More Related Content Similar to Halbyn Rich portfolio 2013 (20) Halbyn Rich portfolio 20132. Halbyn Rich
Senior Workplace Strategy Consultant
and Lead Interior Architect/Space Planner
Owner of Peoplespace - www.peoplespace.co.uk
25 years of workplace consulting experience and integrated solution
know how, specialising in:
Smart Working accommodation strategy and workplace innovation
Holistic approach to board level vision development, informed by business intelligence data
Guiding strategy convergence and design synchronicity in people, property and technology solutions
Business case strength informed by scenario modelling with evidence data
Leading creativity and solution development in unified architectural, mechanical, electrical and ICT
design innovation
Employing architectural aesthetic devices and visual composition techniques in workspace
environments and furniture layouts, to create sense of extra volume, light, comfort and interaction,
within highly space efficient interior designs and space planning excellence
…with: Insight Integrity Innovation Performance
Slide no: 2
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
3. Bangkok Post
Halbyn Rich Times
Pushing the
boundaries
The Smart
Working
Handbook Guardian
Better Ways of Working
Award
Flexibility
Sustainability Award Innovation Award Case study reviews
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
5. Halbyn Rich
A strong track record
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
6. Halbyn Rich
Smart accommodation strategy
People: 2447
Space: 289,937 ft2
Role: Lead Consultant
Responsible for developing strategy recommendations, for the period 2015-2020.
Why? Need room to grow, but with reduced costs
Pressure on space due to increasing people numbers.
Need to dissolve silo culture, by facilitating more collaboration, co-location and flexible working.
Need to move away from reactive “knee-jerk” responses to a more planned approach, to be
more efficient and reduce long term costs.
What was done? Research, analysis, scenario simulation
Interviews and workshops with key stakeholders across the business
Analysis of regional trends in demographics, transport links and investment to identify Optimum
Zones and review of existing sites within zones to indentify optimum properties.
Space demand and supply gap analysis, followed by scenario modelling and cost/benefit analysis
Delivered detailed strategy recommendations for 6 main office sites, within identified optimum
location zones and high level strategy for 67 other properties.
What was the result? Road map to higher performance and lower costs
Strategic direction for realignment of portfolio to support corporate objectives, with
transformations funded by savings in property costs.
Action plan for medium to long term strategy validation, development and delivery.
Action plan for short term improvements/ quick wins, in line with principles from longer term
strategy.
Halbyn has since been appointed to lead the 1st phase application of the approved strategy, to
the two largest properties in the portfolio, including the head office.
Slide no: 6
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
7. Halbyn Rich
Smart sustainability
People: 383
Space: 31,502 ft2
Role: Lead Consultant
Responsible for evaluation of shortlisted properties, guiding workspace vision and space design.
Why? Need new single location and to support teams working together
Review required for London property strategy in response to lease end dates.
Need less fragmented workspaces, improving on existing multiple floors in two separate locations.
Need to support growth, restructuring and better collaboration.
What was done? Space efficiency mapping and workspace design
Analysis of property characteristics to identify best opportunities for enabling corporate objectives.
Interviews and workshops with key stakeholders across the business , to establish requirements.
Collaborative design development process targeting flexibility and environmental sustainability.
Workspaces designed to encourage teamwork and smart working
What was the result? Cost efficient modernisation, aligned to corporate values
A better quality, more productive, more collaborative workplace, with more facilities in less space
Ska Gold Award for sustainability, due to the recycling, reuse and careful procurement of materials
and technologies used in the interior refurbishment.
Slide no: 7
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
8. Halbyn Rich
Workplace agility
People: 70 +
Space: 11,000 ft2
Role: Lead Consultant
Management of super fast track property option scoring , design development and implementation
Why? Need super fast track strategic advice, design and delivery
Workplace to be selected, acquired, designed, delivered and operational within 9 weeks
Need future proof space supporting headcount surges and organisation development.
What was done? Evidence based integrated design
Space Efficiency mapping used in evaluation of property selection options
Super Fast Track delivery assisted by benchmark database
Maximum adaptability in technology solutions integrated within workspace design as single
concept, supporting multi function spaces and highly future proof flexibility.
Audio visual specification informed by benchmark comparisons and people data
What was the result? ‘Mission impossible’ success within budget
Early integrated intelligence approach enabled delivery in “mission Impossible” time frame and
within budget
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
Slide no: 8
9. Halbyn Rich
Workspace optimisation
People: 80
Space: 10,764 ft2
Role: Lead Consultant (Architect and Project Manager)
Responsible for project management, cost control and full design team service
Why? Need to modernise culture and accommodation
Need to encourage collaborative working and support culture change and modernisation
Need to bring fragmented teams together into a single workspace environment
Need upgrade and replacement of mechanical services , roof top plant.
What was done? Single unified solution maximising benefit opportunities
Relocated and redesigned historic document library and research study centre to unlock greater
space efficiency opportunities
Fully integrated design driving tight coordination of building services and architectural elements,
to maximise the sense of space, volume and day light.
Upgraded environmental performance of workspace, including new thermal efficient roof.
What was the result? Exceeded expectations and amazed client
New library and research study centre with additional multi purpose functionality, supporting
training and conference events and resulting in increased visitor attendance rates, extended
opening times. And increased revenue.
The design of the new workspace successfully improved collaboration and supported a culture
change and modernisation programme, scheduled to coincide with the project
The delivered work environment amazed the client, exceeding expectations for the amount of
practical and attractive space.
Both the office space and study centre delivered greater capacity and flexibility in 40% less space
…delivered in 8 weeks
Slide no: 9
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
10. “The approach has transformed the quality of our working environment and
Halbyn Rich I am still amazed by the amount of practical attractive space that has been created”
Week 0 Week 2 Week 4 Week 6 Week 8
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
11. Halbyn Rich
New Ways of Working strategy
People: 2471
Space: 182,986 ft2
Role: Workplace Consultant
Define Smart Working feasibility and develop business case and property rationalisation strategy
Why? Need to synchronise property with new ways of working
Need property strategy that takes advantage of modern ways of working to achieve savings
Need head office to support an additional 750 people to vacate other property at end of lease.
What was done? Data gathering, illustrations and cost /benefit analysis
Wide ranging investigation into the potential to achieve benefits and savings from flexible
working, across all potential business areas, including organisational mapping, collaboration and
affinity needs analysis, space occupancy audits, storage analysis, space plan feasibility studies
and 3d visualisations.
Scenario modelling and holistic business case calculations.
What was the result? Clear direction for workspace upgrades and savings
Detailed report supported by space planning designs, illustrating strong case for major workplace
and work style advances
Slide no: 11
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
12. Halbyn Rich
Collaborative efficiency
People: 60
Space: 7,000 ft2
CGI proposal
Role: Full Turnkey Solution CGI proposal
Advice on workplace strategy, project management and full design & build service
Why? Need new culture, greater collaboration and less cost
Need alternative to traditional property strategy
Need new working environment to support cultural developments
Need to support greater collaboration between teams
Rationalise storage and re use as much existing as possible
What was done? Precision design informed by work style data
Creation of a dual purpose hot desking and team meeting area
Personal mobile storage units (‘puppies’) Delivered
Introduction of library reference zone and breakout meeting area Delivered
High density space efficient storage solutions
Minimising cost by making use of a mix of new and existing furniture
What was the result? Better place to work using 50% less space
Now serving same number of staff (52) with 50% reduction in space, while
improving the quality and functional performance of the working environment and
assisting collaboration and internal communications.
“The office brighter, friendlier and altogether a better place to work”.
Return on investment in less than 12 months and saving £1million within 5years
Slide no: 12
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
13. Halbyn Rich
Space utilisation
People: 3000
Space: 350,000 ft2
Role: Space Planning Consultant
Providing specialist advice on workplace design, for supporting flexible working and developing
space standards .
Why? Need flexibility for rapid growth, without using additional space
Unable to accommodate expanding headcount in current buildings.
Lease ending on short term additional space.
Need to respond quickly to changing FSA role, developing legislation and staff numbers.
Current buildings need upgrade.
What was done? Seminar, workshops, feasibility analysis and coaching
Delivered seminar and workshop sessions to raise understanding of flexible working and best
practice workplace design, breaking down the ‘one person one desk’ mentality.
Analysis of working patterns and future business requirements to create scenario options.
Established flexible workspace principles to support corporate agility, in response to future
headcount uncertainty.
Defined the space supply and demand equation.
Feasibility studies and recommendations for furniture specification.
Coached client’s in house space planning team in design development and delivery.
What was the result? More people in better working environments, at less cost
Retained existing building with no extra accommodation required.
Increased space utilisation and adaptability of space, increasing asset efficiency and cutting churn
costs.
Created innovative future proof solution with a better working environment’
Slide no: 13
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
14. Halbyn Rich
Smart Working local authorities
People: 5000
Space: multiple projects
Role: Workplace Consultant
Providing specialist Smart Working advice to inform programme development and delivery.
Why? Need help to realise Smart Working benefits
Trial flexible working environments need enhancement.
Need to develop Smart Working principles and implementation strategy.
Need to improve collaboration and modernise culture.
What was done? Strategy, programme foundations and delivery support
Piloting of new furniture and ICT concepts as part of quick win workspace enhancements.
Smart Working accommodation strategy, opportunity reports and project initiation proposals.
Holistic business case development and validation to HM Treasury Green Book standard.
Programme development, programme governance advice and project management coaching.
Stakeholder management, change management, ICT coordination and space planning
Working closely with managers and staff on team based work style analysis.
Furniture design, specification, tendering management and procurement support.
Programme communication strategy and design of website.
What was the result? Office portfolio reduced by 45%
A multitude of move and refurbishment projects, each delivered with an
ROI of less than 2 years.
Enabled internal communication efficiency gains and collaborative working
improvements, through better adjacencies and more supportive environments.
Significant improvements in employee work life balance.
The SMART programme is producing a 45% reduction in the Council’s use of
office space.
Slide no: 14
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
15. Halbyn Rich
Smart Working Government
People: 2948
Space: 222,124 ft2
Role: Strategic Advisor
Responsible for workspace transformation proposal, with prime integration and project planning guidance.
Why? Need to do more with less
Need to create space for other public sector occupants within health and safety constraints
Reduce HMT property requirements and maintain flexibility
Need to concepts proposals to inform variation to existing PFI and technology contracts
What was done? Feasibility design study
Layout designs demonstrating greater efficiency in space planning and supporting modern work styles
Common spaces made into practical working environments, including touchdown tables in oversized corridors.
More breakout areas, meeting rooms, quiet rooms and introduction of flexible collaboration zones.
Distinctive walkway design to clearly define escape routes and support DDA best practice
Further options and innovations, including new courtyard walkway and architectural meeting space feature
What was the result? Blue print for better workspace with ROI of less than 1 year
Options for creating space for up to 1558 additional workstations within an improved more productive
working environment, supporting the ability to accommodate another Government department
Road map and business case evidence illustrating full payback of entire investment in less than 1 year
Slide no: 15
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
16. Halbyn Rich
1st flexible working project
delivered in 2001
People: 850
Space: 61,753 ft2
Role: Lead Consultant and member of ‘New ways of working’ think tank
Design Team Leader for implementation of flexible working and new ‘living the brand’ working
environments.
Why? Supporting culture change and property rationalisation
Strategic approach needed for achieving multi site space efficiencies and other business benefits
What was done? Integrated (people, property, technology) change process
Interviews, workshops and online survey informed investment targeting and phasing
Reconfigured campus accommodation to improve communications and collaboration
Introduced 3D brand look and feel and upgraded environment to comply with DDA regulations.
What was the result? 40% cost saving with 20% productivity increase
Flexible working environments delivered 40% reduction in property requirements
Managers and staff in flexible working teams identified 20% increase in productivity
Slide no: 16
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
17. Halbyn Rich
International confidence
People: 3000
Space: 329,376 ft2
Role: Lead Architect and Interim Project Director
Responsible for developing strategy recommendations, for the period 2015-2020.
Why? Super fast business launch in new territory
Multiple projects to support business launch in new market.
Select/construct properties, including head office, call centres, regional offices, data centres and
(during project development) temporary interim work environments.
Complete the above, design and delivery of workspaces and supporting infrastructure for 3000
staff (growing within the same period from a launch team of just 22) within 6 months.
What was done? Analysis and unified multidiscipline development
Property strategy / selection guided by detailed analysis of business dynamics, demanding future
proofing agility requirements and brand values translated into 3D look and feel criteria.
Fully integrated building services infrastructure, interior architecture and 3d brand experience,
maximising potential flexibility and multi functional capability within the workspace.
What was the result? Set new standard for design and future proofing
Successful delivery of projects in Bangkok and throughout Thailand, with results recognised for
setting new benchmark standard for Orange offices (globally and in UK).
The high degree of adaptability, woven into every aspect of the design concept, allowed the
rapidly changing organisational structure and local cultural influences to be accommodated
throughout the design development and beyond completion without adding to project costs.
Following this success I was commissioned by Orange as member of their ‘future ways of
working’ think tank and went on to design and deliver the Orange Working Life (OWL) projects.
Having seen the results of the project in Bangkok, HSBC commissioned work for their floors in
the same building, which in turn won an HSBC award for innovation.
Slide no: 17
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
19. Halbyn Rich
Designed and delivered
from concrete shell
within 6 months
Slide no: 19
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
20. Halbyn Rich
Better solutions,
faster and at less cost
People: 760
Space: 106,400ft2
Role: Lead Interior Architect
Responsible for developing strategy recommendations, for the period 2015-2020.
Why? Need to support rapid growth and flexibility
Pressure from rapid growth of new internet broadcasting business, associated
recruitment drive and developing organisational design
What was done? Making the most of a blank canvass
Stripped out all existing interior elements and services, back to concrete shell
Designed and delivered highly flexible open plan space
Bespoke joinery and metal fabrication to create unique working environment
Creative lighting solutions, meeting best practice at less that traditional cost
Bespoke sound booth, product testing and video editing pod
What was the result? Unique results at fast track pace
Entire process of Stakeholder engagement, design and implementation completed,
furnished and fully operational, to high quality standards and within budget, all in
less than 9 months
Slide no: 20
Copyright © 2002-2013 Peoplespace Limited - All Rights Reserved.
21. Thank you
Halbyn Rich
hrich@peoplespace.co.uk
+44(0)7973744219
www.peoplespace.co.uk
www.linkedin.com/in/halbynrich