Capt. Robert van den Berg Inc. Marine Surveyors and Consultants
1832 Duke of York Quay
Virginia Beach, VA 23454
Tel 757 481-6903 FAX 757 496-5554
E- Mail: MrnSurvey@aol.com
Date: July 08, 2007
EXAMINED FOR THE ACCOUNT OF WHOM IT MAY CONCERN:
Survey Report No. FL 0707161
AT THE REQUEST OF: David Sun
FOR ACCOUNT OF: Friendship Transport Inc
370 Amapola Ave Suite 202
Torrance, CA 90501
VESSEL: Rotterdam Express Voy 53W27
SHIPMENT: 350 Ton Siemens Generator
Baosteel Power Station Unit 4 Project
SURVEY PERFORMED: June 26 & July 07, 2007
SURVEY LOCATION: Norfolk International Terminals
Norfolk, VA
Acting upon a request by Mr. David Sun of Friendship Transport Inc., undersigned surveyor did,
on June 26 & July 07, 2007 attend on the Norfolk International Terminals, Norfolk, VA in order to
inspect a Siemens Generator and to witness the loading and securing of a this Generator on board
the mv Rotterdam Express.
We found that the Generator had arrived by rail on or about June 25 2007 and was located on Pier
I Southside. We found the Generator in excellent condition, free of any visible damages.
On July 07, 2007, during the loading operation also in attendance were Mr. Sirish Kasarabada of
Eagle Maritime Consultants Inc., representing Siemens Westinghouse Power Corp. and Mr. James
Reiter of the National Cargo Bureau representing Hapag Lloyd.
FL 0707161
Page 2
July 07, 2007
06:15 Surveyor on terminal.
06:45 – 07:10 Pre loading Conference on vessel
07:00 Stevedores on pier.
07:20 Stevedores started to positioning flat racks and materials in Bay 38 PS
08:00 Floating Crane Chesapeake 1000 moves to Pier 1 South side.
08:18 Floating Crane in position.
08:20 – 08:45 Securing conference next to railcar with generator.
08:45 Slings positioned on Generator. Started to burn off last 4 securing bolts.
09:03 Start lifting Generator
09:07 Generator free from railcar
09:55 Flat racks and steel I beams in position in Bay 38
10:04 Floating Crane alongside vessel, start maneuvering to come in position.
10:34 Generator makes soft contact with container OOLU 559766-3
10:50 Generator positioned on beams in Bay 38
12:20 Completed securing of Generator.
Securing
The securing followed more or less the plan as prepared by Hapag LLoyd
Generator: Twenty four Chain & Turnbuckle lashings each side. Two on each end.
Issued without prejudice.
L. Robert van den Berg
CAPT. ROBERT VAN DEN BERG
INDEPENDENT MARINE
SURVEYOR
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report
Siemens 350 Generator Shipment Survey Report

More Related Content

Viewers also liked

ISO power point presentation
ISO power point presentationISO power point presentation
ISO power point presentationnduka rotimi
 
2016 Spring Trip to Top US Universities
2016 Spring Trip to Top US Universities2016 Spring Trip to Top US Universities
2016 Spring Trip to Top US UniversitiesA L
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone PresentationDavid Sun
 
Презентация "Бизнес английский: переговоры и переписка"
Презентация "Бизнес английский: переговоры и переписка"Презентация "Бизнес английский: переговоры и переписка"
Презентация "Бизнес английский: переговоры и переписка"EnglishDom
 

Viewers also liked (7)

ISO power point presentation
ISO power point presentationISO power point presentation
ISO power point presentation
 
2016 Spring Trip to Top US Universities
2016 Spring Trip to Top US Universities2016 Spring Trip to Top US Universities
2016 Spring Trip to Top US Universities
 
JST transcript
JST transcriptJST transcript
JST transcript
 
Apresentação zenklub
Apresentação zenklubApresentação zenklub
Apresentação zenklub
 
Capstone Presentation
Capstone PresentationCapstone Presentation
Capstone Presentation
 
Презентация "Бизнес английский: переговоры и переписка"
Презентация "Бизнес английский: переговоры и переписка"Презентация "Бизнес английский: переговоры и переписка"
Презентация "Бизнес английский: переговоры и переписка"
 
Presentación1
Presentación1Presentación1
Presentación1
 

Similar to Siemens 350 Generator Shipment Survey Report

brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.brian timpson
 
CV_James McDonald1[1]
CV_James McDonald1[1]CV_James McDonald1[1]
CV_James McDonald1[1]Jim McDonald
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAPPham Quang
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAPPham Quang
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Alistair Lamont
 
M. Lyons Resume to Present 6-4-2015
M. Lyons Resume to Present  6-4-2015M. Lyons Resume to Present  6-4-2015
M. Lyons Resume to Present 6-4-2015Morgan Lyons
 

Similar to Siemens 350 Generator Shipment Survey Report (7)

brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
CV_James McDonald1[1]
CV_James McDonald1[1]CV_James McDonald1[1]
CV_James McDonald1[1]
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
Abe Resume
Abe ResumeAbe Resume
Abe Resume
 
M. Lyons Resume to Present 6-4-2015
M. Lyons Resume to Present  6-4-2015M. Lyons Resume to Present  6-4-2015
M. Lyons Resume to Present 6-4-2015
 

Siemens 350 Generator Shipment Survey Report

  • 1. Capt. Robert van den Berg Inc. Marine Surveyors and Consultants 1832 Duke of York Quay Virginia Beach, VA 23454 Tel 757 481-6903 FAX 757 496-5554 E- Mail: MrnSurvey@aol.com Date: July 08, 2007 EXAMINED FOR THE ACCOUNT OF WHOM IT MAY CONCERN: Survey Report No. FL 0707161 AT THE REQUEST OF: David Sun FOR ACCOUNT OF: Friendship Transport Inc 370 Amapola Ave Suite 202 Torrance, CA 90501 VESSEL: Rotterdam Express Voy 53W27 SHIPMENT: 350 Ton Siemens Generator Baosteel Power Station Unit 4 Project SURVEY PERFORMED: June 26 & July 07, 2007 SURVEY LOCATION: Norfolk International Terminals Norfolk, VA Acting upon a request by Mr. David Sun of Friendship Transport Inc., undersigned surveyor did, on June 26 & July 07, 2007 attend on the Norfolk International Terminals, Norfolk, VA in order to inspect a Siemens Generator and to witness the loading and securing of a this Generator on board the mv Rotterdam Express. We found that the Generator had arrived by rail on or about June 25 2007 and was located on Pier I Southside. We found the Generator in excellent condition, free of any visible damages. On July 07, 2007, during the loading operation also in attendance were Mr. Sirish Kasarabada of Eagle Maritime Consultants Inc., representing Siemens Westinghouse Power Corp. and Mr. James Reiter of the National Cargo Bureau representing Hapag Lloyd.
  • 2. FL 0707161 Page 2 July 07, 2007 06:15 Surveyor on terminal. 06:45 – 07:10 Pre loading Conference on vessel 07:00 Stevedores on pier. 07:20 Stevedores started to positioning flat racks and materials in Bay 38 PS 08:00 Floating Crane Chesapeake 1000 moves to Pier 1 South side. 08:18 Floating Crane in position. 08:20 – 08:45 Securing conference next to railcar with generator. 08:45 Slings positioned on Generator. Started to burn off last 4 securing bolts. 09:03 Start lifting Generator 09:07 Generator free from railcar 09:55 Flat racks and steel I beams in position in Bay 38 10:04 Floating Crane alongside vessel, start maneuvering to come in position. 10:34 Generator makes soft contact with container OOLU 559766-3 10:50 Generator positioned on beams in Bay 38 12:20 Completed securing of Generator. Securing The securing followed more or less the plan as prepared by Hapag LLoyd Generator: Twenty four Chain & Turnbuckle lashings each side. Two on each end. Issued without prejudice. L. Robert van den Berg CAPT. ROBERT VAN DEN BERG INDEPENDENT MARINE SURVEYOR