DED
DETAIL ENGINEERING DESAIN
SARANA AIR BERSIH P3K DESA SUKAMEKAR
KECAMATAN SUKARAJA
LAPORAN DOKUMEN DED SARANA AIR BERSIH P3K
Sukabumi, ........................................
KELOMPOK MASYARAKAT DESA SUKAMEKAR
(............................................ )
Ketua Pokmas
MENYETUJUI,
CAMAT KECAMATAN SUKAMEKAR KEPALA DESA SUKAMEKAR
( ............................................................. ) ( .................................................... )
Tenaga Ahli Perencanaan
( ......................................... )
KONSULTAN PENDAMPING P3K
( ......................................................)
MenaraAir
Kap.1,5M3-2Unit
Sumbermataair
SKEMATIKSYSTEM
SKALA:-
KranUmum
KranUmum
-SKEMATIKSYSTEMAIRBERSIH
PipaAWdia.4"
PipaAWdia.1/2"
PipaAWdia.1/2"
PipaAWdia.1/2"
PipaAWdia.1/2"
PipaAWdia.3"PipaAWdia.3"
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
-DENAHBRONCAPTERING
-POTONGAN
-TAMPAK
-DETAIL
160
90
100
318
200
140
284
15
10
185375
440
440
735
6080
30
160
70
70
40
30
635
330
32
1:100
KECAMATANSUKARAJA
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
GAMBAR
NAMAPROYEK
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
CAMAT
KECAMATANSUKARAJA
KETUAPOKMAS
KEPALADESASUKAMEKAR
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
TANPASKALA
DETAILCONTOHPEMADATANTIMBUNAN
jalanH.2
Dibawahjalur
jalanH.1
Diluarjalur
galianyangnormal.
Dalamparit
yangdipilih
pasir(tidaklekat)
Timbunantanah
yangbesar
batu-batuan
batu-batuatau
yangbebasdari
Mengisitimbunan
100mm
Lapisan-lapisan
Lapisan150mm
150mm
Lapisan-lapisan
TANPASKALA
PEMASANGANDIATASDASARPARITGALIANTANAHYANGJELEK
PEMASANGANDIATASDASARPARITGALIANTANAHYANGBAIK
TANPASKALA
H.1(mm)H.2(mm)
1200
1000
600450
800
1000
D65mm
250mmD80mm
D300mm
1050
900
800
700400
450
550
750350-450
250-300
150-200
80-100
W
LEBARMAKSIMAL
(mm)(mm)
LEBARMINIMAL
W(mm)
DIAMETERPIPA
TYPE-TYPEPARITGALIANYANGBERBEDA
WW
W
W
W
-DETAILPEMASANGANPIPA
-DETAILGALIANPIPA
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
1010
ØPIPA
PASIRDIPADATKAN
MT
BETON
PASIRDIPADATKAN
PASIRDIPADATKAN
PASIRDIPADATKAN
MUKATANAH
MT
60
BETON
60
BETON
Ø8-10
7.5
7.5
7.5107.510
60
7.5107.510
60
107.5
60
7.510
10
60
PASIRDIPADATKANTRUSTBLOCK
Ø 8-10
Ø8-10
KATUPUDARA
VALVEØ50
BETON
BETONTUMBUK
UNION
Ø50mmATAUØ65mm
GT.VALVEDGTHREADEDENDS
FLANGEDENDS
TRUSHBLOCK
GATEVALVEDENGAN
MT
TAPPINGBAND
GIPØ20mm/Ø25mm
STOPCOCK
KATUPUDARA
TRUSTBLOCK
GATEVALVEØ80mm
KATUPUDARA
DENGANHANDLE
BETON
60
MT
60
VARIABLE
MT
60
BETON
VARIABLE
10
ØPIPA
PIPASELUBUNG
PVCØ100
ØPIPA
10
VARIABLE
BETON
60
MT
PASIRDIPADATKAN
CHECKVALVE
60
10
6010
107.5
PASIRDIPADATKAN
1010
VARIABLEØPIPA
1010
VARIABLEØPIPA
1010
-DETAILPEMASANGANKRAN
-DETAILBOXKRAN
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
PEMBESIANPLATATASDENAHRESERVOIR
t
E
cP
Lc t
D
ct
MANHOLE
BALOK 20/25
B
t
A
c t
cP
MANHOLE
VENTØ1.5"
tc
BALOK20/25
MANHOLE
D
C
ct
MANHOLEPENGURASDANPELUAP
KESALURANTERDEKAT
A
INLET(PVC)2"
ctL
VENTØ1.5"
OUTLETPVC2"
PENGURAS
DIAMETER
KONTRUKSIRESERVOIRDANPEMBESIAN
RESERVOIR
KAPASITAS
(M3)
(cm)
L
(cm)
P
(mm)
INLET
DIAMETER
(H)
(cm)
Fb
TINGGIAIR
(mm)(mm)(mm)
OUTLET
DIAMETER
BALOK
PEMBESIANPEMBESIANPLAT
BAWAHATAS(mm)
PELUAP
DIAMETER
DINDING
TEBALBETON
tTc
52002002012050755010-200Ø12-150Ø12-200Ø252040
1030020020150755010-200Ø12-150Ø12-200Ø25204050
50
50
Ø12Ø
6
8-200
Ø
6
Ø128-200
2040025020200755010-200Ø12-150Ø12-200Ø25204050506ØØ128-200
3050030020200755010-200Ø12-150Ø12-200Ø25204050506ØØ128-200
32001502012050755010-200Ø12-150Ø12-200Ø25204050Ø12Ø8-2006
4050040020200755010-200Ø12-150Ø12-200Ø25204050506ØØ128-200
5050050020200755010-200Ø12-150Ø12-200Ø25204050506ØØ128-200
-DENAHRESERVOAR
-DENAHPEMBESIANATAS
-TABELKAPASITASUKURAN
RESERVOAR
BCE
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
MUKAAIR
KLEMBESI
PENAHANPIPA
TRASRAM1:2:3
POTONGANC-C
P
POTONGANA-A
POTONGANB-B
tcLtc
tcL
TANAHURUG
DIPADATKAN
MUKAAIR
100
MUKATANAH
HT
12 10
Fb
MANHOLE60X60
Ø2"INLET
MUKATANAH
VENT
BALOK20/25
Ø1.5"
100
HT
12
Fb
10
MUKATANAH
OUTLET2"
VENTØ1.5"
INLET(PVC)2"
MUKATANAH
100
HT
BETONBERTULANG
PASIRURUG
LANTAIKERJA
tc
Æ2"INLET
PENGURASDANPELUAP2"
c
BENDLONGSOCKET
t
TANAHURUG
DIPADATKAN
MUKATANAH
MANHOLE60X60
PELUAP
BALOK20/25
MUKATANAH
BENDLONGSOCKET
PENGURASDANPELUAP2"
TRASRAM1:2:3
ct
Æ100
KLEMBESI
PENAHANPIPA
SARINGAN
PENGURAS
OUTLET2"
MUKAAIR
Fb
12 10
MANHOLE60X60
VENTØ1.5"
PELUAP
BALOK20/25
Æ100
MANHOLE60X60
-POTONGAN
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
RABATBETON1:3
KLEMBESI
PENAHANPIPA
PVCCLASSAW
POTONGANE-E
tcLct
PASIRURUG10cm
LANTAIKERJA5cm
POTONGAND-D
MUKATANAH
100
HT
WATERSTOP
1012
Fb
MANHOLE60X60
T FbH
100
tc
WATERSTOP
MUKATANAH
SLOOP2%
MUKAAIR
WATERSTOP
MUKATANAH
BALOK20/25
Pct
BALOK20/25
MUKAAIR
WATERSTOP
MUKATANAH
PEMASANGANPIPAPENGURASDANPELUAP
LONGBENDALLSOCKETTRASRAM1:2:3
PENGURASDANPELUAP(PVC)
KESALURANTERDEKAT
PENGURAS
PELUAP100
MUKAAIR
30
MUKATANAH
MURBAUT10mm
DYNABOLT10mm
1012
MANHOLE60X60MANHOLE60X60
MANHOLE60X60
-POTONGAN
-DETAILPOTONGANPENGURAS
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
12
12-150
PEMBESIANPLAT
ENGSEL
DETAILTUTUPMANHOLE
DILASPENUH
DINDINGBETON
PLATBESI3mm
DETAILPIPADINDING
SINGLEFLANGE
KAPASITAS
150
50
(M3)
RESERVOIR
DIAMETER
INLET
(mm)(mm)
150
DIAMETER
PELUAP
30
Fb
(cm)
150150
PENGURAS
DIAMETER
(mm)
OUTLET
DIAMETER
500
P
(cm)
(mm)
500
L
(cm)
25200
ATAS
10-200
(mm)
TINGGIAIR
Æ
(H)
T
BAWAH
Æ
t
DILASPENUH
DETAILPIPADINDING
DOUBLEFLANGE
7.5
ØPIPA
7.5
DINDINGBETON
PLATBESI3mm
202020
DETAILMANHOLE
202020
PLATBESI3mm
PEMBESIAN
Ø PIPA
1 1/2
DETAILKLEMPENAHANPIPA
4020
TEBALBETON
t
Æ
DINDING
12-150
c
Æ10
8-200
6
BALOK
Æ
PLATBESIT=2mm
PLATBESI3mm
DILASPENUH
DETAILPIPAVENT
MURBAUD10mm
PIPAPELUAP
PVC(AW)VARIASI
PLATBESIT=2mm
ØPIPA
7.5
7.5
MURBAUD10mm
Ø PIPA
10
30
PLATBETON
DYNABOLT10mm
PLATBETON
DYNABOLT10mm
12.5
PENGANGKAT
12.5
TUTUPPLATBESI3mm
1080/80
12
60
GIP2"
KAWATKASA
50
-DETAILRESERVOAR
1:100
P3K
JUDULGAMBAR
NOLEMBARSKALAJMLLEMBAR
PROGRAMPENINGKATANPARTISIPASI
PEMBANGUNANKECAMATAN
GAMBAR
NAMAPROYEK
KEGIATAN
GAMBAR
MENYETUJUI
PEMBANGUNANSARANAAIRBERSIH
KETUAPOKMAS
DIPERIKSADIVERIFIKASI
KONSULTANPENDAMPING
KECAMATANSUKARAJA
DESASUKAMEKAR
PEMERINTAHKABUPATENSUKABUMI
PEMBANGUNANSARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
DEDPERENCANAAN
SARANAAIRBERSIH
DESASUKAMEKAR
KECAMATANSUKARAJA
CAMAT
KECAMATANSUKARAJA
KEPALADESASUKAMEKAR
RAB
RENCANA ANGGARAN BIAYA
SARANA AIR BERSIH P3K DESA SUKAMEKAR
KECAMATAN SUKARAJA
Propinsi : Jawa Barat Pokmas :
Kabupaten : Sukabumi Jenis Kegiatan :
Kecamatan : Sukaraja Volume : 1 Unit
Desa : Sukamekar Lokasi :
Volume /
No. Satuan Panjang Lebar Tinggi Jumlah Kuantitas
( m ) ( m ) ( m )
1 Pembangunan Broncaptering
1. Galian M3 2,00 3,00 0,50 3,00
2. Urugan Kembali M3 1,00
3. Pasangan Batu Kali 1 : 4 M3 2,00 3,00 2,00 12,00
4. Plesteran & Acian 1 : 4 ; 2cm M2 2,00 3,00 x 2,00 12,00
5. Tutup Beton 1 : 2 :3 M3 2,00 3,00 0,12 0,72
6. Pengecatan M2 12,00
7. Tutup manhole+RANGKA bh 2,00
2
1. Pengukuran Dan Pembersihan Lapangan M' 1,50 2,00 3,00
2. Galian Tanah Biasa M3 0,30 0,30 0,25 x 2,00 0,05
3. Urugan Pasir M3 3,00 2,00 0,12 0,72
4. Urugan Tanah Kembali M3 0,07
5. Buangan Tanah Sisa Galian M3 0,07
B Pekerjaan Beton Dan Pasangan
1. Beton Bertulang Lengkap Dengan Bekisting
1. Lantai 1 : 2 : 3 M3 3,00 2,00 0,12 x 2,00 1,44
2. Dinding 1 : 2 : 3 M3 3,00 2,00 2,00 x 2,00 24,00
3. Atap 1 : 2 : 3 M3 3,00 2,00 0,12 x 2,00 1,44
4. Lantai Kerja 1 : 3 : 5 M3 3,00 2,00 0,05 x 2,00 0,60
2. Pengadaan Dan Pemasangan Water Stop M' 2,00
C Pekerjaan Besi
Unit 2,00
Unit 2,00
2,00
D Pengadaan Pipa Dan Accsesories Unit
E Pemasangan Pipa Dan Accessories
F Pengecatan Dinding Luar tembok baru. 4,50
3
A Pengadaan Pipa dan asesories
1. Pipa PVC AW (4") m 700 700
2. Knee 4" Bh 10,00
3. Tee All Socket 4"x3" Bh 1,00
4. Dop 4" Bh 3,00
5. Lem Kg 1,00
6. Pipa PVC AW (3") m 1.700 1.700
7. Knee 3" Bh 10,00
8. Tee All Socket 3"x 1/2" Bh 1,00
9. Dop 3" Bh 3,00
10. Lem Kg 1,00
B Pekerjaan Konstruksi
1. Pemasangan Pipa PVC dan Accsesories
2. Pemasangan Accsesories Pipa
Pembangunan Reservoar kap. 2 M3
Pemasangan Instalasi Pipa dan Acsesoris 3000
m
A Pekerjaan Tanah
1. Pekerjaan Tangga Monyet Dari Besi Beton Dia.16
mm
2. Pekerjaan Tutup Manhole 80 x 80, Dengan
Konstruksi Besi Plat t =3 mm, Rangka Besi Siku
5.50.50 Termasuk Kunci Gembok
3. Klem Besi Penahan Pipa Over Flow
PROGRAM PENINGKATAN PARTISIPASI PEMBANGUNAN KECAMATAN ( P3K )
SKETSA
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN
Uraian Pekerjaan
Sketsa & Perhitungan Volume Pekerjaan
Pemb. Sarana Air Bersih
RAB - 1
Volume /
No. Satuan Panjang Lebar Tinggi Jumlah Kuantitas
( m ) ( m ) ( m )
SKETSA
Uraian Pekerjaan
Sketsa & Perhitungan Volume Pekerjaan
4 Pembangunan Jalur Pipa - -
A. Pembuatan Jalur pipa pemanfaat
1. Beton Bertulang 1 : 2 : 3 M3
2. Beton Rabat 1 : 3 : 5 M3
Pipa PVC Dia. 1/2" M' 1.000,00
Knee 90 PVC Dia. 1/2" Bh 500,00
Reducer PVC Dia. 1" x 1/2" Bh
Tee PVC Dia. 1/2" Bh 100,00
Water meter Dia. 1/2" Unit 70,00
Kran Dia. 1/2" Bh 70,00
B Pemasangan
Pipa PVC Dia. 1/2" M' 1.000,00
Knee 90 PVC Dia. 1/2" Bh 500,00
Reducer PVC Dia. 1" x 1/2" Bh -
Tee PVC Dia. 1/2" Bh 100,00
Water meter Dia. 1/2" Unit 70,00
Kran Dia. 1/2" Bh 70,00
DIBUAT OLEH :
KETUA POKMAS
( ...................................)
Sukamekar,...................................................
Propinsi : Jawa Barat Pokmas :
Kabupaten : Sukabumi Jenis Kegiatan :
Kecamatan : Sukaraja Volume :1 Unit
Desa : Sukamekar Lokasi :
1 Pembangunan Broncaptering
1. Galian 3,000 m3
0,400 Tukang Gali 1,200 HOK 100.000 120.000
2. Urugan Kembali 1,000 -
0,250 Tukang Gali 0,250 HOK 100.000 25.000
3. Pasangan Batu Kali 1 : 4 12,000 -
1,100 Batu belah 15/20 cm 13,200 M³ 300.000 3.960.000
163,000 PC (50 Kg) 1.956,0 Kg 1.500 2.934.000
0,520 Pasir pasang 6,240 M³ 280.000 1.747.200
1,345 P e k e r j a 16,145 HOK 80.000 1.291.607
0,487 Tukang batu 5,840 HOK 100.000 583.973
4. Plesteran & Acian 1 : 4 ; 2cm 12,000 -
5,000 PC (50 Kg) 60,000 Kg 1.500 90.000
0,019 Pasir pasang 0,228 m³ 280.000 63.840
0,286 P e k e r j a 3,432 HOK 80.000 274.560
0,214 Tukang Batu 2,568 HOK 100.000 256.800
5. Pek. Plat Lantai t.12 cm Besi Wire Mesh M.8 (2Rangkap) -
0,720 m3
20,000 Tulangan Wire Mesh M.8 14,400 55.000 792.000
8,000 Beqisting Multiplek T.9 mm 5,760 m2
0,036 Kayu papan Albasia 0,026 M3 1.000.000 25.796
0,400 Paku Biasa 2" - 5" 0,288 Kg 15.000 4.320
0,200 Minyak Bekisting 0,144 Lt 16.500 2.376
0,015 Balok Kayu Borneo 5/7 0,011 M3 1.000.000 10.800
0,350 Plywood tebal 9 mm 0,252 Lbr 150.000 37.800
6,000 Dolken dia 8 - 10/400 cm 4,320 Btg 22.750 98.280
0,660 Pekerja 0,475 HOK 80.000 38.016
0,330 Tukang Kayu 0,238 HOK 100.000 23.760
Cor Beton 1:2:3 0,720 m3
336,000 PC (50 Kg) 241,9 kg 1.500 362.880
0,810 Split pecah mesin 1/2 0,583 M³ 300.000 174.960
0,490 Pasir beton 0,353 M³ 280.000 98.784
1,500 Pekerja 1,080 HOK 80.000 86.400
0,250 Tukang Batu 0,180 HOK 100.000 18.000
6. Pengecatan 12,000 m2
0,100 plamir 1,200 Kg 12.600 15.120
0,100 Cat dasar 1,200 Kg 25.500 30.600
0,260 Cat penutup 2x 3,120 Kg 25.500 79.560
0,500 Ampelas 6,000 lbr 2.600 15.600
0,010 Rol cat 0,120 bh 38.500 4.620
0,020 Pekerja 0,240 HOK 80.000 19.200
0,063 Tukang cat 0,756 HOK 100.000 75.600
7. Tutup manhole+RANGKA
Tutup Manhole+Rangka 2,000 bh 100.000 200.000
8. Perlengkapan
Pipa Penguras PVC Dia. 2" 2,000 M 25.000 50.000
Stop Kran Dia.2" 2,000 BH 50.000 100.000
Valve Socket Dia. 2" 2,000 BH 16.300 32.600
Pipa Peluap Dia. 2" 2,000 M 25.000 50.000
Pipa Vent Dia. 1.5" 2,000 M 18.750 37.500
Bend GI Dia. 2" 3,000 BH 50.000 150.000
Tee Vent 1.5" 4,000 BH 30.000 120.000
Sub Total (1) 14.101.553
(per Item Pekerjaan)
No Koefisien VolumeU raian
TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
Pemb. Sarana Air
Bersih
Satuan Harga Satuan
PROGRAM PENINGKATAN PARTISIPASI PEMBANGUNAN KECAMATAN ( P3K )
PERHITUNGAN KEBUTUHAN DAN BIAYA
Jumlah Harga
RAB - 2RAB - 2
No Koefisien VolumeU raian Satuan Harga Satuan Jumlah Harga
2 Pembangunan Reservoar kap. 2 M3 -
A Pekerjaan Tanah -
1. Pengukuran Dan Pembersihan Lapangan 3,000 m' -
0,100 Pekerja 0,300 HOK 80.000 24.000
2. Galian Tanah Biasa 0,045 M³ -
0,400 Tukang Gali 0,018 HOK 100.000 1.800
3. Urugan Pasir 0,720 M³ -
1,200 Pasir urug 0,864 M³ 150.000 129.600
0,300 P e k e r j a 0,216 HOK 80.000 17.280
4. Urugan Tanah Kembali 0,072 M³ -
0,250 Tukang Gali 0,018 HOK 100.000 1.800
5. Buangan Tanah Sisa Galian 0,072 M³ -
0,250 Tukang Gali 0,018 HOK 100.000 1.800
B Pekerjaan Beton Dan Pasangan -
1. Lantai 1 : 2 : 3 1,440 M³ -
20,000 Tulangan Wire Mesh M.8 28,800 M2 55.000,00 1.584.000
8,000 Beqisting Multiplek T.9 mm 11,520 -
0,036 Kayu papan Albasia 0,052 M³ 1.000.000 51.593
0,400 Paku Biasa 2" - 5" 0,576 Kg 15.000 8.640
0,2000 Minyak Bekisting 0,288 Lt 16.500 4.752
0,015 Balok Kayu Borneo 5/7 0,022 M3 1.000.000 21.600
0,350 Plywood tebal 9 mm 0,504 Lbr 150.000 75.600
6,000 Dolken dia 8 - 10/400 cm 8,640 Btg 22.750 196.560
0,668 Pekerja 7,694 HOK 80.000 615.532
0,336 Tukang Kayu 0,484 HOK 100.000 48.354
-
Cor Beton 1:2:3 1,440 M³ -
336,000 PC (50 Kg) 483,840 kg 1.500 725.760
0,810 Split pecah mesin 1/2 1,166 M³ 300.000 349.920
0,49 Pasir beton 0,706 M³ 280.000 197.568
1,500 Pekerja 2,160 HOK 80.000 172.800
0,250 Tukang Batu 0,360 HOK 100.000 36.000
2. Dinding 1 : 2 : 3 24,000 M³ -
70,000 Bata merah 1.680,000 Kg 1.500 2.520.000
9,680 PC (50 Kg) 8,000 M2 1.500 12.000
0,045 Pasir pasang 1,080 M³ 280.000 302.400
0,300 Pekerja 7,200 HOK 80.000 576.000
0,100 Tukang Kayu 2,400 HOK 100.000 240.000
3. Atap 1 : 2 : 3 1,440 m2
20,0000 Tulangan Wire Mesh M.8 28,800 M2 55.000 1.584.000
8,0000 Beqisting Multiplek T.9 mm 11,520 -
0,0339 Kayu papan Albasia 0,049 M³ 1.000.000 48.815
0,4000 Paku Biasa 2" - 5" 0,576 Kg 15.000 8.640
0,2000 Minyak Bekisting 0,288 Lt 16.500 4.752
0,0150 Balok Kayu Borneo 5/7 0,022 M3 1.000.000 21.600
0,3500 Plywood tebal 9 mm 0,504 Lbr 150.000 75.600
6,0000 Dolken dia 8 - 10/400 cm 8,640 Btg 22.750 196.560
0,6600 Pekerja 0,950 HOK 80.000 76.032
0,3300 Tukang Kayu 0,475 HOK 100.000 47.520
-
Cor Beton 1:2:3 1,440 M³ -
336,0000 PC (50 Kg) 483,840 kg 1.500 725.760
0,8100 Split pecah mesin 1/2 1,166 M³ 300.000 349.920
0,4900 Pasir beton 0,706 M³ 280.000 197.568
1,5000 Pekerja 2,160 HOK 80.000 172.800
0,2500 Tukang Batu 0,360 HOK 100.000 36.000
4. Lantai Kerja 1 : 3 : 5 0,600 m³
197,8000 PC (50 Kg) 118,680 Kg 1.500 178.020
0,5500 Pasir beton 0,330 m³ 280.000 92.400
0,9300 Batu pecah mesin 2/3 0,558 m³ 300.000 167.400
2,0000 P e k e r j a 1,200 HOK 80.000 96.000
0,5000 Tukang Batu 0,300 HOK 100.000 30.000
No Koefisien VolumeU raian Satuan Harga Satuan Jumlah Harga
5. Pengadaan Dan Pemasangan Water Stop
Water Stop Dari Plat Baja Tebal 3 x 200 mm - m' 140.000 -
C Pekerjaan Besi
Pekerjaan Tangga Monyet Dari Besi Beton Dia.16 mm 2,000 Unit 100.000 200.000
Pekerjaan Tutup Manhole 80 x 80, Dengan Konstruksi Besi Plat2,000 Unit 100.000 200.000
t =3 mm, Rangka Besi Siku 5.50.50 Termasuk Kunci Gembok
Klem Besi Penahan Pipa Over Flow 2,000 Unit 12.500 25.000
D Pengadaan Pipa Dan Accsesories
Pipa Inlet
Wall Pipe All Flange L = 60 cm Dia.2,5" 1,000 Unit 65.000 65.000
Flange Socket Dia. 2.5" 1,000 Bh 30.000 30.000
Bend 90 CI All Flange Dia. 2.5" 2,000 Bh 30.000 60.000
Pipa PVC Dia. 2.5" 1,500 M' 35.000 52.500
Loose Flange Dia. 2.5" 1,000 Bh 30.000 30.000
Pipa Outlet -
Wall Pipe All Flange L = 60 cm Dia. (2.5" ) 3,000 Unit 65.000 195.000
Flange Socket Dia. (2.5" ) 3,000 Bh 30.000 90.000
Bend 90 CI All Flange Dia. (2.5" ) 6,000 Bh 30.000 180.000
Pipa PVC Dia. (2.5" ) 4,500 M' 35.000 157.500
Loose Flange Dia. (2.5" ) 3,000 Bh 30.000 90.000
Gate Valve Dia (2.5" ) 3,000 Bh 30.000 90.000
Pipa Outlet -
Wall Pipe PVC All Flange L = 60 cm Dia. 1" 2,000 Unit 45.000 90.000
Flange Socket Dia. 1" 2,000 Bh 20.000 40.000
Bend 90 CI All Flange Dia. 1" 4,000 Bh 30.000 120.000
Pipa PVC Dia. 1" 3,000 M' 15.000 45.000
Loose Flange Dia. 1" 2,000 Bh 25.000 50.000
Stop Kran Dia. 1" 2,000 Bh 30.000 60.000
Pipa Penguras & Pipa Over flow -
Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) 1,000 Unit 65.000 65.000
Pipa PVC Dia. (2.5" ) 2,000 M' 35.000 70.000
Flange Socket Dia. (2.5" ) 1,000 Bh 30.000 30.000
Bend 90 CI All Flange Dia. (2.5" ) 1,000 Bh 30.000 30.000
Pipa PVC Dia. (2.5" ) 1,000 M' 35.000 35.000
Loose Flange Dia. (2.5" ) 1,000 Bh 30.000 30.000
Pipa Vent -
Pengadaan Pipa Vent Dia. 2.5" (Sesuai Gambar) 2,000 Unit 35.000 70.000
E Pemasangan Pipa Dan Accessories
Pipa Inlet
Wall Pipe PVC All Flange L = 60 cm Dia.2.5" 1,000 Unit 2.500 2.500
Flange Socket Dia. 2.5" 1,000 Bh 2.500 2.500
Bend 90 CI All Flange Dia. 2.5" 2,000 Bh 2.500 5.000
Pipa PVC Dia. 2.5" 1,500 M' 4.000 6.000
Loose Flange Dia. 2.5" 1,000 Bh 2.500 2.500
Pipa Outlet -
Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) 3,000 Unit 2.500 7.500
Flange Socket Dia. (2.5" ) 3,000 Bh 2.500 7.500
Bend 90 CI All Flange Dia. (2.5" ) 6,000 Bh 2.500 15.000
Pipa PVC Dia. (2.5" ) 4,500 M' 4.000 18.000
Loose Flange Dia. (2.5" ) 3,000 Bh 2.500 7.500
Gate Valve Dia (2.5" ) 3,000 Bh 2.500 7.500
Lengkap Dengan Box Valve 60 mm x 60 mm dan Kunci Gembok -
Pipa Outlet -
Wall Pipe PVC All Flange L = 60 cm Dia. 1" 2,000 Unit 1.500 3.000
Flange Socket Dia. 1" 2,000 Bh 1.500 3.000
Bend 90 CI All Flange Dia. 1" 4,000 Bh 1.500 6.000
Pipa PVC Dia. 1" 3,000 M' 1.500 4.500
Loose Flange Dia. 1" 2,000 Bh 1.500 3.000
Stop Kran Dia. 1" 2,000 Bh 1.500 3.000
Bok Valve Uk. 60 mm x 60 mm dan Kunci Gembok 1,000 Bh 1.500 1.500
Pipa Penguras & Pipa Over flow -
Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) 1,000 Unit 2.500 2.500
Pipa PVC Dia. (2.5" ) 2,000 M' 4.000 8.000
Flange Socket Dia. (2.5" ) 1,000 Bh 4.000 4.000
Bend 90 CI All Flange Dia. (2.5" ) 1,000 Bh 4.000 4.000
Pipa PVC Dia. (2.5" ) 1,000 M' 4.000 4.000
Loose Flange Dia. (2.5" ) 1,000 Bh 4.000 4.000
Pipa Vent -
Pipa Vent Dia. 2.5" 2,000 Unit 4.000 8.000
No Koefisien VolumeU raian Satuan Harga Satuan Jumlah Harga
F Pengecatan Dinding Luar tembok baru.
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)4,500 m2
0,1000 plamir 0,450 Kg 12.600 5.670
0,1000 Cat dasar 0,450 Kg 25.500 11.475
0,2600 Cat penutup 2x 1,170 Kg 25.500 29.835
0,5000 Ampelas 2,250 lbr 2.600 5.850
0,0100 Rol cat 0,045 bh 38.500 1.733
0,0200 Pekerja 0,090 HOK 80.000 7.200
0,0630 Tukang cat 0,284 HOK 100.000 28.350
Sub Total (2) 14.454.859
3 Pemasangan Instalasi Pipa dan Acsesoris 3000 m
A Pengadaan Pipa dan asesories
1. Pipa PVC AW (4") 700,0 M' 87.500 61.250.000
2. Knee 4" 10,000 Buah 23.000 230.000
3. Tee All Socket 4"x3" 1,000 Buah 13.000 13.000
4. Dop 4" 3,000 Buah 8.000 24.000
5. Lem 1,000 kg 50.000 50.000
6. Pipa PVC AW (3") 1.700,0 M' 50.000 85.000.000
7. Knee 3" 10,000 Buah 23.000 230.000
8. Tee All Socket 3"x 1/2" 1,000 Buah 13.000 13.000
9. Dop 3" 3,000 Buah 8.000 24.000
10. Lem 1,000 kg 50.000 50.000
B Pekerjaan Konstruksi
1. Pemasangan Pipa PVC dan Accsesories
1. Pipa PVC AW (4") 700 M' 4.000 2.800.000
2. Knee 4" 10,000 Buah 2.500 25.000
3. Tee All Socket 4"x3" 6,000 Buah 2.500 15.000
4. Dop 4" 3,000 Buah 2.500 7.500
6. Pipa PVC AW (3") 1.700,0 M' 4.000 6.800.000
7. Knee 3" 10,0 Buah 2.500 25.000
8. Tee All Socket 3"x 1/2" 1,0 Buah 2.500 2.500
9. Dop 3" 3,0 Buah 2.500 7.500
Sub Total (3) 156.566.500
4 Pembangunan Jalur Pipa - Unit
A. Pembuatan Jalur pipa pemanfaat
1. Beton Bertulang 1 : 2 : 3 - M³
336,0000 PC (50 Kg) - kg 1.400 -
0,8100 Split pecah mesin 1/2 - M³ 300.000 -
0,4900 Pasir beton - M³ 280.000 -
1,5000 Pekerja - HOK 80.000 -
0,2500 Tukang Batu - HOK 100.000 -
2. Beton Rabat 1 : 3 : 5 - M³
218,0000 PC (50 Kg) - kg 1.400 -
0,8300 Split pecah mesin 1/2 - M³ 300.000 -
0,5400 Pasir beton - M³ 280.000 -
1,5000 Pekerja - HOK 80.000 -
0,2500 Tukang Batu - HOK 100.000 -
Pipa PVC Dia. 1/2" 1.000,000 M' 6.250 6.250.000
Knee 90 PVC Dia. 1/2" 500,000 Bh 4.000 2.000.000
Reducer PVC Dia. 1" x 1/2" - Bh 4.000 -
Tee PVC Dia. 1/2" 100,000 Bh 4.000 400.000
Water meter Dia. 1/2" 70,000 Unit 150.000 10.500.000
Kran Dia. 1/2" 70,000 Bh 25.000 1.750.000
B Pemasangan
Pipa PVC Dia. 1/2" 1.000,000 M' 2.500 2.500.000
Knee 90 PVC Dia. 1/2" 500,000 Bh 1.500 750.000
Reducer PVC Dia. 1" x 1/2" - Bh 1.500 -
Tee PVC Dia. 1/2" 100,000 Bh 1.500 150.000
Water meter Dia. 1/2" 70,000 Unit 15.000 1.050.000
Kran Dia. 1/2" 70,000 Bh 1.500 105.000
, Sub Total (4) 25.455.000
5 ADMINISTRASI 1,000 Ls
1,0000 Prasasti 1,000 Bh 200.000 200.000
1,0000 Papan Proyek 1,000 Ls 100.000 100.000
1,0000 Foto copy proposal & LPJ 1,000 Ls 500.000 500.000
20,0000 Materai 20,000 bh 7.000 140.000
1,0000 ATK 1,000 Ls 60.000 60.000
Sub Total (5) 1.000.000
No Koefisien VolumeU raian Satuan Harga Satuan Jumlah Harga
5 Perencanaan Dokumen DED Tenaga Ahli 1,000 Ls
1,0000 Gambar desain 1,000 Ls 2.500.000 2.500.000
1,0000 Rencana Anggaran Biaya (RAB) 1,000 Ls 2.000.000 2.000.000
1,0000 Survey Lokasi 1,000 Ls 1.000.000 1.000.000
1,0000 Cetak DED 1,000 Ls 500.000 500.000
1,0000 Monitoring Lapangan 1,000 Ls 1.000.000 1.000.000
Sub Total (5) 7.000.000
Jumlah Biaya Kontruksi 210.577.912
Jumlah Biaya Administrasi 8.000.000
Jumlah Total 218.577.912
Dibulatkan 218.577.000
DIBUAT OLEH :
KETUA POKMAS
( ...................................)
Sukamerkar,....................................
Kabupaten : Sukabumi No. RAB :
Kecamatan : Sukaraja Jenis Kegiatan :Pemb. Sarana Air Bersih
Desa : Sukamekar Volume :1 Unit
Pokmas : Lokasi :
1. TENAGA KERJA :
1. Tukang HOK 15,75 1,7 14 100.000 174.757 1.400.000
2. Pekerja HOK 43,34 1,3 42 80.000 106.615 3.360.813
- -
281.372 4.760.813
2. BAHAN BANGUNAN :
1 Batu belah 15/20 cm M³ 13,20 0,20 13,0 300.000 60.000 3.900.000
2 PC (50 Kg) Kg 3.352,28 2,28 3.350,0 1.500 3.420 5.025.000
3 Pasir pasang M³ 7,55 0,05 7,5 280.000 13.440 2.100.000
4 Tulangan Wire Mesh M.8 m2 72,00 - 72,0 55.000 - 3.960.000
5 Kayu papan Albasia m3 0,13 0,03 0,1 1.000.000 26.205 100.000
6 Paku Biasa 2" - 5" Kg 1,44 0,04 1,4 15.000 600 21.000
7 Minyak Bekisting Lt 0,72 0,22 0,5 16.500 3.630 8.250
8 Balok Kayu Borneo 5/7 M3 0,05 0,05 - 1.000.000 54.000 -
9 Plywood tebal 9 mm Lbr 1,26 0,26 1,0 150.000 39.000 150.000
10 Dolken dia 8 - 10/400 cm Btg 21,60 0,60 21,0 22.750 13.650 477.750
11 Split pecah mesin 1/2 M³ 2,92 0,42 2,5 300.000 124.800 750.000
12 Pasir beton M³ 2,09 0,09 2,0 280.000 26.320 560.000
13 Batu pecah mesin 2/3 M³ 0,56 0,06 0,5 300.000 17.400 150.000
13 Pasir urug M³ 0,86 0,36 0,5 150.000 54.600 75.000
14 plamir kg 1,65 0,15 1,5 12.600 1.890 18.900
15 Cat dasar kg 5,94 0,94 5,0 25.500 23.970 127.500
16 Ampelas lbr 8,25 0,25 8,0 2.600 650 20.800
17 Rol cat bh 0,17 0,17 - 38.500 6.353 -
18 Tutup Manhole+Rangka bh 2,00 - 2,0 100.000 - 200.000
19 Bata merah kg 1.680,00 - 1.680,0 1.500 - 2.520.000
20 Pipa Penguras PVC Dia. 2" M 2,00 - 2,0 25.000 - 50.000
21 Stop Kran Dia.2" BH 2,00 - 2,0 50.000 - 100.000
22 Valve Socket Dia. 2" BH 2,00 - 2,0 16.300 - 32.600
23 Pipa Peluap Dia. 2" M 2,00 - 2,0 25.000 - 50.000
24 Pipa Vent Dia. 1.5" M 2,00 - 2,0 18.750 - 37.500
25 Bend GI Dia. 2" BH 3,00 - 3,0 50.000 - 150.000
26 Tee Vent 1.5" BH 4,00 - 4,0 30.000 - 120.000
27 Water Stop Dari Plat Baja Tebal 3 x 200 mm m' - - - 140.000 - -
28 Unit 2,00 - 2,0 100.000 - 200.000
29 Unit 2,00 - 2,0 100.000 - 200.000
30 Klem Besi Penahan Pipa Over Flow Unit 2,00 - 2,0 12.500 - 25.000
31 Wall Pipe All Flange L = 60 cm Dia.2,5" Unit 1,00 - 1,0 65.000 - 65.000
32 Flange Socket Dia. 2.5" Bh 1,00 - 1,0 30.000 - 30.000
33 Bend 90 CI All Flange Dia. 2.5" Bh 2,00 - 2,0 30.000 - 60.000
34 Pipa PVC Dia. 2.5" M' 1,50 - 1,5 35.000 - 52.500
35 Loose Flange Dia. 2.5" Bh 1,00 - 1,0 30.000 - 30.000
36 Wall Pipe All Flange L = 60 cm Dia. (2.5" ) Unit 3,00 - 3,0 65.000 - 195.000
37 Flange Socket Dia. (2.5" ) Bh 3,00 - 3,0 30.000 - 90.000
38 Bend 90 CI All Flange Dia. (2.5" ) Bh 6,00 - 6,0 30.000 - 180.000
39 Pipa PVC Dia. (2.5" ) M' 4,50 0,50 4,0 35.000 17.500 140.000
40 Loose Flange Dia. (2.5" ) Bh 3,00 - 3,0 30.000 - 90.000
41 Gate Valve Dia (2.5" ) Bh 3,00 - 3,0 30.000 - 90.000
42 Wall Pipe PVC All Flange L = 60 cm Dia. 1" Unit 2,00 - 2,0 45.000 - 90.000
43 Flange Socket Dia. 1" Bh 2,00 - 2,0 20.000 - 40.000
44 Bend 90 CI All Flange Dia. 1" Bh 4,00 - 4,0 30.000 - 120.000
45 Pipa PVC Dia. 1" M' 3,00 - 3,0 15.000 - 45.000
46 Loose Flange Dia. 1" Bh 2,00 - 2,0 25.000 - 50.000
47 Stop Kran Dia. 1" Bh 2,00 - 2,0 30.000 - 60.000
48 Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) Unit 1,00 - 1,0 65.000 - 65.000
49 Pipa PVC Dia. (2.5" ) M' 2,00 - 2,0 35.000 - 70.000
50 Flange Socket Dia. (2.5" ) Bh 1,00 - 1,0 30.000 - 30.000
51 Bend 90 CI All Flange Dia. (2.5" ) Bh 1,00 - 1,0 30.000 - 30.000
52 Pipa PVC Dia. (2.5" ) M' 1,00 - 1,0 35.000 - 35.000
53 Loose Flange Dia. (2.5" ) Bh 1,00 - 1,0 30.000 - 30.000
54 Pengadaan Pipa Vent Dia. 2.5" (Sesuai Gambar) Unit 2,00 - 2,0 35.000 - 70.000
57 1. Pipa PVC AW (4") M' 700,00 - 700,0 87.500 - 61.250.000
58 2. Knee 4" Buah 10,00 - 10,0 23.000 - 230.000
59 3. Tee All Socket 4"x3" Buah 1,00 - 1,0 13.000 - 13.000
60 4. Dop 4" Buah 3,00 - 3,0 8.000 - 24.000
61 5. Lem kg 1,00 - 1,0 50.000 - 50.000
57 6. Pipa PVC AW (3") M' 1.700,00 - 1.700,0 50.000 - 85.000.000
58 7. Knee 3" Buah 10,00 - 10,0 23.000 - 230.000
59 8. Tee All Socket 3"x 1/2" Buah 1,00 - 1,0 13.000 - 13.000
60 9. Dop 3" Buah 3,00 - 3,0 8.000 - 24.000
61 10. Lem kg 1,00 - 1,0 50.000 - 50.000
62 Pipa PVC Dia. 1/2" M' 1.000,00 - 1.000,0 6.250 - 6.250.000
63 Knee 90 PVC Dia. 1/2" Bh 500,00 - 500,0 4.000 - 2.000.000
64 Reducer PVC Dia. 1" x 1/2" Bh - - - 4.000 - -
65 Tee PVC Dia. 1/2" Bh 100,00 - 100,0 4.000 - 400.000
66 Water meter Dia. 1/2" Unit 70,00 - 70,0 150.000 - 10.500.000
67 Kran Dia. 1/2" Bh 70,00 - 70,0 25.000 - 1.750.000
487.427 190.670.800Total Bahan
NO SatuanKomponen/Bentuk Kontribusi Swadaya Masyarakat
Total Volume
Dari P3K
Sub Total Tenaga Kerja (1)
Pekerjaan Tangga Monyet Dari Besi Beton Dia.16 mm
PROGRAM PENINGKATAN PARTISIPASI PEMBANGUNAN KECAMATAN ( P3K )
RENCANA ANGGARAN BIAYA SWADAYA & P3K
Dari Swadaya Dari P3K
Pekerjaan Tutup Manhole 80 x 80, Dengan Konstruksi
Besi Plat
HARGA
SATUAN (Rp)
Dari
Swadaya
JUMLAH BIAYA (Rp)
TOTAL
RAB - 3
NO SatuanKomponen/Bentuk Kontribusi Swadaya Masyarakat
Total Volume
Dari P3K Dari Swadaya Dari P3K
HARGA
SATUAN (Rp)
Dari
Swadaya
JUMLAH BIAYA (Rp)
TOTAL
1 Wall Pipe PVC All Flange L = 60 cm Dia.2.5" Unit 1,0 1,0 - 2.500 2.500 -
2 Flange Socket Dia. 2.5" Bh 1,0 1,0 - 2.500 2.500 -
3 Bend 90 CI All Flange Dia. 2.5" Bh 2,0 2,0 - 2.500 5.000 -
4 Pipa PVC Dia. 2.5" M' 1,5 1,5 - 4.000 6.000 -
5 Loose Flange Dia. 2.5" Bh 1,0 1,0 - 2.500 2.500 -
6 Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) Unit 3,0 3,0 - 2.500 7.500 -
7 Flange Socket Dia. (2.5" ) Bh 3,0 3,0 - 2.500 7.500 -
8 Bend 90 CI All Flange Dia. (2.5" ) Bh 6,0 6,0 - 2.500 15.000 -
9 Pipa PVC Dia. (2.5" ) M' 4,5 4,5 - 4.000 18.000 -
10 Loose Flange Dia. (2.5" ) Bh 3,0 3,0 - 2.500 7.500 -
11 Gate Valve Dia (2.5" ) Bh 3,0 3,0 - 2.500 7.500 -
12 Wall Pipe PVC All Flange L = 60 cm Dia. 1" Unit 2,0 2,0 - 1.500 3.000 -
13 Flange Socket Dia. 1" Bh 2,0 2,0 - 1.500 3.000 -
14 Bend 90 CI All Flange Dia. 1" Bh 4,0 4,0 - 1.500 6.000 -
15 Pipa PVC Dia. 1" M' 3,0 3,0 - 1.500 4.500 -
16 Loose Flange Dia. 1" Bh 2,0 2,0 - 1.500 3.000 -
17 Stop Kran Dia. 1" Bh 2,0 2,0 - 1.500 3.000 -
18 Bok Valve Uk. 60 mm x 60 mm dan Kunci Gembok Bh 1,0 1,0 - 1.500 1.500 -
19 Wall Pipe PVC All Flange L = 60 cm Dia. (2.5" ) Unit 1,0 1,0 - 2.500 2.500 -
20 Pipa PVC Dia. (2.5" ) M' 2,0 2,0 - 4.000 8.000 -
21 Flange Socket Dia. (2.5" ) Bh 1,0 - 1,0 4.000 - 4.000
22 Bend 90 CI All Flange Dia. (2.5" ) Bh 1,0 1,0 - 4.000 4.000 -
23 Pipa PVC Dia. (2.5" ) M' 1,0 1,0 - 4.000 4.000 -
24 Loose Flange Dia. (2.5" ) Bh 1,0 1,0 - 4.000 4.000 -
25 Pipa Vent Dia. 2.5" Unit 2,0 2,0 - 4.000 8.000 -
26 Pipa PVC Dia. 1/2" M' 1.000,0 - 1.000,0 2.500 - 2.500.000
27 Knee 90 PVC Dia. 1/2" Bh 500,0 - 500,0 1.500 - 750.000
28 Reducer PVC Dia. 1" x 1/2" Bh - - - 1.500 - -
29 Tee PVC Dia. 1/2" Bh 100,0 - - 1.500 - -
30 Water meter Dia. 1/2" Unit 70,0 40,0 30,0 15.000 600.000 450.000
31 Kran Dia. 1/2" Bh 70,0 70,0 - 1.500 105.000 -
32 1. Pipa PVC AW (4") M' 700,0 - 700,0 4.000 - 2.800.000
33 2. Knee 4" Buah 10,0 - 10,0 2.500 - 25.000
34 3. Tee All Socket 4"x3" Buah 6,0 - 6,0 2.500 - 15.000
35 4. Dop 4" Buah 3,0 - 3,0 2.500 - 7.500
32 6. Pipa PVC AW (3") M' 1.700,0 - 1.700,0 4.000 - 6.800.000
33 7. Knee 3" Buah 10,0 3,0 7,0 2.500 7.500 17.500
34 8. Tee All Socket 3"x 1/2" Buah 1,0 1,0 - 2.500 2.500 -
35 9. Dop 3" Buah 3,0 3,0 - 2.500 7.500 -
858.500 13.369.000
3. Perencanaan Dokumen DED Tenaga Ahli
1 Gambar desain ls 1,00 - 1 2.500.000 - 2.500.000
2 Rencana Anggaran Biaya (RAB) lot 1,00 - 1 2.000.000 - 2.000.000
3 Survey Lokasi ls 1,00 - 1 1.000.000 - 1.000.000
4 Cetak DED ls 1,00 - 1 500.000 - 500.000
5 Monitoring Lapangan ls 1,00 - 1 1.000.000 - 1.000.000
- 7.000.000
4. ADMINISTRASI :
1 Prasasti Bh 1 - 1 200.000 - 200.000
2 Papan Proyek Ls 1 - 1 100.000 - 100.000
4 Foto copy proposal & LPJ Ls 1 - 1 500.000 - 500.000
5 Materai bh 20 - 20 7.000 - 140.000
6 ATK Ls 1 - 1 60.000 - 60.000
- 1.000.000
5. DANA TUNAI *)
1. Uang Tunai
6. TANAH/TANAMAN
1 Tanah m2
2 Tanaman Produktif Btg
3 Aset lainnya
7 KONSUMSI
1 Konsumsi (makanan/minuman) Ls/Pkt
1.627.299 216.800.613
Sub Total Lahan (6)
E Pemasangan Pipa Dan Accessories
Sub Total Alat (3)
Sub Total Administrasi (4)
Sub Total Dana Tunai (5)
Sub Total Bahan (2)
JUMLAH BIAYA (Rp.)
Jumlah biaya Upah Swadaya & P3K (Rp.)
Jumlah Total biaya Konstruksi Swadaya & P3K (1+2+3+4)
5.042.185
218.427.912
Sub Total Konsumsi (7)
DIBUAT OLEH :
KETUA POKMAS
( ...................................)
Sukamekar,.....................................

More Related Content

What's hot

Sosialisasi muatan PP 22 tahun 2021 (terkait pl)
Sosialisasi muatan PP 22 tahun 2021 (terkait pl)Sosialisasi muatan PP 22 tahun 2021 (terkait pl)
Sosialisasi muatan PP 22 tahun 2021 (terkait pl)Heri Romansyah
 
Pedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedungPedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedunginfosanitasi
 
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...Penataan Ruang
 
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...Ellan Syahnoorizal Siregar
 
Gambar teknis perencanaan drainase
Gambar teknis perencanaan drainaseGambar teknis perencanaan drainase
Gambar teknis perencanaan drainaseinfosanitasi
 
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...Ellan Syahnoorizal Siregar
 
11 sistem jaringan dan bangunan irigasi
11   sistem jaringan dan bangunan irigasi11   sistem jaringan dan bangunan irigasi
11 sistem jaringan dan bangunan irigasiKharistya Amaru
 
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1infosanitasi
 
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air MinumPedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minuminfosanitasi
 
Pedoman teknis-ipal-2011
Pedoman teknis-ipal-2011Pedoman teknis-ipal-2011
Pedoman teknis-ipal-2011yoga marta
 
Buku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air MinumBuku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air MinumJoy Irman
 
perencanaan intake
perencanaan intakeperencanaan intake
perencanaan intakeReza Nuari
 
Pedoman Pengelolaan Sistem Penyediaan Air Minum
Pedoman Pengelolaan Sistem Penyediaan Air MinumPedoman Pengelolaan Sistem Penyediaan Air Minum
Pedoman Pengelolaan Sistem Penyediaan Air Minuminfosanitasi
 
Draft pedoman program pisew
Draft pedoman program pisewDraft pedoman program pisew
Draft pedoman program pisewlihin01
 
Penyelenggaraan Sistem Drainase Perkotaan - A2 Perencanaan
Penyelenggaraan Sistem Drainase Perkotaan - A2 PerencanaanPenyelenggaraan Sistem Drainase Perkotaan - A2 Perencanaan
Penyelenggaraan Sistem Drainase Perkotaan - A2 PerencanaanJoy Irman
 
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...Mellianae Merkusi
 
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah Joy Irman
 
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air MinumPedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minuminfosanitasi
 

What's hot (20)

Sosialisasi muatan PP 22 tahun 2021 (terkait pl)
Sosialisasi muatan PP 22 tahun 2021 (terkait pl)Sosialisasi muatan PP 22 tahun 2021 (terkait pl)
Sosialisasi muatan PP 22 tahun 2021 (terkait pl)
 
Pedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedungPedoman persyaratan teknis bangunan gedung
Pedoman persyaratan teknis bangunan gedung
 
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
Permen PU Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Pen...
 
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...
Sni 3434-2008-tata cara perhitungan harga satuan pekerjaan kayu untuk banguna...
 
Gambar teknis perencanaan drainase
Gambar teknis perencanaan drainaseGambar teknis perencanaan drainase
Gambar teknis perencanaan drainase
 
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...
Sni 7395-2008-tata cara perhitungan harga satuan pekerjaan penutup lantai dan...
 
11 sistem jaringan dan bangunan irigasi
11   sistem jaringan dan bangunan irigasi11   sistem jaringan dan bangunan irigasi
11 sistem jaringan dan bangunan irigasi
 
Sni 6774 2008.air bersih
Sni 6774 2008.air bersihSni 6774 2008.air bersih
Sni 6774 2008.air bersih
 
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1
Permen PU No 12 Tahun 2014 tentang Drainase Perkotaan - Lamp1
 
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air MinumPedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
 
Pedoman teknis-ipal-2011
Pedoman teknis-ipal-2011Pedoman teknis-ipal-2011
Pedoman teknis-ipal-2011
 
Buku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air MinumBuku Panduan Pengembangan Air Minum
Buku Panduan Pengembangan Air Minum
 
perencanaan intake
perencanaan intakeperencanaan intake
perencanaan intake
 
Pedoman Pengelolaan Sistem Penyediaan Air Minum
Pedoman Pengelolaan Sistem Penyediaan Air MinumPedoman Pengelolaan Sistem Penyediaan Air Minum
Pedoman Pengelolaan Sistem Penyediaan Air Minum
 
Draft pedoman program pisew
Draft pedoman program pisewDraft pedoman program pisew
Draft pedoman program pisew
 
Penyelenggaraan Sistem Drainase Perkotaan - A2 Perencanaan
Penyelenggaraan Sistem Drainase Perkotaan - A2 PerencanaanPenyelenggaraan Sistem Drainase Perkotaan - A2 Perencanaan
Penyelenggaraan Sistem Drainase Perkotaan - A2 Perencanaan
 
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...
Rencana Pembangunan dan Pengembangan Perumahan dan Kawasan Permukiman (RP3KP)...
 
Laporan Akhir
Laporan AkhirLaporan Akhir
Laporan Akhir
 
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
Penyusunan Rencana Induk Sistem Pengelolaan Air Limbah
 
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air MinumPedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
 

Ded Pipanisasi Air Bersih