SlideShare a Scribd company logo
1 of 4
RESUME
AYAN ROYCHOWDHURY
Matangini Hazra Road (Ushumpur)
P.O. Agarpara; KOL.109 E.Mail:-
ayanroychowdhury74@gmail.com
Ph. 9830187859 / 9830817500
TECHNICAL QUALIFICATION : I) DIPLOMA ENGINEER (Electrical)
(Passed 3Yrs Electrical Diploma engineering in the
year 1996 from West Bengal State Council for
Technical Education)
: II) CERTIFICATE IN HARDWARE ENGG.
(From TULEC Computer Centre in the year
2000)
EDUCATIONAL QUALIFICATION : MADHYAMIK
(Passed Madhyamik in the year 1990)
: HIGHER SECONDARY
(Passed H.S in the year 1992 )
DATE OF BIRTH : 23RD
SEPT. 1974
FATHER’S NAME : Mr. Adris Roychowdhury
MARITAL STATUS : Married
PRESENT EMPLOYMENT : Working as a Facility Manager in 3RD
EYE
SECURITY GUARDING PVT. LTD. From 1st
August’16
Developer: Bengal Peerless
Responsible for all types of Soft (Security & HK) &
Engineering Maintenance services at site.
Generating of DMR, MMR, SOPs; Maintaining all
Soft & Engineering check lists and PPM as per the
Schedule. Team Strength: 47
LAST EMPLOYMENT : Worked as Facility Manager in NFS Mainten-
ance & Services Pvt Ltd from Feb’16 to July’16.
Developer: IDEAL Group.
Looked after all Soft & Engineering services.
LAST OCUPATION : SELF Employed ( From Nov’12 to JAN’16).
(Proprietor of own Firm).
Worked as a Project executer of FAS, BMS,
Access Control and CCTV, Project of different
MNC Company like JCIPL,TYCO,Honeywell &
UTC Group of companies .
Looked after
1. All Operation (Project & Maintenance of
Engineering & Facility).
2. All Compliances (PF, ESI, ST, VAT, IT,
Wages) as per client’s demand.
3. Also looked after electro mechanical man
power supply in different sites like Hiland
Woods, ITC sonar Bangla, Taj Bengal, CTS,
IBM, TCS, Avani Mall under Honeywell
Automation India Ld, Johnson Controls india
pvt ltd.
4. Billing part of the eshtablishment.
PREVIOUS EMPLOYMENT: : JONES LANG LASALLE (IFM)
i) JLL Designation: Executive Engineer
Site: ACCENTURE
Site Designation: Executive Engineer
Worked as Executive Engineer from 1st
Sept’ 2011
To 10th
Nov’12.
Responsible for all types of Electro-Mechanical part
Including 11 X 90 KVA UPS System of the site.
Reaport to: FM (JLL) & City lead (Accenture)
ii) JLL Designation: Executive Engineer
Site: Morgan Stanley- Kolkata
Site Designation: Facility Manager
Worked as a Facility Manager (Adminstration)
From 8th
Feb’2011 to 31st
August’2011.
Reporting Person: i) Assist. Vice President (JLL)
ii}All India Morgan Stanley
A/C Manager (JLL)
--------------------------------------------------------------------------------------------------------------------------------
PAST EXPERIENCE i)BISHOPSGATE SERVICES PVT.LTD.
Worked as a Technical Facility Manager at Loginn
Hospitality (Stesalit Tower) from 3rd
June’2010 to
7th
Feb’2011.
Developer: Sureka Properties (Bengal Park
Chamber).
Job Responsibility: Looked after 1500 kva LT
Distribution Sys, 750kva DG plant, 320x2 TR
Chilling plant, WTP & Hydropnumatic control
Water distribution sys, BMS sys etc. Report to
CEO of Bengal Park Chamber.
ii) CB RICHARD ELLIS SOUTH ASSIA PVT
LTD.
Worked as an Assistant Manager Of Asset
Service at the site Greenwood Nook & Axis Mall,
from Nov.’09, Developer Shrachi/Bengal Peerless
Site Designationt- Facility Manager
Job Responsibility : Looked after all types of
Engineering(Electro-Mech.) & Soft maintenance
like House Keeping and Security. Making DMR,
MMR, Facility observation Report & Follow up with
All AMC Vendors. Report to Regional Operation
Manager & Regional Associate Director.
Maintaining MIS of the site and generating the
Monthly bill.
iii) JONES LANG LASALLE MEGHRAJ (JLLM)
Working as a Shift Engr from Oct 07’ to Oct’09. at
Hiland Park Site.
Job Responsibility:Electrical distribution 11KV/
440V Sys.,Water Treatment Plant
including R.O Plant,Fire Fighting Sys & Fire Alarm
System , All types of Electromech related problem
solution. DG Plant (320 x 9 kva) Operation &
Maintenance. Making of DMR & Reported to FM &
OM.
iv) HOFINCONS INFOTECH & INDUSTRIAL
SERVICES PVT.LTD. (Sister concern of TYCO
Fire & Security).
(Worked as a Electrical Shift Engr. In The Oberoi
Grand Hotel, kol (Engineering Div.) from Oct.05’
To May ‘2006.
Responsibility:1000KVA+1200KVA+250*2KVA
Substation operation & maintenance. 1150KVA+
1100KVA+250KVA DG set and UPS operation &
Maintenance.
450*2 TR Chilling plant Operation & main-
tenance.Fire Hydrant sys. Operation & maintenance.
3 T Capacity Boiler Operation & Maintenance.
v) JOHNSON CONTROLS (I) PVT.LTD.
(Worked from July 2001’to Sep’2005’)
Job Responsibility: Maintenance of FAS Sys.
Maintenance of Fire Hydrant Sys.,CCTV Sys.
& BMS Sys.
vi) INFOTECH SERVICES
(Worked as a Hardware Engr . from Nov.2000’ to
Jun 2001’)
vii) METAL & STEEL FACTORY
(One year Industrial Training from Dec.1997’ to
Nov.1998’)
Current Salary drawn : CTC 27K PM
Expected Salary : Negotiable
SIGNATURE
SIGNATURE

More Related Content

Similar to Ayan_Bio Data 3rd Eye (20)

Arun Saluja (1)
Arun Saluja (1)Arun Saluja (1)
Arun Saluja (1)
 
Arun Saluja (1)
Arun Saluja (1)Arun Saluja (1)
Arun Saluja (1)
 
resume arun saluja (1) (1)
resume arun saluja (1) (1)resume arun saluja (1) (1)
resume arun saluja (1) (1)
 
Ravishankar-CV
Ravishankar-CVRavishankar-CV
Ravishankar-CV
 
Muhammad Noman Resume
Muhammad Noman ResumeMuhammad Noman Resume
Muhammad Noman Resume
 
The last Curriculum Vitae CV
The last Curriculum Vitae CVThe last Curriculum Vitae CV
The last Curriculum Vitae CV
 
subrat resume
subrat resumesubrat resume
subrat resume
 
saravResume
saravResumesaravResume
saravResume
 
Updated My CV pdf
Updated My CV  pdfUpdated My CV  pdf
Updated My CV pdf
 
Skm Nov. 2016
Skm  Nov. 2016Skm  Nov. 2016
Skm Nov. 2016
 
Coenie curriculum vitae2
Coenie curriculum vitae2Coenie curriculum vitae2
Coenie curriculum vitae2
 
Muhammad Ahmed 01
Muhammad Ahmed 01Muhammad Ahmed 01
Muhammad Ahmed 01
 
RESUME (AjitDas)
RESUME (AjitDas)RESUME (AjitDas)
RESUME (AjitDas)
 
Nedal Nemer CV
Nedal Nemer CVNedal Nemer CV
Nedal Nemer CV
 
Old resume forman
Old resume formanOld resume forman
Old resume forman
 
Thomas vincent cv
Thomas vincent cvThomas vincent cv
Thomas vincent cv
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Resume(1)
Resume(1)Resume(1)
Resume(1)
 
Tushar Resume
Tushar ResumeTushar Resume
Tushar Resume
 
jey new resume
jey new resumejey new resume
jey new resume
 

Ayan_Bio Data 3rd Eye

  • 1. RESUME AYAN ROYCHOWDHURY Matangini Hazra Road (Ushumpur) P.O. Agarpara; KOL.109 E.Mail:- ayanroychowdhury74@gmail.com Ph. 9830187859 / 9830817500 TECHNICAL QUALIFICATION : I) DIPLOMA ENGINEER (Electrical) (Passed 3Yrs Electrical Diploma engineering in the year 1996 from West Bengal State Council for Technical Education) : II) CERTIFICATE IN HARDWARE ENGG. (From TULEC Computer Centre in the year 2000) EDUCATIONAL QUALIFICATION : MADHYAMIK (Passed Madhyamik in the year 1990) : HIGHER SECONDARY (Passed H.S in the year 1992 ) DATE OF BIRTH : 23RD SEPT. 1974 FATHER’S NAME : Mr. Adris Roychowdhury MARITAL STATUS : Married PRESENT EMPLOYMENT : Working as a Facility Manager in 3RD EYE SECURITY GUARDING PVT. LTD. From 1st August’16 Developer: Bengal Peerless Responsible for all types of Soft (Security & HK) & Engineering Maintenance services at site. Generating of DMR, MMR, SOPs; Maintaining all Soft & Engineering check lists and PPM as per the Schedule. Team Strength: 47 LAST EMPLOYMENT : Worked as Facility Manager in NFS Mainten- ance & Services Pvt Ltd from Feb’16 to July’16. Developer: IDEAL Group. Looked after all Soft & Engineering services. LAST OCUPATION : SELF Employed ( From Nov’12 to JAN’16). (Proprietor of own Firm). Worked as a Project executer of FAS, BMS, Access Control and CCTV, Project of different MNC Company like JCIPL,TYCO,Honeywell & UTC Group of companies .
  • 2. Looked after 1. All Operation (Project & Maintenance of Engineering & Facility). 2. All Compliances (PF, ESI, ST, VAT, IT, Wages) as per client’s demand. 3. Also looked after electro mechanical man power supply in different sites like Hiland Woods, ITC sonar Bangla, Taj Bengal, CTS, IBM, TCS, Avani Mall under Honeywell Automation India Ld, Johnson Controls india pvt ltd. 4. Billing part of the eshtablishment. PREVIOUS EMPLOYMENT: : JONES LANG LASALLE (IFM) i) JLL Designation: Executive Engineer Site: ACCENTURE Site Designation: Executive Engineer Worked as Executive Engineer from 1st Sept’ 2011 To 10th Nov’12. Responsible for all types of Electro-Mechanical part Including 11 X 90 KVA UPS System of the site. Reaport to: FM (JLL) & City lead (Accenture) ii) JLL Designation: Executive Engineer Site: Morgan Stanley- Kolkata Site Designation: Facility Manager Worked as a Facility Manager (Adminstration) From 8th Feb’2011 to 31st August’2011. Reporting Person: i) Assist. Vice President (JLL) ii}All India Morgan Stanley A/C Manager (JLL) -------------------------------------------------------------------------------------------------------------------------------- PAST EXPERIENCE i)BISHOPSGATE SERVICES PVT.LTD. Worked as a Technical Facility Manager at Loginn Hospitality (Stesalit Tower) from 3rd June’2010 to 7th Feb’2011. Developer: Sureka Properties (Bengal Park Chamber). Job Responsibility: Looked after 1500 kva LT Distribution Sys, 750kva DG plant, 320x2 TR Chilling plant, WTP & Hydropnumatic control Water distribution sys, BMS sys etc. Report to CEO of Bengal Park Chamber. ii) CB RICHARD ELLIS SOUTH ASSIA PVT LTD. Worked as an Assistant Manager Of Asset Service at the site Greenwood Nook & Axis Mall, from Nov.’09, Developer Shrachi/Bengal Peerless Site Designationt- Facility Manager
  • 3. Job Responsibility : Looked after all types of Engineering(Electro-Mech.) & Soft maintenance like House Keeping and Security. Making DMR, MMR, Facility observation Report & Follow up with All AMC Vendors. Report to Regional Operation Manager & Regional Associate Director. Maintaining MIS of the site and generating the Monthly bill. iii) JONES LANG LASALLE MEGHRAJ (JLLM) Working as a Shift Engr from Oct 07’ to Oct’09. at Hiland Park Site. Job Responsibility:Electrical distribution 11KV/ 440V Sys.,Water Treatment Plant including R.O Plant,Fire Fighting Sys & Fire Alarm System , All types of Electromech related problem solution. DG Plant (320 x 9 kva) Operation & Maintenance. Making of DMR & Reported to FM & OM. iv) HOFINCONS INFOTECH & INDUSTRIAL SERVICES PVT.LTD. (Sister concern of TYCO Fire & Security). (Worked as a Electrical Shift Engr. In The Oberoi Grand Hotel, kol (Engineering Div.) from Oct.05’ To May ‘2006. Responsibility:1000KVA+1200KVA+250*2KVA Substation operation & maintenance. 1150KVA+ 1100KVA+250KVA DG set and UPS operation & Maintenance. 450*2 TR Chilling plant Operation & main- tenance.Fire Hydrant sys. Operation & maintenance. 3 T Capacity Boiler Operation & Maintenance. v) JOHNSON CONTROLS (I) PVT.LTD. (Worked from July 2001’to Sep’2005’) Job Responsibility: Maintenance of FAS Sys. Maintenance of Fire Hydrant Sys.,CCTV Sys. & BMS Sys. vi) INFOTECH SERVICES (Worked as a Hardware Engr . from Nov.2000’ to Jun 2001’) vii) METAL & STEEL FACTORY (One year Industrial Training from Dec.1997’ to Nov.1998’) Current Salary drawn : CTC 27K PM Expected Salary : Negotiable