SlideShare a Scribd company logo
1 of 36
TSX:TGZ / OTCQX:TGCDF
121 Singapore
May 23-24, 2018
Building a
Multi-Asset Mid-Tier
West African Gold Producer
Richard Young
President & Chief Executive Officer
2
Forward-Looking Statements
3
All information included in this presentation, including any information as to Teranga’s future financial or operating performance and other statements that express management’s
expectations or estimates of future performance, other than statements of historical fact, constitute forward-looking information or forward-looking statements within the meaning of
applicable securities laws and are based on expectations, estimates and projections as of the date hereof. Forward-looking statements are included for the purpose of providing
information about management’s current expectations and plans relating to the future. Wherever possible, words such as “plans”, “expects”, “scheduled”, “trends”, “indications”,
“potential”, “estimates”, “predicts”, “anticipate”, “to establish”, “believe”, “intend”, “ability to”, or statements that certain actions, events or results “may”, “could”, “would”, “might”,
“will”, or are "likely" to be taken, occur or be achieved, or the negative of these words or other variations thereof, have been used to identify such forward-looking information.
Specific forward-looking statements include, without limitation, all disclosure regarding future results of operations, economic conditions and anticipated courses of action.
Although the forward-looking statements contained herein reflect management's current beliefs and reasonable assumptions based upon information available to management as
of the date hereof, Teranga cannot be certain that actual results will be consistent with such forward-looking information. Such assumptions include, among others, the ability to
obtain any requisite governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic
conditions, anticipated future estimates of free cash flow, and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements.
The risks and uncertainties that may affect forward-looking statements include, among others, the inherent risks involved in exploration and development of mineral properties,
including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other
factors, such as project execution delays, many of which are beyond the control of Teranga. For a more comprehensive discussion of the risks faced by Teranga, and which may
cause the actual financial results, performance or achievements of Teranga to be materially different from estimated future results, performance or achievements expressed or
implied by forward-looking information or forward-looking statements, please refer to Teranga’s latest Annual Information Form filed with Canadian securities regulatory authorities
at www.sedar.com or on Teranga’s website at www.terangagold.com. The risks described in the Annual Information Form (filed and viewable on www.sedar.com and on
Teranga’s website at www.terangagold.com) are hereby incorporated by reference herein. Teranga disclaims any intention or obligation to update or revise any forward-looking
statements whether as a result of new information, future events or otherwise, except as required by applicable law. Nothing herein should be construed as either an offer to sell
or a solicitation to buy or sell Teranga securities.
All references to Teranga include its subsidiaries unless the context requires otherwise. This presentation contains references to Teranga using the words “we”, “us”, “our” and
similar words and the reader is referred to using the words “you”, “your” and similar words. All dollar amounts stated are denominated in U.S. dollars unless specified otherwise.
4
Deep Value Based on Cash and 2P Reserves
(C$)
Gold Price per Ounce Assumption
Cash balance as at March 31, 2018
Wahgnion Project NPV5% based on 2P(1)
Sabodala NPV5% based on 2P(2)
$5.25
$1.45
$0.72
$1,300
$5.37
TGZ Current
Share Price
(closing price
May 10, 2018)
$7.42
NPV* Per Share
based on cash &
2P reserves(1)(2)
Excludes potential value from:
• Wahgnion infill drill program
• Golden Hill
• Afema and Côte d’Ivoire assets
*Refer to Appendix – Non-IFRS Performance Measures
Refer to Appendix – Endnotes (1) and (2)
USD/CAD FX rate 0.79
Senegal
Côte d’Ivoire
Burkina Faso
Mali
Guinea
Guinea-
Bisseau
The Gambia
Ghana
Benin
Niger
Sierra
Leone
Liberia
Togo
Sabodala Gold Mine
• Long-life mine
• More than 1.4Moz production
since late 2010
5
Wahgnion Development Project
• Expect to close financing and
commence construction in Q2 2018
• Reserve update expected by mid-year
Golden Hill Exploration JV
• Initial resource expected in 2018
• Fully funded to feasibility
Gourma
Exploration
JV
Guitry
Dianra
Mahepleu
Tiassale
Sangaredougou
Building a Multi-Asset Mid-Tier Gold Producer in Mining-Friendly West Africa
Teranga has nearly
4.0 million ounces of
gold reserves from
its Sabodala Gold Mine
and its Wahgnion
Development Project(1)(2)
Afema
Refer to Appendix – Endnotes (1) and (2)
Achieved record
production of
233,267 oz
of gold
Announced positive
feasibility for
Wahgnion Project
including reserves
of 1.2Moz(1)
Positive drill results
from Golden Hill
Entered into joint
venture on Afema
land package in
Côte d’lvoire
FY2017 Highlights
6
  
Refer to Appendix – Endnote (1)
7

Prospectors & Developers Association of Canada
2017 Environmental & Social Responsibility Award
United Nations Global Compact
Network Canada Sustainability Award
3X Winner of Corporate Knights Future 40
Responsible Corporate Leaders in Canada
Capital Finance International: Best ESG
Responsible Mining Management West Africa
Leading With Our Social License



Sabodala
Senegal, West Africa
8
*Refer to Appendix – Non-IFRS Performance Measures
Refer to Appendix – Endnotes (2),(5),(6) and (9) 9
Exploration Prospects
Mineral Resources
Masato Style Bulk
Tonnage Gold Trend
Golouma Style High-
Grade Gold Trend
Mining Concession
Exploration Permits
Previous Mine License
Sabodala
Mill
Sabodala Mine License &
Regional Land Package
Largest Gold Producer in Senegal:
Continuing to Replace Reserves, Strong 5-Year Profile
Mali
Niakafiri
Goumbati
West
Life of Mine
Summary(2)(5)(6)
5 years
(2018-2022)
13 years
(2018-2030)
Annual production 213koz 176koz
All-in sustaining costs* $885/oz $893/oz
Total free cash flow* $230M $556M
2.7Moz
2P Reserves(2)
4.4Moz
M&I Resources(9)
13-Year
Mine Life(9)
Wahgnion Project
Burkina Faso, West Africa
10
11
Solid Start to Teranga’s Second Mine – Wahgnion
Nogbele
Stinger
15km from plant
Samavogo
25km from plant
Fourkoura
6km from plant
Life of Mine Summary
Initial
5.5 years
LOM
(9 years)
Annual production(4)(5) 131koz 119koz
All-in Sustaining Costs* $807/oz $843/oz
Total free cash flow* $302M $409M
Pre-production capital** ($232M)
Net cash flow $176M
*Refer to Appendix – Non-IFRS Performance Measures
**Pre-production capital costs of $232 million excludes $12 million in construction readiness activities
spent prior to major construction
Refer to Appendix – Endnotes (1), (4), (5) and (10)
1.2Moz
2P
Reserves(1)
1.8Moz
M&I
Resources(10)
0.7Moz
Inferred
Resources(10)
Wahgnion Development Project
Permitted mining license: 89 km2
Exploration licenses:+1,000 km2
Four initial deposits at Wahgnion
(Nogbele, Samavogo, Fourkoura
& Stinger) located in close proximity
to proposed plant site
Proposed
Processing Plant
Kafina West
Raul
Hillside
12
Significant Upside Potential at Wahgnion
Samavogo
Nogbele
Fourkoura
Stinger
Bagu Sud
Korindougou
Ouahiri
Sud
Near-Term Upside: Mid-2018 Reserve Update
• 73,000-metre infill drill program targeted inferred
resources located near to the current reserve pits
• Objective is to increase drill hole density within the
existing inferred resources
• Targeting to convert 25%-50% of inferred resources
Mid to Long-Term Upside: ~12 Drill-Ready Targets
• Targets have potential to become resources and are
within trucking distance of proposed plant site
• Konatvogo: 2,000-metre NW-trending anomaly
between Fourkoura and Nogbele deposits. Up to
21.6 g/t Au from altered shear-hosted quartz vein
outcrops
• Bassongoro: 1,500-metre NNE-trending soil and
auger anomaly (up to 15g/t Au). Intersection of
regional Nianka and Fourkoura structures undrilled
Raul
Proposed Plant Site
Kondandougoug
Konatvogo
Bazogo
Bassongoro
Samavogo North
MuddhiPetit Colline
Reserve Deposits
Exploration Targets
Golden Hill
Burkina Faso
13
14
Sources
š Semafo Corporate Presentation (Mar 2017)
² Roxgold Corporate Presentation (Feb 2017)
Âł Endeavour Corporate Presentation (Feb 2017)
⁴ Acacia Preliminary Results (Feb 2017)
⁾ Savary Corporate Presentation (Mar 2017)
M&I Resources are inclusive of P&P Reserves
Uniquely Positioned: High-Grade, Big Potential Siou Pit
M&I: 0.89 Moz š
Mana
M&I: 3.63 Moz š
HoundĂŠ
M&I: 2.55 Moz Âł
Yaramoko
M&I: 0.81 Moz ²
Acacia JVs ⁴
Karankasso JV
Inf: 0.67 Moz ⁾
South HoundĂŠ JV
Inf: 2.10 Moz ⁴
Sarama Permits
Teranga’s
Golden Hill
JV
Situated in the Heart of the HoundĂŠ Belt (Burkina Faso)
• 468 km2 situated ~250 km NE of Wahgnion
• One of the most prospective gold belts in the world
• In close proximity and along strike to other deposits
One of the Best High-Grade Projects in West Africa
• Plan to release an initial resource for Golden Hill’s
most advanced prospects by end of 2018
• $25 million financing secured for the future
advancement of Golden Hill feasibility study
Joint Venture with Boss Resources (51%, earning 80%)
• Teranga, as the operator, can earn an 80% interest
in the JV upon delivery of a feasibility study and
the payment of AUD2.5 million
15
Five Prospects Within ~6-Kilometre Radius of Central Point
• In just one year, there have been three discoveries at
Golden Hill
• To date Golden Hill has produced a series of high-grade,
near-surface drill results at the first five prospects:
– Ma
– Jackhammer Hill
– Peksou
– C-Zone
– Nahiri
• The close proximity of these targets
and prospects lends itself to a central
mill/multi-deposit operation similar to
Sabodala and Wahgnion
For full details on Golden Hill, please visit www.terangagold.com
Rapidly Progressing Towards an Initial Resource
GEOLOGY
Tarkwaian Type Sediments
Volcano Sediments
Mixed Volcano Sediments & Volcanics
Basalt
Grantoid
Batholith
Ma North
Ma Main
Ma East
Jackhammer Hill
PeksouC-Zone
B-Zone
A-Zone
Nahiri
Côte d’Ivoire Exploration
Guitry & Afema
16
Guitry
• Completed the first-ever drilling program on the
property
– 68 shallow air-core sectional profile holes
– comprising 3,300 metres over the central
1 km extent of our current 7 km strike
length gold-in-soil geochem anomaly
• Results from this first pass, near-surface drilling
program, will help us determine where to focus
subsequent exploration within this large target
Endeavour
Endeavour
Perseus
Randgold
Côte d’Ivoire
Guitry
Tiassale
Mahepleu
Sangaredougou
Operating Gold Mine/ Development Project
Newcrest
Dianra
17
Afema
Exciting Opportunities in Côte d’Ivoire
Ahafo
17 Moz
Newmont
3 Afema
Exploration
Permits
Afema
Mining Permit
Bibiani
7 Moz
Resolute
Chirano
5 Moz
Kinross
Edikan
6.6 Moz
Perseus
Bogoso/Prestea18
Moz Gold Star
Konogo
1.4 Moz
Signature Metals
Akyem
Newmont
Essase
5.19 Moz
Obotan
5.5 Moz
Asanko
Obuasi 41 Moz
Anglo Gold Ashanti
Kubi 0.9 Moz
Asaute Gold Corporation
Damang 7.1 Moz
Goldfields
Tarkwa 24 Moz
Iduapriem
8.2 Moz
AngloGold Ashanti
Kumasi
Cape Coast
Sefwi-Bibiani
Gold Belt
Asankrangwa
Gold Belt
Ashanti
Gold Belt
Winneba-Kibi
Gold Belt
18
Afema: Historical Resource* of 2Moz of Gold
Well Located Geologically
• Along trend and within the same gold belts
of a number of high profile producing mines
in Ghana
Q1 2018 Activities
• Finalized Afema joint venture with Sodim
Limited (51%, earning 70%)
• Initiated early-stage field exploration at both
the mine license and regional land package
totaling 1,400 km2
*Refer to Appendix – Afema Mine License Historical Resource Estimate
Ghana
Côte d’Ivoire
Afema Joint Venture
19
Afema
Mine License
Afema
Exploration
Permit
Afema
Exploration
Permit Afema
Exploration
Permit
AyamĂŠ Gold Horizon
(33k Strike Length)
Bafla Gold Horizon
(34 km Strike Length)
Sefwi-Bibiani Gold Belt
(34 km Strike Length)
Asankrangwa Gold Belt
(30 km Strike Length)
Andina Gold Horizon
(13 km Strike Length)
Next Steps
• Compile and review previous
technical data to assist in guiding
exploration programs
• Re-model historic resources to
identify areas for initial drilling
evaluation
• Anticipate initiation of a property-
wide stream-sediment BLEG
sampling program, soil sampling
and drilling during Q2 2018
Wrap-Up
20
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
~$100M annual free cash flow* (11)
Significantly Increasing Production and Improving Free Cash Flow
21*Refer to Appendix – Non-IFRS Performance Measures
Refer to Appendix – Endnotes (3), (4), (5), (7) and (11)
Teranga Consolidated Production Profile (koz)(3),(4),(7)
350Koz
~$70M annual free cash flow*(5)
2020 – 2022
Sabodala + Wahgnion
~350Koz annual
production
Opportunities to maintain
production and free cash flow
through resource conversion &
discoveries at Sabodala &
Wahgnion
Strong Financial Position
22
$60 Million
Cash balance
as at March 31, 2018
+$90 Million(6)
Estimated cash flow from
Sabodala 2018-2019
$190 Million
Wahgnion Project debt +
Golden Hill facility
Solid Financial
Position
to optimize our Sabodala
Operations, bring Wahgnion
into production and to advance
Golden Hill through feasibility
Refer to Appendix – Endnote (6)
Top 10 Shareholders
% of o/s
shares
Shares Owned
as at May 10, 2018
1 Tablo Corporation 21.7% 23,322,400
2 Van Eck Associates Corporation 6.2% 6,683,022
3 Ruffer LLP 4.8% 5,176,743
4 Heartland Advisors 4.1% 4,350,000
5 Oppenheimer Funds 3.2% 3,380,828
6 Dimensional Fund Advisors 2.9% 3,100,539
7 Franklin Advisers 2.5% 2,707,200
8 Connor, Clark & Lunn Inv Mgmt 1.8% 1,875,000
9 Universal-Investment Gesellschaft 1.6% 1,735,000
10 LSV Asset Management 1.6% 1,719,540
23
Share Price Performance (TSX: TGZ)
(Closing price on December 12, 2017 – May 10, 2018)
Capital Structure and Recent Share Price Performance
Source: IR Insight on May 10, 2018
+6%
+12%
TGZ-TSX
GDXJ
Gold Price
Capital Structure (at March 31, 2018 unless otherwise noted)
Common shares outstanding 107.3M
Stock options outstanding 5.7M
Fully diluted 113.0M
Number of shares owned by insiders 23.8M
Market capitalization (May 10, 2018) C$576M
Cash / Net cash US$60M / US$45M
ASX Delisting
Completed Compulsory Sale Facility before markets open
on December 13 – stock price hit low of C$2.30
(compared to C$2.42 closing price on December 12)
+122%
Regular exploration updates
Initial resource estimations by year end
Golden HillSabodala
Production of 210Koz-225Koz
2018 News Flow and Milestones
24
Commence mill construction in Q2
Update resources in Q2
Update reserves in Q3
Update NI 43-101 technical report
Project updates from Guitry and Afema
Wahgnion Côte d’Ivoire
Potential for Significant Share Price Appreciation
25
Teranga’s Share Price (C$)
vs. Net Present Value* (NPV)(12) per Share
57%
*Refer to Appendix – Non-IFRS Performance Measures
Refer to Appendix – Endnote (12)
$5.37
$7.02
$8.42
Share Price
(May 10, 2018 close)
BMO NPV per Share
(Spot)
Revalued Share Price
0.9x
Current TGZ
NPV Trading
Multiple(12)
1.2x
Average NPV Multiple
for Medium
Producers(12)
Data Source: BMO GoldPages published May 7, 2018
617
609
350
339
287
165
143
88
Roxgold
B2Gold
Semafo
Golden Star
Endeavour
Teranga
Alacer
Perseus
EV/2P Reserves ($/oz)
EV/2018E EBITDA
3.3
3.4
4.2
5.1
5.8
5.9
29.5
Golden Star
Roxgold
Teranga
B2Gold
Semafo
Endeavour
Alacer
Appendix
26
2018 Outlook
27
Notes to 2018 Guidance
A. 22,500 ounces of gold production are to be sold to Franco-Nevada Corporation
at 20% of the spot gold price.
B. Total cash cost per ounce sold is a non-IFRS financial measure and does not
have a standard meaning under IFRS.
C. All-in sustaining costs per ounce is a non-IFRS financial measure and does not
have a standard meaning under IFRS. All-in sustaining costs per ounce sold
include total cash costs per ounce, administration expenses, share based
compensation and sustaining capital expenditures as defined by the World
Gold Council. All-in sustaining costs also include cash / (non-cash) inventory
movements and non-cash amortization of advanced royalties.
D. Exploration and evaluation costs includes both Expensed Exploration, primarily
attributable to exploration work on exploration permits, and Capitalized
Reserve Development, which is work performed on Mine Licenses.
E. Site development costs for 2018 include village relocation costs for the
Sabodala village.
F. Excludes capitalized deferred stripping costs, included in mine production
costs.
G. Construction readiness / early works expenditures for 2018 includes
anticipated expenditures for the construction of the Wahgnion Gold Project
prior to completion of a debt facility agreement.
Other
This forecast financial information is based on the following material assumptions
for 2018: gold price: $1,250 per ounce; light fuel oil price $0.87/L; heavy fuel oil
price $0.50/L; Euro:USD exchange rate of 1:1.17
Other important assumptions: any political events are not expected to impact
operations, including movement of people, supplies and gold shipments; grades
and recoveries will remain consistent with the life-of-mine plan to achieve the
forecast gold production; and no unplanned delays in or interruption of scheduled
production.
2018
Guidance
Operating Results
Ore mined (‘000t) 2,000 – 2,500
Waste mined (‘000t) 35,000 – 37,000
Total mined (‘000t) 37,000 – 39,500
Grade mined (g/t) 2.50 – 3.00
Strip ratio waste/ore 16.5 – 18.5
Ore milled (‘000t) 4,200 – 4,400
Head grade (g/t) 1.70 – 1.90
Recovery rate % 90.0 – 91.5
Gold produced A
(oz) 210,000 – 225,000
Cost of sales per ounce sold $/oz sold 950 – 1,025
Total cash cost per ounce sold B
$/oz sold 700 – 750
All-in sustaining costs C
$/oz sold 1,000 – 1,075
Cash / (non-cash) inventory movements and amortized advanced royalty
costs C $/oz sold -50
All-in sustaining costs (excluding cash / (non-cash) inventory movements
and amortized advanced royalty costs) C $/oz sold 950 – 1,025
Mining ($/t mined) 2.25 – 2.50
Mining long haul ($/t hauled) 2.50 – 3.50
Milling ($/t milled) 11.00 – 12.50
General and Administration ($/t milled) 4.25 – 4.50
Mine Production Costs $ millions 162.0 – 172.0
Corporate Administration Expense $ millions 11.0 – 13.0
Regional Administration Costs $ millions ~2.0
Community Social Responsibility Expense $ millions 4.0 – 5.0
Exploration and Evaluation D
$ millions ~15.0
Sabodala Capital Expenditures
Mine site sustaining $ millions 10.0 – 15.0
Site development costs E
$ millions 10.0 – 15.0
Total Sabodala Capital Expenditures F
$ millions 20.0 – 30.0
Growth Capital Expenditures
Wahgnion early works G
$ millions ~30.0
Wahgnion construction H
$ millions 140.0 – 160.0
Total Growth Capital Expenditures $ millions 170.0 – 190.0
2828
Ma Prospect – Representative Drill SectionMa Prospect – Drill Plan
Excellent Grades Near Surface and to Depth at Ma Structural Complex
High-Grade, All Along Strike at Jackhammer Hill Prospect
29
Jackhammer Hill Prospect – Representative Drill SectionJackhammer Hill Prospect – Drill Plan
Executive Team
30
Richard Young, CPA
President & CEO
25+ years experience in gold mining
including 13 years at Barrick Gold including
finance and corporate development
Paul Chawrun, P.Eng, MBA
Chief Operating Officer
25+ years experience in mining including
serving as Director, Technical Services
at Detour Gold
Navin Dyal, CPA
Chief Financial Officer
13 years experience in mining including 7
years at Barrick Gold as Head of Finance
in copper business unit
David Savarie, LL.B
General Counsel & Corporate Secretary
11 years of Corporate Counsel experience
in mining including his role as Deputy
General Counsel and Corporate Secretary
of Gabriel Resources
Aziz Sy, P.Eng, M.Sc., MBA
General Manager, SGO
17+ years experience in managing gold
exploration projects, including his work as
Vice President Senegal Operations for the
Oromin Joint Venture Group until its
acquisition in 2014 by Teranga Gold
Sepanta Dorri, MAcc, MBA, CPA
VP, Corporate and Stakeholder Development
10 years experience in mining including 5 years at
Xstrata Nickel in Strategic Planning and M&A.
2012 winner of the WXN Top 100 Canada's Most
Powerful Women award, Trailblazers and
Trendsetters Category
David Mallo, B.Sc. Geology
VP, Exploration
35+ years of mineral exploration in project
evaluation and program management, playing
an integral role in acquisition, discovery, and
exploration of world-class deposits including
Eskay Creek and Cobre Panama
Alan Hill, M.Eng
Chairman
35+ years experience in
mining including 20 years at
Barrick Gold in project
evaluation and development
Christopher Lattanzi, B.Eng
Director
30 years experience in mining
property valuation, scoping, feasibility
studies and project monitoring on a
global basis. Founder of Micon
International
Richard Young, CPA
President & CEO
25+ years experience in gold
mining including 13 years at
Barrick Gold in finance and
corporate development
Jendayi Frazer, Ph.D.
Director
17 years experience in key roles
supporting initiatives and policies
to build Africa’s equity and commodity
markets. First woman U.S. Ambassador
to South Africa
William Biggar, MA, CPA
Director
25+ years experience in senior
executive positions in investment,
mining and real estate including
Barrick Gold and Merrill Lynch
Edward Goldenberg, MA, BCl
Director
Distinguished career in policy including
10 years as Senior Policy Advisor to the
Prime Minister of Canada and the Prime
Minister's Chief of Staff in 2003. Honourary
Doctorate of Laws from McGill University
David Mimran
Director & Teranga’s Largest Shareholder
CEO of Grands Moulins d’Abidjan and
Grands Moulins de Dakar, among the
largest producers of agri-food in West
Africa. Special Advisor to the Government
of the Republic of CĂ´te d'Ivoire
Alan Thomas, CPA
Director
30+ years mining and energy
industry experience in senior
financial and director roles including
6 years as VP and CFO of ShawCor
and 11 years as CFO of Noranda
Frank Wheatley, LL.B
Director
28 years mining industry experience as
director, senior officer and legal counsel.
Extensive experience in public financing,
project debt financing, permitting of large-
scale mining projects and strategic M&A
Board of Directors
31
Qualified Persons Statement
32
The technical information contained in this document relating to the Sabodala open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Stephen Ling, P. Eng who is a member of the Professional
Engineers Ontario. Mr. Ling is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Ling has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ling has consented to the inclusion in this document of the matters based on his compiled
information in the form and context in which it appears in this document.
The technical information contained in this document relating to Sabodala mineral resource estimates is based on, and fairly represents, information compiled by Ms. Patti Nakai-Lajoie. Ms. Nakai-Lajoie, P. Geo., is a Member of the Association
of Professional Geoscientists of Ontario. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Ms. Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity which she is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this
document of the matters based on her compiled information in the form and context in which it appears in this document.
The technical information contained in this document relating to the Sabodala underground ore reserves estimates is based on, and fairly represents, information compiled by Jeff Sepp, P. Eng., of Roscoe Postle Associates Inc. (“RPA”), who is
a member of the Professional Engineers Ontario. Mr. Sepp is “independent” within the meaning of NI 43-101. Mr. Sepp has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Sepp has consented to the inclusion in this document of the matters based on his compiled information in the form
and context in which it appears in this document.
The technical information contained in this document relating to the Wahgnion open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Glen Ehasoo, P. Eng., of RPA, who is a member of the Association
of Professional Engineers and Geoscientists of British Columbia. Mr. Ehasoo is "independent" within the meaning of NI 43-101. Mr. Ehasoo has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ehasoo has consented to the inclusion in this document of the matters based on his
compiled information in the form and context in which it appears in this document.
The technical information contained in this document relating to Wahgnion mineral resource estimates is based on, and fairly represents, information compiled by Mr. David Ross, P.Geo., of RPA, who is a Member of the Association of
Professional Geoscientists of Ontario. Mr. Ross is "independent" within the meaning of NI 43-101. Mr. Ross has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ross has consented to the inclusion in this document of the matters based on his compiled information in the form and
context in which it appears in this document.
Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Mann has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a “Qualified Person” as under NI 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in
this document relating to exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data
underlying the information. The samples are prepared at site and assayed in the SGS laboratory located at the site. Analysis for diamond drilling is sent for fire assay analysis at ALS Johannesburg, South Africa. Mr. Mann has consented to the
inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document.
Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and
Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted
into mineral reserves.
Teranga confirms that it is not aware of any new information or data that materially affects the information included in the technical reports for the Sabodala Project (August 30, 2017) and the Wahgnion Project (October 20, 2017) pursuant
to National Instrument 43-101 - Standards of Disclosure for Mineral Projects (the “Technical Reports”), or year end 2017 results, market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcements concerning the Technical Reports continue to apply and have not materially changed.
33
Non-IFRS Performance Measures
The Company has included non-IFRS measures in this document, including “total cash costs”, “total cash costs per ounce sold”, “all-in sustaining costs” (“AISC”), “AISC (excluding cash / (non-cash) inventory movements
and amortized advanced royalty costs)”, “AISC per ounce”, “AISC (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs) per ounce”, “average realized gold price”, “earnings before
interest, taxes, depreciation and amortization” (“EBITDA”), “free cash flow”, “adjusted net profit attributable to shareholders” and “adjusted basic earnings per share”. These measures are intended to provide additional
information only and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are
not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently.
“Total cash costs” figures are calculated in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and included leading North American
gold producers. The Gold Institute ceased operations in 2002, but the standard is considered the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary and the
cost measures presented may not be comparable to other similarly titled measure of other companies. “Total cash costs per ounce sold” is a common financial performance measure in the gold mining industry but has
no standard meaning under IFRS. The Company reports total cash costs on a sales basis. The World Gold Council (“WGC”) definition of AISC seeks to extend the definition of total cash costs by adding corporate
general and administrative costs, reclamation and remediation costs (including accretion and amortization), exploration and study costs (capital and expensed), capitalized stripping costs and sustaining capital
expenditures and represents the total costs of producing gold from current operations. AISC excludes income tax payments, interest costs, costs related to business acquisitions and items needed to normalize earnings.
Consequently, this measure is not representative of all of the Company’s cash expenditures. In addition, the calculation of AISC does not include depreciation expense as it does not reflect the impact of expenditures
incurred in prior periods. Therefore, it is not indicative of the Company’s overall profitability. The Company also expands upon the WGC definition of AISC by presenting an additional measure of “AISC (excluding cash /
(non-cash) inventory movements and amortized advanced royalty costs)”. This measure excludes cash and non-cash inventory movements and amortized advanced royalty costs which management does not believe to
be true cash costs and are not fully indicative of performance for the period. For Sabodala and Wahgnion, life of mine total cash costs and AISC figures used in this presentation are before cash/non-cash inventory
movements and exclude any allocation of corporate overheads. Consolidated total cash costs and all-in sustaining cost figures add corporate overhead costs.
“Average realized price” excludes from revenues unrealized gains and losses on non-hedge derivative contracts. Management uses this measure to better understand the price realized in each reporting period for gold
and silver sales.
“EBITDA” excludes income tax, finance costs (before accretion expense), interest income, depreciation and amortization, and non-cash impairment charges from net profits. EBITDA is intended to provide additional
information to investors and analysts and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.
Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to: fund working capital needs, service debt obligations, and fund capital expenditures.
“Free cash flow” is calculated as net cash flow provided by operating activities less sustaining capital expenditures. The Company believes this to be a useful indicator of our ability generate cash for growth initiatives.
Starting in 2018, the Company adopted “adjusted net profit attributable to shareholders” and “adjusted basic earnings per share” as new non-IFRS financial measures. These non-IFRS financial measures are used by
management and investors to measure the underlying operating performance of the Company. Presenting these measures from period to period will help management and investors evaluate earnings trends more
readily in comparison with results from prior periods. The Company calculates “adjusted net profit attributable to shareholders” as net profit attributable to shareholders adjusted to exclude specific items that are
significant, but not reflective of the underlying operations of the Company, including: the impact of unrealized and realized foreign exchange gains and losses, gains and losses on derivative instruments, accretion
expense on long-term obligations, impairment provisions and reversals thereof, and other unusual or non-recurring items. “Adjusted basic earnings per share” is calculated using the weighted average number of shares
outstanding under the basic method of earnings per share as determined under IFRS.
For more information regarding these measures, please refer to the Company’s management’s discussion and analysis accessible on the Company’s website at www.terangagold.com.
34
A number of economic and technical studies have been prepared on the Afema project prior to Teranga’s entry into the Afema JV with Sodim. The most recent study, which included a mineral
resource estimate for the Afema mine license, was issued by RockRidge Consulting Services Geologists for and on behalf of TGL and is dated as of June 27, 2016 (the “June 2016 Historical
Estimate”). The June 2016 Historical Estimate includes an Indicated oxide resource estimate of 110Koz (comprised of 2.7Mt at an average grade of 1.26 g/t Au) and Inferred oxide resources of
122Koz (comprised of 3.0Mt at an average grade of 1.26 g/t Au). In addition, it includes an Indicated transitional resource estimate of 59Koz (comprised of 1.3Mt at an average grade of 1.39 g/t Au)
and an Inferred transitional resource of 28Koz (comprised of 0.8Mt at an average grade of 1.11 g/t Au). Finally, the June 2016 Historical Estimate provides a sulphide resource estimate as follows:
865Koz Indicated ounces (comprised of 17.3Mt at an average grade of 1.55 g/t Au) and 806Koz inferred ounces (comprised of 17.8Mt at an average grade of 1.40 g/t Au). This historical estimate is
reported as using a cut-off grade of 0.5 g/t Au.
RockRidge further states that it reviewed the geological and grade continuity to supplement the review of data quality in order to confirm the CIM mineral resource classification categories used. As
well, the June 2016 Historical Estimate states the following with respect to the basis of the mineral resource estimate:
• mineralized volumes were received for oxide, transitional and sulphide modelled volumes;
• gold grades were determined using ordinary kriging and Inverse distance squared interpolation (depending on data density) into a 3-dimensional block model constrained by
mineralization wireframes;
• the block models comprised sub-celled block dimensions of 5m x 5m x 1m and 5m x 5m x 2m (depending on data sampling interval);
• mineralized wireframes were truncated to the topographic surface reflecting the mining that had previously occurred on the property;
• gold values were investigated for outlier values and put though two statistical capping/cutting routines;
• Datamine Studio 3 was the modelling package; and
• relationship between geology and preliminary mining and economic factors was taken into account at all times.
Teranga considers the June 2016 Historical Estimate to be a “historical estimate” as defined under NI 43-101 and relevant as the most recent resource estimate on the Afema project. Further
drilling, resource modelling and updates to key economic assumptions would be required to upgrade or verify these historical estimates as current mineral resources and accordingly they should be
relied upon only as a historical resource estimate. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves and Teranga is
not treating the historical estimate as current mineral resources or mineral reserves.
Afema Mine License Historical Resource Estimate
Endnotes
35
1. Refers to proven and probable reserves of 1.2Moz for the Wahgnion project as per reserve estimate as of September 7, 2017 included in the Wahgnion technical report dated October 20, 2017 available on the
Company’s website at www.terangagold.com and SEDAR at www.sedar.com.
2. Refers to proven and probable reserves of 2.7Moz for the Sabodala project as per reserve estimate as of June 30, 2017 included in the Sabodala NI 43-101 technical report dated August 30, 2017 available on
the Company’s website at www.terangagold.com and SEDAR at www.sedar.com.
3. This production target is based on proven and probable reserves only from Teranga’s Sabodala Project as at June 30, 2017. For more information regarding Teranga Gold’s Mineral Reserves and Resources and
related notes, please refer to the NI 43-101 compliant technical report for the Sabodala Project dated August 30, 2017 available on the Company’s website at www.terangagold.com and on SEDAR at
www.sedar.com.
4. This production target is based on proven and probable ore reserves only for Teranga’s Wahgnion Project as at September 7, 2017. For more information regarding the Wahgnion’s Mineral Reserves and
Resources and related notes, please refer to the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Company’s website at www.terangagold.com and on
SEDAR at www.sedar.com.
5. LOM assumptions include: Gold Price $1,250 per ounce
Heavy Fuel Oil (HFO): Wahgnion - $0.59 per litre; Sabodala - $0.46 per litre
Light Fuel Oil (LFO): Wahgnion - $1.04 per litre ($0.88 per litre during construction period); Sabodala - $0.81 per litre
Euro to USD Exchange Rate: $1.10
6. This Sabodala free cash flow is an estimate that is based on the updated life of mine plan and reserve estimate for the Sabodala project, as set out in the Technical Report of Teranga for the Sabodala Project,
Senegal, West Africa, dated August 30, 2017 (the “Sabodala Technical Report”). See in particular Section 21 of the Sabodala Technical Report - Capital and Operating Costs.
7. See the NI 43-101 compliant technical report for the Wahgnion Project. This LOM production plan assumes that the Wahgnion Project plant construction will commence in Q1 2018. If the Wahgnion plant
construction commences in Q2 2018 instead, the LOM production plan is expected to shift by several months.
8. Other considerations (uses) is an estimate of potential other uses of the Company’s cash during the period, including, but not limited to, discretionary exploration expenditures, financing costs and any cost overrun
or minimum cash requirements that might be contained in any completed debt financing agreement. Actual amounts may total more or less than the aggregate amount specified.
9. Teranga’s Sabodala Mineral Reserves and Mineral Resources estimates as at June 30, 2017. For more information regarding Sabodala’s Mineral Reserves and Resources and related notes, please refer to the NI
43-101 compliant technical report for the Sabodala Project dated August 30, 2017 accessible on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com.
10. Teranga’s Wahgnion Mineral Reserves and Mineral Resources estimates as at September 7, 2017. For more information regarding Wahgnion’s Mineral Reserves and Resources and related notes, please refer to
the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com.
11. Free cash flow excludes Wahgnion financing and corporate-wide resource development and exploration expenditures. Please see table on slide 7 of the Company’s Investor & Analyst Workshop presentation
dated September 14, 2017, which was filed on www.sedar.com.
12. Net Present Value (“NPV”) per share is a Non-IFRS financial measure. NPV per share, average NPV multiple of medium producers, and Teranga’s share price is as per BMO GoldPages published May 7, 2018.
According to BMO GoldPages, NPV per share is calculated using the net present value of the life of mine cash flows based on the NI 43-101 plan, less cash flow of corporate costs, less net debt per share, using
the model at SPOT commodity prices and exchange rates. The “Revalued Share Price” is calculated using the NPV per share at SPOT times the NPV multiples as listed. The BMO NPV calculation assumes a
US$1,345 SPOT gold price per ounce, 5% discount, 0.79 USD/CAD exchange rate.
Trish Moran
Head of Investor Relations
77 King Street West, Suite 2110
Toronto, ON M5K 2A1
T: +1.416.607.4507
E: investor@terangagold.com
W: terangagold.com
TSX:TGZ / OTCQX:TGCDF

More Related Content

What's hot

Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018Teranga Gold
 
2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16GoldenStarResources
 
2016 june investor presentation
2016 june investor presentation2016 june investor presentation
2016 june investor presentationGoldenStarResources
 
Investor presentation dec 2016
Investor presentation dec 2016Investor presentation dec 2016
Investor presentation dec 2016GoldenStarResources
 
11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-finalTeranga Gold
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014Teranga Gold
 
Third Quarter Financial and Operating Results
Third Quarter Financial and Operating ResultsThird Quarter Financial and Operating Results
Third Quarter Financial and Operating ResultsTeranga Gold
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
07 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final207 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final2Teranga Gold
 
Td securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalTd securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalSemafoCorporate
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum Teranga Gold
 
Asx report slides final
Asx report slides final Asx report slides final
Asx report slides final Teranga Gold
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalalamosgoldinc
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Teranga Gold
 
Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016GoldQuest Mining Corp.
 
Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017SemafoCorporate
 
European Gold Forum Investor Presentation
European Gold Forum Investor PresentationEuropean Gold Forum Investor Presentation
European Gold Forum Investor PresentationTeranga Gold
 
033016 tasiast expansion studies
033016 tasiast expansion studies033016 tasiast expansion studies
033016 tasiast expansion studiesLaura Hildred
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceTeranga Gold
 

What's hot (20)

Teranga gold 1x1 presentation bmo 2018
Teranga gold 1x1 presentation   bmo 2018Teranga gold 1x1 presentation   bmo 2018
Teranga gold 1x1 presentation bmo 2018
 
2016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul162016 june investor presentation - update at 19 jul16
2016 june investor presentation - update at 19 jul16
 
2016 june investor presentation
2016 june investor presentation2016 june investor presentation
2016 june investor presentation
 
Investor presentation dec 2016
Investor presentation dec 2016Investor presentation dec 2016
Investor presentation dec 2016
 
11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final11 21-2016-teranga-gold-swiss-mining-final
11 21-2016-teranga-gold-swiss-mining-final
 
European Gold Forum 2014
European Gold Forum 2014European Gold Forum 2014
European Gold Forum 2014
 
Third Quarter Financial and Operating Results
Third Quarter Financial and Operating ResultsThird Quarter Financial and Operating Results
Third Quarter Financial and Operating Results
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
07 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final207 28-16-teranga-gold-q2-2016-slides-final2
07 28-16-teranga-gold-q2-2016-slides-final2
 
Td securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-finalTd securities-mining-conference-january-2016-final
Td securities-mining-conference-january-2016-final
 
European Gold Forum
European Gold Forum European Gold Forum
European Gold Forum
 
Asx report slides final
Asx report slides final Asx report slides final
Asx report slides final
 
Alamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 finalAlamos corporate presentation july 22 2016 final
Alamos corporate presentation july 22 2016 final
 
Sprott Natural Resource Symposium
Sprott Natural Resource Symposium Sprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016Gold quest Corporate Presentation November-2016
Gold quest Corporate Presentation November-2016
 
Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017Presentation PDAC March 6, 2017
Presentation PDAC March 6, 2017
 
European Gold Forum Investor Presentation
European Gold Forum Investor PresentationEuropean Gold Forum Investor Presentation
European Gold Forum Investor Presentation
 
033016 tasiast expansion studies
033016 tasiast expansion studies033016 tasiast expansion studies
033016 tasiast expansion studies
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 

Similar to 121 singapore teranga presentation - 1x1

Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018Teranga Gold
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentationTeranga Gold
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - finalTeranga Gold
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource SymposiumTeranga Gold
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek finalTeranga Gold
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2Teranga Gold
 
Bmo finale web low res
Bmo finale web low resBmo finale web low res
Bmo finale web low resSemafoCorporate
 
03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny finalTeranga Gold
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcastTeranga Gold
 
BMO - Investor Presentation
BMO - Investor PresentationBMO - Investor Presentation
BMO - Investor PresentationSemafoCorporate
 
Waterfront Capital Europe Marketing
Waterfront Capital Europe MarketingWaterfront Capital Europe Marketing
Waterfront Capital Europe MarketingTeranga Gold
 
National bank qc june 2016 lr
National bank qc june 2016 lrNational bank qc june 2016 lr
National bank qc june 2016 lrSemafoCorporate
 
08 12-16 teranga gold august marketing presentation final
08 12-16 teranga gold august marketing presentation final08 12-16 teranga gold august marketing presentation final
08 12-16 teranga gold august marketing presentation finalTeranga Gold
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Teranga Gold
 
Teranga Gold Q1 2015 Investor Presentation
Teranga Gold Q1 2015 Investor PresentationTeranga Gold Q1 2015 Investor Presentation
Teranga Gold Q1 2015 Investor PresentationTeranga Gold
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-finalTeranga Gold
 
Agm july 2013 final
Agm july 2013 finalAgm july 2013 final
Agm july 2013 finalTeranga Gold
 
Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017SemafoCorporate
 
2017 Q2 Results
2017 Q2 Results2017 Q2 Results
2017 Q2 ResultsTeranga Gold
 

Similar to 121 singapore teranga presentation - 1x1 (20)

Teranga gold agm 2018
Teranga gold   agm 2018Teranga gold   agm 2018
Teranga gold agm 2018
 
teranga gold swiss mining presentation
teranga gold swiss mining presentationteranga gold swiss mining presentation
teranga gold swiss mining presentation
 
Website slides november 26, 2017 - final
Website slides   november 26, 2017 - finalWebsite slides   november 26, 2017 - final
Website slides november 26, 2017 - final
 
Sprott Natural Resource Symposium
Sprott Natural Resource SymposiumSprott Natural Resource Symposium
Sprott Natural Resource Symposium
 
2017 beaver creek final
2017 beaver creek final2017 beaver creek final
2017 beaver creek final
 
2017 dgf final2
2017 dgf final22017 dgf final2
2017 dgf final2
 
Bmo finale web low res
Bmo finale web low resBmo finale web low res
Bmo finale web low res
 
03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final03 26-15 - stonegate marketing in tx and ny final
03 26-15 - stonegate marketing in tx and ny final
 
Tgz q1 2018 results webcast
Tgz q1 2018 results webcastTgz q1 2018 results webcast
Tgz q1 2018 results webcast
 
BMO - Investor Presentation
BMO - Investor PresentationBMO - Investor Presentation
BMO - Investor Presentation
 
Waterfront Capital Europe Marketing
Waterfront Capital Europe MarketingWaterfront Capital Europe Marketing
Waterfront Capital Europe Marketing
 
National bank qc june 2016 lr
National bank qc june 2016 lrNational bank qc june 2016 lr
National bank qc june 2016 lr
 
08 12-16 teranga gold august marketing presentation final
08 12-16 teranga gold august marketing presentation final08 12-16 teranga gold august marketing presentation final
08 12-16 teranga gold august marketing presentation final
 
Teranga Gold AGM Presentation
Teranga Gold AGM Presentation Teranga Gold AGM Presentation
Teranga Gold AGM Presentation
 
Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013Producing & Exploring: Denver Gold Forum 2013
Producing & Exploring: Denver Gold Forum 2013
 
Teranga Gold Q1 2015 Investor Presentation
Teranga Gold Q1 2015 Investor PresentationTeranga Gold Q1 2015 Investor Presentation
Teranga Gold Q1 2015 Investor Presentation
 
2018 february slides 1x1-final
2018 february slides 1x1-final2018 february slides 1x1-final
2018 february slides 1x1-final
 
Agm july 2013 final
Agm july 2013 finalAgm july 2013 final
Agm july 2013 final
 
Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017Bank of America Merrill Lynch Conference - May 18, 2017
Bank of America Merrill Lynch Conference - May 18, 2017
 
2017 Q2 Results
2017 Q2 Results2017 Q2 Results
2017 Q2 Results
 

More from Teranga Gold

Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcastTeranga Gold
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-finalTeranga Gold
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast finalTeranga Gold
 
04 27-2017-q1-slides-final3
04 27-2017-q1-slides-final304 27-2017-q1-slides-final3
04 27-2017-q1-slides-final3Teranga Gold
 
09 14-16 teranga gold pgm summit investor presentation final
09 14-16 teranga gold pgm summit investor presentation final09 14-16 teranga gold pgm summit investor presentation final
09 14-16 teranga gold pgm summit investor presentation finalTeranga Gold
 
Teranga Gold August Investor Presentation
Teranga Gold August Investor Presentation Teranga Gold August Investor Presentation
Teranga Gold August Investor Presentation Teranga Gold
 
August Investor Presentation
August Investor Presentation August Investor Presentation
August Investor Presentation Teranga Gold
 

More from Teranga Gold (7)

Tgz q2 2018 results webcast
Tgz q2 2018 results webcastTgz q2 2018 results webcast
Tgz q2 2018 results webcast
 
2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final2018 january 1x1 investor presentation vancouver-final
2018 january 1x1 investor presentation vancouver-final
 
Tgz q3 2017 results webcast final
Tgz q3 2017 results webcast   finalTgz q3 2017 results webcast   final
Tgz q3 2017 results webcast final
 
04 27-2017-q1-slides-final3
04 27-2017-q1-slides-final304 27-2017-q1-slides-final3
04 27-2017-q1-slides-final3
 
09 14-16 teranga gold pgm summit investor presentation final
09 14-16 teranga gold pgm summit investor presentation final09 14-16 teranga gold pgm summit investor presentation final
09 14-16 teranga gold pgm summit investor presentation final
 
Teranga Gold August Investor Presentation
Teranga Gold August Investor Presentation Teranga Gold August Investor Presentation
Teranga Gold August Investor Presentation
 
August Investor Presentation
August Investor Presentation August Investor Presentation
August Investor Presentation
 

Recently uploaded

No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 

Recently uploaded (20)

Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 

121 singapore teranga presentation - 1x1

  • 1. TSX:TGZ / OTCQX:TGCDF 121 Singapore May 23-24, 2018 Building a Multi-Asset Mid-Tier West African Gold Producer
  • 2. Richard Young President & Chief Executive Officer 2
  • 3. Forward-Looking Statements 3 All information included in this presentation, including any information as to Teranga’s future financial or operating performance and other statements that express management’s expectations or estimates of future performance, other than statements of historical fact, constitute forward-looking information or forward-looking statements within the meaning of applicable securities laws and are based on expectations, estimates and projections as of the date hereof. Forward-looking statements are included for the purpose of providing information about management’s current expectations and plans relating to the future. Wherever possible, words such as “plans”, “expects”, “scheduled”, “trends”, “indications”, “potential”, “estimates”, “predicts”, “anticipate”, “to establish”, “believe”, “intend”, “ability to”, or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are "likely" to be taken, occur or be achieved, or the negative of these words or other variations thereof, have been used to identify such forward-looking information. Specific forward-looking statements include, without limitation, all disclosure regarding future results of operations, economic conditions and anticipated courses of action. Although the forward-looking statements contained herein reflect management's current beliefs and reasonable assumptions based upon information available to management as of the date hereof, Teranga cannot be certain that actual results will be consistent with such forward-looking information. Such assumptions include, among others, the ability to obtain any requisite governmental approvals, the accuracy of mineral reserve and mineral resource estimates, gold price, exchange rates, fuel and energy costs, future economic conditions, anticipated future estimates of free cash flow, and courses of action. Teranga cautions you not to place undue reliance upon any such forward-looking statements. The risks and uncertainties that may affect forward-looking statements include, among others, the inherent risks involved in exploration and development of mineral properties, including government approvals and permitting, changes in economic conditions, changes in the worldwide price of gold and other key inputs, changes in mine plans and other factors, such as project execution delays, many of which are beyond the control of Teranga. For a more comprehensive discussion of the risks faced by Teranga, and which may cause the actual financial results, performance or achievements of Teranga to be materially different from estimated future results, performance or achievements expressed or implied by forward-looking information or forward-looking statements, please refer to Teranga’s latest Annual Information Form filed with Canadian securities regulatory authorities at www.sedar.com or on Teranga’s website at www.terangagold.com. The risks described in the Annual Information Form (filed and viewable on www.sedar.com and on Teranga’s website at www.terangagold.com) are hereby incorporated by reference herein. Teranga disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law. Nothing herein should be construed as either an offer to sell or a solicitation to buy or sell Teranga securities. All references to Teranga include its subsidiaries unless the context requires otherwise. This presentation contains references to Teranga using the words “we”, “us”, “our” and similar words and the reader is referred to using the words “you”, “your” and similar words. All dollar amounts stated are denominated in U.S. dollars unless specified otherwise.
  • 4. 4 Deep Value Based on Cash and 2P Reserves (C$) Gold Price per Ounce Assumption Cash balance as at March 31, 2018 Wahgnion Project NPV5% based on 2P(1) Sabodala NPV5% based on 2P(2) $5.25 $1.45 $0.72 $1,300 $5.37 TGZ Current Share Price (closing price May 10, 2018) $7.42 NPV* Per Share based on cash & 2P reserves(1)(2) Excludes potential value from: • Wahgnion infill drill program • Golden Hill • Afema and CĂ´te d’Ivoire assets *Refer to Appendix – Non-IFRS Performance Measures Refer to Appendix – Endnotes (1) and (2) USD/CAD FX rate 0.79
  • 5. Senegal CĂ´te d’Ivoire Burkina Faso Mali Guinea Guinea- Bisseau The Gambia Ghana Benin Niger Sierra Leone Liberia Togo Sabodala Gold Mine • Long-life mine • More than 1.4Moz production since late 2010 5 Wahgnion Development Project • Expect to close financing and commence construction in Q2 2018 • Reserve update expected by mid-year Golden Hill Exploration JV • Initial resource expected in 2018 • Fully funded to feasibility Gourma Exploration JV Guitry Dianra Mahepleu Tiassale Sangaredougou Building a Multi-Asset Mid-Tier Gold Producer in Mining-Friendly West Africa Teranga has nearly 4.0 million ounces of gold reserves from its Sabodala Gold Mine and its Wahgnion Development Project(1)(2) Afema Refer to Appendix – Endnotes (1) and (2)
  • 6. Achieved record production of 233,267 oz of gold Announced positive feasibility for Wahgnion Project including reserves of 1.2Moz(1) Positive drill results from Golden Hill Entered into joint venture on Afema land package in CĂ´te d’lvoire FY2017 Highlights 6    Refer to Appendix – Endnote (1)
  • 7. 7  Prospectors & Developers Association of Canada 2017 Environmental & Social Responsibility Award United Nations Global Compact Network Canada Sustainability Award 3X Winner of Corporate Knights Future 40 Responsible Corporate Leaders in Canada Capital Finance International: Best ESG Responsible Mining Management West Africa Leading With Our Social License   
  • 9. *Refer to Appendix – Non-IFRS Performance Measures Refer to Appendix – Endnotes (2),(5),(6) and (9) 9 Exploration Prospects Mineral Resources Masato Style Bulk Tonnage Gold Trend Golouma Style High- Grade Gold Trend Mining Concession Exploration Permits Previous Mine License Sabodala Mill Sabodala Mine License & Regional Land Package Largest Gold Producer in Senegal: Continuing to Replace Reserves, Strong 5-Year Profile Mali Niakafiri Goumbati West Life of Mine Summary(2)(5)(6) 5 years (2018-2022) 13 years (2018-2030) Annual production 213koz 176koz All-in sustaining costs* $885/oz $893/oz Total free cash flow* $230M $556M 2.7Moz 2P Reserves(2) 4.4Moz M&I Resources(9) 13-Year Mine Life(9)
  • 11. 11 Solid Start to Teranga’s Second Mine – Wahgnion Nogbele Stinger 15km from plant Samavogo 25km from plant Fourkoura 6km from plant Life of Mine Summary Initial 5.5 years LOM (9 years) Annual production(4)(5) 131koz 119koz All-in Sustaining Costs* $807/oz $843/oz Total free cash flow* $302M $409M Pre-production capital** ($232M) Net cash flow $176M *Refer to Appendix – Non-IFRS Performance Measures **Pre-production capital costs of $232 million excludes $12 million in construction readiness activities spent prior to major construction Refer to Appendix – Endnotes (1), (4), (5) and (10) 1.2Moz 2P Reserves(1) 1.8Moz M&I Resources(10) 0.7Moz Inferred Resources(10) Wahgnion Development Project Permitted mining license: 89 km2 Exploration licenses:+1,000 km2 Four initial deposits at Wahgnion (Nogbele, Samavogo, Fourkoura & Stinger) located in close proximity to proposed plant site Proposed Processing Plant
  • 12. Kafina West Raul Hillside 12 Significant Upside Potential at Wahgnion Samavogo Nogbele Fourkoura Stinger Bagu Sud Korindougou Ouahiri Sud Near-Term Upside: Mid-2018 Reserve Update • 73,000-metre infill drill program targeted inferred resources located near to the current reserve pits • Objective is to increase drill hole density within the existing inferred resources • Targeting to convert 25%-50% of inferred resources Mid to Long-Term Upside: ~12 Drill-Ready Targets • Targets have potential to become resources and are within trucking distance of proposed plant site • Konatvogo: 2,000-metre NW-trending anomaly between Fourkoura and Nogbele deposits. Up to 21.6 g/t Au from altered shear-hosted quartz vein outcrops • Bassongoro: 1,500-metre NNE-trending soil and auger anomaly (up to 15g/t Au). Intersection of regional Nianka and Fourkoura structures undrilled Raul Proposed Plant Site Kondandougoug Konatvogo Bazogo Bassongoro Samavogo North MuddhiPetit Colline Reserve Deposits Exploration Targets
  • 14. 14 Sources š Semafo Corporate Presentation (Mar 2017) ² Roxgold Corporate Presentation (Feb 2017) Âł Endeavour Corporate Presentation (Feb 2017) ⁴ Acacia Preliminary Results (Feb 2017) ⁾ Savary Corporate Presentation (Mar 2017) M&I Resources are inclusive of P&P Reserves Uniquely Positioned: High-Grade, Big Potential Siou Pit M&I: 0.89 Moz š Mana M&I: 3.63 Moz š HoundĂŠ M&I: 2.55 Moz Âł Yaramoko M&I: 0.81 Moz ² Acacia JVs ⁴ Karankasso JV Inf: 0.67 Moz ⁾ South HoundĂŠ JV Inf: 2.10 Moz ⁴ Sarama Permits Teranga’s Golden Hill JV Situated in the Heart of the HoundĂŠ Belt (Burkina Faso) • 468 km2 situated ~250 km NE of Wahgnion • One of the most prospective gold belts in the world • In close proximity and along strike to other deposits One of the Best High-Grade Projects in West Africa • Plan to release an initial resource for Golden Hill’s most advanced prospects by end of 2018 • $25 million financing secured for the future advancement of Golden Hill feasibility study Joint Venture with Boss Resources (51%, earning 80%) • Teranga, as the operator, can earn an 80% interest in the JV upon delivery of a feasibility study and the payment of AUD2.5 million
  • 15. 15 Five Prospects Within ~6-Kilometre Radius of Central Point • In just one year, there have been three discoveries at Golden Hill • To date Golden Hill has produced a series of high-grade, near-surface drill results at the first five prospects: – Ma – Jackhammer Hill – Peksou – C-Zone – Nahiri • The close proximity of these targets and prospects lends itself to a central mill/multi-deposit operation similar to Sabodala and Wahgnion For full details on Golden Hill, please visit www.terangagold.com Rapidly Progressing Towards an Initial Resource GEOLOGY Tarkwaian Type Sediments Volcano Sediments Mixed Volcano Sediments & Volcanics Basalt Grantoid Batholith Ma North Ma Main Ma East Jackhammer Hill PeksouC-Zone B-Zone A-Zone Nahiri
  • 17. Guitry • Completed the first-ever drilling program on the property – 68 shallow air-core sectional profile holes – comprising 3,300 metres over the central 1 km extent of our current 7 km strike length gold-in-soil geochem anomaly • Results from this first pass, near-surface drilling program, will help us determine where to focus subsequent exploration within this large target Endeavour Endeavour Perseus Randgold CĂ´te d’Ivoire Guitry Tiassale Mahepleu Sangaredougou Operating Gold Mine/ Development Project Newcrest Dianra 17 Afema Exciting Opportunities in CĂ´te d’Ivoire
  • 18. Ahafo 17 Moz Newmont 3 Afema Exploration Permits Afema Mining Permit Bibiani 7 Moz Resolute Chirano 5 Moz Kinross Edikan 6.6 Moz Perseus Bogoso/Prestea18 Moz Gold Star Konogo 1.4 Moz Signature Metals Akyem Newmont Essase 5.19 Moz Obotan 5.5 Moz Asanko Obuasi 41 Moz Anglo Gold Ashanti Kubi 0.9 Moz Asaute Gold Corporation Damang 7.1 Moz Goldfields Tarkwa 24 Moz Iduapriem 8.2 Moz AngloGold Ashanti Kumasi Cape Coast Sefwi-Bibiani Gold Belt Asankrangwa Gold Belt Ashanti Gold Belt Winneba-Kibi Gold Belt 18 Afema: Historical Resource* of 2Moz of Gold Well Located Geologically • Along trend and within the same gold belts of a number of high profile producing mines in Ghana Q1 2018 Activities • Finalized Afema joint venture with Sodim Limited (51%, earning 70%) • Initiated early-stage field exploration at both the mine license and regional land package totaling 1,400 km2 *Refer to Appendix – Afema Mine License Historical Resource Estimate Ghana CĂ´te d’Ivoire
  • 19. Afema Joint Venture 19 Afema Mine License Afema Exploration Permit Afema Exploration Permit Afema Exploration Permit AyamĂŠ Gold Horizon (33k Strike Length) Bafla Gold Horizon (34 km Strike Length) Sefwi-Bibiani Gold Belt (34 km Strike Length) Asankrangwa Gold Belt (30 km Strike Length) Andina Gold Horizon (13 km Strike Length) Next Steps • Compile and review previous technical data to assist in guiding exploration programs • Re-model historic resources to identify areas for initial drilling evaluation • Anticipate initiation of a property- wide stream-sediment BLEG sampling program, soil sampling and drilling during Q2 2018
  • 21. 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 ~$100M annual free cash flow* (11) Significantly Increasing Production and Improving Free Cash Flow 21*Refer to Appendix – Non-IFRS Performance Measures Refer to Appendix – Endnotes (3), (4), (5), (7) and (11) Teranga Consolidated Production Profile (koz)(3),(4),(7) 350Koz ~$70M annual free cash flow*(5) 2020 – 2022 Sabodala + Wahgnion ~350Koz annual production Opportunities to maintain production and free cash flow through resource conversion & discoveries at Sabodala & Wahgnion
  • 22. Strong Financial Position 22 $60 Million Cash balance as at March 31, 2018 +$90 Million(6) Estimated cash flow from Sabodala 2018-2019 $190 Million Wahgnion Project debt + Golden Hill facility Solid Financial Position to optimize our Sabodala Operations, bring Wahgnion into production and to advance Golden Hill through feasibility Refer to Appendix – Endnote (6)
  • 23. Top 10 Shareholders % of o/s shares Shares Owned as at May 10, 2018 1 Tablo Corporation 21.7% 23,322,400 2 Van Eck Associates Corporation 6.2% 6,683,022 3 Ruffer LLP 4.8% 5,176,743 4 Heartland Advisors 4.1% 4,350,000 5 Oppenheimer Funds 3.2% 3,380,828 6 Dimensional Fund Advisors 2.9% 3,100,539 7 Franklin Advisers 2.5% 2,707,200 8 Connor, Clark & Lunn Inv Mgmt 1.8% 1,875,000 9 Universal-Investment Gesellschaft 1.6% 1,735,000 10 LSV Asset Management 1.6% 1,719,540 23 Share Price Performance (TSX: TGZ) (Closing price on December 12, 2017 – May 10, 2018) Capital Structure and Recent Share Price Performance Source: IR Insight on May 10, 2018 +6% +12% TGZ-TSX GDXJ Gold Price Capital Structure (at March 31, 2018 unless otherwise noted) Common shares outstanding 107.3M Stock options outstanding 5.7M Fully diluted 113.0M Number of shares owned by insiders 23.8M Market capitalization (May 10, 2018) C$576M Cash / Net cash US$60M / US$45M ASX Delisting Completed Compulsory Sale Facility before markets open on December 13 – stock price hit low of C$2.30 (compared to C$2.42 closing price on December 12) +122%
  • 24. Regular exploration updates Initial resource estimations by year end Golden HillSabodala Production of 210Koz-225Koz 2018 News Flow and Milestones 24 Commence mill construction in Q2 Update resources in Q2 Update reserves in Q3 Update NI 43-101 technical report Project updates from Guitry and Afema Wahgnion CĂ´te d’Ivoire
  • 25. Potential for Significant Share Price Appreciation 25 Teranga’s Share Price (C$) vs. Net Present Value* (NPV)(12) per Share 57% *Refer to Appendix – Non-IFRS Performance Measures Refer to Appendix – Endnote (12) $5.37 $7.02 $8.42 Share Price (May 10, 2018 close) BMO NPV per Share (Spot) Revalued Share Price 0.9x Current TGZ NPV Trading Multiple(12) 1.2x Average NPV Multiple for Medium Producers(12) Data Source: BMO GoldPages published May 7, 2018 617 609 350 339 287 165 143 88 Roxgold B2Gold Semafo Golden Star Endeavour Teranga Alacer Perseus EV/2P Reserves ($/oz) EV/2018E EBITDA 3.3 3.4 4.2 5.1 5.8 5.9 29.5 Golden Star Roxgold Teranga B2Gold Semafo Endeavour Alacer
  • 27. 2018 Outlook 27 Notes to 2018 Guidance A. 22,500 ounces of gold production are to be sold to Franco-Nevada Corporation at 20% of the spot gold price. B. Total cash cost per ounce sold is a non-IFRS financial measure and does not have a standard meaning under IFRS. C. All-in sustaining costs per ounce is a non-IFRS financial measure and does not have a standard meaning under IFRS. All-in sustaining costs per ounce sold include total cash costs per ounce, administration expenses, share based compensation and sustaining capital expenditures as defined by the World Gold Council. All-in sustaining costs also include cash / (non-cash) inventory movements and non-cash amortization of advanced royalties. D. Exploration and evaluation costs includes both Expensed Exploration, primarily attributable to exploration work on exploration permits, and Capitalized Reserve Development, which is work performed on Mine Licenses. E. Site development costs for 2018 include village relocation costs for the Sabodala village. F. Excludes capitalized deferred stripping costs, included in mine production costs. G. Construction readiness / early works expenditures for 2018 includes anticipated expenditures for the construction of the Wahgnion Gold Project prior to completion of a debt facility agreement. Other This forecast financial information is based on the following material assumptions for 2018: gold price: $1,250 per ounce; light fuel oil price $0.87/L; heavy fuel oil price $0.50/L; Euro:USD exchange rate of 1:1.17 Other important assumptions: any political events are not expected to impact operations, including movement of people, supplies and gold shipments; grades and recoveries will remain consistent with the life-of-mine plan to achieve the forecast gold production; and no unplanned delays in or interruption of scheduled production. 2018 Guidance Operating Results Ore mined (‘000t) 2,000 – 2,500 Waste mined (‘000t) 35,000 – 37,000 Total mined (‘000t) 37,000 – 39,500 Grade mined (g/t) 2.50 – 3.00 Strip ratio waste/ore 16.5 – 18.5 Ore milled (‘000t) 4,200 – 4,400 Head grade (g/t) 1.70 – 1.90 Recovery rate % 90.0 – 91.5 Gold produced A (oz) 210,000 – 225,000 Cost of sales per ounce sold $/oz sold 950 – 1,025 Total cash cost per ounce sold B $/oz sold 700 – 750 All-in sustaining costs C $/oz sold 1,000 – 1,075 Cash / (non-cash) inventory movements and amortized advanced royalty costs C $/oz sold -50 All-in sustaining costs (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs) C $/oz sold 950 – 1,025 Mining ($/t mined) 2.25 – 2.50 Mining long haul ($/t hauled) 2.50 – 3.50 Milling ($/t milled) 11.00 – 12.50 General and Administration ($/t milled) 4.25 – 4.50 Mine Production Costs $ millions 162.0 – 172.0 Corporate Administration Expense $ millions 11.0 – 13.0 Regional Administration Costs $ millions ~2.0 Community Social Responsibility Expense $ millions 4.0 – 5.0 Exploration and Evaluation D $ millions ~15.0 Sabodala Capital Expenditures Mine site sustaining $ millions 10.0 – 15.0 Site development costs E $ millions 10.0 – 15.0 Total Sabodala Capital Expenditures F $ millions 20.0 – 30.0 Growth Capital Expenditures Wahgnion early works G $ millions ~30.0 Wahgnion construction H $ millions 140.0 – 160.0 Total Growth Capital Expenditures $ millions 170.0 – 190.0
  • 28. 2828 Ma Prospect – Representative Drill SectionMa Prospect – Drill Plan Excellent Grades Near Surface and to Depth at Ma Structural Complex
  • 29. High-Grade, All Along Strike at Jackhammer Hill Prospect 29 Jackhammer Hill Prospect – Representative Drill SectionJackhammer Hill Prospect – Drill Plan
  • 30. Executive Team 30 Richard Young, CPA President & CEO 25+ years experience in gold mining including 13 years at Barrick Gold including finance and corporate development Paul Chawrun, P.Eng, MBA Chief Operating Officer 25+ years experience in mining including serving as Director, Technical Services at Detour Gold Navin Dyal, CPA Chief Financial Officer 13 years experience in mining including 7 years at Barrick Gold as Head of Finance in copper business unit David Savarie, LL.B General Counsel & Corporate Secretary 11 years of Corporate Counsel experience in mining including his role as Deputy General Counsel and Corporate Secretary of Gabriel Resources Aziz Sy, P.Eng, M.Sc., MBA General Manager, SGO 17+ years experience in managing gold exploration projects, including his work as Vice President Senegal Operations for the Oromin Joint Venture Group until its acquisition in 2014 by Teranga Gold Sepanta Dorri, MAcc, MBA, CPA VP, Corporate and Stakeholder Development 10 years experience in mining including 5 years at Xstrata Nickel in Strategic Planning and M&A. 2012 winner of the WXN Top 100 Canada's Most Powerful Women award, Trailblazers and Trendsetters Category David Mallo, B.Sc. Geology VP, Exploration 35+ years of mineral exploration in project evaluation and program management, playing an integral role in acquisition, discovery, and exploration of world-class deposits including Eskay Creek and Cobre Panama
  • 31. Alan Hill, M.Eng Chairman 35+ years experience in mining including 20 years at Barrick Gold in project evaluation and development Christopher Lattanzi, B.Eng Director 30 years experience in mining property valuation, scoping, feasibility studies and project monitoring on a global basis. Founder of Micon International Richard Young, CPA President & CEO 25+ years experience in gold mining including 13 years at Barrick Gold in finance and corporate development Jendayi Frazer, Ph.D. Director 17 years experience in key roles supporting initiatives and policies to build Africa’s equity and commodity markets. First woman U.S. Ambassador to South Africa William Biggar, MA, CPA Director 25+ years experience in senior executive positions in investment, mining and real estate including Barrick Gold and Merrill Lynch Edward Goldenberg, MA, BCl Director Distinguished career in policy including 10 years as Senior Policy Advisor to the Prime Minister of Canada and the Prime Minister's Chief of Staff in 2003. Honourary Doctorate of Laws from McGill University David Mimran Director & Teranga’s Largest Shareholder CEO of Grands Moulins d’Abidjan and Grands Moulins de Dakar, among the largest producers of agri-food in West Africa. Special Advisor to the Government of the Republic of CĂ´te d'Ivoire Alan Thomas, CPA Director 30+ years mining and energy industry experience in senior financial and director roles including 6 years as VP and CFO of ShawCor and 11 years as CFO of Noranda Frank Wheatley, LL.B Director 28 years mining industry experience as director, senior officer and legal counsel. Extensive experience in public financing, project debt financing, permitting of large- scale mining projects and strategic M&A Board of Directors 31
  • 32. Qualified Persons Statement 32 The technical information contained in this document relating to the Sabodala open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Stephen Ling, P. Eng who is a member of the Professional Engineers Ontario. Mr. Ling is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Ling has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ling has consented to the inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document. The technical information contained in this document relating to Sabodala mineral resource estimates is based on, and fairly represents, information compiled by Ms. Patti Nakai-Lajoie. Ms. Nakai-Lajoie, P. Geo., is a Member of the Association of Professional Geoscientists of Ontario. Ms. Nakai-Lajoie is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Ms. Nakai-Lajoie has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a "Qualified Person" under NI 43-101 Standards of Disclosure for Mineral Projects. Ms. Nakai-Lajoie has consented to the inclusion in this document of the matters based on her compiled information in the form and context in which it appears in this document. The technical information contained in this document relating to the Sabodala underground ore reserves estimates is based on, and fairly represents, information compiled by Jeff Sepp, P. Eng., of Roscoe Postle Associates Inc. (“RPA”), who is a member of the Professional Engineers Ontario. Mr. Sepp is “independent” within the meaning of NI 43-101. Mr. Sepp has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Sepp has consented to the inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document. The technical information contained in this document relating to the Wahgnion open pit mineral reserve estimates is based on, and fairly represents, information compiled by Mr. Glen Ehasoo, P. Eng., of RPA, who is a member of the Association of Professional Engineers and Geoscientists of British Columbia. Mr. Ehasoo is "independent" within the meaning of NI 43-101. Mr. Ehasoo has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ehasoo has consented to the inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document. The technical information contained in this document relating to Wahgnion mineral resource estimates is based on, and fairly represents, information compiled by Mr. David Ross, P.Geo., of RPA, who is a Member of the Association of Professional Geoscientists of Ontario. Mr. Ross is "independent" within the meaning of NI 43-101. Mr. Ross has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a “Qualified Person” under NI 43-101 Standards of Disclosure for Mineral Projects. Mr. Ross has consented to the inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document. Teranga's exploration programs are being managed by Peter Mann, FAusIMM. Mr. Mann is a full time employee of Teranga and is not "independent" within the meaning of NI 43-101. Mr. Mann has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a “Qualified Person” as under NI 43-101 Standards of Disclosure for Mineral Projects. The technical information contained in this document relating to exploration results are based on, and fairly represents, information compiled by Mr. Mann. Mr. Mann has verified and approved the data disclosed in this release, including the sampling, analytical and test data underlying the information. The samples are prepared at site and assayed in the SGS laboratory located at the site. Analysis for diamond drilling is sent for fire assay analysis at ALS Johannesburg, South Africa. Mr. Mann has consented to the inclusion in this document of the matters based on his compiled information in the form and context in which it appears in this document. Teranga's disclosure of mineral reserve and mineral resource information is governed by NI 43-101 under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as may be amended from time to time by the CIM ("CIM Standards"). There can be no assurance that those portions of mineral resources that are not mineral reserves will ultimately be converted into mineral reserves. Teranga confirms that it is not aware of any new information or data that materially affects the information included in the technical reports for the Sabodala Project (August 30, 2017) and the Wahgnion Project (October 20, 2017) pursuant to National Instrument 43-101 - Standards of Disclosure for Mineral Projects (the “Technical Reports”), or year end 2017 results, market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements concerning the Technical Reports continue to apply and have not materially changed.
  • 33. 33 Non-IFRS Performance Measures The Company has included non-IFRS measures in this document, including “total cash costs”, “total cash costs per ounce sold”, “all-in sustaining costs” (“AISC”), “AISC (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs)”, “AISC per ounce”, “AISC (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs) per ounce”, “average realized gold price”, “earnings before interest, taxes, depreciation and amortization” (“EBITDA”), “free cash flow”, “adjusted net profit attributable to shareholders” and “adjusted basic earnings per share”. These measures are intended to provide additional information only and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measures are not necessarily indicative of operating profit or cash flow from operations as determined under IFRS. Other companies may calculate these measures differently. “Total cash costs” figures are calculated in accordance with a standard developed by The Gold Institute, which was a worldwide association of suppliers of gold and gold products and included leading North American gold producers. The Gold Institute ceased operations in 2002, but the standard is considered the accepted standard of reporting cash cost of production in North America. Adoption of the standard is voluntary and the cost measures presented may not be comparable to other similarly titled measure of other companies. “Total cash costs per ounce sold” is a common financial performance measure in the gold mining industry but has no standard meaning under IFRS. The Company reports total cash costs on a sales basis. The World Gold Council (“WGC”) definition of AISC seeks to extend the definition of total cash costs by adding corporate general and administrative costs, reclamation and remediation costs (including accretion and amortization), exploration and study costs (capital and expensed), capitalized stripping costs and sustaining capital expenditures and represents the total costs of producing gold from current operations. AISC excludes income tax payments, interest costs, costs related to business acquisitions and items needed to normalize earnings. Consequently, this measure is not representative of all of the Company’s cash expenditures. In addition, the calculation of AISC does not include depreciation expense as it does not reflect the impact of expenditures incurred in prior periods. Therefore, it is not indicative of the Company’s overall profitability. The Company also expands upon the WGC definition of AISC by presenting an additional measure of “AISC (excluding cash / (non-cash) inventory movements and amortized advanced royalty costs)”. This measure excludes cash and non-cash inventory movements and amortized advanced royalty costs which management does not believe to be true cash costs and are not fully indicative of performance for the period. For Sabodala and Wahgnion, life of mine total cash costs and AISC figures used in this presentation are before cash/non-cash inventory movements and exclude any allocation of corporate overheads. Consolidated total cash costs and all-in sustaining cost figures add corporate overhead costs. “Average realized price” excludes from revenues unrealized gains and losses on non-hedge derivative contracts. Management uses this measure to better understand the price realized in each reporting period for gold and silver sales. “EBITDA” excludes income tax, finance costs (before accretion expense), interest income, depreciation and amortization, and non-cash impairment charges from net profits. EBITDA is intended to provide additional information to investors and analysts and do not have any standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Management believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow to: fund working capital needs, service debt obligations, and fund capital expenditures. “Free cash flow” is calculated as net cash flow provided by operating activities less sustaining capital expenditures. The Company believes this to be a useful indicator of our ability generate cash for growth initiatives. Starting in 2018, the Company adopted “adjusted net profit attributable to shareholders” and “adjusted basic earnings per share” as new non-IFRS financial measures. These non-IFRS financial measures are used by management and investors to measure the underlying operating performance of the Company. Presenting these measures from period to period will help management and investors evaluate earnings trends more readily in comparison with results from prior periods. The Company calculates “adjusted net profit attributable to shareholders” as net profit attributable to shareholders adjusted to exclude specific items that are significant, but not reflective of the underlying operations of the Company, including: the impact of unrealized and realized foreign exchange gains and losses, gains and losses on derivative instruments, accretion expense on long-term obligations, impairment provisions and reversals thereof, and other unusual or non-recurring items. “Adjusted basic earnings per share” is calculated using the weighted average number of shares outstanding under the basic method of earnings per share as determined under IFRS. For more information regarding these measures, please refer to the Company’s management’s discussion and analysis accessible on the Company’s website at www.terangagold.com.
  • 34. 34 A number of economic and technical studies have been prepared on the Afema project prior to Teranga’s entry into the Afema JV with Sodim. The most recent study, which included a mineral resource estimate for the Afema mine license, was issued by RockRidge Consulting Services Geologists for and on behalf of TGL and is dated as of June 27, 2016 (the “June 2016 Historical Estimate”). The June 2016 Historical Estimate includes an Indicated oxide resource estimate of 110Koz (comprised of 2.7Mt at an average grade of 1.26 g/t Au) and Inferred oxide resources of 122Koz (comprised of 3.0Mt at an average grade of 1.26 g/t Au). In addition, it includes an Indicated transitional resource estimate of 59Koz (comprised of 1.3Mt at an average grade of 1.39 g/t Au) and an Inferred transitional resource of 28Koz (comprised of 0.8Mt at an average grade of 1.11 g/t Au). Finally, the June 2016 Historical Estimate provides a sulphide resource estimate as follows: 865Koz Indicated ounces (comprised of 17.3Mt at an average grade of 1.55 g/t Au) and 806Koz inferred ounces (comprised of 17.8Mt at an average grade of 1.40 g/t Au). This historical estimate is reported as using a cut-off grade of 0.5 g/t Au. RockRidge further states that it reviewed the geological and grade continuity to supplement the review of data quality in order to confirm the CIM mineral resource classification categories used. As well, the June 2016 Historical Estimate states the following with respect to the basis of the mineral resource estimate: • mineralized volumes were received for oxide, transitional and sulphide modelled volumes; • gold grades were determined using ordinary kriging and Inverse distance squared interpolation (depending on data density) into a 3-dimensional block model constrained by mineralization wireframes; • the block models comprised sub-celled block dimensions of 5m x 5m x 1m and 5m x 5m x 2m (depending on data sampling interval); • mineralized wireframes were truncated to the topographic surface reflecting the mining that had previously occurred on the property; • gold values were investigated for outlier values and put though two statistical capping/cutting routines; • Datamine Studio 3 was the modelling package; and • relationship between geology and preliminary mining and economic factors was taken into account at all times. Teranga considers the June 2016 Historical Estimate to be a “historical estimate” as defined under NI 43-101 and relevant as the most recent resource estimate on the Afema project. Further drilling, resource modelling and updates to key economic assumptions would be required to upgrade or verify these historical estimates as current mineral resources and accordingly they should be relied upon only as a historical resource estimate. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves and Teranga is not treating the historical estimate as current mineral resources or mineral reserves. Afema Mine License Historical Resource Estimate
  • 35. Endnotes 35 1. Refers to proven and probable reserves of 1.2Moz for the Wahgnion project as per reserve estimate as of September 7, 2017 included in the Wahgnion technical report dated October 20, 2017 available on the Company’s website at www.terangagold.com and SEDAR at www.sedar.com. 2. Refers to proven and probable reserves of 2.7Moz for the Sabodala project as per reserve estimate as of June 30, 2017 included in the Sabodala NI 43-101 technical report dated August 30, 2017 available on the Company’s website at www.terangagold.com and SEDAR at www.sedar.com. 3. This production target is based on proven and probable reserves only from Teranga’s Sabodala Project as at June 30, 2017. For more information regarding Teranga Gold’s Mineral Reserves and Resources and related notes, please refer to the NI 43-101 compliant technical report for the Sabodala Project dated August 30, 2017 available on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com. 4. This production target is based on proven and probable ore reserves only for Teranga’s Wahgnion Project as at September 7, 2017. For more information regarding the Wahgnion’s Mineral Reserves and Resources and related notes, please refer to the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com. 5. LOM assumptions include: Gold Price $1,250 per ounce Heavy Fuel Oil (HFO): Wahgnion - $0.59 per litre; Sabodala - $0.46 per litre Light Fuel Oil (LFO): Wahgnion - $1.04 per litre ($0.88 per litre during construction period); Sabodala - $0.81 per litre Euro to USD Exchange Rate: $1.10 6. This Sabodala free cash flow is an estimate that is based on the updated life of mine plan and reserve estimate for the Sabodala project, as set out in the Technical Report of Teranga for the Sabodala Project, Senegal, West Africa, dated August 30, 2017 (the “Sabodala Technical Report”). See in particular Section 21 of the Sabodala Technical Report - Capital and Operating Costs. 7. See the NI 43-101 compliant technical report for the Wahgnion Project. This LOM production plan assumes that the Wahgnion Project plant construction will commence in Q1 2018. If the Wahgnion plant construction commences in Q2 2018 instead, the LOM production plan is expected to shift by several months. 8. Other considerations (uses) is an estimate of potential other uses of the Company’s cash during the period, including, but not limited to, discretionary exploration expenditures, financing costs and any cost overrun or minimum cash requirements that might be contained in any completed debt financing agreement. Actual amounts may total more or less than the aggregate amount specified. 9. Teranga’s Sabodala Mineral Reserves and Mineral Resources estimates as at June 30, 2017. For more information regarding Sabodala’s Mineral Reserves and Resources and related notes, please refer to the NI 43-101 compliant technical report for the Sabodala Project dated August 30, 2017 accessible on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com. 10. Teranga’s Wahgnion Mineral Reserves and Mineral Resources estimates as at September 7, 2017. For more information regarding Wahgnion’s Mineral Reserves and Resources and related notes, please refer to the NI 43-101 compliant technical report for the Wahgnion Project dated October 20, 2017 accessible on the Company’s website at www.terangagold.com and on SEDAR at www.sedar.com. 11. Free cash flow excludes Wahgnion financing and corporate-wide resource development and exploration expenditures. Please see table on slide 7 of the Company’s Investor & Analyst Workshop presentation dated September 14, 2017, which was filed on www.sedar.com. 12. Net Present Value (“NPV”) per share is a Non-IFRS financial measure. NPV per share, average NPV multiple of medium producers, and Teranga’s share price is as per BMO GoldPages published May 7, 2018. According to BMO GoldPages, NPV per share is calculated using the net present value of the life of mine cash flows based on the NI 43-101 plan, less cash flow of corporate costs, less net debt per share, using the model at SPOT commodity prices and exchange rates. The “Revalued Share Price” is calculated using the NPV per share at SPOT times the NPV multiples as listed. The BMO NPV calculation assumes a US$1,345 SPOT gold price per ounce, 5% discount, 0.79 USD/CAD exchange rate.
  • 36. Trish Moran Head of Investor Relations 77 King Street West, Suite 2110 Toronto, ON M5K 2A1 T: +1.416.607.4507 E: investor@terangagold.com W: terangagold.com TSX:TGZ / OTCQX:TGCDF