Young-Davidson Mine
Luc Guimond, General Manager
CIBC Site Tour June 4, 2014
www.auricogold.com
FORWARD LOOKING STATEMENTS
This presentation contains forward-looking statements and forward-looking information as defined under Canadian and U.S. securities laws. All statements,
other than statements of historical fact, are forward-looking statements. The words "expect", "believe", "anticipate", "will", "intend", "estimate", "forecast",
"budget" and similar expressions identify forward-looking statements. Forward-looking statements include information as to strategy, plans or future financial or
operating performance, such as the Company’s expansion plans, project timelines, production plans, projected cash flows or capital expenditures, cost
estimates, projected exploration results, reserve and resource estimates and other statements that express management’s expectations or estimates of future
performance.
Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are
inherently subject to significant uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those
projected in the forward-looking statements, including: uncertainty of production and cost estimates; fluctuations in the price of gold and foreign exchange
rates; the uncertainty of replacing depleted reserves; the risk that the Young-Davidson shaft will not perform as planned; the risk that mining operations do not
meet expectations; the risk that projects will not be developed accordingly to budgets or timelines, changes in laws in Canada, Mexico and other jurisdictions
in which the Company may carry on business; risks of obtaining necessary licenses, permits or approvals for operations or projects such as Kemess; disputes
over title to properties; the speculative nature of mineral exploration and development; risks related to aboriginal title claims; compliance risks with respect to
current and future environmental regulations; disruptions affecting operations; opportunities that may be pursued by the Company; employee relations;
availability and costs of mining inputs and labor; the ability to secure capital to execute business plans; volatility of the Company’s share price; continuation of
the dividend and dividend reinvestment plan; the effect of future financings; litigation; risk of loss due to sabotage and civil disturbances; the values of assets
and liabilities based on projected future cash flows; risks arising from derivative instruments or the absence of hedging; adequacy of internal control over
financial reporting; changes in credit rating; and the impact of inflation.
Actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained
herein. Such statements are based on a number of assumptions which may prove to be incorrect, including assumptions about: business and economic
conditions; commodity prices and the price of key inputs such as labour, fuel and electricity; credit market conditions and conditions in financial markets
generally; revenue and cash flow estimates, production levels, development schedules and the associated costs; ability to procure equipment and supplies
and on a timely basis; the timing of the receipt of permits and other approvals for projects and operations; the ability to attract and retain skilled employees and
contractors for the operations; the accuracy of reserve and resource estimates; the impact of changes in currency exchange rates on costs and results;
interest rates; taxation; and ongoing relations with employees and business partners. The Company disclaims any intention or obligation to update or revise
any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.
Cautionary Note to U.S. Investors Concerning Measured, Indicated and Inferred Resources
This presentation uses the terms "measured," "indicated" and "inferred” resources. We advise investors that while those terms are recognized and required by
Canadian regulations, the United States Securities and Exchange Commission does not recognize them. “Inferred” resources” have a great amount of
uncertainty as to their existence and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be
upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies.
United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral
reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally
mineable.
2
► Quality asset base in top jurisdictions
► Young-Davidson mine (Ontario, Canada)
► El Chanate mine (Sonora, Mexico)
► 2014 production growth of up to 25%
► Production growth of up to 32% at the
Young-Davidson mine
► Strong pro-forma liquidity position of $341M(7)
► Significant Canadian tax loss pools
► Leverage to the weakening Canadian dollar
► Strong FCF growth profile underpinned by
Young-Davidson ramp-up
AuRico at a Glance
Overview Operations and Projects
Young-Davidson (100%)
Location: Ontario, Canada
Stage: Production
El Chanate (100%)
Location: Sonora State, Mexico
Stage: Production
Young-Davidson
El Chanate
Kemess Underground
Primary Asset Summary
3
Young-
Davidson
El Chanate Consolidated
2014E Production (koz) 140 - 160 70 - 80 210 – 240
2014E Cash Costs
(US$/oz)(3)(4) $700 - $800 $625 - $725 $675 – $775
2014E AISC (US$/oz)(3) $1,100-$1,200 $1,000-$1,100 $1,100-$1,200
2013 P&P Reserves (Moz)(6) 3.7 1.0 6.5
2013 Total Resources (Moz)(6) 5.9 1.3 9.48
Est. Remaining Mine Life 20+ 9 -
Resources are inclusive of reserves
Kemess Underground (100%)
Location: B.C., Canada
Stage: Development
(3) Refer to endnote #3 (4) Refer to endnote #4 (6) Refer to endnote #6 (7) Refer to endnote #7 3
Young-Davidson Overview
• Historic production from underground gold mines in
Timmins and Kirkland Lake (~108 M Oz.)
• Five mines with greater than 5 million ounces
production, Young-Davidson is likely to be the sixth
► Low cost producer with strong
production growth profile
► Long mine life: Opportunity to expand
as reserves increase
► Located in a stable jurisdiction, close to
major centres
► First gold pour on April 30th, 2012
► Underground commercial production
declared Oct. 31/13
(1) Refer to endnote #1.
0
5
10
15
20
Hollinger1910-68
Dome1910-2013
McIntyre1912-88
KerrAddison1938-96
LakeshoreMineK.L.1918-65
WrightHargreaves1921-65
TeckHughes1917-68
Aunor
Hallnor
Sylvanite1927-61
Preston
UpperCanada1938-71
Paymaster
Coniarium
Young-Davidson
Pamour
Macassa1933-99+2002-13
HoylePond
Ounces(Millions)
Historic Production from U/G Mines of Timmins
& Kirkland Lake(1)
Historical Production YD P&P YD M&I YD Inferred
Active
4
Rich Tradition – Mine History
► Site of two former producers
► 20+ years in operation
► +1,200 tpd average production rate
► Early pioneers of bulk mining
► +1 million tonne stopes underground
► Mined ~9 million tonnes; produced 970,000 oz.
► Average realized grade of 3.37 g/tonne
► Profitable operations at realized grades
► Supported dividend payments
Period Mine Tonnes Grade (g/t) Produced (Oz)
1934 to 1957 YD 5,653,000 3.21 585,000
1934 to 1954 MCM 3,205,000 3.66 378,000
1981 to 1982 MCM 96,400 2.36 7,300
Total 8,954,400 3.37 970,300
Young-Davidson Mine (YD)
Matachewan Consolidated Mine (MCM)
5
Responsible Mining
Fostering positive relationships with all stakeholders
► Solid safety record
► 1.8M hours lost time injury free
► Strong First Nations support
► Partnerships with local communities
► Hiring and training locally
► 88% of mine workforce from local regions
► Supporting local suppliers
► $41M spent with local suppliers in 2013
6
Solid Production Growth
Stable and Growing Production Profile(2)
► 7th consecutive quarter of production growth
► Q2 on track to be the 8th consecutive quarter of production growth
(2) Refer to endnote #2.
17,825
26,363
28,281
29,252
30,099
33,103
35,104
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14E
GoldOuncesproduced
7
Underground Mining Rates
► Highly mechanized, productive bulk mining methodologies
► Low manning requirements
► Up to 65,000 tonne stopes
► Underground productivity metrics – Q1/14
► Avg. 2,611 tpd - target of 4,000 tpd by end of 2014
► Development metres averaged 42m/day (3,772 metres)
► Avg. unit costs of $45/t , declining to $40/t at year-end
3,000
4,000
6,000
8,000 8,000
2013A 2014E 2015E 2016E 2017E
OretonnesperDay
Underground Mine Ramp-up
(Year-End Productivity Targets)
YE target of
2,000tpd
1,130
1,611
1,417
2,590
2,611
1,941
2,445
2,620
2,986
3,772
Q1 13 Q2 13 Q3 13 Q4 13 Q1 14
Developmentmetres
UGtonnesperday
Underground Productivity (tpd) and
Development (m)
UG target tpd UG tpd (actual) UG development (actual)
Commercial
Production
Oct. 31/13 170
U/G miners
198
U/G miners
210
U/G miners
222
U/G miners
100% increase in productivity with
only a 30% manning increase
8
Underground Mine Plan
► Transverse long hole stoping
► For wider zones (12-40m)
► 30m sub levels
► Longitudinal retreat
► For areas < 12m widths
► 2014 mine plan - 42 stopes
► 78 stopes in 2015
► Annual lateral development
requirements of 10-12kms (2014-2016)
► Reducing to 9-10kms per year
► Paste plant commissioned Jan. 1/14
► Mined first secondary stope
► Mining recovery ~ 92%
► Dilution ~10%
► Underground reserve - 2.81 g/t
YD West
Zone
3.7M reserve ounces with exploration upside
YD Historic
Mine Workings
Open Pit
Ramp Portal
10350L
MCM Shaft
9890L
9590L
9400L
9200L
8900L
MCM Historic
Mine Workings
NG Shaft
9
Transverse Longhole Stoping
► For wider zones over 12m
► Requires less development per stope
► 95% of 2014 mine plan is transverse longhole stoping
10
Shaft System Productivities
► Supports increased underground
mining rates
► Improved productivity vs. ramp
haulage
► All ore now skipped to
surface
► Optimizes cycle time
► Enhanced cost efficiencies
► Reduces mobile equipment
requirements
► Improves ventilation
► Capacity of 8,000tpd of ore
Shaft and hoisting infrastructure facilitates 8 years of Upper Mine production
11
Lower Mine Development
Accessing 20+ years of mine life
► Lower mine provides access to
20+ years of mine life
► MCM shaft sinking work
currently underway
► Completion mid-2015
► Men and materials shaft
► Reaming Northgate shaft begins
H2 2016
► Shaft bottom infrastructure
construction in 2017
► Northgate shaft hoisting from
8900L beginning in 2019
12
Underground Ore Contribution
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
OreTonnesPerDay
Underground Ore Contribution
2014 - 2037
Upper Mine Lower Mine Development Ore
13
Process Plant Performance YTD
Crusher
► Mill processed approx. 7,150 tpd in Q1
► Target of 7,000 to 7,500 tpd in 2014
► Amended permit for 10,000 tpd per calendar day
► Significant processing flexibility
► Potential early treatment of longer term
stockpile inventory
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14
Tonnesperday
Mill Productivity (tpd)
Target tpd Mill tpd
14
Labour:
22%
OP Contractor
1%
UG Contractor
18%
UG Consum.
15%
Mtce
6%
Power
9%
Reagents
9%
Other
20%
Labour:
15%
OP Contractor
15%
UG Contractor
21%UG
Consum.
10%
Mtce
9%
Power
9%
Reagents
7%
Other
14%
Unit Costs & Currency Sensitivities
Unit Costs
per tonne1 2014 Estimates Life of Mine
Underground $40-$45 $35
Open Pit $4.50-$5.00 -
Mill Processing $16-$17 $15
Administration2 $4.00-$4.25 $3.50
Footnotes:
1. Assumes 0.95 CAD$ to every 1 US dollar
2. Per tonne processed
Significant Leverage to CAD$/US$
► 90-95% of all outflows in CAD$
► 10% change in CAD would have an impact
on OCF of approx. $15M in 2014
Fixed Cost Structure:
Approx. 60% of costs are fixed
► 15-20% decrease in operating costs in H2 driven
by significant reduction in contractors
► Open pit contractors demobilize once open pit
operations cease in late May
► Eliminates open pit diesel requirements in H2
► Increasing level of underground lateral
development completed in-house
H1 2014 Cost Structure H2 2014 Cost Structure
15
Capital Investment Schedule
2014 2015 2016 2017 2018 2019
Sustaining Mine
Development
$30-$35 $38-$43 $38-$43 $33-$38 $28-$33 $28-$33
8,000tpd Ramp-up
Development
$15 $10 $5 - - -
Sustaining Fixed Assets $10 $5 $10 $10 $14 $14
Other Growth Capital $25 $8 $11 $7 $2 $4
Lower Mine Capital Investment (millions)
MCM Shaft Sink $24
Shaft Bottom
Development
$10
NG Shaft Pilot & Ream $14
Lower Mine Ramp $28
Shaft Bottom Loadout $10
Lower Mine Level
Development
$25
Sustaining Capital $55-$60 $52-$57 $52-$57 $43-$48 $43-$48 $38-$43
Growth Capital $50 $29 $38 $19 $24 $10
Total Capital $105-$110 $81-$86 $90-$95 $62-$67 $67-$72 $48-$53
Information for 2015 to 2019 should be considered as estimates only and not considered official company guidance.
Assumes $0.95 CD:$1 US for 2014
16
Young-Davidson Life of Mine
0
50
100
150
200
250
300
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037
Thousandsofgoldounces
Tonnesperday
Open Pit Ore Underground Ore Stockpiled Ore Ounces
► Mine life of over 20 years with potential to expand
► Significant exploration and reserve growth potential
► Deposit remains open to the west and at depth
Lower mine ore contribution begins in 2018
17
Young-Davidson Outlook
2014 Young-Davidson
Operational Estimates(5)
Life of Mine
Gold Production (ounces) 140,000 – 160,000 207,000/year
Underground Mine Cash Costs(3)(4) $650 - $750 $650
Open Pit (incl. stockpile)(3)(4) $850 - $950 -
Cash Costs per Ounce(3)(4) $700 - $800 $565
All-in Sustaining Costs per ounce(3) $1,100 - $1,200 $881
2014 Young-Davidson
Operational Estimates (000’s)(5)
Life of Mine
Lower Mine Vertical Development $25,000 -
Non-Recurring Capital $25,000 -
Sustaining Capital $55,000 - $60,000 $40,000
Total Capital Investment $105,000 - $110,000 -
(3) Refer to endnote #3 (4) Refer to endnote #4 (5) Refer to endnote #5 18
Young-Davidson Reserves and Reserves
Young-Davidson Mineral Reserve Estimates – Gold(6)
Category Tonnes (000’s) Grade (g/t) Ounces (000’s)
Surface
Proven 3,298 1.01 107
Probable 686 1.52 33
P&P (Surface) 3,984 1.10 140
Underground
Proven 10,626 2.90 990
Probable 28,669 2.78 2,566
P&P (Underground) 39,296 2.81 3,556
Total P&P 43,280 2.66 3,696
Young-Davidson Mineral Resource Estimates – Gold(6)
Category Tonnes (000’s) Grade (g/t) Ounces (000’s)
Surface
Measured 233 0.96 7
Indicated 535 1.41 24
M&I (Surface) 769 1.28 32
Underground
Measured 5,300 2.95 504
Indicated 11,659 2.62 981
M&I (Underground) 16,960 2.27 1,484
Total M&I 17,729 2.66 1,516
Inferred Surface 31 0.99 1
Inferred Underground 3,689 2.72 323
Total Inferred 3,720 2.71 324
(6) Refer to endnote #6
Underground reserve base is comprised of quality, high margin ounces even at a lower gold price
19
Endnotes
1. Data provided by the Timmins Resident Geologist Program Ontario Geological Survey for the Ministry of Northern Development & Mines (2006).
2. Production figures include gold ounces only. Production at the Young-Davidson mine includes pre-production ounces, which include ounces produced prior to the
declaration of commercial production on September 1, 2012, and the declaration of commercial production in the underground mine on October 31, 2013.
3. Cash Costs per Gold Ounce and All-In Sustaining Costs Per Gold Ounce are Non-GAAP measures that do not have any standardized meaning prescribed by
International Financial Reporting Standards (“IFRS” or “GAAP”), and that should not be considered in isolation from or as a substitute for performance measures
prepared in accordance with GAAP. See the Non-GAAP Measures section on page 23 of the Management's Discussion and Analysis for the year ended
December 31, 2013 available on the Company website at www.auricogold.com. 2013 cash costs are prior to inventory net realizable value adjustments &
reversals.
4. Cash costs for the Young-Davidson mine is calculated on a per gold ounce basis, net of by-product revenues and net realizable value adjustments. Prior to 2014,
gold ounces include ounces produced at the Young-Davidson mine. Commencing in 2014 cash costs for the Young-Davidson mine will be calculated based on
ounces sold. Prior to commissioning the underground mine at Young-Davidson, cash costs were calculated on ounces produced from the open pit only. All
underground costs were capitalized, and any revenue related to underground ounces sold was credited against capital expenditures. Subsequent to the
declaration of commercial production in the underground mine, cash costs are calculated on ounces produced from both the open pit and underground mines,
and revenue related to the sale of underground ounces is recognized in the Company’s Statement of Operations as revenue. 2013 cash costs are prior to
inventory net realizable value adjustments & reversals.
5. For more information regarding AuRico Gold’s 2014 operational estimates, including production, costs, and capital investments, please refer to the press release
dated February 6, 2014 titled AuRico Gold Announces 2014 Operational Outlook available on the Company website at www.auricogold.com.
6. Reserves and resources for Young-Davidson and El Chanate mines, Kemess Underground Project, and Orion represent gold grade as per technical reports and
Company disclosure. For more information regarding AuRico Gold’s Mineral Reserves and Resources as at December 31, 2013 and the Kemess Feasibility
Study, please refer to the press release dated March 3, 2014 titled AuRico Reports 2013 Reserve & Resource Update and Kemess Feasibility Study Results,
available on the Company website at www.auricogold.com. Measured and indicated resources excludes inferred resources. Core lengths in El Chanate drilling
highlights are not necessarily true widths.
7. Based on the Company’s cash balance as of December 31, 2013.
20
Appendix
2013 Mineral Reserve Estimates - Gold
22
Mineral Reserve Estimates – Gold(6)
Category Tonnes (000’s) Grade (g/t) Ounces (000’s)
Young-Davidson Surface Proven 3,298 1.01 107
Probable 686 1.52 33
P&P 3,984 1.10 140
Underground Proven 10,626 2.90 990
Probable 28,669 2.78 2,566
P&P 39,296 2.81 3,556
Total P&P 43,280 2.66 3,696
El Chanate Proven 29,223 0.72 676
Probable 16,115 0.67 346
Total P&P 45,337 0.70 1,023
Kemess
Underground
Proven - - -
Probable 100,373 0.56 1,805
Total P&P 100,373 0.56 1,805
AuRico Total P&P 188,990 1.07 6,524
(6) Refer to endnote #6
22
2013 Mineral Resource Estimates - Gold
23Note: Mineral Resources are in addition to Mineral Reserves
Mineral Resource Estimates – Gold(6)
Category Tonnes (000’s) Grade (g/t) Ounces (000’s)
Young-Davidson Surface Measured 233 0.96 7
Indicated 535 1.41 24
M&I 769 1.28 32
Underground Measured 5,300 2.95 504
Indicated 11,659 2.62 981
M&I 16,960 2.27 1,484
Total M&I 17,729 2.66 1,516
Surface Inferred 31 0.99 1
Underground Inferred 3,689 2.72 323
Total Inferred 3,720 2.71 324
El Chanate Measured 2,158 0.31 22
Indicated 2,129 0.40 27
Total
M&I 4,287 0.36 49
Inferred 579 0.75 14
Kemess
Underground
Measured - - -
Indicated 65,432 0.41 854
Total
M&I 65,432 0.41 854
Inferred 9,969 0.39 125
Orion (50%) M&I - - -
Inferred 554 3.66 65
Total
M&I 554 3.66 65
Inferred 91 3.33 10
AuRico Total M&I 88,001 0.88 2,484
Inferred 14,357 1.02 472
(6) Refer to endnote #6
23
2013 Mineral Resource Estimates – Copper
and Silver
24Note: Mineral Resources are in addition to Mineral Reserves
Mineral Reserve and Resource Estimates – Copper and Silver(6)
Grade Contained Metal
Category Tonnes (000’s) Ag (g/t) Cu (%) Ag (000’s) oz Cu (000’s) lbs
Kemess
Underground
Probable Reserves 100,373 2.0 0.28 6,608 619,151
Indicated Resources 65,432 1.8 0.24 3,811 346,546
Inferred Resources 9,969 1.6 0.21 503 46,101
Orion (50%) Indicated Resources 554 309 - 5,503 -
Inferred Resources 91 95 - 275 -
(6) Refer to endnote #6
24

More Related Content

What's hot

Scotiabank Latin American Mining Conference 2013
Scotiabank Latin American Mining Conference 2013Scotiabank Latin American Mining Conference 2013
Scotiabank Latin American Mining Conference 2013AuRico Gold
 
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDetourGold
 
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7waAuRico Gold
 
SSR Mining Corporate Presentation 071317
SSR Mining Corporate Presentation   071317SSR Mining Corporate Presentation   071317
SSR Mining Corporate Presentation 071317SilverStandard
 
European Gold Forum
European Gold Forum  European Gold Forum
European Gold Forum AuRico Gold
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal MarketingAuRico Gold
 
Scotiabank Mining Conference - December 4, 2013
Scotiabank Mining Conference - December 4, 2013Scotiabank Mining Conference - December 4, 2013
Scotiabank Mining Conference - December 4, 2013AuRico Gold
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk PresentationAuRico Gold
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517SilverStandard
 
Newgoldpresafton
NewgoldpresaftonNewgoldpresafton
Newgoldpresaftonnewgold2011
 
TD Securities Mining Conference
TD Securities Mining ConferenceTD Securities Mining Conference
TD Securities Mining ConferenceAuRico Gold
 
Q3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callQ3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callAmélie Laliberté
 
RBC Capital Markets Global Mining & Materials Conference
RBC Capital Markets Global Mining & Materials Conference RBC Capital Markets Global Mining & Materials Conference
RBC Capital Markets Global Mining & Materials Conference AuRico Gold
 
Denver Gold Forum 2013
Denver Gold Forum 2013Denver Gold Forum 2013
Denver Gold Forum 2013AuRico Gold
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 
GMP Securities Mining Conference
GMP Securities Mining ConferenceGMP Securities Mining Conference
GMP Securities Mining ConferenceAuRico Gold
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v finalnewgold2011
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference yamanagold2016
 
Ssri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSsri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSilverStandard
 

What's hot (20)

Scotiabank Latin American Mining Conference 2013
Scotiabank Latin American Mining Conference 2013Scotiabank Latin American Mining Conference 2013
Scotiabank Latin American Mining Conference 2013
 
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
 
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa06 17-14 rbc capital market mining and metals conference v001-l7z7wa
06 17-14 rbc capital market mining and metals conference v001-l7z7wa
 
SSR Mining Corporate Presentation 071317
SSR Mining Corporate Presentation   071317SSR Mining Corporate Presentation   071317
SSR Mining Corporate Presentation 071317
 
European Gold Forum
European Gold Forum  European Gold Forum
European Gold Forum
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
Scotiabank Mining Conference - December 4, 2013
Scotiabank Mining Conference - December 4, 2013Scotiabank Mining Conference - December 4, 2013
Scotiabank Mining Conference - December 4, 2013
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
BMO Sales Desk Presentation
BMO Sales Desk PresentationBMO Sales Desk Presentation
BMO Sales Desk Presentation
 
Ssri corp. pres._-_051517
Ssri corp. pres._-_051517Ssri corp. pres._-_051517
Ssri corp. pres._-_051517
 
Newgoldpresafton
NewgoldpresaftonNewgoldpresafton
Newgoldpresafton
 
TD Securities Mining Conference
TD Securities Mining ConferenceTD Securities Mining Conference
TD Securities Mining Conference
 
Q3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf callQ3 2017 results call nov 9 2017 conf call
Q3 2017 results call nov 9 2017 conf call
 
RBC Capital Markets Global Mining & Materials Conference
RBC Capital Markets Global Mining & Materials Conference RBC Capital Markets Global Mining & Materials Conference
RBC Capital Markets Global Mining & Materials Conference
 
Denver Gold Forum 2013
Denver Gold Forum 2013Denver Gold Forum 2013
Denver Gold Forum 2013
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
GMP Securities Mining Conference
GMP Securities Mining ConferenceGMP Securities Mining Conference
GMP Securities Mining Conference
 
Corporate presentation january 2017 v final
Corporate presentation   january 2017 v finalCorporate presentation   january 2017 v final
Corporate presentation january 2017 v final
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Ssri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate PresentationSsri - June 2017 Corporate Presentation
Ssri - June 2017 Corporate Presentation
 

Viewers also liked

Corporate Presentation November 2015
Corporate Presentation November 2015Corporate Presentation November 2015
Corporate Presentation November 2015Western Areas Ltd
 
Corporate Presentation October 2016
Corporate Presentation October 2016Corporate Presentation October 2016
Corporate Presentation October 2016Western Areas Ltd
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013Western Areas Ltd
 
Corporate Presentation October 2015
Corporate Presentation October 2015Corporate Presentation October 2015
Corporate Presentation October 2015Western Areas Ltd
 
Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Ltd
 
Corporate Presentation May 2016
Corporate Presentation May 2016Corporate Presentation May 2016
Corporate Presentation May 2016Western Areas Ltd
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014Western Areas Ltd
 
RIU Conference February 2016
RIU Conference February 2016RIU Conference February 2016
RIU Conference February 2016Western Areas Ltd
 
Corporate Presentation September 2016
Corporate Presentation September 2016Corporate Presentation September 2016
Corporate Presentation September 2016Western Areas Ltd
 
Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Western Areas Ltd
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014Western Areas Ltd
 
Australian Nickel Conference October 2016
Australian Nickel Conference October 2016Australian Nickel Conference October 2016
Australian Nickel Conference October 2016Western Areas Ltd
 
Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Western Areas Ltd
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015Western Areas Ltd
 
Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Western Areas Ltd
 
Corporate Presentation March 2016
Corporate Presentation March 2016Corporate Presentation March 2016
Corporate Presentation March 2016Western Areas Ltd
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013Western Areas Ltd
 
Diggers & Dealers Presentation Aug 2014
Diggers & Dealers Presentation Aug 2014Diggers & Dealers Presentation Aug 2014
Diggers & Dealers Presentation Aug 2014Western Areas Ltd
 

Viewers also liked (20)

Corporate Presentation November 2015
Corporate Presentation November 2015Corporate Presentation November 2015
Corporate Presentation November 2015
 
Corporate Presentation October 2016
Corporate Presentation October 2016Corporate Presentation October 2016
Corporate Presentation October 2016
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Corporate Presentation October 2015
Corporate Presentation October 2015Corporate Presentation October 2015
Corporate Presentation October 2015
 
Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015Western Areas Corporate Presentation April 2015
Western Areas Corporate Presentation April 2015
 
Corporate Presentation May 2016
Corporate Presentation May 2016Corporate Presentation May 2016
Corporate Presentation May 2016
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
RIU Conference February 2016
RIU Conference February 2016RIU Conference February 2016
RIU Conference February 2016
 
Corporate Presentation September 2016
Corporate Presentation September 2016Corporate Presentation September 2016
Corporate Presentation September 2016
 
Half Year Results Presentation February 2015
Half Year Results Presentation February 2015Half Year Results Presentation February 2015
Half Year Results Presentation February 2015
 
Corporate Presentation October 2014
Corporate Presentation October 2014Corporate Presentation October 2014
Corporate Presentation October 2014
 
FY 15 Results Presentation
FY 15 Results PresentationFY 15 Results Presentation
FY 15 Results Presentation
 
Australian Nickel Conference October 2016
Australian Nickel Conference October 2016Australian Nickel Conference October 2016
Australian Nickel Conference October 2016
 
Half Year Results Presentation February 2016
Half Year Results Presentation February 2016Half Year Results Presentation February 2016
Half Year Results Presentation February 2016
 
Corporate Presentation June 2015
Corporate Presentation June 2015Corporate Presentation June 2015
Corporate Presentation June 2015
 
Half Year Results Presentation February 2014
Half Year Results Presentation February 2014Half Year Results Presentation February 2014
Half Year Results Presentation February 2014
 
Corporate Presentation March 2016
Corporate Presentation March 2016Corporate Presentation March 2016
Corporate Presentation March 2016
 
FY2014 Results Presentation
FY2014 Results PresentationFY2014 Results Presentation
FY2014 Results Presentation
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Diggers & Dealers Presentation Aug 2014
Diggers & Dealers Presentation Aug 2014Diggers & Dealers Presentation Aug 2014
Diggers & Dealers Presentation Aug 2014
 

Similar to 06 04-14 young davidson cibc site tour v001-k6z4pi

Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference AuRico Gold
 
Credit Suisse Global Precious Metals Conference 2013
Credit Suisse Global Precious Metals Conference 2013 Credit Suisse Global Precious Metals Conference 2013
Credit Suisse Global Precious Metals Conference 2013 AuRico Gold
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal MarketingAuRico Gold
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketingAuRico Gold
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver MarketingAuRico Gold
 
05 19-14 european marketing
05 19-14 european marketing05 19-14 european marketing
05 19-14 european marketingAuRico Gold
 
02 24-14 bmo metals and mining conference
02 24-14 bmo metals and mining conference02 24-14 bmo metals and mining conference
02 24-14 bmo metals and mining conferenceAuRico Gold
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal MarketingAuRico Gold
 
GMP Sales Desk Presentation
GMP Sales Desk PresentationGMP Sales Desk Presentation
GMP Sales Desk PresentationAuRico Gold
 
Scotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceScotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceAuRico Gold
 
2015 TD Securities Mining Conference Presentation
2015 TD Securities Mining Conference Presentation2015 TD Securities Mining Conference Presentation
2015 TD Securities Mining Conference PresentationAuRico Gold
 
Sales Desk Presentation - February 2-6, 2015
Sales Desk Presentation - February 2-6, 2015Sales Desk Presentation - February 2-6, 2015
Sales Desk Presentation - February 2-6, 2015AuRico Gold
 
AUQ General Meeting Presentation
 AUQ General Meeting Presentation AUQ General Meeting Presentation
AUQ General Meeting PresentationAuRico Gold
 
Sales Desk Presentation - January 14-16, 2015
Sales Desk Presentation - January 14-16, 2015Sales Desk Presentation - January 14-16, 2015
Sales Desk Presentation - January 14-16, 2015AuRico Gold
 
04 28-14 winnipeg marketing
04 28-14 winnipeg marketing04 28-14 winnipeg marketing
04 28-14 winnipeg marketingAuRico Gold
 
Boston/London Marketing
Boston/London MarketingBoston/London Marketing
Boston/London MarketingAuRico Gold
 
Q3 2014 Webcast Presentation
Q3 2014 Webcast PresentationQ3 2014 Webcast Presentation
Q3 2014 Webcast PresentationAuRico Gold
 
08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentationAuRico Gold
 
NYC Boston Marketing
NYC Boston MarketingNYC Boston Marketing
NYC Boston MarketingAuRico Gold
 

Similar to 06 04-14 young davidson cibc site tour v001-k6z4pi (20)

Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference Bank of America Merrill Lynch Canada Mining Conference
Bank of America Merrill Lynch Canada Mining Conference
 
Credit Suisse Global Precious Metals Conference 2013
Credit Suisse Global Precious Metals Conference 2013 Credit Suisse Global Precious Metals Conference 2013
Credit Suisse Global Precious Metals Conference 2013
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
05 29-14 toronto marketing
05 29-14 toronto marketing05 29-14 toronto marketing
05 29-14 toronto marketing
 
Vancouver Marketing
Vancouver MarketingVancouver Marketing
Vancouver Marketing
 
05 19-14 european marketing
05 19-14 european marketing05 19-14 european marketing
05 19-14 european marketing
 
02 24-14 bmo metals and mining conference
02 24-14 bmo metals and mining conference02 24-14 bmo metals and mining conference
02 24-14 bmo metals and mining conference
 
Montreal Marketing
Montreal MarketingMontreal Marketing
Montreal Marketing
 
GMP Sales Desk Presentation
GMP Sales Desk PresentationGMP Sales Desk Presentation
GMP Sales Desk Presentation
 
Scotiabank Mining for Margin Conference
Scotiabank Mining for Margin ConferenceScotiabank Mining for Margin Conference
Scotiabank Mining for Margin Conference
 
2015 TD Securities Mining Conference Presentation
2015 TD Securities Mining Conference Presentation2015 TD Securities Mining Conference Presentation
2015 TD Securities Mining Conference Presentation
 
Sales Desk Presentation - February 2-6, 2015
Sales Desk Presentation - February 2-6, 2015Sales Desk Presentation - February 2-6, 2015
Sales Desk Presentation - February 2-6, 2015
 
Toronto Marketing
Toronto MarketingToronto Marketing
Toronto Marketing
 
AUQ General Meeting Presentation
 AUQ General Meeting Presentation AUQ General Meeting Presentation
AUQ General Meeting Presentation
 
Sales Desk Presentation - January 14-16, 2015
Sales Desk Presentation - January 14-16, 2015Sales Desk Presentation - January 14-16, 2015
Sales Desk Presentation - January 14-16, 2015
 
04 28-14 winnipeg marketing
04 28-14 winnipeg marketing04 28-14 winnipeg marketing
04 28-14 winnipeg marketing
 
Boston/London Marketing
Boston/London MarketingBoston/London Marketing
Boston/London Marketing
 
Q3 2014 Webcast Presentation
Q3 2014 Webcast PresentationQ3 2014 Webcast Presentation
Q3 2014 Webcast Presentation
 
08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation08 08-14-q2-2014-webcast-presentation
08 08-14-q2-2014-webcast-presentation
 
NYC Boston Marketing
NYC Boston MarketingNYC Boston Marketing
NYC Boston Marketing
 

More from AuRico Gold

Scotiabank NYC Mining Conference
Scotiabank NYC Mining ConferenceScotiabank NYC Mining Conference
Scotiabank NYC Mining ConferenceAuRico Gold
 
2015 Annual & Special Meeting of Shareholders
2015 Annual & Special Meeting of Shareholders2015 Annual & Special Meeting of Shareholders
2015 Annual & Special Meeting of ShareholdersAuRico Gold
 
Q1 2015 Webcast Presentation
Q1 2015 Webcast PresentationQ1 2015 Webcast Presentation
Q1 2015 Webcast PresentationAuRico Gold
 
AuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold
 
Morgan Stanley Metals & Mining Conference
Morgan Stanley Metals & Mining ConferenceMorgan Stanley Metals & Mining Conference
Morgan Stanley Metals & Mining ConferenceAuRico Gold
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationAuRico Gold
 
Q4 2014 Webcast Presentation
Q4 2014 Webcast PresentationQ4 2014 Webcast Presentation
Q4 2014 Webcast PresentationAuRico Gold
 
2014 first quarter report
2014 first quarter report2014 first quarter report
2014 first quarter reportAuRico Gold
 
Q4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalQ4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalAuRico Gold
 

More from AuRico Gold (9)

Scotiabank NYC Mining Conference
Scotiabank NYC Mining ConferenceScotiabank NYC Mining Conference
Scotiabank NYC Mining Conference
 
2015 Annual & Special Meeting of Shareholders
2015 Annual & Special Meeting of Shareholders2015 Annual & Special Meeting of Shareholders
2015 Annual & Special Meeting of Shareholders
 
Q1 2015 Webcast Presentation
Q1 2015 Webcast PresentationQ1 2015 Webcast Presentation
Q1 2015 Webcast Presentation
 
AuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger PresentationAuRico Gold / Alamos Gold Merger Presentation
AuRico Gold / Alamos Gold Merger Presentation
 
Morgan Stanley Metals & Mining Conference
Morgan Stanley Metals & Mining ConferenceMorgan Stanley Metals & Mining Conference
Morgan Stanley Metals & Mining Conference
 
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference PresentationBMO Capital Markets 24th Global Metals & Mining Conference Presentation
BMO Capital Markets 24th Global Metals & Mining Conference Presentation
 
Q4 2014 Webcast Presentation
Q4 2014 Webcast PresentationQ4 2014 Webcast Presentation
Q4 2014 Webcast Presentation
 
2014 first quarter report
2014 first quarter report2014 first quarter report
2014 first quarter report
 
Q4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation finalQ4 2013 financial results webcast presentation final
Q4 2013 financial results webcast presentation final
 

Recently uploaded

如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 

Recently uploaded (20)

Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 

06 04-14 young davidson cibc site tour v001-k6z4pi

  • 1. Young-Davidson Mine Luc Guimond, General Manager CIBC Site Tour June 4, 2014 www.auricogold.com
  • 2. FORWARD LOOKING STATEMENTS This presentation contains forward-looking statements and forward-looking information as defined under Canadian and U.S. securities laws. All statements, other than statements of historical fact, are forward-looking statements. The words "expect", "believe", "anticipate", "will", "intend", "estimate", "forecast", "budget" and similar expressions identify forward-looking statements. Forward-looking statements include information as to strategy, plans or future financial or operating performance, such as the Company’s expansion plans, project timelines, production plans, projected cash flows or capital expenditures, cost estimates, projected exploration results, reserve and resource estimates and other statements that express management’s expectations or estimates of future performance. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by management, are inherently subject to significant uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements, including: uncertainty of production and cost estimates; fluctuations in the price of gold and foreign exchange rates; the uncertainty of replacing depleted reserves; the risk that the Young-Davidson shaft will not perform as planned; the risk that mining operations do not meet expectations; the risk that projects will not be developed accordingly to budgets or timelines, changes in laws in Canada, Mexico and other jurisdictions in which the Company may carry on business; risks of obtaining necessary licenses, permits or approvals for operations or projects such as Kemess; disputes over title to properties; the speculative nature of mineral exploration and development; risks related to aboriginal title claims; compliance risks with respect to current and future environmental regulations; disruptions affecting operations; opportunities that may be pursued by the Company; employee relations; availability and costs of mining inputs and labor; the ability to secure capital to execute business plans; volatility of the Company’s share price; continuation of the dividend and dividend reinvestment plan; the effect of future financings; litigation; risk of loss due to sabotage and civil disturbances; the values of assets and liabilities based on projected future cash flows; risks arising from derivative instruments or the absence of hedging; adequacy of internal control over financial reporting; changes in credit rating; and the impact of inflation. Actual results and developments are likely to differ, and may differ materially, from those expressed or implied by the forward-looking statements contained herein. Such statements are based on a number of assumptions which may prove to be incorrect, including assumptions about: business and economic conditions; commodity prices and the price of key inputs such as labour, fuel and electricity; credit market conditions and conditions in financial markets generally; revenue and cash flow estimates, production levels, development schedules and the associated costs; ability to procure equipment and supplies and on a timely basis; the timing of the receipt of permits and other approvals for projects and operations; the ability to attract and retain skilled employees and contractors for the operations; the accuracy of reserve and resource estimates; the impact of changes in currency exchange rates on costs and results; interest rates; taxation; and ongoing relations with employees and business partners. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law. Cautionary Note to U.S. Investors Concerning Measured, Indicated and Inferred Resources This presentation uses the terms "measured," "indicated" and "inferred” resources. We advise investors that while those terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize them. “Inferred” resources” have a great amount of uncertainty as to their existence and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable. 2
  • 3. ► Quality asset base in top jurisdictions ► Young-Davidson mine (Ontario, Canada) ► El Chanate mine (Sonora, Mexico) ► 2014 production growth of up to 25% ► Production growth of up to 32% at the Young-Davidson mine ► Strong pro-forma liquidity position of $341M(7) ► Significant Canadian tax loss pools ► Leverage to the weakening Canadian dollar ► Strong FCF growth profile underpinned by Young-Davidson ramp-up AuRico at a Glance Overview Operations and Projects Young-Davidson (100%) Location: Ontario, Canada Stage: Production El Chanate (100%) Location: Sonora State, Mexico Stage: Production Young-Davidson El Chanate Kemess Underground Primary Asset Summary 3 Young- Davidson El Chanate Consolidated 2014E Production (koz) 140 - 160 70 - 80 210 – 240 2014E Cash Costs (US$/oz)(3)(4) $700 - $800 $625 - $725 $675 – $775 2014E AISC (US$/oz)(3) $1,100-$1,200 $1,000-$1,100 $1,100-$1,200 2013 P&P Reserves (Moz)(6) 3.7 1.0 6.5 2013 Total Resources (Moz)(6) 5.9 1.3 9.48 Est. Remaining Mine Life 20+ 9 - Resources are inclusive of reserves Kemess Underground (100%) Location: B.C., Canada Stage: Development (3) Refer to endnote #3 (4) Refer to endnote #4 (6) Refer to endnote #6 (7) Refer to endnote #7 3
  • 4. Young-Davidson Overview • Historic production from underground gold mines in Timmins and Kirkland Lake (~108 M Oz.) • Five mines with greater than 5 million ounces production, Young-Davidson is likely to be the sixth ► Low cost producer with strong production growth profile ► Long mine life: Opportunity to expand as reserves increase ► Located in a stable jurisdiction, close to major centres ► First gold pour on April 30th, 2012 ► Underground commercial production declared Oct. 31/13 (1) Refer to endnote #1. 0 5 10 15 20 Hollinger1910-68 Dome1910-2013 McIntyre1912-88 KerrAddison1938-96 LakeshoreMineK.L.1918-65 WrightHargreaves1921-65 TeckHughes1917-68 Aunor Hallnor Sylvanite1927-61 Preston UpperCanada1938-71 Paymaster Coniarium Young-Davidson Pamour Macassa1933-99+2002-13 HoylePond Ounces(Millions) Historic Production from U/G Mines of Timmins & Kirkland Lake(1) Historical Production YD P&P YD M&I YD Inferred Active 4
  • 5. Rich Tradition – Mine History ► Site of two former producers ► 20+ years in operation ► +1,200 tpd average production rate ► Early pioneers of bulk mining ► +1 million tonne stopes underground ► Mined ~9 million tonnes; produced 970,000 oz. ► Average realized grade of 3.37 g/tonne ► Profitable operations at realized grades ► Supported dividend payments Period Mine Tonnes Grade (g/t) Produced (Oz) 1934 to 1957 YD 5,653,000 3.21 585,000 1934 to 1954 MCM 3,205,000 3.66 378,000 1981 to 1982 MCM 96,400 2.36 7,300 Total 8,954,400 3.37 970,300 Young-Davidson Mine (YD) Matachewan Consolidated Mine (MCM) 5
  • 6. Responsible Mining Fostering positive relationships with all stakeholders ► Solid safety record ► 1.8M hours lost time injury free ► Strong First Nations support ► Partnerships with local communities ► Hiring and training locally ► 88% of mine workforce from local regions ► Supporting local suppliers ► $41M spent with local suppliers in 2013 6
  • 7. Solid Production Growth Stable and Growing Production Profile(2) ► 7th consecutive quarter of production growth ► Q2 on track to be the 8th consecutive quarter of production growth (2) Refer to endnote #2. 17,825 26,363 28,281 29,252 30,099 33,103 35,104 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Q2 14E GoldOuncesproduced 7
  • 8. Underground Mining Rates ► Highly mechanized, productive bulk mining methodologies ► Low manning requirements ► Up to 65,000 tonne stopes ► Underground productivity metrics – Q1/14 ► Avg. 2,611 tpd - target of 4,000 tpd by end of 2014 ► Development metres averaged 42m/day (3,772 metres) ► Avg. unit costs of $45/t , declining to $40/t at year-end 3,000 4,000 6,000 8,000 8,000 2013A 2014E 2015E 2016E 2017E OretonnesperDay Underground Mine Ramp-up (Year-End Productivity Targets) YE target of 2,000tpd 1,130 1,611 1,417 2,590 2,611 1,941 2,445 2,620 2,986 3,772 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Developmentmetres UGtonnesperday Underground Productivity (tpd) and Development (m) UG target tpd UG tpd (actual) UG development (actual) Commercial Production Oct. 31/13 170 U/G miners 198 U/G miners 210 U/G miners 222 U/G miners 100% increase in productivity with only a 30% manning increase 8
  • 9. Underground Mine Plan ► Transverse long hole stoping ► For wider zones (12-40m) ► 30m sub levels ► Longitudinal retreat ► For areas < 12m widths ► 2014 mine plan - 42 stopes ► 78 stopes in 2015 ► Annual lateral development requirements of 10-12kms (2014-2016) ► Reducing to 9-10kms per year ► Paste plant commissioned Jan. 1/14 ► Mined first secondary stope ► Mining recovery ~ 92% ► Dilution ~10% ► Underground reserve - 2.81 g/t YD West Zone 3.7M reserve ounces with exploration upside YD Historic Mine Workings Open Pit Ramp Portal 10350L MCM Shaft 9890L 9590L 9400L 9200L 8900L MCM Historic Mine Workings NG Shaft 9
  • 10. Transverse Longhole Stoping ► For wider zones over 12m ► Requires less development per stope ► 95% of 2014 mine plan is transverse longhole stoping 10
  • 11. Shaft System Productivities ► Supports increased underground mining rates ► Improved productivity vs. ramp haulage ► All ore now skipped to surface ► Optimizes cycle time ► Enhanced cost efficiencies ► Reduces mobile equipment requirements ► Improves ventilation ► Capacity of 8,000tpd of ore Shaft and hoisting infrastructure facilitates 8 years of Upper Mine production 11
  • 12. Lower Mine Development Accessing 20+ years of mine life ► Lower mine provides access to 20+ years of mine life ► MCM shaft sinking work currently underway ► Completion mid-2015 ► Men and materials shaft ► Reaming Northgate shaft begins H2 2016 ► Shaft bottom infrastructure construction in 2017 ► Northgate shaft hoisting from 8900L beginning in 2019 12
  • 14. Process Plant Performance YTD Crusher ► Mill processed approx. 7,150 tpd in Q1 ► Target of 7,000 to 7,500 tpd in 2014 ► Amended permit for 10,000 tpd per calendar day ► Significant processing flexibility ► Potential early treatment of longer term stockpile inventory - 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Q3 13 Q4 13 Q1 14 Tonnesperday Mill Productivity (tpd) Target tpd Mill tpd 14
  • 15. Labour: 22% OP Contractor 1% UG Contractor 18% UG Consum. 15% Mtce 6% Power 9% Reagents 9% Other 20% Labour: 15% OP Contractor 15% UG Contractor 21%UG Consum. 10% Mtce 9% Power 9% Reagents 7% Other 14% Unit Costs & Currency Sensitivities Unit Costs per tonne1 2014 Estimates Life of Mine Underground $40-$45 $35 Open Pit $4.50-$5.00 - Mill Processing $16-$17 $15 Administration2 $4.00-$4.25 $3.50 Footnotes: 1. Assumes 0.95 CAD$ to every 1 US dollar 2. Per tonne processed Significant Leverage to CAD$/US$ ► 90-95% of all outflows in CAD$ ► 10% change in CAD would have an impact on OCF of approx. $15M in 2014 Fixed Cost Structure: Approx. 60% of costs are fixed ► 15-20% decrease in operating costs in H2 driven by significant reduction in contractors ► Open pit contractors demobilize once open pit operations cease in late May ► Eliminates open pit diesel requirements in H2 ► Increasing level of underground lateral development completed in-house H1 2014 Cost Structure H2 2014 Cost Structure 15
  • 16. Capital Investment Schedule 2014 2015 2016 2017 2018 2019 Sustaining Mine Development $30-$35 $38-$43 $38-$43 $33-$38 $28-$33 $28-$33 8,000tpd Ramp-up Development $15 $10 $5 - - - Sustaining Fixed Assets $10 $5 $10 $10 $14 $14 Other Growth Capital $25 $8 $11 $7 $2 $4 Lower Mine Capital Investment (millions) MCM Shaft Sink $24 Shaft Bottom Development $10 NG Shaft Pilot & Ream $14 Lower Mine Ramp $28 Shaft Bottom Loadout $10 Lower Mine Level Development $25 Sustaining Capital $55-$60 $52-$57 $52-$57 $43-$48 $43-$48 $38-$43 Growth Capital $50 $29 $38 $19 $24 $10 Total Capital $105-$110 $81-$86 $90-$95 $62-$67 $67-$72 $48-$53 Information for 2015 to 2019 should be considered as estimates only and not considered official company guidance. Assumes $0.95 CD:$1 US for 2014 16
  • 17. Young-Davidson Life of Mine 0 50 100 150 200 250 300 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 Thousandsofgoldounces Tonnesperday Open Pit Ore Underground Ore Stockpiled Ore Ounces ► Mine life of over 20 years with potential to expand ► Significant exploration and reserve growth potential ► Deposit remains open to the west and at depth Lower mine ore contribution begins in 2018 17
  • 18. Young-Davidson Outlook 2014 Young-Davidson Operational Estimates(5) Life of Mine Gold Production (ounces) 140,000 – 160,000 207,000/year Underground Mine Cash Costs(3)(4) $650 - $750 $650 Open Pit (incl. stockpile)(3)(4) $850 - $950 - Cash Costs per Ounce(3)(4) $700 - $800 $565 All-in Sustaining Costs per ounce(3) $1,100 - $1,200 $881 2014 Young-Davidson Operational Estimates (000’s)(5) Life of Mine Lower Mine Vertical Development $25,000 - Non-Recurring Capital $25,000 - Sustaining Capital $55,000 - $60,000 $40,000 Total Capital Investment $105,000 - $110,000 - (3) Refer to endnote #3 (4) Refer to endnote #4 (5) Refer to endnote #5 18
  • 19. Young-Davidson Reserves and Reserves Young-Davidson Mineral Reserve Estimates – Gold(6) Category Tonnes (000’s) Grade (g/t) Ounces (000’s) Surface Proven 3,298 1.01 107 Probable 686 1.52 33 P&P (Surface) 3,984 1.10 140 Underground Proven 10,626 2.90 990 Probable 28,669 2.78 2,566 P&P (Underground) 39,296 2.81 3,556 Total P&P 43,280 2.66 3,696 Young-Davidson Mineral Resource Estimates – Gold(6) Category Tonnes (000’s) Grade (g/t) Ounces (000’s) Surface Measured 233 0.96 7 Indicated 535 1.41 24 M&I (Surface) 769 1.28 32 Underground Measured 5,300 2.95 504 Indicated 11,659 2.62 981 M&I (Underground) 16,960 2.27 1,484 Total M&I 17,729 2.66 1,516 Inferred Surface 31 0.99 1 Inferred Underground 3,689 2.72 323 Total Inferred 3,720 2.71 324 (6) Refer to endnote #6 Underground reserve base is comprised of quality, high margin ounces even at a lower gold price 19
  • 20. Endnotes 1. Data provided by the Timmins Resident Geologist Program Ontario Geological Survey for the Ministry of Northern Development & Mines (2006). 2. Production figures include gold ounces only. Production at the Young-Davidson mine includes pre-production ounces, which include ounces produced prior to the declaration of commercial production on September 1, 2012, and the declaration of commercial production in the underground mine on October 31, 2013. 3. Cash Costs per Gold Ounce and All-In Sustaining Costs Per Gold Ounce are Non-GAAP measures that do not have any standardized meaning prescribed by International Financial Reporting Standards (“IFRS” or “GAAP”), and that should not be considered in isolation from or as a substitute for performance measures prepared in accordance with GAAP. See the Non-GAAP Measures section on page 23 of the Management's Discussion and Analysis for the year ended December 31, 2013 available on the Company website at www.auricogold.com. 2013 cash costs are prior to inventory net realizable value adjustments & reversals. 4. Cash costs for the Young-Davidson mine is calculated on a per gold ounce basis, net of by-product revenues and net realizable value adjustments. Prior to 2014, gold ounces include ounces produced at the Young-Davidson mine. Commencing in 2014 cash costs for the Young-Davidson mine will be calculated based on ounces sold. Prior to commissioning the underground mine at Young-Davidson, cash costs were calculated on ounces produced from the open pit only. All underground costs were capitalized, and any revenue related to underground ounces sold was credited against capital expenditures. Subsequent to the declaration of commercial production in the underground mine, cash costs are calculated on ounces produced from both the open pit and underground mines, and revenue related to the sale of underground ounces is recognized in the Company’s Statement of Operations as revenue. 2013 cash costs are prior to inventory net realizable value adjustments & reversals. 5. For more information regarding AuRico Gold’s 2014 operational estimates, including production, costs, and capital investments, please refer to the press release dated February 6, 2014 titled AuRico Gold Announces 2014 Operational Outlook available on the Company website at www.auricogold.com. 6. Reserves and resources for Young-Davidson and El Chanate mines, Kemess Underground Project, and Orion represent gold grade as per technical reports and Company disclosure. For more information regarding AuRico Gold’s Mineral Reserves and Resources as at December 31, 2013 and the Kemess Feasibility Study, please refer to the press release dated March 3, 2014 titled AuRico Reports 2013 Reserve & Resource Update and Kemess Feasibility Study Results, available on the Company website at www.auricogold.com. Measured and indicated resources excludes inferred resources. Core lengths in El Chanate drilling highlights are not necessarily true widths. 7. Based on the Company’s cash balance as of December 31, 2013. 20
  • 22. 2013 Mineral Reserve Estimates - Gold 22 Mineral Reserve Estimates – Gold(6) Category Tonnes (000’s) Grade (g/t) Ounces (000’s) Young-Davidson Surface Proven 3,298 1.01 107 Probable 686 1.52 33 P&P 3,984 1.10 140 Underground Proven 10,626 2.90 990 Probable 28,669 2.78 2,566 P&P 39,296 2.81 3,556 Total P&P 43,280 2.66 3,696 El Chanate Proven 29,223 0.72 676 Probable 16,115 0.67 346 Total P&P 45,337 0.70 1,023 Kemess Underground Proven - - - Probable 100,373 0.56 1,805 Total P&P 100,373 0.56 1,805 AuRico Total P&P 188,990 1.07 6,524 (6) Refer to endnote #6 22
  • 23. 2013 Mineral Resource Estimates - Gold 23Note: Mineral Resources are in addition to Mineral Reserves Mineral Resource Estimates – Gold(6) Category Tonnes (000’s) Grade (g/t) Ounces (000’s) Young-Davidson Surface Measured 233 0.96 7 Indicated 535 1.41 24 M&I 769 1.28 32 Underground Measured 5,300 2.95 504 Indicated 11,659 2.62 981 M&I 16,960 2.27 1,484 Total M&I 17,729 2.66 1,516 Surface Inferred 31 0.99 1 Underground Inferred 3,689 2.72 323 Total Inferred 3,720 2.71 324 El Chanate Measured 2,158 0.31 22 Indicated 2,129 0.40 27 Total M&I 4,287 0.36 49 Inferred 579 0.75 14 Kemess Underground Measured - - - Indicated 65,432 0.41 854 Total M&I 65,432 0.41 854 Inferred 9,969 0.39 125 Orion (50%) M&I - - - Inferred 554 3.66 65 Total M&I 554 3.66 65 Inferred 91 3.33 10 AuRico Total M&I 88,001 0.88 2,484 Inferred 14,357 1.02 472 (6) Refer to endnote #6 23
  • 24. 2013 Mineral Resource Estimates – Copper and Silver 24Note: Mineral Resources are in addition to Mineral Reserves Mineral Reserve and Resource Estimates – Copper and Silver(6) Grade Contained Metal Category Tonnes (000’s) Ag (g/t) Cu (%) Ag (000’s) oz Cu (000’s) lbs Kemess Underground Probable Reserves 100,373 2.0 0.28 6,608 619,151 Indicated Resources 65,432 1.8 0.24 3,811 346,546 Inferred Resources 9,969 1.6 0.21 503 46,101 Orion (50%) Indicated Resources 554 309 - 5,503 - Inferred Resources 91 95 - 275 - (6) Refer to endnote #6 24