Your SlideShare is downloading. ×
MetroRapid board_ops_committee
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

MetroRapid board_ops_committee

413
views

Published on

Published in: Travel

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
413
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • \n
  • Route 1 (North Lamar / South Congress)(Tech Ridge to Slaughter) (~ 21 miles) \n 22 – 60’ Articulated Buses \nRoute 2 (Burnet / South Lamar) (St. David’s North to Westgate) (~ 16 miles)\n 18 – 40’ Standard Buses \nTransit Signal Prioritization (City of Austin GPS based infrastructure)\n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • Transcript

    • 1. Project UpdateCapital Metropolitan Transportation Authority Board Operations and Planning Committee DRAFT
    • 2. MetroRapid Project• MetroRapid Routes – Route 1 (North Lamar / South Congress) – Route 2 (Burnet / South Lamar) MetroRapid Stops 77 Total Stops (6” curb level boarding) – 8 Downtown Stops (shared) – Shelters, Dynamic Message Sign, Lighting, Signage• Vehicle Location Systems• Transit Signal Prioritization• North Ops Facility Modifications• Ticket Vending (10 City of Austin “Parkeon” unit pilot)• Service Startup + Operation + Dispatch 2 DRAFT DRAFT
    • 3. Project Benefits / Measures FTA Identified Customer Benefits – Frequent all day service (14 hours) – 10 minute peak / 15 minute off peak frequency – Faster Service: limited stops, transit signal priority – Vehicles – Low Floor Level Boarding – Ridership: corridors exceeding 3000 / day – Stations: unique branding / signage, Dynamic Message Signs 3 DRAFT
    • 4. Project Benefits / Measures Capital Metro Performance Measures – Increased ridership – Reduced travel time – Improved on-time performance – Increased frequency of service 10 minute peak / 15 minute off peak – Improved customer experience / satisfaction – “Before & After Study” completed 2 years following service start 4 DRAFT
    • 5. Federal Transit Administration • FTA “Very Small Starts” 80/20 Grant • $47,621,000 Total Project • $38,097,000 FTA Grant Funding • $ 9,524,000 Capital Metro Share • Project Construction Grant Agreement • FTA to submit PCGA for execution following CMTA notification • FTA notified CMTA that 3rd Party Agreements “of significant risk” are to be executed before PCGA approval • FTA conducting Technical Capacity Review of Project Team 12/15. 5 DRAFT
    • 6. Project Assessment Process FTA Grant – Federal Transit Administration (FTA) Coordination – Project Construction Grant Agreement (PCGA) review Project Review – Project Charter Developed – MetroRapid Service Defined – Project Scope, Schedule, Budget – Project Risks Identified – Project Benefits – Project Team Structure Evaluation – City of Austin Participation City of Austin Coordination 6 DRAFT
    • 7. Project AssessmentMetroRapi Previous Current Potential Net Risksd Savings QuantifiedCapital $45,977,000 $48,150,761 ($2,178,500 $45,972,261 $16,607,427Budget * )Schedule Service Start Service StartRoute 1 2012 2013 min. floatRoute 2 2013 2013 min. float Primary Budget Differences (previous to current) • State parking meters ($375k) • Increased Program Mgmt. ($1.2m) • R.O.W. acquisition ($1.78m) • QA/QC, System Integration • Increased North Ops modifications ($150k) • Reduced Vehicle expense ($1.5m) • Increased System Costs ($280k) • Reduced Utility relocation ($220k) * Budget totals includes $4 mm unallocated contingency; 7 excludes inflation rate multiplier included in grant. DRAFT
    • 8. Primary Project Issues City of Austin Project Timing / Coordination – Urban Rail – “Great Streets” – Guadalupe / Lavaca Corridor Study FTA requirement to execute 3rd Party Agreements – that pose a “significant risk” to the project before PCGA execution Estimated Project Risks: $16.6 million – $14.4 million “Controllable” Risks – $2.2 million “Non-controllable” Risks – Unallocated Contingency Budgeted: $4 million “Controllable” Risks – MetroRapid Area Stop Area additional pedestrian, bicycle circulation (~ 10 months) – 14” Boarding Height platforms (~ 8 months) – Additional vehicle modifications (~ 90 days) “Non-Controllable” Risks – Unforeseen utility, R.O.W. issues 8 DRAFT
    • 9. Project Preliminary Timeline 9 DRAFT
    • 10. Project Change Control Process • Process to control any proposed change which impacts scope, schedule, budget – from any source •Change Control Review Process – administered by Project Controls • Team Level Review • Project Manager Level Review • QA/QC + Systems Integration Review • Program Manager Review • Steering Committee Review 10 DRAFT
    • 11. Questions? 11