2. Objectives
►Explain causes of cargo damage
►Explain who is responsible for correct
packing
►Explain the document flow for correct
packing
►Explain what container to be used for what
cargo
3. Objectives
►List the steps to be made before
loading a container
►Explain the good working practices
during stuffing of a container
►Explain the reasons and procedures for
packing several kinds of cargo into a
container
►Explain the procedures during stripping
of a container
48. Container Suitability
►1 Is it the right container
►2 Is it the right type
►3 Is it the right size
►4 Is its rating adequate
►5 Is it made of the right material
52. Working Methods
►1 Position and preparing container
►2 Preparing for work
►3 Using appropriate equipment
►4 Using safe manual methods
►5 Using dunnage correctly
►6 Preventing condensation
►7 Packing safely
►8 Following special instructions
►9 Following loading plan
53. Container Preparation
►1 Position container correctly
►2 Set on firm level ground
►3 Secure trailer > Brake and Chock
►4 Support trailer
►5 Floor level with loading platform
►6 Close gap with plate or ram
58. Good Mechanical Handling
Practices
►1 Select the best machine
►2 Check floor loading
►3 Use electric machines
►4 Use appropriate attachments
►5 Check load is secure
►6 Use ramps, bridge plates
►7 Use pallet trucks over short distances
►8 Carry loads near to ground
►9 Keep loads up-slope
65. Good Manual Handling
►1 Lay dunnage progressively
►2 Remove empty pallets
►3 Lower packages onto soft material
►4 Do NOT drag cargo > use rollers
►5 Use hooks or grips ONLY when safe
►6 Handle carefully
►7 Lift Safely
68. Preventing Condensation
Do Not
►1 Pack wet cargo or wet container
►2 Use wet dunnage
►3 Pack moisture producing goods with
moisture sensitive ones
►4 Allow moisture sensitive goods to
touch container walls or roof
►5 Pack sweaty cargoes under
waterproof sheets
69. Preventing Condensation
DO
►6 Protect machinery by vacuum packing
or coating
►7 Use absorbent dunnage
►8 Use temperature controlled containers
and or holds
►9 Use vented/ventilated containers and
or holds
►10 Leave air duct spaces
70. Packing Safely
►1 DO pack scrap metal and ore carefully
►2 Do NOT pack damaged packages
►3 Do NOT smoke
►4 DO wear appropriate protective
clothing
►5 DO take care when working with
machinery
►6 DO label the container when
fumigating, using dry ice or packing
dangerous goods
72. Pack To The Plan
►1 Follow the loading plan
►2 Conform any alterations to the plan
►3 Check each packages as it is loaded
►4 Tick off on the tally list
►5 Note any damage difference on the list
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90. Packing Special Cargoes
►1 Long cargoes
►2 Oversized and heavy lifts
►3 Refrigerated cargoes
►4 Dry bulk cargoes
►5 Liquid bulk cargoes
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104. Packing Reefers
►1 Select a suitable container
►2 Prepare the container
►3 Check the container temperature
►4 Pre-cool the cargo, check temperature
►5 Pack at the cold store
►6 Leave air ducts when stacking
►7 Do not stack above load line
105. Packing reefers
►8 Hang on rails if appropriate
►9 When packed close doors
►10 Check position of ventilation
►11 Check setpoint and mark the chart
►12 Write temperature etc on packing list.
106.
107.
108. Completing Packing
►1 Secure the cargo
►2 Brace/shore at the door
►3 Replace cover of open top
►4 Sign tally list
►5 Complete container packing list, put
copy inside door and distribute copies
►6 For dangerous goods complete a
container packing certificate and attach
placards
109. Completing Packing
►7 Close and seal the door
►8 Attach fumigant/refrigerant labels
►9 Request container removal
►10 Weigh the container
111. Preparing To Unpack
►1 Position and secure the container
►2 Check container external condition
►3 Inspect and remove the door seal
►4 Carefully open and secure the door
►5 Inspect the container contents
►6 Retrieve the container packing list
112. Unpacking
►1 Use handling equipment, but correctly
►2 If unpacking by hand, follow all
appropriate precautions
►3 Unpack in sequence and tally
►4 Sort and reassemble the consignment at
the door
►5 Palletize small loose items
113. Unpacking
►6 Check each package for condition and
identity
►7 Take damaged packages to the
appropriate holding area
►8 Remove separating dunnage carefully
►9 Attach a pile tag to each stored
consignment