SEVERN TUNNEL TRAIN COLLISION
locationof accident : Severn tunnel ,London.
• Date of accident: 07/12/1991
• Country: United Kingdom
• Accident type: Front-Rear Collision.
7 DECEMBER,1991.
• The disastrous day, there was an error in the signalling system.
• A HST (high speed train) entering the tunnel first, received driving permission for
careful driving through the tunnel.
• The motor vehicle train driving behind the HST did not stop at the signal in front of
the tunnel gateway, and proceeded through the tunnel at a considerable higher
speed than the HST. The motor vehicle train caught up with the first train
immediately before the western tunnel outlet, and was unable to stop in time.
TUNNEL
• This was the first sub sea railway tunnel, and it was first opened in 1886.
• The Tunnel was built by the Great Western Railway to provide a direct link between London
and South Wales.
• The Severn Tunnel is a double-track, brick-lined tunnel carrying the South Wales main line
of British Railways Intercity Great Western under the Severn Estuary between Pilning, on the
English side, and Severn Tunnel Junction (STJ).
• Its principal dimensions are:
• Length: 4 miles 628 yards
• Width: 26 feet
• Height: 20 feet from rail level to the crown of the Tunnel
HIGH SPEED TRAIN
• 1 B10,Intercity High Speed Train (HST) from Paddington to Cardiff, which entered
the Tunnel at approximately 10.20. This train consisted of front and rear power cars
and eight passenger coaches, weighing approximately 41 3 tonnes.
• There were 129 passengers and three employees on the train.
THE SPRINTER TRAIN
• 1 F08, the 07.00 Regional Railways Sprinter from Portsmouth Harbour to Cardiff,
which followed the HST into the Tunnel at approximately 10.26a.m.
• This was a Class 155 two-car Diesel Multiple Unit weighing approximately 77
tonnes.
• There were 168 passengers and two employees on this train.
SEQUENCE OF COLLISION
SEQUENCE OF COLLISION
• The high speed rain enters into tunnel at 10:20 a.m.
• The sprinter train enter into tunnel at 10:26 a.m.
• The collision occurs at 10:28 a.m.
•Resulting in:- 183 injured and 5 seriously
injured.
COLLISION HAPPENS BECAUSE
• The sprinter train driver Mr.Carpenter saw the signal N164.
• It means the route is clear and the sprinter train can enter into the tunnel.
CAUSES OF COLLISION
Did Driver Carpenter pass Signal N164 at Danger?
The driver of sprinter train saw Signal N164 change from red to green as the Sprinter
approached the signal at walking pace. He said he accelerated past the signal and was
travelling at "not far short of line speed“
when he saw the HST's tail-lights ahead. He immediately applied the emergency brake
and took his feet off the driver's safety device (DSD) - he assumed that he also closed
the power handle as a normal reaction.
WAS THERE AN ERROR BY THE S&T
TECHNICIANS?
(SIGNAL & TELECOMMUNICATION ENGINEERING DEPARTMENT)
• It seems clear that for much of the day of the accident the voltage at the detector
heads was out of tolerance, evidently due to the combined effects of cracking and
the low temperature. Taking the evidence at face value, it appears that the voltage
on the Down counter was out of tolerance. If the voltage was temperature-
dependent as suggested, it may well have been out of tolerance throughout the
morning, which should have prevented the signal from being cleared by re-setting
the evaluator.
AFTER COLLISION
• Implementation of the Emergency Plan went seriously wrong in several ways:
• The breaking of the Tunnel tell-tale wire did not produce an immediate response at
the Newport Panel because it was wrongly assumed to be due to a failure and not
to an emergency
• The precise location of the incident was not properly communicated in the early
stages, basically because no one checked the location quoted against the Tunnel
plan; most of the radio pagers issued to members of the BR Rescue Team failed,
apparently due to lack of maintenance, or possibly through not being switched on.
THE COLLISION IS BECAUSE OF
• The negligence at driver side
[because everyday at this time the sprinter train is stopping at
entrance of tunnel, and allow the high speed train to pass]
• Technical fault at signal
[the signal is not working properly due to high voltage]
• The negligence of S&T department worker
[they didn’t pay attention towards misbehaving of signal or high voltage problem]
CONCLUSION
• The conclusions of the Inquiry are:
• The accident was caused either by an unaccountable error on the part of the
Sprinter Driver or the S&T Technicians working in the STJ Relay Room; or possibly,
although this seems most unlikely, by a momentary or intermittent wrong-side
signalling failure which left no detectable trace, and has not recurred since the
accident.
ACCIDENT / INCIDENT INVESTIGATION
- GENERAL SAFETY PROGRAM
• Purpose
• To establish a method to handle accidents and incidents situations that occur on
campus property. These include both incidents and accidents which involve
employees and visitors, vendors, clients, spectators.
• Accident / Incident Investigations
• Accidents / Incidents must be investigated to an appropriate degree. As a result
we have two levels of investigations, a formal and an informal investigation.
FORMAL INVESTIGATIONS:
• Formal investigations are conducted for serious accidents. Both EHS / HW Officer
and the department and/or the sponsoring organization involved are participants
in the investigation.
INFORMAL INVESTIGATIONS BY SUPERVISORS:
• Since the supervisor/faculty advisor/organization representative is the
person charged with preventing accidents / incidents in his/her work
group or organization, that person should be actively involved in filling out
the appropriate form to determine the cause or causes of the
incident/accident and to implement corrective actions.
• Incident/accident forms may be downloaded from the Safety, Health,
Environmental web page for use in conducting the investigation.
INVESTIGATION PROCEDURE
• 1. Call or gather the necessary person(s) to conduct the investigation and obtain the
investigation kit.
• 2. Secure the area where the injury occurred and preserve the work area as it is.
• 3. Identify and gather witnesses to the injury event.
• 4. Interview the involved worker.
• 5. Interview all witnesses.
INVESTIGATION PROCEDURE
• 6. Document the scene of the injury through photos or videos.
• 7. Complete the investigation report, including determination of what caused the
incident and what corrective actions will prevent recurrences.
• 8. Use results to improve the injury and illness prevention program to better
identify and control hazards before they result in incidents.
• 9. Ensure follow-up on completion of corrective actions.
REFERENCE:-
• HM Railway Inspectorate, UK Railway inquiry report.
• UK Railway Accident Archives.
• Christian D, Francesca M, Ilaria Neri, Tunnel accident data and review of accident investigation
methodologies
• https://en.wikipedia.org/wiki/Severn_Tunnel_rail_accident
• accident investigation https://www.ccohs.ca/oshanswers/hsprograms/investig.html
• www.nsc.org/.../How-To-Conduct-An-Incident-Investigation.
Severn tunnel train collision

More Related Content

Similar to Severn tunnel train collision

10 Case Studies in Health and safety Training
10 Case Studies in Health and safety Training10 Case Studies in Health and safety Training
10 Case Studies in Health and safety TrainingJayaKarthic1
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
bomaby high incident on platform in india
bomaby high incident on platform in indiabomaby high incident on platform in india
bomaby high incident on platform in indiasuhas1984in
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Crosstown TO
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidentsPrem kumar
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Crosstown TO
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014Crosstown TO
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Brittany Maxwell
 
Tank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationTank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationAdvisian
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Fatality benoi yard 19 may 2014 (2)
Fatality benoi yard 19 may 2014 (2)Fatality benoi yard 19 may 2014 (2)
Fatality benoi yard 19 may 2014 (2)bobrobbo
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Crosstown TO
 

Similar to Severn tunnel train collision (20)

10 Case Studies in Health and safety Training
10 Case Studies in Health and safety Training10 Case Studies in Health and safety Training
10 Case Studies in Health and safety Training
 
Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018Chaplin - Avenue Construction Liaison Committee - June 2018
Chaplin - Avenue Construction Liaison Committee - June 2018
 
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
Chaplin - Avenue Construction Liaison Committee Meeting - March 2018
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
bomaby high incident on platform in india
bomaby high incident on platform in indiabomaby high incident on platform in india
bomaby high incident on platform in india
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
 
Overview of crane incidents
Overview of crane incidentsOverview of crane incidents
Overview of crane incidents
 
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
Eglinton Crosstown LRT Project Virtual Open House - East - Science Centre to ...
 
Imcasf12 14
Imcasf12 14Imcasf12 14
Imcasf12 14
 
Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018
 
Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)Central assessment unit CAU(Steve Bentham)
Central assessment unit CAU(Steve Bentham)
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014
 
Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017Mount Pleasant Station Open House - April 2017
Mount Pleasant Station Open House - April 2017
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018
 
Tank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationTank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge Mitigation
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Fatality benoi yard 19 may 2014 (2)
Fatality benoi yard 19 may 2014 (2)Fatality benoi yard 19 may 2014 (2)
Fatality benoi yard 19 may 2014 (2)
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017
 

Recently uploaded

Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answersdalebeck957
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Recently uploaded (20)

Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in  Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in Uttam Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
latest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answerslatest AZ-104 Exam Questions and Answers
latest AZ-104 Exam Questions and Answers
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Severn tunnel train collision

  • 2. locationof accident : Severn tunnel ,London. • Date of accident: 07/12/1991 • Country: United Kingdom • Accident type: Front-Rear Collision.
  • 3. 7 DECEMBER,1991. • The disastrous day, there was an error in the signalling system. • A HST (high speed train) entering the tunnel first, received driving permission for careful driving through the tunnel. • The motor vehicle train driving behind the HST did not stop at the signal in front of the tunnel gateway, and proceeded through the tunnel at a considerable higher speed than the HST. The motor vehicle train caught up with the first train immediately before the western tunnel outlet, and was unable to stop in time.
  • 4. TUNNEL • This was the first sub sea railway tunnel, and it was first opened in 1886. • The Tunnel was built by the Great Western Railway to provide a direct link between London and South Wales. • The Severn Tunnel is a double-track, brick-lined tunnel carrying the South Wales main line of British Railways Intercity Great Western under the Severn Estuary between Pilning, on the English side, and Severn Tunnel Junction (STJ). • Its principal dimensions are: • Length: 4 miles 628 yards • Width: 26 feet • Height: 20 feet from rail level to the crown of the Tunnel
  • 5. HIGH SPEED TRAIN • 1 B10,Intercity High Speed Train (HST) from Paddington to Cardiff, which entered the Tunnel at approximately 10.20. This train consisted of front and rear power cars and eight passenger coaches, weighing approximately 41 3 tonnes. • There were 129 passengers and three employees on the train.
  • 6. THE SPRINTER TRAIN • 1 F08, the 07.00 Regional Railways Sprinter from Portsmouth Harbour to Cardiff, which followed the HST into the Tunnel at approximately 10.26a.m. • This was a Class 155 two-car Diesel Multiple Unit weighing approximately 77 tonnes. • There were 168 passengers and two employees on this train.
  • 8. SEQUENCE OF COLLISION • The high speed rain enters into tunnel at 10:20 a.m. • The sprinter train enter into tunnel at 10:26 a.m. • The collision occurs at 10:28 a.m. •Resulting in:- 183 injured and 5 seriously injured.
  • 9. COLLISION HAPPENS BECAUSE • The sprinter train driver Mr.Carpenter saw the signal N164. • It means the route is clear and the sprinter train can enter into the tunnel.
  • 10. CAUSES OF COLLISION Did Driver Carpenter pass Signal N164 at Danger? The driver of sprinter train saw Signal N164 change from red to green as the Sprinter approached the signal at walking pace. He said he accelerated past the signal and was travelling at "not far short of line speed“ when he saw the HST's tail-lights ahead. He immediately applied the emergency brake and took his feet off the driver's safety device (DSD) - he assumed that he also closed the power handle as a normal reaction.
  • 11. WAS THERE AN ERROR BY THE S&T TECHNICIANS? (SIGNAL & TELECOMMUNICATION ENGINEERING DEPARTMENT) • It seems clear that for much of the day of the accident the voltage at the detector heads was out of tolerance, evidently due to the combined effects of cracking and the low temperature. Taking the evidence at face value, it appears that the voltage on the Down counter was out of tolerance. If the voltage was temperature- dependent as suggested, it may well have been out of tolerance throughout the morning, which should have prevented the signal from being cleared by re-setting the evaluator.
  • 12. AFTER COLLISION • Implementation of the Emergency Plan went seriously wrong in several ways: • The breaking of the Tunnel tell-tale wire did not produce an immediate response at the Newport Panel because it was wrongly assumed to be due to a failure and not to an emergency • The precise location of the incident was not properly communicated in the early stages, basically because no one checked the location quoted against the Tunnel plan; most of the radio pagers issued to members of the BR Rescue Team failed, apparently due to lack of maintenance, or possibly through not being switched on.
  • 13. THE COLLISION IS BECAUSE OF • The negligence at driver side [because everyday at this time the sprinter train is stopping at entrance of tunnel, and allow the high speed train to pass] • Technical fault at signal [the signal is not working properly due to high voltage] • The negligence of S&T department worker [they didn’t pay attention towards misbehaving of signal or high voltage problem]
  • 14. CONCLUSION • The conclusions of the Inquiry are: • The accident was caused either by an unaccountable error on the part of the Sprinter Driver or the S&T Technicians working in the STJ Relay Room; or possibly, although this seems most unlikely, by a momentary or intermittent wrong-side signalling failure which left no detectable trace, and has not recurred since the accident.
  • 15. ACCIDENT / INCIDENT INVESTIGATION - GENERAL SAFETY PROGRAM • Purpose • To establish a method to handle accidents and incidents situations that occur on campus property. These include both incidents and accidents which involve employees and visitors, vendors, clients, spectators. • Accident / Incident Investigations • Accidents / Incidents must be investigated to an appropriate degree. As a result we have two levels of investigations, a formal and an informal investigation.
  • 16. FORMAL INVESTIGATIONS: • Formal investigations are conducted for serious accidents. Both EHS / HW Officer and the department and/or the sponsoring organization involved are participants in the investigation.
  • 17. INFORMAL INVESTIGATIONS BY SUPERVISORS: • Since the supervisor/faculty advisor/organization representative is the person charged with preventing accidents / incidents in his/her work group or organization, that person should be actively involved in filling out the appropriate form to determine the cause or causes of the incident/accident and to implement corrective actions. • Incident/accident forms may be downloaded from the Safety, Health, Environmental web page for use in conducting the investigation.
  • 18. INVESTIGATION PROCEDURE • 1. Call or gather the necessary person(s) to conduct the investigation and obtain the investigation kit. • 2. Secure the area where the injury occurred and preserve the work area as it is. • 3. Identify and gather witnesses to the injury event. • 4. Interview the involved worker. • 5. Interview all witnesses.
  • 19. INVESTIGATION PROCEDURE • 6. Document the scene of the injury through photos or videos. • 7. Complete the investigation report, including determination of what caused the incident and what corrective actions will prevent recurrences. • 8. Use results to improve the injury and illness prevention program to better identify and control hazards before they result in incidents. • 9. Ensure follow-up on completion of corrective actions.
  • 20. REFERENCE:- • HM Railway Inspectorate, UK Railway inquiry report. • UK Railway Accident Archives. • Christian D, Francesca M, Ilaria Neri, Tunnel accident data and review of accident investigation methodologies • https://en.wikipedia.org/wiki/Severn_Tunnel_rail_accident • accident investigation https://www.ccohs.ca/oshanswers/hsprograms/investig.html • www.nsc.org/.../How-To-Conduct-An-Incident-Investigation.