Your SlideShare is downloading. ×
Construction of NASA Discovery flight shuttle
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Construction of NASA Discovery flight shuttle

5,972
views

Published on

This slideshow shows the entire process of how NASA builds the Discovery flight shuttle

This slideshow shows the entire process of how NASA builds the Discovery flight shuttle

Published in: Technology, Education

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
5,972
On Slideshare
0
From Embeds
0
Number of Embeds
23
Actions
Shares
0
Downloads
125
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. SHUTTLE PROCESSING (Before Flight Activities Rarely Seen By The General Public) DISCOVERY http://thinkabdul.com
  • 2. External Tank Arrives by Barge from MS
  • 3.  
  • 4. Vertical Assembly Building External Tank
  • 5. Removing External Tank From Carrier
  • 6.  
  • 7. External Tank Enters VAB
  • 8. External Tank in VAB
  • 9. Preparing to Lift the Tank to Vertical
  • 10. Lifting Tank
  • 11. Solid Rockets Are Attached
  • 12. Engines Are Attached To Solids
  • 13. Engines Are Attached To The Shuttle In The Shuttle Processing Facility
  • 14.  
  • 15.  
  • 16.  
  • 17. Shuttle In Sling Ready For Lift In VAB
  • 18. Shuttle Has Been Moved To VAB And And Will Be Attached To External Tank
  • 19.  
  • 20. Shuttle is Attached
  • 21.  
  • 22.  
  • 23.  
  • 24. Payload Preparation Room (PPR)
  • 25. Cargo Package For ISS
  • 26. New Module For ISS
  • 27. Payload Ready To Be Moved to The Launch Pad
  • 28.  
  • 29. Payload Carrier Leaves PPR
  • 30.  
  • 31. Payload Being Moved To Launch Pad
  • 32.  
  • 33. Lifting Payload Into Position For Insertion Into Discovery When It Arrives At The Pad
  • 34.  
  • 35.  
  • 36. Shuttle Discovery Leaves VAB
  • 37.  
  • 38. Shuttle & Crawler Launch Pad TRIP: Length--- 3 ½ mi Time--- 6-8 hours
  • 39.  
  • 40. Crawler Control
  • 41.  
  • 42. DISCOVERY ARRIVES AT PAD
  • 43.  
  • 44.  
  • 45.  
  • 46. READY FOR LAUNCH
  • 47. We Have Lift Off
  • 48. Thank You http://thinkabdul.com