SlideShare a Scribd company logo
1 of 4
Informatica Power center Training:
Course duration: 40 hours
Pre-requisites:
 Basic of SQL
 Basic of data warehouse concepts
 Basic overview of UNIX
Course contents:
 Overview of data warehouse project life cycle
 What is the use of data warehouse in BI
 Data warehouse models
 Different types of dimensions
 Different types of facts
 Life cycle of data warehouse project
 Different layers involved in DW project
 Project specific SQL concepts
 Basics of UNIX.
 Informatica power center client and server architecture.
 Difference between PC Express and Earlier version
 Power center client and server installation (PC Express 9.6.1)
 Defining sources.
 Database as a source
 Flat files as a source
 Defining Targets
 Importing from databases
 Creating a new target from power center
 Informatica developer (power center designer)
 Mapping introduction
 Ports
 Mapping – Table to Table
 Mapping -Flat file/Table to Table/Flat file
 Connected and un-connected transformations
 Active and passive transformation
 Pre and post SQL override
 Mapping, Session and Workflow
 Creating Mappings, sessions and workflows.
 Starting Mappings and workflows.
 Monitoring Mappings and workflows.
 Setting properties of session task.
 Transformations
 Expression transformation
 Filter transformation
 Router transformation
 Joiner transformation
 Aggregator transformation
 Rank transformation
 Union transformation
 Sequence generator transformation
 Stored procedure transformation
 XML transformation
 Update strategy transformation
 Dynamic and static lookup
 Connected and un-connected lookup
 Tasks
 Assignment task
 Decision task
 Email task
 Event raise task
 Event wait task
 Command task
 Timer task
 Control task
 Re-usable informatica objects
 Mapplets
 Re-usable session task
 Worklets
 Informatica advanced features
 Target load plan
 Constraint based load plan
 Mapping parameters
 Mapping variables
 Session parameters
 Link conditions
 Copying repository
 Deleting repository
 Creating repository
 Pointing repository to other DB users.
 Creating multiple DI engines for a repository
 Complete Data warehouse project using informatica power center
 Understanding project requirement
 Defining end to end architecture
 Defining data models(Facts, Dimensions and driving tables)
 Extracting data from different data sources(ETL1 Extract Layer)
 Populating staging area(ETL2 Transform layer)
 Loading SCD type 1/2/3 dimensions (ETL3 Load Layer)
 Loading dimensional keys to respective fact tables
 Splitting Fact tables specific to reporting requirement(Data mart)
 Aggregating Data mart tables
 Pointing respective tables to respective reports
 Informatica project and Interview specific contents.
 Slowly changing dimension(SCD Type 1) implementation
 Slowly changing dimension(SCD Type 2) implementation
 Slowly changing dimension(SCD Type 3) implementation
 Static and dynamic caches in lookup transformation
 How to implement CDC(capture data change)
 How to implement Initial load and incremental load
 Different tuning options available in informatica power center
 How to implement partitioning concept in informatica power center
Informatica Power center Training course contents

More Related Content

Viewers also liked

IMPLEMENTATION OF CAR LOAN SCHEME
IMPLEMENTATION OF CAR LOAN SCHEMEIMPLEMENTATION OF CAR LOAN SCHEME
IMPLEMENTATION OF CAR LOAN SCHEME
Arijit Bhattacharya
 

Viewers also liked (9)

Rd 1932 ds 3-0-4
Rd 1932 ds 3-0-4Rd 1932 ds 3-0-4
Rd 1932 ds 3-0-4
 
Thursdays with the California Library Association (CLA)
Thursdays with the California Library Association (CLA)Thursdays with the California Library Association (CLA)
Thursdays with the California Library Association (CLA)
 
Portfólio - Pamela Vasconcelos
Portfólio - Pamela VasconcelosPortfólio - Pamela Vasconcelos
Portfólio - Pamela Vasconcelos
 
Michael Leander Nielsen: Motoren Eller Ferrarien
Michael Leander Nielsen: Motoren Eller FerrarienMichael Leander Nielsen: Motoren Eller Ferrarien
Michael Leander Nielsen: Motoren Eller Ferrarien
 
ppt for online exanition system
ppt for online exanition systemppt for online exanition system
ppt for online exanition system
 
Unit 6 critical approaches.
Unit 6 critical approaches.Unit 6 critical approaches.
Unit 6 critical approaches.
 
Proyecto udi secundaria def
Proyecto udi secundaria defProyecto udi secundaria def
Proyecto udi secundaria def
 
Planning Very Large Scale Document Repositories with High Availability in Sha...
Planning Very Large Scale Document Repositories with High Availability in Sha...Planning Very Large Scale Document Repositories with High Availability in Sha...
Planning Very Large Scale Document Repositories with High Availability in Sha...
 
IMPLEMENTATION OF CAR LOAN SCHEME
IMPLEMENTATION OF CAR LOAN SCHEMEIMPLEMENTATION OF CAR LOAN SCHEME
IMPLEMENTATION OF CAR LOAN SCHEME
 

Informatica Power center Training course contents

  • 1. Informatica Power center Training: Course duration: 40 hours Pre-requisites:  Basic of SQL  Basic of data warehouse concepts  Basic overview of UNIX Course contents:  Overview of data warehouse project life cycle  What is the use of data warehouse in BI  Data warehouse models  Different types of dimensions  Different types of facts  Life cycle of data warehouse project  Different layers involved in DW project  Project specific SQL concepts  Basics of UNIX.  Informatica power center client and server architecture.  Difference between PC Express and Earlier version  Power center client and server installation (PC Express 9.6.1)  Defining sources.  Database as a source  Flat files as a source  Defining Targets  Importing from databases  Creating a new target from power center  Informatica developer (power center designer)  Mapping introduction  Ports  Mapping – Table to Table  Mapping -Flat file/Table to Table/Flat file  Connected and un-connected transformations  Active and passive transformation  Pre and post SQL override  Mapping, Session and Workflow  Creating Mappings, sessions and workflows.  Starting Mappings and workflows.  Monitoring Mappings and workflows.
  • 2.  Setting properties of session task.  Transformations  Expression transformation  Filter transformation  Router transformation  Joiner transformation  Aggregator transformation  Rank transformation  Union transformation  Sequence generator transformation  Stored procedure transformation  XML transformation  Update strategy transformation  Dynamic and static lookup  Connected and un-connected lookup  Tasks  Assignment task  Decision task  Email task  Event raise task  Event wait task  Command task  Timer task  Control task  Re-usable informatica objects  Mapplets  Re-usable session task  Worklets  Informatica advanced features  Target load plan  Constraint based load plan  Mapping parameters  Mapping variables  Session parameters  Link conditions  Copying repository  Deleting repository  Creating repository  Pointing repository to other DB users.
  • 3.  Creating multiple DI engines for a repository  Complete Data warehouse project using informatica power center  Understanding project requirement  Defining end to end architecture  Defining data models(Facts, Dimensions and driving tables)  Extracting data from different data sources(ETL1 Extract Layer)  Populating staging area(ETL2 Transform layer)  Loading SCD type 1/2/3 dimensions (ETL3 Load Layer)  Loading dimensional keys to respective fact tables  Splitting Fact tables specific to reporting requirement(Data mart)  Aggregating Data mart tables  Pointing respective tables to respective reports  Informatica project and Interview specific contents.  Slowly changing dimension(SCD Type 1) implementation  Slowly changing dimension(SCD Type 2) implementation  Slowly changing dimension(SCD Type 3) implementation  Static and dynamic caches in lookup transformation  How to implement CDC(capture data change)  How to implement Initial load and incremental load  Different tuning options available in informatica power center  How to implement partitioning concept in informatica power center