LEARNING OUTCOMES
•To understand the nature of risk in order to measure risk
•To understand how risk factors are incorporated into
modelling risk
•To understand the properties of componentVaR
2
The Question Being Asked inVaR
“What loss level is such that we are X% confident it will not be
exceeded in N business days?”
3
VaR and Regulatory Capital
• Regulators base the capital they require banks to keep on
VaR
• The market-risk capital has traditionally been calculated
from a 10-dayVaR estimated where the confidence level is
99%
• Credit risk and operational risk capital are based on a one-
year 99.9%VaR
4
Advantages ofVaR
• It captures an important aspect of risk
in a single number
• It is easy to understand
• It asks the simple question: “How bad can things get?”
5
VaR vs. Expected Shortfall
• VaR is the loss level that will not be exceeded with a specified
probability
• Expected shortfall (ES) is the expected loss given that the loss
is greater than theVaR level (also called C-VaR andTail Loss)
• Regulators have indicated that they plan to move from using
VaR to using ES for determining market risk capital
• Two portfolios with the sameVaR can have very different
expected shortfalls
6
Distributions with the SameVaR but
Different Expected Shortfalls
VaR
VaR
7
Coherent Risk Measures
• Define a coherent risk measure as the amount of cash that
has to be added to a portfolio to make its risk acceptable
• Properties of coherent risk measure
• If one portfolio always produces a worse outcome than another
its risk measure should be greater
• If we add an amount of cash K to a portfolio its risk measure
should go down by K
• Changing the size of a portfolio by l should result in the risk
measure being multiplied by l
• The risk measures for two portfolios after they have been
merged should be no greater than the sum of their risk measures
before they were merged 8
VaR vs Expected Shortfall
• VaR satisfies the first three conditions but not the fourth one
• ES satisfies all four conditions.
9
Spectral Risk Measures
1. A spectral risk measure assigns weights to quantiles of the loss
distribution
2. VaR assigns all weight to Xth percentile of the loss distribution
3. Expected shortfall assigns equal weight to all percentiles
greater than the Xth percentile
4. For a coherent risk measure weights must be a non-decreasing
function of the percentiles
10
Normal Distribution Assumption
• When losses (gains) are normally distributed with
mean m and standard deviation s
11
)
1
(
2
ES
)
(
VaR
2
1
2
X
e
X
N
Y








s
m
s
m
Changing theTime Horizon
• If losses in successive days are independent, normally distributed, and have
a mean of zero
12
T
T
T




ES
day
-
1
ES
day
-
T
VaR
day
-
1
VaR
day
-
Choice ofVaR Parameters
• Time horizon should depend on how quickly portfolio can be
unwound. Regulators are planning to move toward a system
where ES is used and the time horizon depends on liquidity.
• Confidence level depends on objectives. Regulators use 99% for
market risk and 99.9% for credit/operational risk.
• A bank wanting to maintain a AA credit rating might use
confidence levels as high as 99.97% for internal calculations.
13
AggregatingVaRs
An approximate approach that seems to works well is
whereVaRi is theVaR for the ith segment,VaRtotal is the totalVaR, and rij is the coefficient
of correlation between losses from the ith and jth segments
14
 r

i j
ij
j
iVaR
VaR
VaRtotal
Properties of ComponentVaR
• The componentVaR is approximately the same as the incrementalVaR
• The totalVaR is the sum of the componentVaR’s (Euler’s theorem)
• The componentVaR therefore provides a sensible way of allocatingVaR to
different activities
15
Back-testing
• Back-testing aVaR calculation methodology involves
looking at how often exceptions (loss >VaR) occur
• Alternatives: a) compareVaR with actual change in portfolio
value and b) compareVaR with change in portfolio value
assuming no change in portfolio composition
16
Bunching
• Bunching occurs when exceptions are not evenly spread throughout the
back testing period
• Statistical tests for bunching have been developed by Christoffersen
17

More Related Content

Similar to Chapter 8-The VaR Approach.pptx

Liquidity Risk Measurement
Liquidity Risk MeasurementLiquidity Risk Measurement
Liquidity Risk MeasurementRaja Abdarrahman
 
2016-09-29 GS1 Session Slides
2016-09-29 GS1 Session Slides2016-09-29 GS1 Session Slides
2016-09-29 GS1 Session SlidesMichael Solomon
 
BlueBookAcademy.com - Risk, Return & Diversification Techniques
BlueBookAcademy.com - Risk, Return & Diversification TechniquesBlueBookAcademy.com - Risk, Return & Diversification Techniques
BlueBookAcademy.com - Risk, Return & Diversification Techniquesbluebookacademy
 
Application of square root of time scaling
Application of square root of time scalingApplication of square root of time scaling
Application of square root of time scalingAnn Laki
 
corporate finance
corporate financecorporate finance
corporate financeShrey Sao
 
LiquidityRiskManagementDay1Ses4.ppt
LiquidityRiskManagementDay1Ses4.pptLiquidityRiskManagementDay1Ses4.ppt
LiquidityRiskManagementDay1Ses4.pptssuserffce38
 
Risk Management in Financial Institutions
Risk Management in Financial InstitutionsRisk Management in Financial Institutions
Risk Management in Financial InstitutionsArchanaKamble18
 
Portfolio Risk & Return Part 1.pptx
Portfolio Risk & Return Part 1.pptxPortfolio Risk & Return Part 1.pptx
Portfolio Risk & Return Part 1.pptxRahul das
 
Bridging marke- credit risk-Modelling the Incremental Risk Charge.pptx
Bridging marke- credit risk-Modelling the  Incremental Risk Charge.pptxBridging marke- credit risk-Modelling the  Incremental Risk Charge.pptx
Bridging marke- credit risk-Modelling the Incremental Risk Charge.pptxGarima Singh Makhija
 
Risk Management: Maximising Long-Term Growth Presentation
Risk Management: Maximising Long-Term Growth PresentationRisk Management: Maximising Long-Term Growth Presentation
Risk Management: Maximising Long-Term Growth PresentationQuantInsti
 
Measuring risk essentials of financial risk management
Measuring risk essentials of financial risk managementMeasuring risk essentials of financial risk management
Measuring risk essentials of financial risk managementChho Phet
 
Long horizon simulations for counterparty risk
Long horizon simulations for counterparty risk Long horizon simulations for counterparty risk
Long horizon simulations for counterparty risk Alexandre Bon
 
Bloomberg va r
Bloomberg va rBloomberg va r
Bloomberg va rrohanharsh
 
VAR_Models__1705848850 e value at risk presentation
VAR_Models__1705848850 e value at risk presentationVAR_Models__1705848850 e value at risk presentation
VAR_Models__1705848850 e value at risk presentationnhvrmw5mtj
 
Valuing Firm in Distress - A.Damodaran
Valuing Firm in Distress - A.DamodaranValuing Firm in Distress - A.Damodaran
Valuing Firm in Distress - A.DamodaranGiuseppe Fumagalli
 

Similar to Chapter 8-The VaR Approach.pptx (20)

Liquidity Risk Measurement
Liquidity Risk MeasurementLiquidity Risk Measurement
Liquidity Risk Measurement
 
2016-09-29 GS1 Session Slides
2016-09-29 GS1 Session Slides2016-09-29 GS1 Session Slides
2016-09-29 GS1 Session Slides
 
BlueBookAcademy.com - Risk, Return & Diversification Techniques
BlueBookAcademy.com - Risk, Return & Diversification TechniquesBlueBookAcademy.com - Risk, Return & Diversification Techniques
BlueBookAcademy.com - Risk, Return & Diversification Techniques
 
Application of square root of time scaling
Application of square root of time scalingApplication of square root of time scaling
Application of square root of time scaling
 
corporate finance
corporate financecorporate finance
corporate finance
 
LiquidityRiskManagementDay1Ses4.ppt
LiquidityRiskManagementDay1Ses4.pptLiquidityRiskManagementDay1Ses4.ppt
LiquidityRiskManagementDay1Ses4.ppt
 
Risk Management in Financial Institutions
Risk Management in Financial InstitutionsRisk Management in Financial Institutions
Risk Management in Financial Institutions
 
Portfolio Risk & Return Part 1.pptx
Portfolio Risk & Return Part 1.pptxPortfolio Risk & Return Part 1.pptx
Portfolio Risk & Return Part 1.pptx
 
Bridging marke- credit risk-Modelling the Incremental Risk Charge.pptx
Bridging marke- credit risk-Modelling the  Incremental Risk Charge.pptxBridging marke- credit risk-Modelling the  Incremental Risk Charge.pptx
Bridging marke- credit risk-Modelling the Incremental Risk Charge.pptx
 
Risk Management: Maximising Long-Term Growth Presentation
Risk Management: Maximising Long-Term Growth PresentationRisk Management: Maximising Long-Term Growth Presentation
Risk Management: Maximising Long-Term Growth Presentation
 
Value At Risk Sep 22
Value At Risk Sep 22Value At Risk Sep 22
Value At Risk Sep 22
 
Measuring risk essentials of financial risk management
Measuring risk essentials of financial risk managementMeasuring risk essentials of financial risk management
Measuring risk essentials of financial risk management
 
Pertemuan 3 portfolio efisien
Pertemuan 3 portfolio efisienPertemuan 3 portfolio efisien
Pertemuan 3 portfolio efisien
 
Risk Measurement in practice
Risk Measurement in practiceRisk Measurement in practice
Risk Measurement in practice
 
C6
C6C6
C6
 
Long horizon simulations for counterparty risk
Long horizon simulations for counterparty risk Long horizon simulations for counterparty risk
Long horizon simulations for counterparty risk
 
Bloomberg va r
Bloomberg va rBloomberg va r
Bloomberg va r
 
Cre Var Brochure
Cre Var BrochureCre Var Brochure
Cre Var Brochure
 
VAR_Models__1705848850 e value at risk presentation
VAR_Models__1705848850 e value at risk presentationVAR_Models__1705848850 e value at risk presentation
VAR_Models__1705848850 e value at risk presentation
 
Valuing Firm in Distress - A.Damodaran
Valuing Firm in Distress - A.DamodaranValuing Firm in Distress - A.Damodaran
Valuing Firm in Distress - A.Damodaran
 

Recently uploaded

Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Sapana Sha
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxhiddenlevers
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...Amil baba
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 

Recently uploaded (20)

Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptxOAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
OAT_RI_Ep19 WeighingTheRisks_Apr24_TheYellowMetal.pptx
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesMulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Mulki Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 

Chapter 8-The VaR Approach.pptx

  • 1. RISK MANAGEMENT TOPIC 8 :THEVAR APPROACH
  • 2. LEARNING OUTCOMES •To understand the nature of risk in order to measure risk •To understand how risk factors are incorporated into modelling risk •To understand the properties of componentVaR 2
  • 3. The Question Being Asked inVaR “What loss level is such that we are X% confident it will not be exceeded in N business days?” 3
  • 4. VaR and Regulatory Capital • Regulators base the capital they require banks to keep on VaR • The market-risk capital has traditionally been calculated from a 10-dayVaR estimated where the confidence level is 99% • Credit risk and operational risk capital are based on a one- year 99.9%VaR 4
  • 5. Advantages ofVaR • It captures an important aspect of risk in a single number • It is easy to understand • It asks the simple question: “How bad can things get?” 5
  • 6. VaR vs. Expected Shortfall • VaR is the loss level that will not be exceeded with a specified probability • Expected shortfall (ES) is the expected loss given that the loss is greater than theVaR level (also called C-VaR andTail Loss) • Regulators have indicated that they plan to move from using VaR to using ES for determining market risk capital • Two portfolios with the sameVaR can have very different expected shortfalls 6
  • 7. Distributions with the SameVaR but Different Expected Shortfalls VaR VaR 7
  • 8. Coherent Risk Measures • Define a coherent risk measure as the amount of cash that has to be added to a portfolio to make its risk acceptable • Properties of coherent risk measure • If one portfolio always produces a worse outcome than another its risk measure should be greater • If we add an amount of cash K to a portfolio its risk measure should go down by K • Changing the size of a portfolio by l should result in the risk measure being multiplied by l • The risk measures for two portfolios after they have been merged should be no greater than the sum of their risk measures before they were merged 8
  • 9. VaR vs Expected Shortfall • VaR satisfies the first three conditions but not the fourth one • ES satisfies all four conditions. 9
  • 10. Spectral Risk Measures 1. A spectral risk measure assigns weights to quantiles of the loss distribution 2. VaR assigns all weight to Xth percentile of the loss distribution 3. Expected shortfall assigns equal weight to all percentiles greater than the Xth percentile 4. For a coherent risk measure weights must be a non-decreasing function of the percentiles 10
  • 11. Normal Distribution Assumption • When losses (gains) are normally distributed with mean m and standard deviation s 11 ) 1 ( 2 ES ) ( VaR 2 1 2 X e X N Y         s m s m
  • 12. Changing theTime Horizon • If losses in successive days are independent, normally distributed, and have a mean of zero 12 T T T     ES day - 1 ES day - T VaR day - 1 VaR day -
  • 13. Choice ofVaR Parameters • Time horizon should depend on how quickly portfolio can be unwound. Regulators are planning to move toward a system where ES is used and the time horizon depends on liquidity. • Confidence level depends on objectives. Regulators use 99% for market risk and 99.9% for credit/operational risk. • A bank wanting to maintain a AA credit rating might use confidence levels as high as 99.97% for internal calculations. 13
  • 14. AggregatingVaRs An approximate approach that seems to works well is whereVaRi is theVaR for the ith segment,VaRtotal is the totalVaR, and rij is the coefficient of correlation between losses from the ith and jth segments 14  r  i j ij j iVaR VaR VaRtotal
  • 15. Properties of ComponentVaR • The componentVaR is approximately the same as the incrementalVaR • The totalVaR is the sum of the componentVaR’s (Euler’s theorem) • The componentVaR therefore provides a sensible way of allocatingVaR to different activities 15
  • 16. Back-testing • Back-testing aVaR calculation methodology involves looking at how often exceptions (loss >VaR) occur • Alternatives: a) compareVaR with actual change in portfolio value and b) compareVaR with change in portfolio value assuming no change in portfolio composition 16