SlideShare a Scribd company logo
1 of 10
Download to read offline
Creating an IWMS
Implementation Plan
The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World
©2012,ARCHIBUS,Inc.Allrightsreserved.
Workplace&
Facilities
Workplace
Infrastructure
RealEstate&
Property
Engineering&
Operations
Space Planning
& Management
Workplace
Services
Real Estate Portfolio
Management
Asset Management
Capital Project
Management
Building Operations
Move
Management
Environmental &
Risk Management
Enterprise
Information
Modeling
Opti
m
i z e A l l o
c
ate
P r e
s
e
rve
En
a
b
l e
Opti
m
i z e A l l o
c
ate
P r e
s
e
rve
En
a
b
l e
Space Allocation & Occupancy
Chargeback, Strategic Planning
Capital Budgeting
Project Management
Condition Assessment
Commissionning
Single or Group Moves
Scenario Planning
Properties, Leases, Costs & Invoicing
Chargeback, Forecasts
Energy, Carbon Footprint
Certification Scoring
HazMat & MSDS
Waste Management
Sustainability, EH&S
Business Continuity
On Demand & Planned Maintenance
Condition Assessment
Furniture, Equipment
IT Asset Tracking / Allocation
Cabling Connectivity
Service Desk, Hoteling
Reservations
Call Center
Fleet Management
A comprehensive IWMS
solution addresses the
broad array of real
estate, infrastructure,
and facilities
management functions
with a fully integrated
approach to reduce
costs, mitigate risk, and
optimize service levels.
Overview
The increased information available through an Integrated Workplace Management System (IWMS)
impacts every part of an organization and can dramatically increase the enterprise’s productivity in
managing real estate, infrastructure, and facilities. Assessing the IWMS opportunity provides a better
understanding of the potential benefits that can be optimized with an IWMS implementation. And an
IWMS Needs Analysis maps the route to the successful utilization of your information and systems.
Features of an IWMS Implementation Plan:
• Experienced direction from IWMS specialists
• Definition of a project’s strategic goals
• Objective analysis of current methods and systems
• Identification of objectives and prioritization of the required tasks
• Analysis of required resources to achieve optimal results
• Clearly documented implementation plan
Benefits of a Plan:
• Provides a clear understanding of the project scope
• Develops coordinated efforts and goals
• Reduces costs and time required for implementation
• Avoids redundant responsibilities, tasks, and information systems
• Provides the basis for an efficient and focused implementation
• Increases overall system functionality and process productivity
Over 4 million users prove it daily—saving their organizations over $100 billion annually
Creating an IWMS Implementation Plan
1
IWMS Implementation Phases
Once your organization recognizes the need for an integrated workplace management system, the
next step is mapping the route to a successful implementation. The opportunity within an organization
to optimize the use of its real estate and facilities assets is significant, however, it is important not
to underestimate the initial effort required to begin the implementation. Typical phases involved in
implementing a successful IWMS solution are:
Phase 1 - IWMS Needs Analysis
1. Preliminary Assessment
2. IWMS Opportunity Analysis
a) Resource Analysis
b) Data Requirements
c) Data Access and Flow
d) Training Requirements
e) Implementation Plan and Analysis Report
Phase 3 - IWMS Implementation
1. Software Installation
2. Data Development and/or Integration
3. Report Production
4. User Training
This document describes the benefits of an IWMS Needs Analysis, an overview of the activities involved, and
the range of IWMS Opportunity Audits that can be performed for different levels of IWMS implementations.
Phase 2 - IWMS Solution Design
1. System Design
2. Standards Development
3. Software Personalization
4. IWMS Procedures Guide
IWMS dashboards
present critical
business
information that
supports strategic
and tactical
decision-making
Phase 4 – Post-Implementation Support
1. Technical Support
2. Review and Evaluation
3. System Enhancements
4. Supplementary User Training
The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World2
Creating an IWMS Implementation Plan
Why Conduct an IWMS Needs Analysis?
A Needs Analysis is the most important phase of an IWMS project. The primary goals of this analysis are
to determine an organization’s requirements for managing its physical assets and facilities processes; the
optimal approaches for automating these real estate and facilities management tasks; and the resources
required.
Define Project Scope
The Needs Analysis is the phase of the project where purposes of
the project are identified; a project team and the roles they will play
are defined; issues are prioritized; desired results are identified; the
level of effort needed to obtain those results is determined; and an
action plan and timeline for accomplishing goals are established.
Determine Priorities
Each organization has different levels of information systems,
data, and methods already in place for managing its real estate
portfolio and facilities assets. A Needs Analysis includes a review
of existing systems, data sources, and methods; attempts to identify
any additional areas that can most benefit from automation;
analyzes current methods to see whether they can be improved, and
determines the required steps to integrate existing systems. Typically,
an organization will want to perform a number of tasks—priorities
must be determined in light of the available resources and benefits.
Establish User-Specific Needs and Personalization
Each organization has unique issues and different means by which to address them. IWMS solutions often
come pre-packaged with generic formats for tracking and managing information. However, the best COTS
(Commercial-Off-The-Shelf) solutions are also adaptable to unique needs of end-users. A Needs Analysis will
identify those areas in which the software should be personalized to best fit the client’s needs.
Specify an Implementation Plan
Implementing a software system without setting goals and detailing the steps required to arrive at those goals
is analogous to driving cross-country without a road map or GPS device. A Needs Analysis helps develop
a map indicating the route to success. It provides a clear understanding of the obstacles that lie ahead, and
plans for the appropriate measures to deal with those obstacles.
Over 4 million users prove it daily—saving their organizations over $100 billion annually
Creating an IWMS Implementation Plan
3
IWMS Needs Analysis Activities
The Needs Analysis usually involves an on-site visit followed by a period of reporting findings. A number of
key areas will be addressed in an analysis of the IWMS requirements of an organization:
Preliminary Assessment
Prior to the on-site visit, communication is initiated to establish some guidelines and structure for the on-site
visit. This involves:
• Identifying and prioritizing needs and goals
• Collecting any relevant materials that the client can provide demonstrating current methods, data,
reporting, and capabilities
• Establishing an initial analysis approach
• Determining the scope of the Needs Analysis
• Defining the project team—this may include in-house staff, consultants, software vendors, A/E firms, and
others
• Specifying the roles of the project team members to avoid conflicting responsibilities
Actual IWMS Needs Analysis
Analysis of Current Resources
The first stage of the on-site visit includes the following key activities:
• Analyzing current capabilities
• Evaluating conceptual reporting and presentation requirements
• Reviewing current space and asset standards
Investigation of Data Requirements
The next major area of review in the IWMS Assessment includes:
• Evaluating current data models
• Establishing modified data models or developing additional ones
• Examining current data sources and translation requirements
Analysis of Data Access and Reporting Requirements
The following steps help maximize the benefits of an IWMS system:
• Examining additional reporting benefits
• Analyzing executive information needs
• Identifying key methods and procedures
• Evaluating data flow requirements
• Investigating additional information distribution benefits to other organizational units
The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World4
Creating an IWMS Implementation Plan
Appropriate Training and Scheduling
An organization may need to provide different levels of training for the Project team, managers, end-users,
systems staff, and/or others:
• The IWMS implementation Project Team may need initial training on the default functionality of the
system to determine existing methods and which areas need the most discussion and analysis
• Managers may only need an overview and access to summary information
• End-users may need detailed relational database, BIM/CAD, and IWMS training
• Systems support personnel will need to understand the file structure of the IWMS system and
possible integration with other ERP systems
• Other topics to explore include: setting up single sign-on with an active directory, automating
drawing publishing, automating workflow rules, using Web Services, and scoping global
deployments
• Additional staff may need training in features that address their particular needs
Implementation Plan and Analysis Report
The result of the analysis is a report that incorporates the following deliverables:
• Translating conceptual requirements into actionable entities
• Establishing the key system parameters and components
• Identifying key tasks and milestones
• Determining Action Plan and Timeline alternatives
• Defining on-going technical needs
• Documenting recommendations, implementation options, and associated costs
Over 4 million users prove it daily—saving their organizations over $100 billion annually
Creating an IWMS Implementation Plan
5
Degrees of Assessment
IWMS Needs Analyses can be conducted on a variety of levels, depending on the types of assets to be
managed, the number of departments involved, and an organization’s overall goals.
Pilot Assessment
The simplest IWMS Needs Analysis can be conducted as part of the training program. For ARCHIBUS, a
typical end-user training program consists of a 4-day course designed to teach the basic skills needed to
work effectively with ARCHIBUS and provides an overview of its many business applications. Participants
will learn about the basic components of ARCHIBUS - databases, drawings, and reports, and its suite of
products – ARCHIBUS Web Central, ARCHIBUS Smart Client, and the Smart Client for AutoCAD and
Revit. Participants will become competent in the core ARCHIBUS application domains: Space Planning &
Management, Building Operations, Real Estate Portfolio Management, and Asset Management. It may
be advisable to budget additional days for initial implementation exercises using the clients’ drawings and
data. During this training period, the trainer can evaluate the differences between the users’ data and
the default structure of the system. Minor alterations to the system’s structure can be made as part of the
training session. If more extensive changes are desired, a proposal can be developed based on the needs
determined during the training session.
The benefit of this method is that
the user and the software solution
providor learn each other’s structures
at the same time and can more
intelligently discuss the issues involved
in aligning the client’s needs with the
system’s capabilities. An additional
benefit is that the cost involved in
getting up and running is, typically,
minimal. The drawbacks are that
this type of analysis only addresses
the needs of those users who are in
the training session and may not fully
cover the needs of other departments
relying on output from the system.
Immediate IWMS Needs Analysis
An Immediate IWMS Needs Analysis involves in-depth analysis as outlined above in the IWMS “Needs
Analysis Activities” section. All departmental representatives are brought together for a number of day-
long, in-house evaluations of their current systems, data, methods, and goals. Interdepartmental asset
management information needs are discussed as well as internal departmental needs.
The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World6
Creating an IWMS Implementation Plan
Once the general parameters of the system have been defined, individual meetings are held with department(s)
having immediate needs and planning to implement the system immediately. Functional system parameters
for the department(s) are specified. The detailed needs of departments who may decide to integrate at a
later time are deferred until a later date.
A formal document is prepared which describes the needs of each department and detailed specifications
for a proposed solution.
The advantages of this level of analysis are that only the areas that will immediately benefit are analyzed at
a detailed level. Start-up time is shorter and data can be implemented quickly in the areas that will realize
the most benefit. The disadvantage is that other departments’ detailed needs may subsequently involve some
rework.
IWMS Opportunity Assessment
The most extensive analysis is provided by the IWMS
Opportunity Assessment. This assessment involves all of the
activities of the Immediate IWMS Needs Analysis. In addition,
any department that will need access to any of the IWMS
information will be evaluated in detail. All cross-departmental
data flows will be determined and an attempt will be made
to define a system that provides every department with data
in the format they require. Departments with existing systems
will be evaluated to determine how their systems are best
integrated with other departments.
The IWMS Opportunity Assessment allows for the possibility of re-engineering existing workflows and
processes rather than merely automating the existing ones. The IWMS Opportunity Assessment can
determine where entire cross-departmental facilities and asset management activities may be redefined to be
more efficient and productive. An organization may discover that the best way to automate two departments’
operations is to merge some of their functions. The data management activities of one department may best
be served by the data generated from other departments.
The potential changes in workflow and technology will have an impact on the people in the organization.
The IWMS Opportunity Assessment will attempt to identify and balance the risks and benefits that may be
associated with significant changes in workflow. Typically, this requires a plan for a phased transition from
the current state to the ideal state so that the change can be managed most beneficially.
This analysis allows the identification of the ideal IWMS solution and the best target IWMS solution (between
the ideal and the achievable). The target is identified by maximizing the potential results/effort ratio. A
formal document is prepared which describes the needs of each department, the flow of data throughout the
organization, and a detailed specification for a proposed solution.
The benefits of this level of assessment are that the needs of every department are addressed and the resulting
specification coordinates all of the data through the organization. In addition, all of the operating processes
as well as individual departmental functions are evaluated. This method is not ideal for all projects, though.
Evaluating everyone’s needs and keeping everyone satisfied can be a lengthy process. Various degrees or
aspects of the IWMS Needs Analysis can be combined to match the needs of the client organization.
Over 4 million users prove it daily—saving their organizations over $100 billion annually
Creating an IWMS Implementation Plan
7
Other Deployment Considerations
Don’t underestimate the role that experience plays in successfully implementing the necessary systems and
processes to transform your real estate, infrastructure, and facilities portfolio.
The ARCHIBUS Implementation Methodologytm
is rooted in 30 years of ARCHIBUS, Inc. experience as
a pioneer in the development of real estate, infrastructure, and facilities automation solutions. It also
aggregates the acquired deployment knowledge based on the best practices and benchmarks of our
4,000,000+ users. Today, you can successfully deploy an ARCHIBUS “commercial-off -the shelf” solution
in as little as 30 days.
Specialized professional services from ARCHIBUS, Inc. and our global network of 1,600+ Business
Partners include opportunity/technology audits, implementation planning and support, project creation/
migration, application personalization/customization, application integration, implementation/
management audits, and more.
Contact your local ARCHIBUS Business Partner or ARCHIBUS, Inc. Professional Services Group
(professionalservices@archibus.com or +1 617-227-2508) for more information on services available, or to
arrange a Needs Analysis at your organization.
Deploy
Support Plan
Assess
Design
Pilot
Develop
AnalysisDeploy
Support Plan
Assess
Design
Pilot
Develop
Analysis
30-Day Rapid Deployment with
ARCHIBUS Implementation Methodology
© 2012, ARCHIBUS, Inc. All rights reserved.
IWMSPlanPaperFinalAug2012
18 Tremont St. • Boston, MA 02108 • USA • Tel: +1 617.227.2508 • archibus.com
The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World
Over 4 million users prove it daily—saving their organizations over $100 billion annually
About ARCHIBUS, Inc.
ARCHIBUS is the #1 global provider of real estate, infrastructure, and facilities management solutions and services
with the total annual expenditures for ARCHIBUS-related products and services exceeding $2.0 billion (USD).
Through effective innovation and business transformation, ARCHIBUS users save their organizations over $100
billion (USD) annually. With ARCHIBUS, organizations can use a single, comprehensive, integrated solution to
make informed strategic decisions that optimize return-on-investment, lower asset lifecycle costs, and increase
enterprise-wide productivity and profitability. ARCHIBUS is the world-wide proponent for the creation of ubiquitous
environmental sustainability.
More than 4,000,000 ARCHIBUS enterprise and Web users collectively manage over 5,000,000 properties,
with organizations reporting facilities-related cost savings as high as 34%. With over 1,600 ARCHIBUS Business
Partners, local and regional support worldwide is available in over 130 countries and more than two dozen
languages. Headquartered in Boston, Massachusetts, ARCHIBUS, Inc. has pioneered computer-aided infrastructure
and facilities management technologies since 1982. For more information, visit archibus.com.

More Related Content

What's hot

KScope15-Reporting with Public Sector Planning and Budgeting_Final1
KScope15-Reporting with Public Sector Planning and Budgeting_Final1KScope15-Reporting with Public Sector Planning and Budgeting_Final1
KScope15-Reporting with Public Sector Planning and Budgeting_Final1Tiffany Ma
 
1010 cd overview light
1010 cd overview light1010 cd overview light
1010 cd overview lightAndrew Hudson
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...journalBEEI
 
Performance Alignment: Linking Resource Management to Organizational Goals
Performance Alignment: Linking Resource Management to Organizational GoalsPerformance Alignment: Linking Resource Management to Organizational Goals
Performance Alignment: Linking Resource Management to Organizational Goalsfmi_igf
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Webinar with Anaplan and IDC: The benefits of connected planning
Webinar with Anaplan and IDC: The benefits of connected planningWebinar with Anaplan and IDC: The benefits of connected planning
Webinar with Anaplan and IDC: The benefits of connected planningAnaplan
 
Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Cisco
 
An introduction to hyperion public sector planning
An introduction to hyperion public sector planningAn introduction to hyperion public sector planning
An introduction to hyperion public sector planningAmit Sharma
 
Template Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosTemplate Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosFernando Palma
 
Bridging the cost schedule divide - integrating primavera and cost systems wh...
Bridging the cost schedule divide - integrating primavera and cost systems wh...Bridging the cost schedule divide - integrating primavera and cost systems wh...
Bridging the cost schedule divide - integrating primavera and cost systems wh...p6academy
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3POOJA UDAYAN
 
Enterprise Performance Management for Finance
Enterprise Performance Management for FinanceEnterprise Performance Management for Finance
Enterprise Performance Management for FinanceFindWhitePapers
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD) jo bitonio
 
IT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance MeasurementIT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance MeasurementGlen Alleman
 
AnaplanOSFINALWebinarPresentation(Forrester)
AnaplanOSFINALWebinarPresentation(Forrester)AnaplanOSFINALWebinarPresentation(Forrester)
AnaplanOSFINALWebinarPresentation(Forrester)Laura Roach
 
Project Portfolio Management - An insiders overview
Project Portfolio Management - An insiders overviewProject Portfolio Management - An insiders overview
Project Portfolio Management - An insiders overviewSaji Madapat
 

What's hot (20)

Ch 11.1 org plan
Ch 11.1 org planCh 11.1 org plan
Ch 11.1 org plan
 
KScope15-Reporting with Public Sector Planning and Budgeting_Final1
KScope15-Reporting with Public Sector Planning and Budgeting_Final1KScope15-Reporting with Public Sector Planning and Budgeting_Final1
KScope15-Reporting with Public Sector Planning and Budgeting_Final1
 
1010 cd overview light
1010 cd overview light1010 cd overview light
1010 cd overview light
 
Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...Business process monitoring system in supporting information technology gover...
Business process monitoring system in supporting information technology gover...
 
Performance Alignment: Linking Resource Management to Organizational Goals
Performance Alignment: Linking Resource Management to Organizational GoalsPerformance Alignment: Linking Resource Management to Organizational Goals
Performance Alignment: Linking Resource Management to Organizational Goals
 
3 pom kc 6 sep. 2010
3 pom kc 6 sep. 20103 pom kc 6 sep. 2010
3 pom kc 6 sep. 2010
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Webinar with Anaplan and IDC: The benefits of connected planning
Webinar with Anaplan and IDC: The benefits of connected planningWebinar with Anaplan and IDC: The benefits of connected planning
Webinar with Anaplan and IDC: The benefits of connected planning
 
Core P3M Data Club
Core P3M Data ClubCore P3M Data Club
Core P3M Data Club
 
Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management Oracle Primavera: Portfolio Management
Oracle Primavera: Portfolio Management
 
An introduction to hyperion public sector planning
An introduction to hyperion public sector planningAn introduction to hyperion public sector planning
An introduction to hyperion public sector planning
 
Template Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviçosTemplate Plano de disponibilidade dos serviços
Template Plano de disponibilidade dos serviços
 
Bridging the cost schedule divide - integrating primavera and cost systems wh...
Bridging the cost schedule divide - integrating primavera and cost systems wh...Bridging the cost schedule divide - integrating primavera and cost systems wh...
Bridging the cost schedule divide - integrating primavera and cost systems wh...
 
Advanced project management mod 3
Advanced project management mod 3Advanced project management mod 3
Advanced project management mod 3
 
Enterprise Performance Management for Finance
Enterprise Performance Management for FinanceEnterprise Performance Management for Finance
Enterprise Performance Management for Finance
 
Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)  Strategy Implementation of Financial and General Services Development (FGSD)
Strategy Implementation of Financial and General Services Development (FGSD)
 
IT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance MeasurementIT Scorecard: An Approach to IT Performance Measurement
IT Scorecard: An Approach to IT Performance Measurement
 
Budgetary Control
Budgetary Control Budgetary Control
Budgetary Control
 
AnaplanOSFINALWebinarPresentation(Forrester)
AnaplanOSFINALWebinarPresentation(Forrester)AnaplanOSFINALWebinarPresentation(Forrester)
AnaplanOSFINALWebinarPresentation(Forrester)
 
Project Portfolio Management - An insiders overview
Project Portfolio Management - An insiders overviewProject Portfolio Management - An insiders overview
Project Portfolio Management - An insiders overview
 

Similar to ARCHIBUS White Paper - Creating an IWMS Implementation Plan

Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system designRahul Hedau
 
Resume - Phillip E Lucier 20150111
Resume - Phillip E  Lucier 20150111Resume - Phillip E  Lucier 20150111
Resume - Phillip E Lucier 20150111Phillip Lucier
 
Development of information system chap 2
Development of information system chap 2Development of information system chap 2
Development of information system chap 2amanuelayde1
 
MIS Session 6
MIS Session 6MIS Session 6
MIS Session 6sant190
 
Bua 235 teamwork
Bua 235 teamwork Bua 235 teamwork
Bua 235 teamwork UMaine
 
mis ch2.pptx
mis ch2.pptxmis ch2.pptx
mis ch2.pptxTeshome48
 
Welingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLikeWelingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLikePrinceTrivedi4
 
Sricharan_Sana_11yrs_MDM_DM_CRM
Sricharan_Sana_11yrs_MDM_DM_CRMSricharan_Sana_11yrs_MDM_DM_CRM
Sricharan_Sana_11yrs_MDM_DM_CRMsricharan sana
 
2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docxtamicawaysmith
 
L15 managing projects(1)
L15 managing projects(1)L15 managing projects(1)
L15 managing projects(1)Nikhil Saxena
 

Similar to ARCHIBUS White Paper - Creating an IWMS Implementation Plan (20)

Enterprise Architecture
Enterprise Architecture Enterprise Architecture
Enterprise Architecture
 
ERP ppt.ppt
ERP ppt.pptERP ppt.ppt
ERP ppt.ppt
 
Mis system analysis and system design
Mis   system analysis and system designMis   system analysis and system design
Mis system analysis and system design
 
Entitlement and Access Manegement
Entitlement and Access ManegementEntitlement and Access Manegement
Entitlement and Access Manegement
 
Resume - Phillip E Lucier 20150111
Resume - Phillip E  Lucier 20150111Resume - Phillip E  Lucier 20150111
Resume - Phillip E Lucier 20150111
 
Development of information system chap 2
Development of information system chap 2Development of information system chap 2
Development of information system chap 2
 
Case Studies
Case StudiesCase Studies
Case Studies
 
MIS Session 6
MIS Session 6MIS Session 6
MIS Session 6
 
Sdlc1
Sdlc1Sdlc1
Sdlc1
 
Resume John Tzanetakis
Resume John TzanetakisResume John Tzanetakis
Resume John Tzanetakis
 
Bua 235 teamwork
Bua 235 teamwork Bua 235 teamwork
Bua 235 teamwork
 
mis ch2.pptx
mis ch2.pptxmis ch2.pptx
mis ch2.pptx
 
Welingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLikeWelingkar First Year Project- ProjectWeLike
Welingkar First Year Project- ProjectWeLike
 
Satish_Gudey
Satish_GudeySatish_Gudey
Satish_Gudey
 
Satish_Gudey
Satish_GudeySatish_Gudey
Satish_Gudey
 
Sricharan_Sana_11yrs_MDM_DM_CRM
Sricharan_Sana_11yrs_MDM_DM_CRMSricharan_Sana_11yrs_MDM_DM_CRM
Sricharan_Sana_11yrs_MDM_DM_CRM
 
Building cbis, mis, csvtu
Building cbis, mis, csvtuBuilding cbis, mis, csvtu
Building cbis, mis, csvtu
 
2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx
 
L15 managing projects(1)
L15 managing projects(1)L15 managing projects(1)
L15 managing projects(1)
 
Presentation2
Presentation2Presentation2
Presentation2
 

ARCHIBUS White Paper - Creating an IWMS Implementation Plan

  • 2. The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World ©2012,ARCHIBUS,Inc.Allrightsreserved. Workplace& Facilities Workplace Infrastructure RealEstate& Property Engineering& Operations Space Planning & Management Workplace Services Real Estate Portfolio Management Asset Management Capital Project Management Building Operations Move Management Environmental & Risk Management Enterprise Information Modeling Opti m i z e A l l o c ate P r e s e rve En a b l e Opti m i z e A l l o c ate P r e s e rve En a b l e Space Allocation & Occupancy Chargeback, Strategic Planning Capital Budgeting Project Management Condition Assessment Commissionning Single or Group Moves Scenario Planning Properties, Leases, Costs & Invoicing Chargeback, Forecasts Energy, Carbon Footprint Certification Scoring HazMat & MSDS Waste Management Sustainability, EH&S Business Continuity On Demand & Planned Maintenance Condition Assessment Furniture, Equipment IT Asset Tracking / Allocation Cabling Connectivity Service Desk, Hoteling Reservations Call Center Fleet Management A comprehensive IWMS solution addresses the broad array of real estate, infrastructure, and facilities management functions with a fully integrated approach to reduce costs, mitigate risk, and optimize service levels. Overview The increased information available through an Integrated Workplace Management System (IWMS) impacts every part of an organization and can dramatically increase the enterprise’s productivity in managing real estate, infrastructure, and facilities. Assessing the IWMS opportunity provides a better understanding of the potential benefits that can be optimized with an IWMS implementation. And an IWMS Needs Analysis maps the route to the successful utilization of your information and systems. Features of an IWMS Implementation Plan: • Experienced direction from IWMS specialists • Definition of a project’s strategic goals • Objective analysis of current methods and systems • Identification of objectives and prioritization of the required tasks • Analysis of required resources to achieve optimal results • Clearly documented implementation plan Benefits of a Plan: • Provides a clear understanding of the project scope • Develops coordinated efforts and goals • Reduces costs and time required for implementation • Avoids redundant responsibilities, tasks, and information systems • Provides the basis for an efficient and focused implementation • Increases overall system functionality and process productivity
  • 3. Over 4 million users prove it daily—saving their organizations over $100 billion annually Creating an IWMS Implementation Plan 1 IWMS Implementation Phases Once your organization recognizes the need for an integrated workplace management system, the next step is mapping the route to a successful implementation. The opportunity within an organization to optimize the use of its real estate and facilities assets is significant, however, it is important not to underestimate the initial effort required to begin the implementation. Typical phases involved in implementing a successful IWMS solution are: Phase 1 - IWMS Needs Analysis 1. Preliminary Assessment 2. IWMS Opportunity Analysis a) Resource Analysis b) Data Requirements c) Data Access and Flow d) Training Requirements e) Implementation Plan and Analysis Report Phase 3 - IWMS Implementation 1. Software Installation 2. Data Development and/or Integration 3. Report Production 4. User Training This document describes the benefits of an IWMS Needs Analysis, an overview of the activities involved, and the range of IWMS Opportunity Audits that can be performed for different levels of IWMS implementations. Phase 2 - IWMS Solution Design 1. System Design 2. Standards Development 3. Software Personalization 4. IWMS Procedures Guide IWMS dashboards present critical business information that supports strategic and tactical decision-making Phase 4 – Post-Implementation Support 1. Technical Support 2. Review and Evaluation 3. System Enhancements 4. Supplementary User Training
  • 4. The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World2 Creating an IWMS Implementation Plan Why Conduct an IWMS Needs Analysis? A Needs Analysis is the most important phase of an IWMS project. The primary goals of this analysis are to determine an organization’s requirements for managing its physical assets and facilities processes; the optimal approaches for automating these real estate and facilities management tasks; and the resources required. Define Project Scope The Needs Analysis is the phase of the project where purposes of the project are identified; a project team and the roles they will play are defined; issues are prioritized; desired results are identified; the level of effort needed to obtain those results is determined; and an action plan and timeline for accomplishing goals are established. Determine Priorities Each organization has different levels of information systems, data, and methods already in place for managing its real estate portfolio and facilities assets. A Needs Analysis includes a review of existing systems, data sources, and methods; attempts to identify any additional areas that can most benefit from automation; analyzes current methods to see whether they can be improved, and determines the required steps to integrate existing systems. Typically, an organization will want to perform a number of tasks—priorities must be determined in light of the available resources and benefits. Establish User-Specific Needs and Personalization Each organization has unique issues and different means by which to address them. IWMS solutions often come pre-packaged with generic formats for tracking and managing information. However, the best COTS (Commercial-Off-The-Shelf) solutions are also adaptable to unique needs of end-users. A Needs Analysis will identify those areas in which the software should be personalized to best fit the client’s needs. Specify an Implementation Plan Implementing a software system without setting goals and detailing the steps required to arrive at those goals is analogous to driving cross-country without a road map or GPS device. A Needs Analysis helps develop a map indicating the route to success. It provides a clear understanding of the obstacles that lie ahead, and plans for the appropriate measures to deal with those obstacles.
  • 5. Over 4 million users prove it daily—saving their organizations over $100 billion annually Creating an IWMS Implementation Plan 3 IWMS Needs Analysis Activities The Needs Analysis usually involves an on-site visit followed by a period of reporting findings. A number of key areas will be addressed in an analysis of the IWMS requirements of an organization: Preliminary Assessment Prior to the on-site visit, communication is initiated to establish some guidelines and structure for the on-site visit. This involves: • Identifying and prioritizing needs and goals • Collecting any relevant materials that the client can provide demonstrating current methods, data, reporting, and capabilities • Establishing an initial analysis approach • Determining the scope of the Needs Analysis • Defining the project team—this may include in-house staff, consultants, software vendors, A/E firms, and others • Specifying the roles of the project team members to avoid conflicting responsibilities Actual IWMS Needs Analysis Analysis of Current Resources The first stage of the on-site visit includes the following key activities: • Analyzing current capabilities • Evaluating conceptual reporting and presentation requirements • Reviewing current space and asset standards Investigation of Data Requirements The next major area of review in the IWMS Assessment includes: • Evaluating current data models • Establishing modified data models or developing additional ones • Examining current data sources and translation requirements Analysis of Data Access and Reporting Requirements The following steps help maximize the benefits of an IWMS system: • Examining additional reporting benefits • Analyzing executive information needs • Identifying key methods and procedures • Evaluating data flow requirements • Investigating additional information distribution benefits to other organizational units
  • 6. The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World4 Creating an IWMS Implementation Plan Appropriate Training and Scheduling An organization may need to provide different levels of training for the Project team, managers, end-users, systems staff, and/or others: • The IWMS implementation Project Team may need initial training on the default functionality of the system to determine existing methods and which areas need the most discussion and analysis • Managers may only need an overview and access to summary information • End-users may need detailed relational database, BIM/CAD, and IWMS training • Systems support personnel will need to understand the file structure of the IWMS system and possible integration with other ERP systems • Other topics to explore include: setting up single sign-on with an active directory, automating drawing publishing, automating workflow rules, using Web Services, and scoping global deployments • Additional staff may need training in features that address their particular needs Implementation Plan and Analysis Report The result of the analysis is a report that incorporates the following deliverables: • Translating conceptual requirements into actionable entities • Establishing the key system parameters and components • Identifying key tasks and milestones • Determining Action Plan and Timeline alternatives • Defining on-going technical needs • Documenting recommendations, implementation options, and associated costs
  • 7. Over 4 million users prove it daily—saving their organizations over $100 billion annually Creating an IWMS Implementation Plan 5 Degrees of Assessment IWMS Needs Analyses can be conducted on a variety of levels, depending on the types of assets to be managed, the number of departments involved, and an organization’s overall goals. Pilot Assessment The simplest IWMS Needs Analysis can be conducted as part of the training program. For ARCHIBUS, a typical end-user training program consists of a 4-day course designed to teach the basic skills needed to work effectively with ARCHIBUS and provides an overview of its many business applications. Participants will learn about the basic components of ARCHIBUS - databases, drawings, and reports, and its suite of products – ARCHIBUS Web Central, ARCHIBUS Smart Client, and the Smart Client for AutoCAD and Revit. Participants will become competent in the core ARCHIBUS application domains: Space Planning & Management, Building Operations, Real Estate Portfolio Management, and Asset Management. It may be advisable to budget additional days for initial implementation exercises using the clients’ drawings and data. During this training period, the trainer can evaluate the differences between the users’ data and the default structure of the system. Minor alterations to the system’s structure can be made as part of the training session. If more extensive changes are desired, a proposal can be developed based on the needs determined during the training session. The benefit of this method is that the user and the software solution providor learn each other’s structures at the same time and can more intelligently discuss the issues involved in aligning the client’s needs with the system’s capabilities. An additional benefit is that the cost involved in getting up and running is, typically, minimal. The drawbacks are that this type of analysis only addresses the needs of those users who are in the training session and may not fully cover the needs of other departments relying on output from the system. Immediate IWMS Needs Analysis An Immediate IWMS Needs Analysis involves in-depth analysis as outlined above in the IWMS “Needs Analysis Activities” section. All departmental representatives are brought together for a number of day- long, in-house evaluations of their current systems, data, methods, and goals. Interdepartmental asset management information needs are discussed as well as internal departmental needs.
  • 8. The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World6 Creating an IWMS Implementation Plan Once the general parameters of the system have been defined, individual meetings are held with department(s) having immediate needs and planning to implement the system immediately. Functional system parameters for the department(s) are specified. The detailed needs of departments who may decide to integrate at a later time are deferred until a later date. A formal document is prepared which describes the needs of each department and detailed specifications for a proposed solution. The advantages of this level of analysis are that only the areas that will immediately benefit are analyzed at a detailed level. Start-up time is shorter and data can be implemented quickly in the areas that will realize the most benefit. The disadvantage is that other departments’ detailed needs may subsequently involve some rework. IWMS Opportunity Assessment The most extensive analysis is provided by the IWMS Opportunity Assessment. This assessment involves all of the activities of the Immediate IWMS Needs Analysis. In addition, any department that will need access to any of the IWMS information will be evaluated in detail. All cross-departmental data flows will be determined and an attempt will be made to define a system that provides every department with data in the format they require. Departments with existing systems will be evaluated to determine how their systems are best integrated with other departments. The IWMS Opportunity Assessment allows for the possibility of re-engineering existing workflows and processes rather than merely automating the existing ones. The IWMS Opportunity Assessment can determine where entire cross-departmental facilities and asset management activities may be redefined to be more efficient and productive. An organization may discover that the best way to automate two departments’ operations is to merge some of their functions. The data management activities of one department may best be served by the data generated from other departments. The potential changes in workflow and technology will have an impact on the people in the organization. The IWMS Opportunity Assessment will attempt to identify and balance the risks and benefits that may be associated with significant changes in workflow. Typically, this requires a plan for a phased transition from the current state to the ideal state so that the change can be managed most beneficially. This analysis allows the identification of the ideal IWMS solution and the best target IWMS solution (between the ideal and the achievable). The target is identified by maximizing the potential results/effort ratio. A formal document is prepared which describes the needs of each department, the flow of data throughout the organization, and a detailed specification for a proposed solution. The benefits of this level of assessment are that the needs of every department are addressed and the resulting specification coordinates all of the data through the organization. In addition, all of the operating processes as well as individual departmental functions are evaluated. This method is not ideal for all projects, though. Evaluating everyone’s needs and keeping everyone satisfied can be a lengthy process. Various degrees or aspects of the IWMS Needs Analysis can be combined to match the needs of the client organization.
  • 9. Over 4 million users prove it daily—saving their organizations over $100 billion annually Creating an IWMS Implementation Plan 7 Other Deployment Considerations Don’t underestimate the role that experience plays in successfully implementing the necessary systems and processes to transform your real estate, infrastructure, and facilities portfolio. The ARCHIBUS Implementation Methodologytm is rooted in 30 years of ARCHIBUS, Inc. experience as a pioneer in the development of real estate, infrastructure, and facilities automation solutions. It also aggregates the acquired deployment knowledge based on the best practices and benchmarks of our 4,000,000+ users. Today, you can successfully deploy an ARCHIBUS “commercial-off -the shelf” solution in as little as 30 days. Specialized professional services from ARCHIBUS, Inc. and our global network of 1,600+ Business Partners include opportunity/technology audits, implementation planning and support, project creation/ migration, application personalization/customization, application integration, implementation/ management audits, and more. Contact your local ARCHIBUS Business Partner or ARCHIBUS, Inc. Professional Services Group (professionalservices@archibus.com or +1 617-227-2508) for more information on services available, or to arrange a Needs Analysis at your organization. Deploy Support Plan Assess Design Pilot Develop AnalysisDeploy Support Plan Assess Design Pilot Develop Analysis 30-Day Rapid Deployment with ARCHIBUS Implementation Methodology
  • 10. © 2012, ARCHIBUS, Inc. All rights reserved. IWMSPlanPaperFinalAug2012 18 Tremont St. • Boston, MA 02108 • USA • Tel: +1 617.227.2508 • archibus.com The #1 Solution for Real Estate, Infrastructure, and Facilities Management in the World Over 4 million users prove it daily—saving their organizations over $100 billion annually About ARCHIBUS, Inc. ARCHIBUS is the #1 global provider of real estate, infrastructure, and facilities management solutions and services with the total annual expenditures for ARCHIBUS-related products and services exceeding $2.0 billion (USD). Through effective innovation and business transformation, ARCHIBUS users save their organizations over $100 billion (USD) annually. With ARCHIBUS, organizations can use a single, comprehensive, integrated solution to make informed strategic decisions that optimize return-on-investment, lower asset lifecycle costs, and increase enterprise-wide productivity and profitability. ARCHIBUS is the world-wide proponent for the creation of ubiquitous environmental sustainability. More than 4,000,000 ARCHIBUS enterprise and Web users collectively manage over 5,000,000 properties, with organizations reporting facilities-related cost savings as high as 34%. With over 1,600 ARCHIBUS Business Partners, local and regional support worldwide is available in over 130 countries and more than two dozen languages. Headquartered in Boston, Massachusetts, ARCHIBUS, Inc. has pioneered computer-aided infrastructure and facilities management technologies since 1982. For more information, visit archibus.com.