SlideShare a Scribd company logo
1 of 1
HVAC PROJECT ENGINEER
• Multi Projects Handling
• Ability to Execute and commissioncomplete CleanRoom HVAC
systems, Fire fighting systems, . ( Chilled watersystems, AHU’s ,
FCU’s, DX packageunits, Ducting & Piping works, fire fighting
systems works as per approved drawings.)
• Achieving the targetand completion of project as per schedule.
• Maintain Quality And safetystandards in site by conducting internal
site meetings with various sub-contractors
• IQ, OQ , PQ documentations, sub-contractorbills certification,erection
bill cetificationand reconcilationof projects.
• Client Co Ordination, attending site weekly,monthlymeetings with
client,consultant,,preparationofMOM,.
Validation of HVAC System as per the requirement

More Related Content

Viewers also liked

Viewers also liked (13)

PV 3 CERT
PV 3 CERTPV 3 CERT
PV 3 CERT
 
Hoje sou tua
Hoje sou tuaHoje sou tua
Hoje sou tua
 
Red social
Red socialRed social
Red social
 
Taller nº 1
Taller nº 1Taller nº 1
Taller nº 1
 
Welcome to Karmsthal Sewa Sansthan
Welcome to Karmsthal Sewa SansthanWelcome to Karmsthal Sewa Sansthan
Welcome to Karmsthal Sewa Sansthan
 
Field study 1
Field study 1Field study 1
Field study 1
 
Aprendizaje Basado en Retos
Aprendizaje Basado en RetosAprendizaje Basado en Retos
Aprendizaje Basado en Retos
 
Taller nº 1
Taller nº 1Taller nº 1
Taller nº 1
 
PV 1 CERT LETTER
PV 1 CERT LETTERPV 1 CERT LETTER
PV 1 CERT LETTER
 
01 vive arlanza. mayo 2014 r
01  vive arlanza. mayo 2014 r01  vive arlanza. mayo 2014 r
01 vive arlanza. mayo 2014 r
 
Hopewell Valley Be Safe Campaign PDF
Hopewell Valley Be Safe Campaign PDFHopewell Valley Be Safe Campaign PDF
Hopewell Valley Be Safe Campaign PDF
 
EKG Project Oral Presentation
EKG Project Oral Presentation EKG Project Oral Presentation
EKG Project Oral Presentation
 
PPG, ECG and Blood Pressure Circuitry
PPG, ECG and Blood Pressure CircuitryPPG, ECG and Blood Pressure Circuitry
PPG, ECG and Blood Pressure Circuitry
 

HVAC -CL

  • 1. HVAC PROJECT ENGINEER • Multi Projects Handling • Ability to Execute and commissioncomplete CleanRoom HVAC systems, Fire fighting systems, . ( Chilled watersystems, AHU’s , FCU’s, DX packageunits, Ducting & Piping works, fire fighting systems works as per approved drawings.) • Achieving the targetand completion of project as per schedule. • Maintain Quality And safetystandards in site by conducting internal site meetings with various sub-contractors • IQ, OQ , PQ documentations, sub-contractorbills certification,erection bill cetificationand reconcilationof projects. • Client Co Ordination, attending site weekly,monthlymeetings with client,consultant,,preparationofMOM,. Validation of HVAC System as per the requirement