaft (29).
Illustration 19 g00893658
23. Remove shaft (29). Use a suitable punch to remove spring pin (30) from shaft (29).
9/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 20 g00893674
24. Remove washers (31) and bearings (32) from planetary gear (33).
25. Repeat Steps 22 through 24 for the other three planetary gears.
Illustration 21 g01208300
26. Fasten Tooling (E) and a suitable lifting device to ring gear (34), as shown. Remove ring
gear (34) from sprocket housing (35). The weight of ring gear (34) is approximately 66 kg
(146 lb).
Illustration 22 g01208542
10/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. 27. Remove O-ring seal (36) from sprocket housing (35).
Illustration 23 g01208553
28. Remove bolts (37) from coupling gear (38).
Illustration 24 g01208572
29. Install suitable forcing bolts (39) in coupling gear (38). Tighten the forcing bolts evenly in
order to loosen coupling gear (38). Remove the coupling gear from the motor housing.
Illustration 25 g01208578
11/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 26 g01208625
30. Remove shims (40) from the motor housing.
Note: Inner cones and outer bearing cones (42) are a slip fit on the motor housing. While
you remove sprocket housing (35) from the motor housing, inner bearing cone (42) may
stay with the sprocket housing or the inner bearing cone may stay on the motor housing.
31. Fasten Tooling (F) and a suitable lifting device to sprocket housing (35). Separate the
sprocket housing from the motor housing. The weight of sprocket housing (35) is
approximately 109 kg (240 lb).
Illustration 27 g01208626
32. Remove the locating pins from the motor housing.
33. Remove Duo-Cone seal (41) from the motor housing.
34. If inner bearing cone (42) remained on the motor housing, then remove the inner bearing
cone.
12/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 28 g01208633
35. Remove Duo-Cone seal (43) from the sprocket housing.
36. If inner bearing cone (42) remained on the sprocket housing, then remove the inner bearing
cone.
37. Remove the bearing cups from the sprocket housing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Jun 19 10:58:39 UTC+0800 2020
13/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D EXCAVATOR PKE
Configuration: 325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03949150
Final Drive - Assemble
SMCS - 4050-016
S/N - A3R1-UP
S/N - AZP1-UP
S/N - BFC1-UP
S/N - BYS1-UP
S/N - CZF1-UP
S/N - DBH1-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC1-UP
S/N - GBR1-UP
S/N - GPB1-UP
S/N - GPK1-UP
S/N - JAT1-UP
S/N - JHJ1-UP
S/N - JJG1-UP
1/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
D 138-7574 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H 5P-3931 Anti-Seize Compound
F 1U-8846 Gasket Sealant
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counterbore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
3/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8818.5 lb) on
the bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2204.6 ± 220.5 lb).
e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y) .
4/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of the coupling gear (26) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this Dimension (X) .
g. The thickness of the shims is equal to (X - Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18) . Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
5/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28) .
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30) .
10. Install alignment pins (30) .
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26) .
6/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
7/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 10 g00708187
13. Install gear (26) .
14. Install bolts (25) in gear (26) . Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18) .
Illustration 12 g00708175
16. Assemble carrier assembly (15) , as follows.
8/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23) .
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
9/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15) . Fasten a 12.7 mm (0.50
inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b) .
22. Install ring gear (17a) on ring gear (17b) .
10/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17) , as shown. Install the ring gears to main
housing (18) . The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
11/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. 25. Install sun gear (14) in carrier assembly (15) .
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7) , as follows.
a. Install bearing (12) in planetary gear (13) .
b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
12/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7) .
30. Install spacer (6) in carrier assembly (7) .
13/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2) . Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2) .
34. Apply Tooling (F) to the mating surface of the ring gear.
14/15