1. Kiln-2 Stoppage
•Kiln-2 stopped on dated 8-Dec-2014 for inspection of
preheater because gamma rays values was disturbed.
•After inspection Cyclone#1 RDF side found partially
blocked with cast able piece in conical portion.
•Cleaning work is in progress.