SlideShare a Scribd company logo
1 of 1
Download to read offline
SOMA
Propsed Green Connector [Highway Removed]
4th Street Promenade
1:20 Section of 4th Stree & Harrison St. [Current]
1:20 Section of 4th & Brannan St. [Proposed]
1:25 Section of 4th St. [Proposed]
1:35 Section of 4th & Stillman St. [Proposed]
LANDSCAPE AS INFRASTRUCTURE
1
2
3
Implementation
of a levee at
Mission Creek
Intergrate bio-
retention
system with
the green
connector
Apply bio-
retention
system on a
street level
CURRENT ELEVATION

More Related Content

Viewers also liked (9)

Reference-Jozsef_Vass-HBCDMD
Reference-Jozsef_Vass-HBCDMDReference-Jozsef_Vass-HBCDMD
Reference-Jozsef_Vass-HBCDMD
 
Anjos do passado
Anjos do passadoAnjos do passado
Anjos do passado
 
Karina Vega
Karina VegaKarina Vega
Karina Vega
 
Segundo B
Segundo BSegundo B
Segundo B
 
Ejercicios Practicos Unidad Iv
Ejercicios Practicos Unidad IvEjercicios Practicos Unidad Iv
Ejercicios Practicos Unidad Iv
 
A razão
A razãoA razão
A razão
 
Holocausto
HolocaustoHolocausto
Holocausto
 
Ejemplo
EjemploEjemplo
Ejemplo
 
El Impacto De Las Ntc En La EducacióN
El Impacto De Las Ntc En La EducacióNEl Impacto De Las Ntc En La EducacióN
El Impacto De Las Ntc En La EducacióN
 

SOMA_work_sample

  • 1. SOMA Propsed Green Connector [Highway Removed] 4th Street Promenade 1:20 Section of 4th Stree & Harrison St. [Current] 1:20 Section of 4th & Brannan St. [Proposed] 1:25 Section of 4th St. [Proposed] 1:35 Section of 4th & Stillman St. [Proposed] LANDSCAPE AS INFRASTRUCTURE 1 2 3 Implementation of a levee at Mission Creek Intergrate bio- retention system with the green connector Apply bio- retention system on a street level CURRENT ELEVATION