SlideShare a Scribd company logo
1 of 22
 
The following presenTaTion is my work, done in The naTion of Colombia
building infrasTruCTure To The hydrauliC shop repair was designed for him
mr. arChiTeCT and mr. engineer friends of mine under The CondiTions and
requiremenTs requesTed by me, based on The airCrafT mainTenanCe manuals
for blaCkhawk
designs for The workbenCh and The TesT benCh as well as To The benChmarks
for mainTenanCe of The differenT ComponenTs of The hydrauliC sysTem of
The airCrafT blaCkhawk were designed in full and made by me, and posiTions
inTo operaTion wiTh The guidanCe of god and my experienCe TeChniCal in my
work, based on The manuals To The mainTenanCe of The blaCkhawk
noTe.
in The following presenTaTion does noT appear arrangemenTs on improving
infrasTruCTure in The building , in The floor and walls as improvemenT in
The sysTem of lighT due To laCk of budgeT for The final delivery of The
projeCT.
afTer a while These arrangemenTs were ConduCTed and CompleTed agree To
The iniTial original designs for work of The building
LeveL 3 project speciaL test bench bLackhawk hydrauLic system
SOUTH     AMERICA     UH60 HYDRAULICS WORKSHOP

More Related Content

Similar to SOUTH AMERICA UH60 HYDRAULICS WORKSHOP

Final Year Project report (Jet Engine)
Final Year Project report (Jet Engine)Final Year Project report (Jet Engine)
Final Year Project report (Jet Engine)Pramod Pawar
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsAmer Abdul Aziz
 
Load sensing control 2M4-12.pdf
Load sensing control 2M4-12.pdfLoad sensing control 2M4-12.pdf
Load sensing control 2M4-12.pdfcarlosserna55
 

Similar to SOUTH AMERICA UH60 HYDRAULICS WORKSHOP (6)

Me for Linkedin
Me for LinkedinMe for Linkedin
Me for Linkedin
 
Final Year Project report (Jet Engine)
Final Year Project report (Jet Engine)Final Year Project report (Jet Engine)
Final Year Project report (Jet Engine)
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
The Value of Building Commissioning
The Value of Building CommissioningThe Value of Building Commissioning
The Value of Building Commissioning
 
Load sensing control 2M4-12.pdf
Load sensing control 2M4-12.pdfLoad sensing control 2M4-12.pdf
Load sensing control 2M4-12.pdf
 
Resume of ECHeausler
Resume of ECHeausler Resume of ECHeausler
Resume of ECHeausler
 

SOUTH AMERICA UH60 HYDRAULICS WORKSHOP

  • 1.
  • 2.
  • 3.   The following presenTaTion is my work, done in The naTion of Colombia building infrasTruCTure To The hydrauliC shop repair was designed for him mr. arChiTeCT and mr. engineer friends of mine under The CondiTions and requiremenTs requesTed by me, based on The airCrafT mainTenanCe manuals for blaCkhawk designs for The workbenCh and The TesT benCh as well as To The benChmarks for mainTenanCe of The differenT ComponenTs of The hydrauliC sysTem of The airCrafT blaCkhawk were designed in full and made by me, and posiTions inTo operaTion wiTh The guidanCe of god and my experienCe TeChniCal in my work, based on The manuals To The mainTenanCe of The blaCkhawk noTe. in The following presenTaTion does noT appear arrangemenTs on improving infrasTruCTure in The building , in The floor and walls as improvemenT in The sysTem of lighT due To laCk of budgeT for The final delivery of The projeCT. afTer a while These arrangemenTs were ConduCTed and CompleTed agree To The iniTial original designs for work of The building
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. LeveL 3 project speciaL test bench bLackhawk hydrauLic system