20.05.2014
Grid code development
The role of grid codes for the future secure, efficient
and ecological electrical system
Andreas Menze
1. TenneT – A brief overview
Europe‘s turntable for electricity
TenneT
Serving app.36 Mio. clients
Operation, maintenance and
development of the EHV system in
parts of Germany and the
Netherlands
Responsible for reliable and
secure operation of the grid on-
and offshore
TenneT: Figures – 2013
o app. 21,000 km circuit length
o 440 substations
o app. 2,600 Employees
o 2.243 bill. € turn around
20.05.2014Grid code development

TenneT Offshore presents on Grid code development

  • 1.
    20.05.2014 Grid code development Therole of grid codes for the future secure, efficient and ecological electrical system Andreas Menze
  • 2.
    1. TenneT –A brief overview
  • 3.
    Europe‘s turntable forelectricity TenneT Serving app.36 Mio. clients Operation, maintenance and development of the EHV system in parts of Germany and the Netherlands Responsible for reliable and secure operation of the grid on- and offshore TenneT: Figures – 2013 o app. 21,000 km circuit length o 440 substations o app. 2,600 Employees o 2.243 bill. € turn around 20.05.2014Grid code development