Building concrete forms, tips and techniques in carpentry
1. There are many strategies, and techniques when Building Concrete
Forms in carpentry. Concrete forms are built to hold wet concrete. Once
the form is built the wet concrete gets poured in the form, this is usually
done by a truck, wheel borrow, or shovel. When the concrete dries the
form is then stripped. After the form is stripped you will have your finish
product. This method is used commonly when building bridges, curves,
and foundation of buildings, pillar, steps, and walls.
2.
3.
4. Sometimes carpenters are working in the middle of highways as cars are
passing by at high speeds. Or they may be required to walk across a plank
carrying a sheet of plywood on a windy day and one wrong move and they
fall into a lake. Now that's exciting. Carpenters get dirty as well, having to
work in the mud and rain swinging a hammer trying to put nails in wood or
using a sledge hammer trying to sink a four foot steak in muddy ground. This
is the hardcore part of carpentry Building Concrete Forms.
5.
6. Before building the concrete form the material such as plywood and two by
fours should be inspected for cracks and serious flaws in that. Using messed
up material will give you weak parts in your form and result to a blowout
meaning wet concrete pours or blows out the form which means you failed
to do the job right. A carpenter's main objective is to not have blowouts
plain and simple. The forms can be characterized into three main categories:
Block, Shuttering Panel and Plank, each having their own advantages.
7.
8. 1. While building remember to build accordingly to what your customer
wants.
2. Always brace and support your forms correctly. There are no short cuts.
3. It’s better to overbuild than it is to under build. Overbuilding assures
you that there will not be any blow out.
4. Using the right nails for the job is very important. Using the wrong size
nails can result to a blowout.
5. All steaks metal or wood should be nailed in the ground until they are at
least 3 feet in.
6. When swinging your hammer remember it's all in the wrist let your
wrist do the swinging.
7. After you are done building the form look over your work make sure you
did not forget anything.
9. BOFU CONSTRUCTION MATERIAL CO., LTD.
No. 9, Dongshan Street, Dalian, China
Website: http://www.bofuform.com/
+86 411 39552555
info@bofuform.com
+86 411 39540931
Mon - Fri: 9:00 - 18:00