SlideShare a Scribd company logo
1 of 2
Download to read offline
phone: + 44 (0)1224 329020 | fax: + 44 (0)1224 310037 | 23 Rubislaw Den North, Aberdeen, AB15 4AL
www.w3gmarine.co.uk
Registered office: 23 Rubislaw Den North, Aberdeen, AB15 4AL
Registration number: SC380197
EFFICIENT—COST EFFECTIVE—SAFE
OWTIS™
phone: + 44 (0)1224 329020 | fax: + 44 (0)1224 310037 | 23 Rubislaw Den North, Aberdeen, AB15 4AL
www.w3gmarine.co.uk
Registered office: 23 Rubislaw Den North, Aberdeen, AB15 4AL
Registration number: SC380197
Principal Dimension
Overall length 194.5m
Length B.P. 182.4m
Beam 38.0m
Depth 14.0m
Draught (Max) 8.1m
Deck Space 5,200m²
Displacement 44,300t
Deadweight 23,500t
Classification
LR +100 AI, WDL, ECO, + LMC,
UMS, ICC, DP(AA), CAC(3),
NAV-1, IBS, IWS
Main Crane
Location - Deck, Port Side
Type - Fully Rotating Lattice
Boom Crane
Electro Hydraulic
Main Hoist Lift Capacity 1,500t
@ 30m (100,000 tm crane)
Auxiliary Hoist Lift Capacity 200t
@ 94m
Auxiliary Deck Crane Port
Location - Aft of
Accommodation Block
Crane Type - Knuckle Boom
Lift Capacity 30t @ 33m
Hoisting Speed 60m/min full
load
Man Riding
Active Heave Compensation
Auxiliary Deck Crane Starboard
Location - Aft of
Accommodation Block
Crane Type - Telescopic Box
Boom
Lift Capacity 24t @ 15m
2t @ 25m
Man Riding
Auxiliary Crane - Mid Ship
a rapid mode change for the
vessel from piles to jacket/
monopile installation.
The carriages and pile handling
equipment will operate using
hydraulic power from vessel.
ROV Hangars
There are two hangars for Work
Class ROV’s - one aft and one
fwd of the main crane, both
equipped with power outlets
and side doors.
Power Plant
6 x Diesel Generators
4.4 MW Output with three
each in two separate engine
rooms
1 x Emergency/Harbour
Generator 0.9 MW
Propulsion
- Aft
3 thrusters, 4 MW,
Azimuth fixed pitch
nozzle mounted propeller
driven by frequency controlled
electric motor
- Fwd
2 x Retractable, 3 MW
Azimuth fixed pitch
nozzle mounted propeller
driven by a frequency
controlled electric motor
2 x Tunnel Thrusters 2.6MW,
bi-directional fixed pitch
propellers
Deck Facility
Air, power, fresh water,
seawater and fuel available on
deck.
Speed
Transit speed 13 knots
Number - 2 off
Location - Above ROV Hanger
Mid Ship (one aft and one fwd
of main crane)
Crane Type - Telescopic Box
Boom
Lift Capacity - 4t @ 25m
Access Gangways
Two Access Gangways - one aft
and one fwd of the main crane
above the ROV Hangars.
- Reach 20m +/- 3 m
- Type Active for attachment,
passive when in use
Grout Storage
Two grout storage silos below
deck to store 700t of cement.
Dedicated air compressors with
dryers to pump the cement to
the grout mixing facility on deck.
Deck Carriage System
This ship has a deck rail system
along the full length of the deck
on the starboard side and aft of
the main crane on the port side.
The rails are used to provide
support and allow the jacket/
monopile to be moved into
storage locations outwith the
crane lift radius.
The jackets can then be moved
into the crane radius whilst the
ship is at sea.
The rails are also utilised for
securing the pile storage and
handling equipment.
The use of the rails will facilitate
Accommodation
Total accommodation 109
persons
- Eight single suites
- Forty nine single cabins
- Twenty six double cabins
All cabins en suite
Hospital for 2 persons
Helideck
The helideck is suitable for
helicopters up to 13t and has a
diameter of 22m.
Lifesaving Appliances
There are two 109 man
lifeboats, one either side of the
accommodation block forward.
Fuel Consumption
Port Standby 5t/day
Port Loading 10t/day
Transit 12 knots 41t/day
Transit full speed 63t/day
DP Operations 34t/day
EFFICIENT—COST EFFECTIVE—SAFE
OWTIS™

More Related Content

What's hot (9)

Masson Marine 2011
Masson Marine 2011Masson Marine 2011
Masson Marine 2011
 
De sac may_doc_ma_vach_option_9722
De sac may_doc_ma_vach_option_9722De sac may_doc_ma_vach_option_9722
De sac may_doc_ma_vach_option_9722
 
De sac may_doc_ma_vach_option_9727
De sac may_doc_ma_vach_option_9727De sac may_doc_ma_vach_option_9727
De sac may_doc_ma_vach_option_9727
 
Ng 964 42m crew boat
Ng 964   42m crew boatNg 964   42m crew boat
Ng 964 42m crew boat
 
Poseidon
Poseidon Poseidon
Poseidon
 
Project of lpo 1512(narendra pal)
Project of lpo 1512(narendra pal)Project of lpo 1512(narendra pal)
Project of lpo 1512(narendra pal)
 
Eicher 11.10 | LCV
Eicher 11.10 | LCVEicher 11.10 | LCV
Eicher 11.10 | LCV
 
Altus optimus-specification
Altus optimus-specificationAltus optimus-specification
Altus optimus-specification
 
X craft
X craftX craft
X craft
 

Viewers also liked

50t_Horizontal_Lay_System
50t_Horizontal_Lay_System50t_Horizontal_Lay_System
50t_Horizontal_Lay_SystemMarzena Haddow
 
Eflow Meeting || Rotinas Anuais de 13o salário | 4W
Eflow Meeting || Rotinas Anuais de 13o salário | 4WEflow Meeting || Rotinas Anuais de 13o salário | 4W
Eflow Meeting || Rotinas Anuais de 13o salário | 4WEflowMeeting
 
2012鹿港 台灣燈會
2012鹿港 台灣燈會2012鹿港 台灣燈會
2012鹿港 台灣燈會lys167
 
My Resume - mainor ramirez
My Resume - mainor ramirezMy Resume - mainor ramirez
My Resume - mainor ramirezMainor Ramirez
 
Eflow Meeting || ECF Lucro Real & Presumido
Eflow Meeting || ECF Lucro Real & PresumidoEflow Meeting || ECF Lucro Real & Presumido
Eflow Meeting || ECF Lucro Real & PresumidoEflowMeeting
 
StepStone Walking for Health and the Benefits of Walking
StepStone Walking for Health and the Benefits of WalkingStepStone Walking for Health and the Benefits of Walking
StepStone Walking for Health and the Benefits of WalkingWellness Counts Ltd
 
Dead Code Elimination
Dead Code EliminationDead Code Elimination
Dead Code EliminationSamiul Ehsan
 
Sete promessas para prevenir perdas em 2017
Sete promessas para prevenir perdas em 2017Sete promessas para prevenir perdas em 2017
Sete promessas para prevenir perdas em 2017Mauser Security
 

Viewers also liked (13)

50t_Horizontal_Lay_System
50t_Horizontal_Lay_System50t_Horizontal_Lay_System
50t_Horizontal_Lay_System
 
Eflow Meeting || Rotinas Anuais de 13o salário | 4W
Eflow Meeting || Rotinas Anuais de 13o salário | 4WEflow Meeting || Rotinas Anuais de 13o salário | 4W
Eflow Meeting || Rotinas Anuais de 13o salário | 4W
 
Mayra reflecion
Mayra reflecionMayra reflecion
Mayra reflecion
 
2012鹿港 台灣燈會
2012鹿港 台灣燈會2012鹿港 台灣燈會
2012鹿港 台灣燈會
 
My Resume - mainor ramirez
My Resume - mainor ramirezMy Resume - mainor ramirez
My Resume - mainor ramirez
 
Eflow Meeting || ECF Lucro Real & Presumido
Eflow Meeting || ECF Lucro Real & PresumidoEflow Meeting || ECF Lucro Real & Presumido
Eflow Meeting || ECF Lucro Real & Presumido
 
StepStone Walking for Health and the Benefits of Walking
StepStone Walking for Health and the Benefits of WalkingStepStone Walking for Health and the Benefits of Walking
StepStone Walking for Health and the Benefits of Walking
 
Dead Code Elimination
Dead Code EliminationDead Code Elimination
Dead Code Elimination
 
Kaden's karate adventure
Kaden's karate adventureKaden's karate adventure
Kaden's karate adventure
 
Plot Blocking
Plot Blocking Plot Blocking
Plot Blocking
 
Sete promessas para prevenir perdas em 2017
Sete promessas para prevenir perdas em 2017Sete promessas para prevenir perdas em 2017
Sete promessas para prevenir perdas em 2017
 
Filosofia de la_economia_dyke_ee_4 (1)
Filosofia de la_economia_dyke_ee_4 (1)Filosofia de la_economia_dyke_ee_4 (1)
Filosofia de la_economia_dyke_ee_4 (1)
 
Swine Flu
Swine FluSwine Flu
Swine Flu
 

Similar to OWTIS_Brochure

Similar to OWTIS_Brochure (20)

Seven_Oceans
Seven_OceansSeven_Oceans
Seven_Oceans
 
deep_orient
deep_orientdeep_orient
deep_orient
 
Seven Cruzeiro
Seven CruzeiroSeven Cruzeiro
Seven Cruzeiro
 
Seven Polaris
Seven PolarisSeven Polaris
Seven Polaris
 
STG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4PagSTG_Jascon 18_Vessel_Leaflet_4Pag
STG_Jascon 18_Vessel_Leaflet_4Pag
 
wellservicer_wbb
wellservicer_wbbwellservicer_wbb
wellservicer_wbb
 
Seven Falcon
Seven FalconSeven Falcon
Seven Falcon
 
Far Samson
Far SamsonFar Samson
Far Samson
 
BOURBON's Fleet
BOURBON's FleetBOURBON's Fleet
BOURBON's Fleet
 
Maritime Executive_Out of Gauge CArgo
Maritime Executive_Out of Gauge CArgoMaritime Executive_Out of Gauge CArgo
Maritime Executive_Out of Gauge CArgo
 
Maritime Executive_HMorrison
Maritime Executive_HMorrisonMaritime Executive_HMorrison
Maritime Executive_HMorrison
 
Bourbon Media
Bourbon MediaBourbon Media
Bourbon Media
 
Seven borealis
Seven borealisSeven borealis
Seven borealis
 
Seven Borealis
Seven BorealisSeven Borealis
Seven Borealis
 
Seven borealis
Seven borealisSeven borealis
Seven borealis
 
Skandi Acergy
Skandi AcergySkandi Acergy
Skandi Acergy
 
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
Specification Sheet_H923 - 65.5m ROV OSV [Kendal]
 
REPORT on RADAR
REPORT on RADARREPORT on RADAR
REPORT on RADAR
 
Watchful Brochure
Watchful BrochureWatchful Brochure
Watchful Brochure
 
Normand Cutter
Normand CutterNormand Cutter
Normand Cutter
 

More from Marzena Haddow

HydroNAS the future of underwater noise mitigation (poster)
HydroNAS the future of underwater noise mitigation (poster)HydroNAS the future of underwater noise mitigation (poster)
HydroNAS the future of underwater noise mitigation (poster)Marzena Haddow
 
HydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigationHydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigationMarzena Haddow
 
S o f e presentation 2013
S o f e   presentation 2013S o f e   presentation 2013
S o f e presentation 2013Marzena Haddow
 

More from Marzena Haddow (6)

HydroNAS_Brochure
HydroNAS_BrochureHydroNAS_Brochure
HydroNAS_Brochure
 
RINA_Paper
RINA_PaperRINA_Paper
RINA_Paper
 
HydroNAS the future of underwater noise mitigation (poster)
HydroNAS the future of underwater noise mitigation (poster)HydroNAS the future of underwater noise mitigation (poster)
HydroNAS the future of underwater noise mitigation (poster)
 
HydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigationHydroNAS the future of underwater noise mitigation
HydroNAS the future of underwater noise mitigation
 
S o f e presentation 2013
S o f e   presentation 2013S o f e   presentation 2013
S o f e presentation 2013
 
October meeting
October meetingOctober meeting
October meeting
 

OWTIS_Brochure

  • 1. phone: + 44 (0)1224 329020 | fax: + 44 (0)1224 310037 | 23 Rubislaw Den North, Aberdeen, AB15 4AL www.w3gmarine.co.uk Registered office: 23 Rubislaw Den North, Aberdeen, AB15 4AL Registration number: SC380197 EFFICIENT—COST EFFECTIVE—SAFE OWTIS™
  • 2. phone: + 44 (0)1224 329020 | fax: + 44 (0)1224 310037 | 23 Rubislaw Den North, Aberdeen, AB15 4AL www.w3gmarine.co.uk Registered office: 23 Rubislaw Den North, Aberdeen, AB15 4AL Registration number: SC380197 Principal Dimension Overall length 194.5m Length B.P. 182.4m Beam 38.0m Depth 14.0m Draught (Max) 8.1m Deck Space 5,200m² Displacement 44,300t Deadweight 23,500t Classification LR +100 AI, WDL, ECO, + LMC, UMS, ICC, DP(AA), CAC(3), NAV-1, IBS, IWS Main Crane Location - Deck, Port Side Type - Fully Rotating Lattice Boom Crane Electro Hydraulic Main Hoist Lift Capacity 1,500t @ 30m (100,000 tm crane) Auxiliary Hoist Lift Capacity 200t @ 94m Auxiliary Deck Crane Port Location - Aft of Accommodation Block Crane Type - Knuckle Boom Lift Capacity 30t @ 33m Hoisting Speed 60m/min full load Man Riding Active Heave Compensation Auxiliary Deck Crane Starboard Location - Aft of Accommodation Block Crane Type - Telescopic Box Boom Lift Capacity 24t @ 15m 2t @ 25m Man Riding Auxiliary Crane - Mid Ship a rapid mode change for the vessel from piles to jacket/ monopile installation. The carriages and pile handling equipment will operate using hydraulic power from vessel. ROV Hangars There are two hangars for Work Class ROV’s - one aft and one fwd of the main crane, both equipped with power outlets and side doors. Power Plant 6 x Diesel Generators 4.4 MW Output with three each in two separate engine rooms 1 x Emergency/Harbour Generator 0.9 MW Propulsion - Aft 3 thrusters, 4 MW, Azimuth fixed pitch nozzle mounted propeller driven by frequency controlled electric motor - Fwd 2 x Retractable, 3 MW Azimuth fixed pitch nozzle mounted propeller driven by a frequency controlled electric motor 2 x Tunnel Thrusters 2.6MW, bi-directional fixed pitch propellers Deck Facility Air, power, fresh water, seawater and fuel available on deck. Speed Transit speed 13 knots Number - 2 off Location - Above ROV Hanger Mid Ship (one aft and one fwd of main crane) Crane Type - Telescopic Box Boom Lift Capacity - 4t @ 25m Access Gangways Two Access Gangways - one aft and one fwd of the main crane above the ROV Hangars. - Reach 20m +/- 3 m - Type Active for attachment, passive when in use Grout Storage Two grout storage silos below deck to store 700t of cement. Dedicated air compressors with dryers to pump the cement to the grout mixing facility on deck. Deck Carriage System This ship has a deck rail system along the full length of the deck on the starboard side and aft of the main crane on the port side. The rails are used to provide support and allow the jacket/ monopile to be moved into storage locations outwith the crane lift radius. The jackets can then be moved into the crane radius whilst the ship is at sea. The rails are also utilised for securing the pile storage and handling equipment. The use of the rails will facilitate Accommodation Total accommodation 109 persons - Eight single suites - Forty nine single cabins - Twenty six double cabins All cabins en suite Hospital for 2 persons Helideck The helideck is suitable for helicopters up to 13t and has a diameter of 22m. Lifesaving Appliances There are two 109 man lifeboats, one either side of the accommodation block forward. Fuel Consumption Port Standby 5t/day Port Loading 10t/day Transit 12 knots 41t/day Transit full speed 63t/day DP Operations 34t/day EFFICIENT—COST EFFECTIVE—SAFE OWTIS™