SP

Saravanan Pazapughal

Sort by
DC Machines with generator and Electronics Engg motor
The information about the quantity under measurement has to be conveyed to thepersonnel handling the instrument or the system for monitoring, control, or analysispurposes
The quantity under measurement makes its first contact with the primary sensingelement of a measurement system
karthika DC Meet 1 Presentation 19.9.2025.ppt
• Four roots are lying on imaginary axis and remaining two roots are lying on left half of s plane.
Choose the test point between s=0 and s=-2, the number of real poles and zeros in the right side is odd number. So the root locus is existing between these two points
A system is said to be completely state controllable if it is possible to transfer the system state from any one initial state X(t0) at any other desired state X(t),in specified finite time by a control vector U(t).
pn-junctiondiodeJJNINIIJOIOOIMOMOKMOMOIM
DC GEN IHIJHOIOOIUOUIUUOJOJUHOPOIJHOIJIH
DC generator construction and operations
chapter 2-measuring instrument.komkjsdbsjh
UNIT-5.pptx.ppt
summing amplifier.ppt
Microprocessors and Microcontrollers.ppt