SCHEMAS UNIFILAIRES DE RACCORDEMENT DES CENTRALES PV 
 
B-1229824874
110 kV
u=105,00 %
B-1229824875
110 kV
u=97,61 %
Centrale de GARAFIRI
L-1229824876
S=6,300 MVA
PF=0,800
B-1229824878
60 kV
u=96,04 %
L-1229824879
P=1,200 MW
PF=0,800
Centrale GRANDES CHUTES
L-1229824881
S=2,500 MVA
PF=1,000
L-1229824883
P=30,780 MW
Poste Kindia
110 kV
u=98,64 %
L-1229824887
P=11,240 MW
PF=0,800
L-1229824889
P=1,416 MW
Poste DONKEA
110 kV
u=97,88 %
Poste MANEAH 110
110 kV
u=97,91 %
Poste MANEAH 225
225 kV
u=97,94 %
L-1229824895
P=32,601 MW
TR2-1229824898
Tap=0
P=27,559 MW
P=-27,559 MW
B-1229824901
225 kV
u=99,97 %
L-1229824902
P=39,060 MW
L-1229824905
P=39,060 MW
B-1229824908
225 kV
u=100,00 %
Centrale KALETA
B-1229824915
110 kV
u=98,17 %
L-1229824916
P=15,395 MW
L-1229824919
P=15,395 MW
L-1229824922
P=80,000 MW
PF=0,800
TR2-1229824924
Tap=0
P=16,490 MW
B-1229824926
60 kV
u=98,19 %
P=-16,490 MW
B-1229824928
110 kV
u=102,70 %
L-1229824929
P=25,556 MW
Poste KIPE
60 kV
u=100,00 %
Poste SOFONIAH
60 kV
u=99,48 %
L-1229824937
P=12,231 MW
L-1229824940
S=38,940 MVA
PF=0,800
L-1229824942
S=32,109 MVA
PF=0,800
Poste Sonofiah
60 kV
u=95,41 %
L-1229824945
P=25,687 MW
L-1229824948
S=0,520 MVA
PF=0,800
Poste Yessoulou
60 kV
u=95,88 %
B-1229824950
110 kV
u=100,00 %
L-1229824951
P=3,788 MW
L-1229824954
P=3,788 MW
B-1229824957
110 kV
B-1229824958
110 kV
L-1229824959
P=0,000 MW
F-1229824966
P=-100,000 MW
Q=-103,087 Mvar
F-1229824968
P=-18,500 MW
Q=150,396 Mvar
F-1229824970
P=-13,000 MW
Q=-8,828 Mvar
L-1229824972
S=25,900 MVA
PF=0,800
TR2-1229824974
Tap=0
P=-15,583 MW
P=15,583 MW
L-1229824977
P=29,614 MW
B-1229824980
110 kV
u=97,76 %
L-1229824981
P=28,670 MW
L-1229824984
P=32,379 MW
F-1229824987
P=-36,000 MW
Q=-75,707 Mvar
L-1229824989
P=2,000 MW
PF=0,800
F-1229824991
P=-89,287 MW
Q=-255,348 Mvar
F-1229824993
P=-37,182 MW
Q=-38,853 Mvar
SIMULATION DE LA SITUATION PROJETEE DU SYSTEME RIC
AVEC CENTRALES BRANCHEES SUR LA MOYENNE TENSION
L-1229825001
P=0,417 MW
Poste de Mamou
30 kV
u=97,14 %
L-1229825008
P=2,268 MW
PF=0,800
L-1229825010
P=0,016 MW
PF=0,800
Poste de Dalaba
30 kV
u=92,81 %
Poste de Pita
30 kV
u=94,29 %
L-1229825015
P=2,209 MW
Centrale de Kinkon
30 kV
u=95,00 %
B-1229825019
6,3 kV
u=108,75 %
L-1229825021
P=2,750 MW
L-1229825024
P=0,921 MW
TR2-1229825027
Tap=0
TR2-1229825030
Tap=0
L-1229825032
P=0,109 MW
PF=0,799
L-1229825037
P=6,335 MW
L-1229825041
P=0,109 MW
Poste de Timbi Madina
30 kV
u=95,97 %
Poste de Labé
30 kV
u=101,60 %
L-1229825046
P=6,941 MW
B-1229825049
30 kV
u=96,04 %
L-1229825051
P=0,350 MW
PF=0,801
L-1229825052
P=0,350 MW
PF=0,801
P=3,400 MW
F-1229825056
P=-3,400 MW
Q=0,000 Mvar
L-1229825060
P=0,715 MW
PF=0,800
P=2,875 MW
P=-2,797 MW
L-1229825066
P=0,517 MW
L-1229825070
P=46,960 MW
L-1229825073
P=2,280 MW
Mamou poste chinois
30 kV
u=96,74 %
L-1229825077
P=0,016 MW
Poste de Boulivel
30 kV
u=94,83 %
B-1229825081
30 kV
u=94,83 %
P=-9,500 MW
P=9,500 MW
DCPV-1229825119
P=-9,500 MW
Q=0,000 Mvar
P=-9,500 MW
DC-1229825122
P=0,000 MW
BDC-1229825125
0,209 kV
u=100,00 %
Centrale PV TARAMBALY
30 kV
u=103,73 %
Centrale de Boké
30 kV
u=106,48 %
TR2-1229825667
Tap=0
TR2-1229825670
Tap=0
P=-0,181 MW
F-1229825673
P=0,362 MW
Q=-14,911 Mvar
Centrale PV Kakoui Boké
0,4 kV
u=100,00 %
TR2-1229825742
Tap=25
P=-4,750 MW
P=4,750 MW
PWM-1229825745
DCPV-1229825746
P=-4,750 MW
Q=0,000 Mvar
P=-4,750 MW
DC-1229825749
P=0,000 MW
P=4,750 MW
BDC-1229825752
0,209 kV
u=100,00 %
B-1229825753
30 kV
u=106,20 %
Centrale PV de Kakoui Boké 5 MW
L1229825756
P=4,750 MW
L-1229825770
S=2,600 MVA
PF=0,800
L-1229825775
S=2,600 MVA
PF=0,800
Poste Souguetta 110 kV
110 kV
u=100,54 %
N1229826323
110 kV
u=100,57 %
L1229826331
P=36,908 MW
L1229826336
P=59,742 MW
L1229826341
P=22,834 MW
TR2-1229826363
Tap=25
P=0,600 MW
N1229826369
30 kV
u=97,92 %
P=-0,600 MW
L-1229826378
S=0,750 MVA
PF=0,800
Poste MAMOU 110 kV
110 kV
u=103,66 %
B-1229826590
0,4 kV
u=100,00 %
TR2-1229826591
Tap=25
P=-28,500 MW
P=28,500 MW
PWM-1229826594
DCPV-1229826595
P=-28,500 MW
Q=0,000 Mvar
P=-28,500 MW
DC-1229826598
P=0,000 MW
P=28,500 MW
BDC-1229826601
0,209 kV
u=100,00 %
B-1229826602
30 kV
u=101,93 %
TR2-1229826617
Tap=25
Centrale PV SERE
110 kV
u=103,95 %
P=-28,500 MW
P=28,500 MW
TR2-1229826816
Tap=25
P=-38,000 MW
Q=0,000 Mvar
Centrale PV SOUGUETTA
110 kV
u=100,48 %
P=38,000 MW
L-1229826865
P=1,810 MW
PF=0,800
L-1229826873
S=17,930 MVA
PF=0,800
L-1229826882
P=50,560 MW
PF=0,800
L1229826888
P=38,000 MW
L1229829337
P=11,190 MW
L-1229829369
P=59,100 MW
PF=0,800
P=19,516 MW
N1229829391
60 kV
u=101,48 %
P=-19,516 MW
L1229829397
P=18,981 MW
L1229829402
P=10,607 MW
L-1229829409
P=25,000 MW
PF=0,800
L1229829636
P=28,500 MW
L1229829641
P=9,500 MW
L1229829646
P=50,000 MW
L1229829651
P=50,000 MW
P=0,000 MW
F-1229825056
P=0,000 MW
Centrale de Boké
30 kV
u=106,48 %
TR2-1229825667
Tap=0
TR2-1229825670
Tap=0
P=-0,181 MW
F-1229825673
P=0,362 MW
Q=-14,911 Mvar
Centrale PV Kakoui Boké
0,4 kV
u=100,00 %
TR2-1229825742
Tap=25
P=-4,750 MW
P=4,750 MW
PWM-1229825745
DCPV-1229825746
P=-4,750 MW
Q=0,000 Mvar
P=-4,750 MW
DC-1229825749
P=0,000 MW
P=4,750 MW
BDC-1229825752
0,209 kV
u=100,00 %
B-1229825753
30 kV
u=106,20 %
Centrale PV de Kakoui Boké 5 MW
L1229825756
P=4,750 MW
L-1229825770
S=2,600 MVA
PF=0,800
L-1229825775
S=2,600 MVA
PF=0,800
B-1229824874
110 kV
u=105,00 %
Centrale de GARAFIRI
L-1229824876
S=6,300 MVA
PF=0,800
L-1229824883
P=30,607 MW
Poste Kindia
110 kV
u=98,65 %
L-1229824887
P=11,240 MW
PF=0,800
L-1229824889
P=1,176 MW
Poste DONKEA
110 kV
u=97,89 %
L-1229824895
P=32,451 MW
TR2-1229824898
Tap=0
P=-27,563 MW
B-1229824901
225 kV
u=99,97 %
L-1229824902
P=39,061 MW
L-1229824905
P=39,061 MW
B-1229824908
225 kV
u=100,00 %
Centrale KALETA
B-1229824928
110 kV
u=102,74 %
L-1229824929
P=24,963 MW
B-1229824957
110 kV
B-1229824958
110 kV
F-1229824966
P=-100,000 MW
Q=-102,841 Mvar
F-1229824970
P=-13,000 MW
Q=-8,828 Mvar
L-1229824972
S=25,900 MVA
PF=0,800
F-1229824987
P=-36,000 MW
Q=-74,672 Mvar
Poste de Mamou
30 kV
u=98,26 %
de Dalaba
30 kV
94,13 %
L-1229825024
P=0,162 MW
L-1229825060
P=3,469 MW
P=-3,411 MW
L-1229825066
P=1,132 MW
L-1229825070
P=46,634 MW
L-1229825073
P=2,280 MW
B-1229825081
30 kV
u=96,24 %
Poste Souguetta 110 kV
110 kV
u=100,57 %
N1229826323
110 kV
u=100,59 %
L1229826331
P=36,905 MW
L1229826336
P=59,390 MW
L1229826341
P=22,485 MW
TR2-1229826363
Tap=25
P=0,600 MW
N1229826369
30 kV
u=97,95 %
P=-0,600 MW
L-1229826378
S=0,750 MVA
PF=0,800
Poste MAMOU 110 kV
110 kV
u=103,75 %
B-1229826590
0,4 kV
u=100,00 %
TR2-1229826591
Tap=25
P=-28,500 MW
P=28,500 MW
PWM-1229826594
DCPV-1229826595
P=-28,500 MW
Q=0,000 Mvar
P=-28,500 MW
P=28,500 MW
BDC-1229826601
0,209 kV
u=100,00 %
B-1229826602
30 kV
u=101,97 %
TR2-1229826617
Tap=25
Centrale PV SERE 30 MWc
110 kV
u=104,03 %
P=-28,500 MW
P=28,500 MW
TR2-1229826816
Tap=25
Centrale PV SOUGUETTA
110 kV
u=100,50 %
P=38,000 MW
L-1229826865
P=1,810 MW
PF=0,800
L-1229826882
P=50,560 MW
PF=0,800
L1229826888
P=38,000 MW
L1229829337
P=11,190 MW
L-1229829409
P=25,000 MW
PF=0,800
L1229829636
P=28,500 MW
L1229829646
P=50,000 MW
L1229829651
P=50,000 MW
B-1229824874
110 kV
u=105,00 %
B-1229824875
110 kV
u=97,62 %
Centrale de GAR
L-1229824876
S=6,300 MVA
PF=0,800
L-1229824879
P=1,200 MW
PF=0,800
e GRANDES CHUTES
L-1229824883
P=30,607 MW
Poste Kindia
110 kV
u=98,65 %
L-1229824887
P=11,240 MW
PF=0,800
L-1229824889
P=1,176 MW
Poste DONKEA
110 kV
u=97,89 %
L-1229824895
P=32,451 MW
B-1229824928
110 kV
u=102,74 %
L-1229824929
P=24,963 MW
F-1229824970
P=-13,000 MW
Q=-8,828 Mvar
TR2-1229824974
Tap=0
P=-15,583 MW
MW
824984
41 MW
F-1229824987
P=-36,000 MW
Q=-74,672 Mvar
Poste de Mamou
30 kV
u=98,26 %
L-1229825008
P=2,268 MW
PF=0,800
L-1229825010
P=0,016 MW
PF=0,800
Poste de Dalaba
30 kV
L-1229825024
P=0,162 MW
P=3,469 MW
P=-3,411 MW
L-1229825066
P=1,132 MW
L-1229825070
P=46,634 MW
L-1229825073
P=2,280 MW
Mamou poste chinois
30 kV
u=97,87 %
L-1229825077
P=0,016 MW
Poste de Boulivel
30 kV
u=96,24 %
B-1229825081
30 kV
u=96,24 %
Poste Souguetta 110 kV
110 kV
u=100,57 %
N1229826323
110 kV
u=100,59 %
L1229826331
P=36,905 MW
L1229826336
P=59,390 MW
L1229826341
P=22,485 MW
TR2-1229826363
Tap=25
P=0,600 MW
N1229826369
30 kV
u=97,95 %
P=-0,600 MW
L-1229826378
S=0,750 MVA
PF=0,800
Poste MAMOU 110 kV
110 kV
u=103,75 %
TR2-1229826816
Tap=25
P=-38,000 MW
Q=0,000 Mvar
Centrale PV SOUGUETTA
110 kV
u=100,50 %
P=38,000 MW
L-1229826865
P=1,810 MW
PF=0,800
L1229826888
P=38,000 MW
L1229829337
P=11,190 MW
L-1229829409
P=25,000 MW
PF=0,800
L1229829636
P=28,500 MW
L1229829646
P=50,000 MW
L1229829651
P=50,000 MW
RACCORDEMENT DE LA CENTRALE PV
DE TRAMBALY A LABE 10 MWc
L-1229824876
S=6,300 MVA
PF=0,800
L-1229824881
S=2,500 MVA
PF=1,000
Poste Kindia
110 kV
u=98,65 %
L-1229824887
P=11,240 MW
PF=0,800
B-1229824928
110 kV
u=102,74 %
L-1229824929
P=24,963 MW
L-1229824948
S=0,520 MVA
PF=0,800
oste Yessoulou
60 kV
u=95,89 %
F-1229824987
P=-36,000 MW
Q=-74,672 Mvar
L-1229825001
P=0,417 MW
Poste de Mamou
30 kV
u=98,26 %
L-1229825008
P=2,268 MW
PF=0,800
L-1229825010
P=0,016 MW
PF=0,800
Poste de Dalaba
30 kV
u=94,13 %
Poste de Pita
30 kV
u=92,86 %
L-1229825015
P=1,126 MW
Centrale de Kinkon
30 kV
u=92,86 %
B-1229825019
6,3 kV
L-1229825021
P=0,000 MW
L-1229825024
P=0,162 MW
TR2-1229825027
Tap=0
TR2-1229825030
Tap=0
L-1229825032
P=0,109 MW
PF=0,799
L-1229825037
P=6,601 MW
L-1229825041
P=0,109 MW
Poste de Timbi Madina
30 kV
u=94,84 %
Poste de Labé
30 kV
u=101,05 %
L-1229825046
P=7,148 MW
B-1229825049
30 kV
u=94,90 %
L-1229825051
P=0,350 MW
PF=0,801
L-1229825052
P=0,350 MW
PF=0,801
P=0,000 MW
F-1229825056
P=0,000 MW
Q=0,000 Mvar
L-1229825060
P=0,715 MW
PF=0,800
P=3,469 MW
P=-3,411 MW
L-1229825066
P=1,132 MW
L-1229825070
P=46,634 MW
L-1229825073
P=2,280 MW
Mamou poste chinois
30 kV
u=97,87 %
L-1229825077
P=0,016 MW
Poste de Boulivel
30 kV
u=96,24 %
B-1229825081
30 kV
u=96,24 %
P=-9,500 MW
P=9,500 MW
DCPV-1229825119
P=-9,500 MW
Q=0,000 Mvar
P=-9,500 MW
DC-1229825122
P=0,000 MW
BDC-1229825125
0,209 kV
u=100,00 %
Centrale PV TARAMBALY
30 kV
u=103,52 %
Poste Souguetta 110 kV
110 kV
u=100,57 %
N1229826323
110 kV
u=100,59 %
L1229826331
P=36,905 MW
L1229826336
P=59,390 MW
L1229826341
P=22,485 MW
TR2-1229826363
Tap=25
P=0,600 MW
N1229826369
30 kV
u=97,95 %
P=-0,600 MW
L-1229826378
S=0,750 MVA
PF=0,800
Poste MAMOU 110 kV
110 kV
u=103,75 %
TR2-12298266
Tap=25
Centrale PV SERE 30 MWc
110 kV
u=104,03 %
P=-28,500 MW
TR2-1229826816
Tap=25
P=-38,000 MW
Q=0,000 Mvar
Centrale PV SOUGUETTA
110 kV
u=100,50 %
P=38,000 MW
L1229826888
P=38,000 MW
L1229829636
P=28,500 MW
L1229829641
P=9,500 MW
       
 
 
Projet :   N° 
  18006 
ETUDE DE FAISABILITE DES CENTRALES SOLAIRES  Page  Out 
GUINEE CONAKRY  1  2 
 
 
RACCORDEMENT DES QUATRE CENTRALES PV AU RESEAU ELECTIQUE 
NATIONAL 
 Les centrales de KINDIA et de MAMOU dont les puissances respectives sont de 40 et 30 MW 
doivent être raccordées sur le réseau HTB existant alimentant les postes HTB/HTA de ces deux villes 
avec une tension de 110 kV. Ce choix s’explique par différents critères techniques : 
• Les puissances fournies par ces deux centrales ne peuvent pas être écoulées sur de simples 
lignes HTA dont la capacité est limitée à 12 MVA. 
• Une faible demande de charge locale d’où l’obligation d’écouler toute la production sur le 
réseau national haute tension interconnecté  par leurs raccordements aux postes HTB/HTA. 
• Les deux lignes de raccordement des deux centrales sur le réseau HTB 110 V se feront avec une 
section normalisée de 228 mm² AAAC, d’une longueur de 7 et 6 km respectivement pour la 
centrale de Mamou et celle de Souguéta. 
 Pour la centrale de TARAMBALY, son raccordement sur le réseau ne pourra se faire qu’en moyenne 
tension, elle sera reliée directement au poste de coupure et de répartition de LABE : 
• La centrale par le biais du poste de répartition HTA LABE, alimentera les villages de Labé, Pita, 
Timbi Madina, Dalaba et Boulivel dont la somme de leurs consommations est estimée à 
environ 6MW. Ces villages alimentés actuellement à partir du poste source de MAMOU à 
travers une ligne HTA 30 kV d’une section de 70/12 mm² ACSR ayant une longueur totale de 90 
km, souffrent  actuellement d’un chute de tension énorme pendant les périodes d’étiage de la 
centrale KINKON. 
• Il sera prévu pour le raccordement de cette centrale au poste de LABE une ligne d’une 
longueur de 18 km et de section 148.1 mm² AAAC. 
 La ville de BOKE est actuellement alimentée par un réseau isolé à travers une centrale diésel 
totalisant une puissance disponible 9,24 MW.  
• Une ligne de section 148.1 mm² en almélec sera prévue pour le raccordement de la nouvelle 
centrale photovoltaïque de 5 MW au réseau de la ville.  
• La construction de cette centrale en première phase tiendra compte de son extension et son 
passage sur la HTB 225 kV prévue dans le cadre du renforcement du réseau de transport de la 
région Ouest guinéen. 
 
       
 
 
Projet :   N° 
  18006 
ETUDE DE FAISABILITE DES CENTRALES SOLAIRES  Page  Out 
GUINEE CONAKRY  2  2 
 
Centrale  Puissance 
(MWc) 
Point de 
raccordement 
Puissance
(MWc) 
Longueur
(km) 
Section 
(mm²) 
Nature 
Chute de 
tension 
% 
Pertes
(kW) 
SERE  30  Poste HTB de 
MAMOU 110kV
30  7  228 
AAAC 
1.34  69 
SOUGUETTA  40  Poste HTB de 
KINDIA 110 kV 
40  7  228 
AAAC 
4.46  369 
TARAMBALY  10  Poste HTA de 
LABE 30 kV 
10  18  148.1 
AAAC 
3.4  567 
BOKE  5  Poste HTA de 
KAKOUI 30 kV 
5  6.5  148.1 
AAAC 
1.85  48 
 
 
 
 
 
   

RACCORDEMENT CENTRALES PV.pdf

  • 1.
  • 2.
    B-1229824874 110 kV u=105,00 % B-1229824875 110kV u=97,61 % Centrale de GARAFIRI L-1229824876 S=6,300 MVA PF=0,800 B-1229824878 60 kV u=96,04 % L-1229824879 P=1,200 MW PF=0,800 Centrale GRANDES CHUTES L-1229824881 S=2,500 MVA PF=1,000 L-1229824883 P=30,780 MW Poste Kindia 110 kV u=98,64 % L-1229824887 P=11,240 MW PF=0,800 L-1229824889 P=1,416 MW Poste DONKEA 110 kV u=97,88 % Poste MANEAH 110 110 kV u=97,91 % Poste MANEAH 225 225 kV u=97,94 % L-1229824895 P=32,601 MW TR2-1229824898 Tap=0 P=27,559 MW P=-27,559 MW B-1229824901 225 kV u=99,97 % L-1229824902 P=39,060 MW L-1229824905 P=39,060 MW B-1229824908 225 kV u=100,00 % Centrale KALETA B-1229824915 110 kV u=98,17 % L-1229824916 P=15,395 MW L-1229824919 P=15,395 MW L-1229824922 P=80,000 MW PF=0,800 TR2-1229824924 Tap=0 P=16,490 MW B-1229824926 60 kV u=98,19 % P=-16,490 MW B-1229824928 110 kV u=102,70 % L-1229824929 P=25,556 MW Poste KIPE 60 kV u=100,00 % Poste SOFONIAH 60 kV u=99,48 % L-1229824937 P=12,231 MW L-1229824940 S=38,940 MVA PF=0,800 L-1229824942 S=32,109 MVA PF=0,800 Poste Sonofiah 60 kV u=95,41 % L-1229824945 P=25,687 MW L-1229824948 S=0,520 MVA PF=0,800 Poste Yessoulou 60 kV u=95,88 % B-1229824950 110 kV u=100,00 % L-1229824951 P=3,788 MW L-1229824954 P=3,788 MW B-1229824957 110 kV B-1229824958 110 kV L-1229824959 P=0,000 MW F-1229824966 P=-100,000 MW Q=-103,087 Mvar F-1229824968 P=-18,500 MW Q=150,396 Mvar F-1229824970 P=-13,000 MW Q=-8,828 Mvar L-1229824972 S=25,900 MVA PF=0,800 TR2-1229824974 Tap=0 P=-15,583 MW P=15,583 MW L-1229824977 P=29,614 MW B-1229824980 110 kV u=97,76 % L-1229824981 P=28,670 MW L-1229824984 P=32,379 MW F-1229824987 P=-36,000 MW Q=-75,707 Mvar L-1229824989 P=2,000 MW PF=0,800 F-1229824991 P=-89,287 MW Q=-255,348 Mvar F-1229824993 P=-37,182 MW Q=-38,853 Mvar SIMULATION DE LA SITUATION PROJETEE DU SYSTEME RIC AVEC CENTRALES BRANCHEES SUR LA MOYENNE TENSION L-1229825001 P=0,417 MW Poste de Mamou 30 kV u=97,14 % L-1229825008 P=2,268 MW PF=0,800 L-1229825010 P=0,016 MW PF=0,800 Poste de Dalaba 30 kV u=92,81 % Poste de Pita 30 kV u=94,29 % L-1229825015 P=2,209 MW Centrale de Kinkon 30 kV u=95,00 % B-1229825019 6,3 kV u=108,75 % L-1229825021 P=2,750 MW L-1229825024 P=0,921 MW TR2-1229825027 Tap=0 TR2-1229825030 Tap=0 L-1229825032 P=0,109 MW PF=0,799 L-1229825037 P=6,335 MW L-1229825041 P=0,109 MW Poste de Timbi Madina 30 kV u=95,97 % Poste de Labé 30 kV u=101,60 % L-1229825046 P=6,941 MW B-1229825049 30 kV u=96,04 % L-1229825051 P=0,350 MW PF=0,801 L-1229825052 P=0,350 MW PF=0,801 P=3,400 MW F-1229825056 P=-3,400 MW Q=0,000 Mvar L-1229825060 P=0,715 MW PF=0,800 P=2,875 MW P=-2,797 MW L-1229825066 P=0,517 MW L-1229825070 P=46,960 MW L-1229825073 P=2,280 MW Mamou poste chinois 30 kV u=96,74 % L-1229825077 P=0,016 MW Poste de Boulivel 30 kV u=94,83 % B-1229825081 30 kV u=94,83 % P=-9,500 MW P=9,500 MW DCPV-1229825119 P=-9,500 MW Q=0,000 Mvar P=-9,500 MW DC-1229825122 P=0,000 MW BDC-1229825125 0,209 kV u=100,00 % Centrale PV TARAMBALY 30 kV u=103,73 % Centrale de Boké 30 kV u=106,48 % TR2-1229825667 Tap=0 TR2-1229825670 Tap=0 P=-0,181 MW F-1229825673 P=0,362 MW Q=-14,911 Mvar Centrale PV Kakoui Boké 0,4 kV u=100,00 % TR2-1229825742 Tap=25 P=-4,750 MW P=4,750 MW PWM-1229825745 DCPV-1229825746 P=-4,750 MW Q=0,000 Mvar P=-4,750 MW DC-1229825749 P=0,000 MW P=4,750 MW BDC-1229825752 0,209 kV u=100,00 % B-1229825753 30 kV u=106,20 % Centrale PV de Kakoui Boké 5 MW L1229825756 P=4,750 MW L-1229825770 S=2,600 MVA PF=0,800 L-1229825775 S=2,600 MVA PF=0,800 Poste Souguetta 110 kV 110 kV u=100,54 % N1229826323 110 kV u=100,57 % L1229826331 P=36,908 MW L1229826336 P=59,742 MW L1229826341 P=22,834 MW TR2-1229826363 Tap=25 P=0,600 MW N1229826369 30 kV u=97,92 % P=-0,600 MW L-1229826378 S=0,750 MVA PF=0,800 Poste MAMOU 110 kV 110 kV u=103,66 % B-1229826590 0,4 kV u=100,00 % TR2-1229826591 Tap=25 P=-28,500 MW P=28,500 MW PWM-1229826594 DCPV-1229826595 P=-28,500 MW Q=0,000 Mvar P=-28,500 MW DC-1229826598 P=0,000 MW P=28,500 MW BDC-1229826601 0,209 kV u=100,00 % B-1229826602 30 kV u=101,93 % TR2-1229826617 Tap=25 Centrale PV SERE 110 kV u=103,95 % P=-28,500 MW P=28,500 MW TR2-1229826816 Tap=25 P=-38,000 MW Q=0,000 Mvar Centrale PV SOUGUETTA 110 kV u=100,48 % P=38,000 MW L-1229826865 P=1,810 MW PF=0,800 L-1229826873 S=17,930 MVA PF=0,800 L-1229826882 P=50,560 MW PF=0,800 L1229826888 P=38,000 MW L1229829337 P=11,190 MW L-1229829369 P=59,100 MW PF=0,800 P=19,516 MW N1229829391 60 kV u=101,48 % P=-19,516 MW L1229829397 P=18,981 MW L1229829402 P=10,607 MW L-1229829409 P=25,000 MW PF=0,800 L1229829636 P=28,500 MW L1229829641 P=9,500 MW L1229829646 P=50,000 MW L1229829651 P=50,000 MW
  • 3.
    P=0,000 MW F-1229825056 P=0,000 MW Centralede Boké 30 kV u=106,48 % TR2-1229825667 Tap=0 TR2-1229825670 Tap=0 P=-0,181 MW F-1229825673 P=0,362 MW Q=-14,911 Mvar Centrale PV Kakoui Boké 0,4 kV u=100,00 % TR2-1229825742 Tap=25 P=-4,750 MW P=4,750 MW PWM-1229825745 DCPV-1229825746 P=-4,750 MW Q=0,000 Mvar P=-4,750 MW DC-1229825749 P=0,000 MW P=4,750 MW BDC-1229825752 0,209 kV u=100,00 % B-1229825753 30 kV u=106,20 % Centrale PV de Kakoui Boké 5 MW L1229825756 P=4,750 MW L-1229825770 S=2,600 MVA PF=0,800 L-1229825775 S=2,600 MVA PF=0,800
  • 4.
    B-1229824874 110 kV u=105,00 % Centralede GARAFIRI L-1229824876 S=6,300 MVA PF=0,800 L-1229824883 P=30,607 MW Poste Kindia 110 kV u=98,65 % L-1229824887 P=11,240 MW PF=0,800 L-1229824889 P=1,176 MW Poste DONKEA 110 kV u=97,89 % L-1229824895 P=32,451 MW TR2-1229824898 Tap=0 P=-27,563 MW B-1229824901 225 kV u=99,97 % L-1229824902 P=39,061 MW L-1229824905 P=39,061 MW B-1229824908 225 kV u=100,00 % Centrale KALETA B-1229824928 110 kV u=102,74 % L-1229824929 P=24,963 MW B-1229824957 110 kV B-1229824958 110 kV F-1229824966 P=-100,000 MW Q=-102,841 Mvar F-1229824970 P=-13,000 MW Q=-8,828 Mvar L-1229824972 S=25,900 MVA PF=0,800 F-1229824987 P=-36,000 MW Q=-74,672 Mvar Poste de Mamou 30 kV u=98,26 % de Dalaba 30 kV 94,13 % L-1229825024 P=0,162 MW L-1229825060 P=3,469 MW P=-3,411 MW L-1229825066 P=1,132 MW L-1229825070 P=46,634 MW L-1229825073 P=2,280 MW B-1229825081 30 kV u=96,24 % Poste Souguetta 110 kV 110 kV u=100,57 % N1229826323 110 kV u=100,59 % L1229826331 P=36,905 MW L1229826336 P=59,390 MW L1229826341 P=22,485 MW TR2-1229826363 Tap=25 P=0,600 MW N1229826369 30 kV u=97,95 % P=-0,600 MW L-1229826378 S=0,750 MVA PF=0,800 Poste MAMOU 110 kV 110 kV u=103,75 % B-1229826590 0,4 kV u=100,00 % TR2-1229826591 Tap=25 P=-28,500 MW P=28,500 MW PWM-1229826594 DCPV-1229826595 P=-28,500 MW Q=0,000 Mvar P=-28,500 MW P=28,500 MW BDC-1229826601 0,209 kV u=100,00 % B-1229826602 30 kV u=101,97 % TR2-1229826617 Tap=25 Centrale PV SERE 30 MWc 110 kV u=104,03 % P=-28,500 MW P=28,500 MW TR2-1229826816 Tap=25 Centrale PV SOUGUETTA 110 kV u=100,50 % P=38,000 MW L-1229826865 P=1,810 MW PF=0,800 L-1229826882 P=50,560 MW PF=0,800 L1229826888 P=38,000 MW L1229829337 P=11,190 MW L-1229829409 P=25,000 MW PF=0,800 L1229829636 P=28,500 MW L1229829646 P=50,000 MW L1229829651 P=50,000 MW
  • 5.
    B-1229824874 110 kV u=105,00 % B-1229824875 110kV u=97,62 % Centrale de GAR L-1229824876 S=6,300 MVA PF=0,800 L-1229824879 P=1,200 MW PF=0,800 e GRANDES CHUTES L-1229824883 P=30,607 MW Poste Kindia 110 kV u=98,65 % L-1229824887 P=11,240 MW PF=0,800 L-1229824889 P=1,176 MW Poste DONKEA 110 kV u=97,89 % L-1229824895 P=32,451 MW B-1229824928 110 kV u=102,74 % L-1229824929 P=24,963 MW F-1229824970 P=-13,000 MW Q=-8,828 Mvar TR2-1229824974 Tap=0 P=-15,583 MW MW 824984 41 MW F-1229824987 P=-36,000 MW Q=-74,672 Mvar Poste de Mamou 30 kV u=98,26 % L-1229825008 P=2,268 MW PF=0,800 L-1229825010 P=0,016 MW PF=0,800 Poste de Dalaba 30 kV L-1229825024 P=0,162 MW P=3,469 MW P=-3,411 MW L-1229825066 P=1,132 MW L-1229825070 P=46,634 MW L-1229825073 P=2,280 MW Mamou poste chinois 30 kV u=97,87 % L-1229825077 P=0,016 MW Poste de Boulivel 30 kV u=96,24 % B-1229825081 30 kV u=96,24 % Poste Souguetta 110 kV 110 kV u=100,57 % N1229826323 110 kV u=100,59 % L1229826331 P=36,905 MW L1229826336 P=59,390 MW L1229826341 P=22,485 MW TR2-1229826363 Tap=25 P=0,600 MW N1229826369 30 kV u=97,95 % P=-0,600 MW L-1229826378 S=0,750 MVA PF=0,800 Poste MAMOU 110 kV 110 kV u=103,75 % TR2-1229826816 Tap=25 P=-38,000 MW Q=0,000 Mvar Centrale PV SOUGUETTA 110 kV u=100,50 % P=38,000 MW L-1229826865 P=1,810 MW PF=0,800 L1229826888 P=38,000 MW L1229829337 P=11,190 MW L-1229829409 P=25,000 MW PF=0,800 L1229829636 P=28,500 MW L1229829646 P=50,000 MW L1229829651 P=50,000 MW RACCORDEMENT DE LA CENTRALE PV DE TRAMBALY A LABE 10 MWc
  • 6.
    L-1229824876 S=6,300 MVA PF=0,800 L-1229824881 S=2,500 MVA PF=1,000 PosteKindia 110 kV u=98,65 % L-1229824887 P=11,240 MW PF=0,800 B-1229824928 110 kV u=102,74 % L-1229824929 P=24,963 MW L-1229824948 S=0,520 MVA PF=0,800 oste Yessoulou 60 kV u=95,89 % F-1229824987 P=-36,000 MW Q=-74,672 Mvar L-1229825001 P=0,417 MW Poste de Mamou 30 kV u=98,26 % L-1229825008 P=2,268 MW PF=0,800 L-1229825010 P=0,016 MW PF=0,800 Poste de Dalaba 30 kV u=94,13 % Poste de Pita 30 kV u=92,86 % L-1229825015 P=1,126 MW Centrale de Kinkon 30 kV u=92,86 % B-1229825019 6,3 kV L-1229825021 P=0,000 MW L-1229825024 P=0,162 MW TR2-1229825027 Tap=0 TR2-1229825030 Tap=0 L-1229825032 P=0,109 MW PF=0,799 L-1229825037 P=6,601 MW L-1229825041 P=0,109 MW Poste de Timbi Madina 30 kV u=94,84 % Poste de Labé 30 kV u=101,05 % L-1229825046 P=7,148 MW B-1229825049 30 kV u=94,90 % L-1229825051 P=0,350 MW PF=0,801 L-1229825052 P=0,350 MW PF=0,801 P=0,000 MW F-1229825056 P=0,000 MW Q=0,000 Mvar L-1229825060 P=0,715 MW PF=0,800 P=3,469 MW P=-3,411 MW L-1229825066 P=1,132 MW L-1229825070 P=46,634 MW L-1229825073 P=2,280 MW Mamou poste chinois 30 kV u=97,87 % L-1229825077 P=0,016 MW Poste de Boulivel 30 kV u=96,24 % B-1229825081 30 kV u=96,24 % P=-9,500 MW P=9,500 MW DCPV-1229825119 P=-9,500 MW Q=0,000 Mvar P=-9,500 MW DC-1229825122 P=0,000 MW BDC-1229825125 0,209 kV u=100,00 % Centrale PV TARAMBALY 30 kV u=103,52 % Poste Souguetta 110 kV 110 kV u=100,57 % N1229826323 110 kV u=100,59 % L1229826331 P=36,905 MW L1229826336 P=59,390 MW L1229826341 P=22,485 MW TR2-1229826363 Tap=25 P=0,600 MW N1229826369 30 kV u=97,95 % P=-0,600 MW L-1229826378 S=0,750 MVA PF=0,800 Poste MAMOU 110 kV 110 kV u=103,75 % TR2-12298266 Tap=25 Centrale PV SERE 30 MWc 110 kV u=104,03 % P=-28,500 MW TR2-1229826816 Tap=25 P=-38,000 MW Q=0,000 Mvar Centrale PV SOUGUETTA 110 kV u=100,50 % P=38,000 MW L1229826888 P=38,000 MW L1229829636 P=28,500 MW L1229829641 P=9,500 MW
  • 7.
               Projet :   N°    18006  ETUDE DE FAISABILITE DES CENTRALES SOLAIRES  Page  Out  GUINEE CONAKRY  1  2      RACCORDEMENT DES QUATRE CENTRALES PV AU RESEAU ELECTIQUE  NATIONAL   Les centrales de KINDIA et de MAMOU dont les puissances respectives sont de 40 et 30 MW  doivent être raccordées sur le réseau HTB existant alimentant les postes HTB/HTA de ces deux villes  avec une tension de 110 kV. Ce choix s’explique par différents critères techniques :  • Les puissances fournies par ces deux centrales ne peuvent pas être écoulées sur de simples  lignes HTA dont la capacité est limitée à 12 MVA.  • Une faible demande de charge locale d’où l’obligation d’écouler toute la production sur le  réseau national haute tension interconnecté  par leurs raccordements aux postes HTB/HTA.  • Les deux lignes de raccordement des deux centrales sur le réseau HTB 110 V se feront avec une  section normalisée de 228 mm² AAAC, d’une longueur de 7 et 6 km respectivement pour la  centrale de Mamou et celle de Souguéta.   Pour la centrale de TARAMBALY, son raccordement sur le réseau ne pourra se faire qu’en moyenne  tension, elle sera reliée directement au poste de coupure et de répartition de LABE :  • La centrale par le biais du poste de répartition HTA LABE, alimentera les villages de Labé, Pita,  Timbi Madina, Dalaba et Boulivel dont la somme de leurs consommations est estimée à  environ 6MW. Ces villages alimentés actuellement à partir du poste source de MAMOU à  travers une ligne HTA 30 kV d’une section de 70/12 mm² ACSR ayant une longueur totale de 90  km, souffrent  actuellement d’un chute de tension énorme pendant les périodes d’étiage de la  centrale KINKON.  • Il sera prévu pour le raccordement de cette centrale au poste de LABE une ligne d’une  longueur de 18 km et de section 148.1 mm² AAAC.   La ville de BOKE est actuellement alimentée par un réseau isolé à travers une centrale diésel  totalisant une puissance disponible 9,24 MW.   • Une ligne de section 148.1 mm² en almélec sera prévue pour le raccordement de la nouvelle  centrale photovoltaïque de 5 MW au réseau de la ville.   • La construction de cette centrale en première phase tiendra compte de son extension et son  passage sur la HTB 225 kV prévue dans le cadre du renforcement du réseau de transport de la  région Ouest guinéen.   
  • 8.
               Projet :   N°    18006  ETUDE DE FAISABILITE DES CENTRALES SOLAIRES  Page  Out  GUINEE CONAKRY  2  2    Centrale  Puissance  (MWc)  Point de  raccordement  Puissance (MWc)  Longueur (km)  Section  (mm²)  Nature  Chute de  tension  %  Pertes (kW)  SERE  30  Poste HTB de  MAMOU 110kV 30  7  228  AAAC  1.34  69  SOUGUETTA  40  Poste HTB de  KINDIA 110 kV  40  7  228  AAAC  4.46  369  TARAMBALY  10  Poste HTA de  LABE 30 kV  10  18  148.1  AAAC  3.4  567  BOKE  5  Poste HTA de  KAKOUI 30 kV  5  6.5  148.1  AAAC  1.85  48