Personal Information
Organization / Workplace
Egypt Egypt
Occupation
Gas Processing Section Head at Wasco
About
Experience:
- From September 2011 to present in el-Wastani-Dana gas Cairo Office as a process engineer for reviewing the company projects development in process & operation aspects
- From November 2007 to September 2011 in el-Wastani fields
including rich gas processing, LPG & condensate production by :
- Three phases separator,
- Mechanical refrigeration unit,
- Turbo-Expander unit,
- Plate and fins heat exchanger,
- De-ethanizer unit,
- Debutanizer unit,
- Condensate stabilization unit,
4
- Including the auxiliary utilities like hot oil system,
- Instrument air supply package,
- Mono ethylene glycol injection,
- Produced water & condensate separation,
- LPG storage, condensate storage (...
- Presentations
- Documents
- Infographics
Api piping poster-signed
Miguel Angel Romero
•
6 years ago
The mexico city explosion of 1984
Mohit Nayal
•
7 years ago
Petroleum Refinery Engineering-Part-2-30-July-2016
Muhammad Rashid Usman
•
7 years ago
Episode 6 : HAZARD IDENTIFICATION (FMEA & HAZOP)
SAJJAD KHUDHUR ABBAS
•
8 years ago
How to read a P&ID for Risk Analysis
risk_inspired
•
12 years ago