SlideShare a Scribd company logo
1 of 5
Download to read offline
ก       ก          ก   ก


   Shredder trip   1

   :
 Turbine Shredder over speed trip
ก กF :
 Set oil pressure turbine       F F 5 kg/cm2
ก       ก       ก   ก


Turbine     1 trip   3.30

    :
        F            turbine       1


ก กF :
  F    F                       กก F        ก
 ก 1 F F                    Fก F F
ก          ก   ก   ก


Turbine ก   1 trip 2.54



    :
 Turbine    ก      1       trip
ก กF :
         EBARA F
ก       ก   ก   ก

      Turbine ก           2 knock   1.15
      :

 Turbine ก            2   overload

ก กF :
  F               F        chute        ก
ก       ก         ก   ก


         3 ก    1

    :
     side plate F     ก3            ก F
slide     F turbine    FF   ก       ก F
    FF           ก
ก กF :
            F

More Related Content

Viewers also liked

Orgtiltuyaaaa
OrgtiltuyaaaaOrgtiltuyaaaa
Orgtiltuyaaaachodroo
 
Lu master folder februari
Lu master folder februariLu master folder februari
Lu master folder februariCoachinggids
 
Analysis of the questionnaire
Analysis of the questionnaireAnalysis of the questionnaire
Analysis of the questionnairesp_gebice
 

Viewers also liked (6)

Wap2.0
Wap2.0Wap2.0
Wap2.0
 
Orgtiltuyaaaa
OrgtiltuyaaaaOrgtiltuyaaaa
Orgtiltuyaaaa
 
Lu master folder februari
Lu master folder februariLu master folder februari
Lu master folder februari
 
Proverbs1
Proverbs1Proverbs1
Proverbs1
 
Analysis of the questionnaire
Analysis of the questionnaireAnalysis of the questionnaire
Analysis of the questionnaire
 
Boiler training Maesod
Boiler training  MaesodBoiler training  Maesod
Boiler training Maesod
 

More from Phemakorn Khoonsri

Centrifugal control system At Mitr Phu Khiaw
Centrifugal control system At Mitr Phu KhiawCentrifugal control system At Mitr Phu Khiaw
Centrifugal control system At Mitr Phu KhiawPhemakorn Khoonsri
 
Modify and edit MCC for boiler control At MPV
Modify and edit MCC for boiler control At MPVModify and edit MCC for boiler control At MPV
Modify and edit MCC for boiler control At MPVPhemakorn Khoonsri
 
Repair and modify motor of boiler
Repair and modify motor of boilerRepair and modify motor of boiler
Repair and modify motor of boilerPhemakorn Khoonsri
 
MPV single line and Circuit Diagram
MPV single line and Circuit DiagramMPV single line and Circuit Diagram
MPV single line and Circuit DiagramPhemakorn Khoonsri
 
Uthong electrical and instrument
Uthong electrical and instrumentUthong electrical and instrument
Uthong electrical and instrumentPhemakorn Khoonsri
 
Control desk for boiler at erawan sugar factory
Control desk for boiler at erawan sugar factoryControl desk for boiler at erawan sugar factory
Control desk for boiler at erawan sugar factoryPhemakorn Khoonsri
 
DCS overview For Boiler At MPV
DCS overview For Boiler At MPVDCS overview For Boiler At MPV
DCS overview For Boiler At MPVPhemakorn Khoonsri
 

More from Phemakorn Khoonsri (13)

Centrifugal control system At Mitr Phu Khiaw
Centrifugal control system At Mitr Phu KhiawCentrifugal control system At Mitr Phu Khiaw
Centrifugal control system At Mitr Phu Khiaw
 
Lightning System AT SKT-B23
Lightning System AT SKT-B23Lightning System AT SKT-B23
Lightning System AT SKT-B23
 
Lightning System At SKT- B24
Lightning System At SKT- B24Lightning System At SKT- B24
Lightning System At SKT- B24
 
Grounding System AT SKT- B23
Grounding System AT SKT- B23Grounding System AT SKT- B23
Grounding System AT SKT- B23
 
Grounding System At SKT-B8
Grounding System At SKT-B8Grounding System At SKT-B8
Grounding System At SKT-B8
 
ESP test record to euroentech
ESP test record to euroentechESP test record to euroentech
ESP test record to euroentech
 
Modify and edit MCC for boiler control At MPV
Modify and edit MCC for boiler control At MPVModify and edit MCC for boiler control At MPV
Modify and edit MCC for boiler control At MPV
 
Repair and modify motor of boiler
Repair and modify motor of boilerRepair and modify motor of boiler
Repair and modify motor of boiler
 
MPV single line and Circuit Diagram
MPV single line and Circuit DiagramMPV single line and Circuit Diagram
MPV single line and Circuit Diagram
 
Uthong electrical and instrument
Uthong electrical and instrumentUthong electrical and instrument
Uthong electrical and instrument
 
Control desk for boiler at erawan sugar factory
Control desk for boiler at erawan sugar factoryControl desk for boiler at erawan sugar factory
Control desk for boiler at erawan sugar factory
 
Maesod boiler training
Maesod boiler trainingMaesod boiler training
Maesod boiler training
 
DCS overview For Boiler At MPV
DCS overview For Boiler At MPVDCS overview For Boiler At MPV
DCS overview For Boiler At MPV
 

Mill house maintenance and repair at mpk

  • 1. ก ก ก Shredder trip 1 : Turbine Shredder over speed trip ก กF : Set oil pressure turbine F F 5 kg/cm2
  • 2. ก ก ก Turbine 1 trip 3.30 : F turbine 1 ก กF : F F กก F ก ก 1 F F Fก F F
  • 3. ก ก ก Turbine ก 1 trip 2.54 : Turbine ก 1 trip ก กF : EBARA F
  • 4. ก ก ก Turbine ก 2 knock 1.15 : Turbine ก 2 overload ก กF : F F chute ก
  • 5. ก ก ก 3 ก 1 : side plate F ก3 ก F slide F turbine FF ก ก F FF ก ก กF : F